Attachment_002a_REVISED_drawings_for_5522R0001_0002.pdf
PDF 2 MB Posted
- Attached to
- REPLACE HVAC COMPONENTS PARK SERVICE, LA Federal contract opportunity
- Solicitation number
- 140P5522R0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site_Visit_Sign-in_for_5522R0001_0002.pdf | ||
| Question_and_Answer_for_RFP_5522R0001_0002.pdf | ||
| Attachment_A_Appendix_1_Test_and_Balancing__0002.pdf | ||
| Sol_140P5522R0001_Amd_0002.pdf | ||
| Attachment_001a_REVISED_Statement_of_Work_for_5522R0001_0002.pdf | ||
| Sol_140P5522R0001_Amd_0001.pdf | ||
| Sol_140P5522R0001.pdf | ||
| Attachment_003_Questionnaire.pdf | ||
| Attachment_004_DB_Wage_Determinations.pdf | ||
| Attachment_002_Drawings.pdf | ||
| Clauses_and_Provisions_P5522R0002.pdf | ||
| Attachment_001_Statement_of_Work.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Manager Date
QUALITY DESIGN CERTIFICATION
OR
OR
Development (Title I)
Prepared in Accordance with Design by Design Development (Title I)
Construction Drawing Not Preceded
Approved by Superintendent on
Variance from Design Development (Title I)
Drawing No.
Date
STATEREGION COUNTY
NAME OF PARK
TITLE OF PROJECTCROFT & ASSOCIATES - P15PC00467
PRIME / ARCH / MEP:
CROFT & ASSOCIATES
KENNESAW, GEORGIA
STRUCTURAL:
PES STRUCTURAL ENGINEERS
ATLANTA, GEORGIA
SheetMark REVISION Date Initial
LOCATION WITHIN PARK
NATIONAL PARK SERVICE
DENVER SERVICE CENTER
UNITED STATES
DEPARTMENT OF THE INTERIOR
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
CONSTRUCTION DOCUMENTS
/3
/2
:0
:5
P M
REPLACE HYDRONIC PUMPS
ACADIAN CULTURAL CENTER
JEAN LAFITTE N.H.P AND PRESERVE
SOUTHEAST LAFAYETTE LOUISIANA
1 5
XX
XXXXXX
243562B
JEAN LAFITTE NATIONAL PARK AND PRESERVE
SITE
501 FISHER RD,
LAFAYETTE, LA
G001
1 KEY PLAN
SCOPE OF
PROJECT AREA
INDEX OF DRAWINGS
SHEET
SUB
SHEET TITLE OF SHEET
1 G001 COVER SHEET
2 M001 MECHANICAL GENERAL NOTES & LEGEND
3 M101 MECHANICAL PLANS
4 M501 MECHANICAL DETAILS
5 M601 WATER FLOW DIAGRAMS
ITEMSYMBOL
DUCT WITH ACOUSTICAL LINING
OUTSIDE AIRO.S.A.
SYMBOL ITEM
DRAIN PIPING
CONDENSER WATER RETURN
CONDENSER WATER SUPPLY
UNION
REDUCER
AUTOMATIC AIR VENT
THERMOMETER
PRESSURE GAGE W/ GAGECOCK
STRAINER W/ BLOWDOWN VALVE
RELIEF VALVE
CHECK VALVE
CONTROL VALVE, 3-WAY
CONTROL VALVE, 2-WAY
PRESSURE REDUCING VALVE
BALANCING COCK
GLOBE VALVE
GATE VALVE
D
CWR
CWS
CALIBRATED BALANCING VALVE
BUTTERFLY VALVEFLEXIBLE CONNECTION
MANUAL AIR VENT WITH CAP
GATE VALVE W/HOSE FITTING
BALL VALVE
THERMOMETER WELL
VALVED PRESSURE GAGE CONNECTION
N.T.S. NOT TO SCALE
HVAC LEGEND-SYMBOL
MOTORIZED CONTROL DAMPER
BOTTOM ELEVATION
ABOVE FINISHED FLOOR
ACCESS DOOR
CONDENSATE DRAIN
FLEXIBLE CONNECTION
OUTSIDE AIR
B.E.
