Solicitation_Q&A.docx

DOCX document 13 KB Posted

Attached to
WOOD SHINGLE ROOF REPLACEMENT, HEHO
Solicitation number
140P6018R0027
Issued by

About this file

Solicitation-Q&A

View the file

Other files

File Type Posted
Sol_140P6018R0027_Amd_0001.pdf PDF
A06_Drawings.pdf PDF
A06_Specifications.pdf PDF
Sol_140P6018R0027.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation_140P6018R0027 Questions & Answers

1. Roofing Debris will fall through the spaced roof deck boards into the buildings. Will the contractor be required to layout tarps to catch all the debris and remove?

a. The Contractor shall remove roofing to minimize debris. Protect existing areas and collect debris to the best amount possible for all debris that is part of the project. Provide tarps as possible (as not all areas are accessible or have attics) in attic areas. Remove debris as possible while protecting and minimizing disturbance of insulation. Be sure to set back in place any insulation that is disturbed during these operations.

i. C.E. Smith house, some areas of attic.

ii. Miles Farmhouse, some areas of attic.

iii. P.T. Smith House, open to structure, sweep upon completion of roofing and return to existing state of cleanliness.

2. Is attic access available in all of the buildings?

a. See note above.

3. Do the attic spaces contain objects of significance that require special handling or protection?

a. Attics do not contain any objects of historic or other significance.

4. The gutters and downspouts at the Miles Farm building are painted, will the new/replacement gutters and downspout be required to be painted? If so, please provide the specifications.

a. Gutters and downspouts are specified and shown to be galvanized finish. Provide and install as specified.

File details come from the government source that posted it.