Amend_3_Attach_3_LimitationsOnSubcontractingReport_Form_0003.xlsx

XLSX spreadsheet 83 KB Posted

Attached to
LI ELECTRICAL SWITCHGEAR (PMIS 258838) Federal contract opportunity
Solicitation number
140P4521R0010
Issued by
Department of the Interior National Park Service

About this file

This document contains a limitations on subcontracting report template for use on 8(a) or socio-economic set-aside service contracts valued over $150,000 awarded by the National Park Service. The template requires the prime contractor to report amounts invoiced for self-performance and subcontractor work, and calculate its own participation percentage to ensure compliance with limitations on subcontracting rules. If not in compliance, the contractor must provide a corrective action plan.

The related federal opportunity is a solicitation from the National Park Service to replace critical high voltage electrical switchgear at the Statue of Liberty National Monument. The project number is PMIS 258838. The solicitation seeks replacement of switchgear to maintain reliability of power to the monument.

View the file

Other files for this federal contract opportunity

Other files attached to LI ELECTRICAL SWITCHGEAR (PMIS 258838), newest first.
File Type Posted
Sol_140P4521R0010_Amd_0003.pdf PDF
Amend_3_Attach_5_Electrical_Fort_wood_0003.pdf PDF
Amend_3_Attach_2_PPQ_0003.docx DOCX document
Amend_3_Attach_6_Liberty_single_line_0003.pdf PDF
Amend_3_Attach_4_Electrical_Fort_wood_1P_0003.pdf PDF
Amend_3_Attach_1_Q-n-A_0003.docx DOCX document
Sol_140P4521R0010_Amd_0002.pdf PDF
Photos_and_Spec_Diagram_0001.zip ZIP file
Sol_140P4521R0010_Amd_0001.pdf PDF
Statue_switchgear_access_map_0001.pdf PDF
Sol_140P4521R0010.pdf PDF
Att 2 DBA WD.pdf PDF
Att 1 STLI 258838 Project Specifications.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Limitations on Subcontracting Limitations on Subcontracting Report National Park Service (NPS) | 7-27-17

This report is required for 8(a) or socio-economic set-aside service contracts (including construction) priced at or above $150,000.

Contract Number:[Insert contract #]
Prime Contractor:[Insert Prime Contractor's company name]
Total Current Contract Price:[Insert the amount of the original contract + all excuted contract modifications]
Type of Set-Aside:[Insert type of set-aside: Small Business, HUBZone, SDVOSB, WOSB, etc.]
Required Participation:[Put an X in the applicable box below per clause 52.219-14]
1) Services (except construction). At least 50 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern.
2) General construction. The concern will perform at least 15 percent of the cost of the contract, not including the cost of materials, with its own employees.
3) Construction by special trade Contractors. The concern will perform at least 25 percent of the cost of the contract, not including the cost of materials, with its own employees.
Participartion Calculation as of the Current Invoice
Amounts shown below shall include amounts from all previous invoices and the current invoice. Exclude the cost of materials.
1) Amount Invoiced by the Prime Contractor:$0
2) Portion of Amount Invoiced for Similarly Situated Subcontractors (SSS)*$0
3) Portion of Amount Invoiced for Non-Similarly Situated Subcontractors (NSS)$0
4) Prime Contractor's Participation %ERROR:#DIV/0!
* Similarly Situated Subcontractor (SSS): A small business Subcontractor that is a participant of the same Small Business Administration (SBA) program that qualified the Prime Contractor as an eligible offeror and awardee of the contract as defined in 13 CFR 125.6 (i.e. Small Business, HUBZone Business, Service Disabled Veteran Owned Small Business (SDOVB), etc.)
** Limitation on Subcontracting Percentage = (Total amount invoiced by the Prime Contractor - Portion of total amount invoiced for Non-Similarly Situated Subcontractors (NSS) / Total amount invoiced by the Prime Contractor)
Corrective Action Plan
If the Prime Contractor's Participation % noted in line 4 above is not in compliance with the % required by contract clause 52.219-14 then the Prime Contractor shall provide a written corrective action plan below:

Sheet2

Services (except construction)
General construction
Construction by special trade contractors

File details come from the government source that posted it. Updated .