A.F.F.
A.D.
C.D.
F.C.
O.A.
FIRE DAMPERF.D.
SYMBOL ITEM
DRAIN PIPINGD
FLEXIBLE CONNECTION
N.T.S. NOT TO SCALE
CD CONDENSATE DRAIN
R.A. RETURN AIR
HVAC LEGEND-SYMBOL
T
THERMOSTAT OR ZONE
SENSOR AS INDICATED IN
MECHANICAL SCHEDULE
REFRIGERANT LIQUIDRL
REFRIGERANT SUCTIONRS
TYPICALTYP.
RETURN AIR DIFFUSER
SUPPLY AIR DIFFUSER
FLEXIBLE DUCTWORK
# KEYED NOTE TAG
AIR DEVICE TAG
DEVICE TYPE
MARK
NECK SIZE (IN.)
AIRFLOW
(CFM)
M
BALANCING DAMPER
CONICAL DUCT TAKEOFF WITH
INTEGRATED BALANCING
DAMPER
XX ###
CATCH BASINCB
HUB DRAINHD
COORDINATION FOR EQUIPMENT SHUTDOWN :
1. CONTRACTOR SHALL SUBMIT A
CONSTRUCTION SCHEDULE INDICATING;
EQUIPMENT DELIVERIES, TIME SCHEDULE FOR
DEMOLITION, TIME SCHEDULE FOR
INSTALLATION OF NEW EQUIPMENT, AND
SCHEDULE FOR EQUIPMENT START-UP.
CONSTRUCTION SCHEDULE SHALL BE
APPROVED BY THE CONTRACTING OFFICER
PRIOR TO PROCEEDING WITH WORK.
2. EQUIPMENT INDICATED TO BE REMOVED SHALL
BE REMOVED FROM THE JOB SITE AND
DISPOSED OF PER STATE AND FEDERAL
REGULATIONS.
3. SITE MUST BE IN OPERATION WHILE WORK IS
BEING COMPLETED.
GENERAL NOTES :
1. THESE DRAWINGS ARE SCHEMATIC, AND ARE
NOT REPRESENTATIVE OF ALL POTENTIAL
CONDITIONS. CONTRACTOR IS RESPONSIBLE
FOR COORDINATION WITH ALL OTHER
DISCIPLINES TO ENSURE PROPER
INSTALLATION OF ALL SYSTEMS AND
EQUIPMENT.
CWS
CWR
HWS
HWR
PRV
RPZA
CHILLED WATER SUPPLY
CHILLED WATER RETURN
HOT WATER SUPPLY
HOT WATER RETURN
PRESSURE REDUCING VALVE
REDUCED PRESSURE ZONE ASSEMBLY
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
A/E FIRM LOCATION WITHIN PARK
TITLE OF SHEET
/3
/2
:0
:5
P M
MECHANICAL GENERAL
NOTES & LEGENDM001
09/30/20
MDJ
JEB
MDJ
2 5
ACADIAN CULTURAL CENTER XX
XXXXXX
243562B
JEAN LAFITTE N.H.P AND PRESERVE
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
CP-1
CP-2
CP-5
CP-6
CP-3
CH-1
HWB-1
AIR HANDLER 2 BOILER
CHILLER
AIR HANDLER 3 ELECTRICAL
HWH-1
CP-7
M501
M501
M501
M501
M501
M501
M501
M501
M501
AIR HANDLER 2 BOILER
CHILLER
AIR HANDLER 3 ELECTRICAL
CP-1
CP-2
CP-5
CP-6
CH-1
HWB-1
CP-7
HWH-1
(EXISTING)
(EXISTING)
(EXISTING)
(EXISTING)
(EXISTING)
(EXISTING)
SHEET KEY NOTES: DEMO
1. EXISTING BOILER PUMP TO REMAIN. EXISTING
SUCTION DIFFUSERS, INCREASERS, FLEX
CONNECTORS, AND CHECK VALVES SHALL REMAIN.
