Amd0001-140P4324R0048_0001.docx

DOCX document 16 KB Posted

Attached to
SPAR REPLACE AGED AND FAILING HUMIDIFIC Federal contract opportunity
Solicitation number
140P4324R0048
Issued by
Department of the Interior National Park Service Northeast Region

About this file

This document is a set of questions and answers (RFIs 1-13) related to Amendment 0001 of Solicitation 140P4324R0048 for the SPAR Update Humidification System, Building 13 project.

The key details are:

  • The normal operational window of the water plant is 24/7/365, with average monthly usage ranging from 150k gallons in summer to 75k gallons in winter.
  • The PLC panel needs to meet the SOW requirements but a specific manufacturer/model is not specified. It should have a UPS to handle the power transition when the backup generator activates.
  • No SCADA software, servers, or additional workstations are required.
  • The existing electrical panel DP-3 will likely power the water panel E-3, but this is not 100% confirmed.
  • All new programming and graphics are required, as there is no existing program to modify.
  • The jockey pumps need to be controlled by both the PLC and a separate control panel.
  • The voltage change from 120V to 208V is required for the jockey pumps, but can be provided by the existing distribution panel.
  • The new equipment will be installed on the old distribution panel, no new panel is required.
  • The PLC will be able to control and monitor various system components like pump hours, tank levels, pump cycles, and set alarms.

View the file

Other files for this federal contract opportunity

Other files attached to SPAR REPLACE AGED AND FAILING HUMIDIFIC, newest first.
File Type Posted
Sol_140P4324R0048_Amd_0002.pdf PDF
Sol_140P4324R0048_Amd_0001.pdf PDF
B08_Solit_Clauses_Construction-SPAR_Humidifiers.docx DOCX document
B08-Attachment_6-Past_Performance_Questionnaire.doc DOC document
B08_Attachment_7-Limitation_on_Subcontracting_Report_Template.xlsx XLSX spreadsheet
A04_SPAR_PMIS_259831_HUMIDITY_SYSTEM__SPECS.pdf PDF
Sol_140P4324R0048.pdf PDF
M3_0_.pdf PDF
B08-WD-MA20240003-7_5_24.pdf PDF
B04-Attachment_2-Tech_Eval_Factors.pdf PDF
A06_SPAR_PMIS_259831_HUMIDITY_SYSTEM__DRAWINGS.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140P4324R0048 SPAR Update Humidification System, Building 13

Amendment 0001 RFIs 1-13

1. What is the flow rate and normal operational window of the water plant?

Government response: The normal operational window of the water plant is 24/7/365, and the gallons used per month, on average, range from 150k gallons in the summer to 75k gallons in the winter.

2. The PLC panel with HMI and Chart recorder what is the PLC manufacturer and model you want to use?

Government response: Can't specify a specific manufacturer or model but it need to be able to fit the SOW (this will be a submittal). The PLC panel used for the wastewater is an automation direct panel with Allen Bradley Compact Logic.

3. Will the PLC be a single PLC or redundant?

Government response: Single

4. Will the PLC be required to have UPS and for how many hours of power and at what percentage of load?

Government response: There is a generator at the building that will turn on if the power goes out. If the panel doesn't have an internal way to keep power for a couple seconds when that transition happens then yes it will need a UPS that can handle the load of the panel but won't need multiple hours of battery backup.

5. What is the SCADA software you are using and how many licenses do you need?

Government response: We are not currently using a SCADA software, but need be able to use SCADA in the future.

6. How many servers do you need and are they redundant?

Government response: No servers needed.

7. Is water panel E-3 powered by electrical panel DP-3?

Government response: Presumably but not 100%, the electric is all coming from that main electric room though that was observed during the site visit.

8. Do you need any additional workstation computers for operations and if so, how many?

Government response: No

9. Is there an existing program that is being used for the site that can be transferred/modified or does this require all brand-new programming including graphics?

Government response: No, needs to be all brand new.

10. Are the jockey pumps controlled directly from PLC or do they need a control panel and is the control panel provided by the manufacturer, or does it need to be built?

Government response: They need to be able to be controlled by the PLC, but also need their own "control panel" like the one that is currently there that can turn on/off the pumps, show hours, and house the circuitry.

11. The documents mentioned the changing of voltage, but don’t specify where, is this for a specific piece of equipment, for the overall service, or is this not needed as the existing panelboard is already listed for 208/120VAC power?

Government response: The voltage change is for the Jockey Pumps, going from 120 to 208, which can be provided from existing DP.

12. Do you need additional circuits beyond what is available for the existing equipment or are you looking to have all the new equipment installed on a new panelboard and abandon the old panelboard?

Government response: New equipment installed on the old panelboard (distribution panel); we are not abandoning the old panel or installing a new one.

13. What is the equipment required to be controlled and/or monitored by the PLC?

Government response: Most of the system will be able to be controlled and monitored by the PLC, such as but not limited to, hours of pumps, tank levels, pump cycle counter, set tank alarm levels, turn on/off pumps.