2. EXISTING CHILLER PUMPS TO REMAIN. DISCONNECT
PUMPS FOR IN-FIELD REBUILD. PUMP CONTROLLERS
TO REMAIN. TYPICAL 2 PUMPS.
3. EXISTING CONDENSER PUMPS TO REMAIN.
DISCONNECT PUMPS FOR IN-FIELD REBUILD. PUMP
CONTROLLERS TO REMAIN. TYPICAL 2 PUMPS.
4. EXISTING WATER HEATER RECIRCULATION PUMP TO REMAIN
5.
6.
7.
EXISTING EQUIPMENT TO REMAIN.
EXISTING CONTROL (JACE) PANEL TO REMAIN.
EXISTING PUMP CONTROLLER TO REMAIN.
8.
# SHEET KEY NOTES: NEW WORK
1. EXISTING BOILER PUMP.
2. EXISTING CHILLER PUMPS, REBUILD AND PERFORM
REALIGNMENT PER ARMSTRONG PUMP
MANUFACTURER RECOMMENDATIONS. TYPICAL 2
PUMPS. SEE PUMP SCHEDULE ON M501. RECONNECT
PUMP TO EXISTING BRANCH CIRCUIT AND
DISCONNECT SWITCH.
3. EXISTING CONDENSER PUMPS, REBUILD AND
PERFORM REALIGNMENT PER ARMSTRONG PUMP
MANUFACTURER RECOMMENDATIONS. TYPICAL 2
PUMPS. SEE PUMP SCHEDULE ON M501. RECONNECT
PUMP TO EXISTING BRANCH CIRCUIT AND
DISCONNECT SWITCH.
4. EXISTING DOMESTIC HOT WATER RECIRCULATION
PUMP, CONNECT TO EXISTING PIPING CIRCUIT.
RECONNECT PUMP TO EXISTING BRANCH CIRCUIT AND
DISCONNECT SWITCH. CONNECT INTO BAS. SEE
POINTS LIST. ON M501.
5. EXISTING PUMP CONTROLLER, CONNECT TO NEW
BOILER PUMP AND CONNECT INTO BAS.
6. GROUT ALL PUMPS TO HOUSEKEEPING PAD. SEE
SPECIFICATION FOR REQUIREMENTS.
7. NEW RPZ AND PRV TO BE INSTALLED AT NOTED
LOCATION AND LOWERED SLIGHTLY SUCH THAT RPZA
IS ACCESSIBLE FOR TESTING. . SEE 9/M-501 FOR
REQUIREMENTS. NEW RPZ AND PRV MUST LEAVE A
MIN. 6" CLEARANCE FROM WALL.
8. EXISTING PUMP IN MECHANICAL ROOM SHALL BE
INSTALLED. CONNECTIONS TO THE PUMP SHALL BE
MADE WITHOUT STRESS TO PIPING OR HANGERS.
REWORK PIPING IF NEEDED TO PROPERLY CONNECT
PUMP. RECONNECT PUMP TO EXISTING BRANCH
CIRCUIT AND DISCONNECT SWITCH.
9. INSULATION ON NEW PIPING (FIBERGLASS INSULATION
W/ PVC JACKET INSIDE AND METAL JACKET ON
EXTERIOR OF PIPING).
GENERAL NOTES:
1. UPON COMPLETION OF PIPING WORK, PERFORM
FULL HYDRONIC TESTING AND BALANCING FOR
CHILLED WATER, CONDENSER WATER, HOT
WATER, AND DOMESTIC HOT WATER SYSTEMS.
2. CONNECT ALL HYDRONIC EQUIPMENT AND NEW
SENSORS INTO EXISTING BAS, AND INCLUDE
GRAPHIC INTERFACE UPDATE. SEE POINTS LIST.
3. RE-INSULATE ANY INCIDENTAL PIPING REPLACED
AS PART OF THIS SCOPE USING MINERAL WOOL
FIBERGLASS INSULATION WITH PVC INSIDE
JACKET AND 0.016" THICK METAL ALUMINUM
EXTERIOR JACKET. PROVIDE MINIMUM 3'-0" PIPING
PER PUMP.
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
A/E FIRM LOCATION WITHIN PARK
TITLE OF SHEET
/3
/2
:1
:4
P M
MECHANICAL PLANSM101
09/30/20
MDJ
JEB
MDJ
3 5
ACADIAN CULTURAL CENTER XX
XXXXXX
243562B
JEAN LAFITTE N.H.P AND PRESERVE
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
M101
1 MECHANICAL PLAN - DEMO
M101
2 MECHANICAL PLAN - NEW WORK
SCALE OF FEET
B L D
G
10 CP-1,2,5 AND 6 CUPLERS WILL BE CHANGED TO TIRE COUPLING
ELEMENT
IN BOILER AND CHILLER ROOMS THE EXISTING RPZS AND
PRVS SHALL BE DEMOLISHED AND REPLACED 2 EACH RPZ 3
EACH PRV
LJWood Highlight
LJWood Highlight
NEW 3/4" FULL FLOW
ISOLATION VALVE
NEW 3/4"
BYPASS LINE
NEW 3/4"
LIQUID-FILLED
PRESSURE
GAUGE
NEW 3/4" FULL FLOW
ISOLATION VALVE
NEW 3/4" STRAINER
EXISTING 3/4" FULL
FLOW ISOLATION VALVE
NEW 1" RPZA BACKFLOW
PREVENTER WITH AIR GAP.
MODEL: WATTS LF909 LEAD-
FREE W/ AIR GAP
ACCESSORY
NEW 3/4" PRV WITH BUILT IN
THERMAL EXPANSION
BYPASS. MODEL: WATTS
LF25AUB-Z3 LEAD-FREE
ROUTE TO FLOOR DRAIN
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
A/E FIRM LOCATION WITHIN PARK
TITLE OF SHEET
/3
/2
:1
:4
P M
MECHANICAL DETAILSM501
09/30/20
MDJ
JEB
MDJ
4 5
ACADIAN CULTURAL CENTER XX
XXXXXX
243562B
JEAN LAFITTE N.H.P AND PRESERVE
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
1) EXISTING PUMP SHALL BE INSTALLED. CONNECT TO EXISTING PIPING.
2) PUMP TO BE REBUILT USING MANUFACTURER-PROVIDED REBUILD KIT. REBUILD SHALL INCLUDE AT A MINIMUM:
SEALS, GASKETS, BEARINGS, COUPLINGS, AND WATER SLINGER.
3) PUMP TO BE RE-ALIGNED. ALIGNMENT SHALL INCLUDE BOTH HOT AND COLD ALIGNMENT MEASUREMENTS
IN ACCORDANCE WITH MANUFACTURERS DIRECTION.
NOTES:
CP-7 TACO IN-LINE 0013-F3-1
WATER
HEATER
10 10 1/6 1,750 PSC -
CP-6 ARMSTRONG
BASE MOUNTED
END SUCTION
4030 CONDENSER 180 30 5 1,750 TEFC 2,3
CP-5 ARMSTRONG
BASE MOUNTED
END SUCTION
4030 CONDENSER 180 30 5 1,750 TEFC 2,3
CP-4 TACO BASE MOUNTED
END SUCTION
FI150 BOILER 88 50 3 1,755 TEFC 1
CP-3 TACO BASE MOUNTED
END SUCTION
FI150 BOILER 88 50 3 1,725 TEFC 1
CP-2 ARMSTRONG
BASE MOUNTED
END SUCTION
4030 CHILLER 140 60 5 1,750 TEFC 2,3
CP-1 ARMSTRONG
BASE MOUNTED
END SUCTION
4030 CHILLER 140 60 5 1,750 TEFC 2,3
MARK MFGR DESCRIPTION MODEL SERVICE
FLOW
(GPM)
HD.
(FT)
MOTOR
(HP) RPM MOTOR NOTES
PUMP SCHEDULE
M501
1 EXISTING BOILER PUMPS, CP-3 AND CP-4
M501
2 EXISTING WATER HEATER PUMP, CP-7
M501
3 EXISTING CHILLER PUMPS, CP-1 AND CP-2
M501
4 EXISTING CONDENSER PUMPS, CP-5 AND CP-6
M501
5 EXISTING JACE PANEL
M501
6 EXISTING BOILER PUMP CONTROLLERS
M501
9 NEW PRV WITH BYPASS AND RPZA DETAIL
M501
7 EXISTING PRV WITH BYPASS - BOILER
EXISTING PUMP,
CP-3, TO REMAIN.
EXISTING SUCTION
AND DICSHARGE
PIPING TO REMAIN.
SEE M601 FOR
SCOPE. TYPICAL 1
PUMP.
EXISTING DOMESTIC
HOT WATER RECIRC
PUMP, CP-7.
PIPE DISCONNECTED.
CONNECT PIPE TO
PUMP AND VERIFY
PROPER OPERATION.
EXISTING JACE
NETWORK CONTROLLER.
MODEL UNC-500
EXISTING PUMP,CP-2
EXISTING PUMP, CP-1 EXISTING PUMP, CP-5
EXISTING PUMP, CP-6
EXISTING PUMP CONTROLLER,
CP-3, TO REMAIN.
EXISTING PUMP CONTROLLER,
CP-4, TO REMAIN.
EXISTING PRV WITH BYPASS
AND RPZA SERVING BOILER TO
BE DEMOLISHED AND REPLACED.
M501
8 EXISTING PRV WITH BYPASS- CONDENSER/CHILLED WATER
EXISTING PRV WITH BYPASS
SERVING CONDENSER WATER
AND CHILLED WILL BE
DEMOLISHED AND REPLACED .
5 - INCLUDE TREND LOGGING PROGRAM FUNCTION
4 - INCLUDE OPTIMUM START PROGRAMMING
3 - INCLUDE OVERRIDE SCHEDULING PROGRAMMING
2 - INCLUDE HOLIDAY SCHEDULING PROGRAMMING
1 - INCLUDE TIM-OF-DAY SCHEDULING PROGRAMMING
NOTES:
CP-7 X X X X
PUMPS: DOM. HOT WATER
CHILLED WATER VALVE
CP-1, CP-2, CP-5, CP-6 X X X X X X
PUMPS: CHILLED WATER
CP-3, CP-4 X X X X X X 1,2,3,4
PUMPS: BOILER
S T
A R
T
S T
O P
E N
A B
LE
D
IS
B A
LE
S T
A T
U S
P R
E S
S U
R E
S W
IC
T
H
M E
T E
R P
U
LS
E
C U
R R
E N
T R
E
LA
Y
P H
A S
E M
O N
IT
O
R
V O
LT
S
A M
P S
D
IF
F E
R E
N T
IA
L
P R
E S
S U
R E
P H
A S
E M
O N
IT
O
R
M O
T O
R R
P M
DIGITAL DIGITAL ANALOG
INPUT/OUTPUT
SUMMARY
OUTPUTS INPUTS
NOTES
M501
10 EXISTING RPZA - CONDENSER/CHILLED WATER
EXISTING RPZA SERVING
CONDENSER WATER AND
CHILLED WATER WILL BE
DEMMOLISHED AND REPLACED.
LJWood Highlight
LJWood Highlight
LJWood Highlight
LJWood Highlight
LJWood Highlight
LJWood Highlight
LJWood Highlight
LJWood Highlight
LJWood Highlight
LJWood Highlight
WATER COOLED CHILLER
COOLING TOWER
ET-3
AS-3
CP-1
(EXISTING)
CP-2
(EXISTING)
AS-2
ET-2
CP-5
(EXISTING)
CP-6
(EXISTING)
AHU-2
SUPPLY
AHU-3
SUPPLY
AHU-1
SUPPLY
CHEMICAL
FEEDER
CHEMICAL
FEEDER
4 4
CHILLED WATER PUMPS: 140 GPM
CHILLED WATER: 36 GPM
CONDENSER WATER PUMPS: 180 GPM
CHILLED WATER: 54 GPM CHILLED WATER: 41 GPM
HWB-1
ET-1
AS-1
CP-3
(EXISTING)
CP-4
(FURNISHED BY
OWNER)
AHU-2
SUPPLY
AHU-3
SUPPLY
AHU-1
SUPPLY
M501
CHEMICAL
FEEDER
5 5
4 4
BOILER PUMPS: 88 GPM
HOT WATER: 21 GPM HOT WATER: 45 GPM HOT WATER: 22 GPM
SHEET KEY NOTES: FLOW DIAGRAMS#
REDUCER
FLEXIBLE CONNECTION
CONTROL VALVE, 3-WAY
BUTTERFLY VALVE
CHECK VALVE
PRESSURE SENSOR
NEW WORK - SINGLE LINE
EXISTING - SINGLE LINE
EXISTING TO BE DEMOLISHED
1. INSTALL PUMP LOCATED IN MECHANICAL
ROOM. CONNECT TO EXISTING PIPING.
SEE PUMP SCHEDULE SHEET M-103.
2. EXISTING CHILLER PUMPS, REBUILD AND
PERFORM REALIGNMENT PER
ARMSTRONG PUMP MANUFACTURER
RECOMMENDATIONS. TYPICAL 2 PUMPS.
3. EXISTING CONDENSER PUMPS, REBUILD
AND PERFORM REALIGNMENT PER
ARMSTRONG PUMP MANUFACTURER
RECOMMENDATIONS. TYPICAL 2 PUMPS.
4. REPLACE EXISTING PRESSURE AND
TEMPERATURE GAUGES AND WITH NEW
LIQUID-FILLED GAUGES.
5. TEST AND VERIFY PROPER OPERATION
OF EXISTING DIFFERENTIAL PRESSURE
SENSOR. PROVIDE WIRING &
PROGRAMMING SERVICE TO CONNECT
INTO BAS.
6. EXISTING 3/4" RPZA AND PRV TO BE
DEMOLISHED AND REPLACED WITH NEW
ASSEMBLY. SEE DETAIL
7. EXISTING 3/4" RPZA AND PRV TO BE
DEMOLISHED AND REPLACED WITH NEW
ASSEMBLY. SEE DETAIL
8. REPLACED CONTROL HOT WATER VALVE
AT AHU-3
HVAC LEGEND
SYMBOL NAME
LIMIT OF WORK
COR CONTRACTING OFFICER
OF RECORD
VFD
VFD
BI - WATER PUMP STATUS
BO - WATER PUMP START / STOP
CT
AO - WATER PUMP SPEED
BI - WATER PUMP FAULT
M
BI - WATER PUMP STATUS
BO - WATER PUMP START / STOP
AO - WATER PUMP SPEED
BI - WATER PUMP FAULT
CT
M
CWR
PS
PS
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
A/E FIRM LOCATION WITHIN PARK
TITLE OF SHEET
/3
/2
:1
:5
P M
WATER FLOW DIAGRAMSM601
09/30/20
MDJ
JEB
MDJ
5 5
ACADIAN CULTURAL CENTER XX
XXXXXX
243562B
JEAN LAFITTE N.H.P AND PRESERVE
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
NOT TO SCALEM601
1 CONDENSER & CHILLED WATER PIPING FLOW DIAGRAM
NOT TO SCALEM601
2 HOT WATER HEATING PIPING FLOW DIAGRAM
NOT TO SCALEM601
3 CHILLED, CONDENSER, & HOT WATER PUMP CONTROLS
LJWood Highlight
LJWood Highlight
| G001 - COVER SHEET |
| M001 - MECHANICAL GENERAL NOTES & LEGEND |
| M101 - MECHANICAL PLANS |
| M501 - MECHANICAL DETAILS |
| M601 - WATER FLOW DIAGRAMS |
File details come from the government source that posted it. Updated .