This document contains a sources sought announcement and statement of work for a federal contract opportunity with the National Park Service. The project involves cyclic maintenance, carpet replacement, and roof replacement at the historic Province Lands Visitor Center located within Cape Cod National Seashore. Responses were due by December 30, 2020 with work to be completed within 60 days of notice to proceed. The contract is set aside for woman-owned small businesses and has an estimated value between $250,000-$500,000. Interested parties were required to submit detailed past experience and capabilities statements within six pages demonstrating relevant experience with historic site work, carpet installation, and roof replacement. The statement of work provides additional requirements for the cyclic maintenance, carpet replacement, and roof repair deliverables.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions & Answers Regarding Solicitation ID 140P4321R0005,
1. Question: The SOW mentions that unless explicitly indicated, new materials shall match those being replaced. What is the manufacture/model number of the carpet currently in place?
Answer: 24" X 24" Carpet Tiles Manufacture #: Sierra (Sandoval) Manufacturer: Beaulieu.
GSA Advantage Contract No. GS27F-0027V Landar Co. LLC PO Box 83 Williamsport, PA
17703 (570) 279-4627.
Color: Sierra Sandoval
Construction Tip-Sheared Loop
Yarn Content Zeftron® with 25% Recycled Content
Dye Method Solution Dyed
Machine Gauge 1/12 in.
Stitch Count 11.3 s.p.i.
Average Density 10068
Finished Pile Thickness 0.11800000000000000 in
Yarn Weight Tufted 34 oz. per sq. yd.
Primary Backing Non Woven
Secondary Backing Nexterra®
Total Recycled Content
40% minimum post consumer recycled content
Width 24" x 24" (61 cm. x 61cm.)
Performance
Static Control Less Than 3.5 k.v. Step
Flame Resistance Passes (DOC FF-1-70)
Flooring Radiant Panel Class 1(ASTM E-648)
Smoke Density Less Than 450 (ASTM E-662)
Soil Resistance Commercial Anti-Soil Protection
CRI Green Label Plus Certification #GLP8595
Puralex This Product Contains Puralex
Warranties
Wear Lifetime Limited Warranty
Static Lifetime Warranty
Edge Ravel Lifetime Warranty
Zippering Lifetime Warranty, not to zipper
Delamination Lifetime Warranty, under normal use
Tuft Bind Lifetime Warranty
2. Question: Will the visitor center be closed during the reconditioning? If not, will the CO be able to block off sections for specific day?
Answer: VC will be open, contractor will be able to block off sections with proper notification/coordination.
3. Question: Will the roof observation deck be closed for the duration of the roof restoration?
Answer: What is anticipated duration of roof restoration? If it is 2-3 weeks, then yes, if longer, accommodations will need to be proposed and approved.
4. Question: Will the contractor be allowed to tether to the roof structure as part of a fall prevention plan?
Answer: Would need to see specifics of tethering system but it is possible.
5. Question: Does the COR have a preference as to the order or sequence of the interior painting? Example, Lobby, Reception, Office…
Answer: No, will want a proposed sequence from contractor – will work with contractor to minimize disruption. Same for carpet installation.
6. Question: Will the contractor have to remove and place back furniture or other interior obstructions?
Answer: Contractor will have to move and reinstall anything that is not a permanent fixture or object.
7. Question: Will draping or tarping of interior structures be allowed?
Answer: Yes – temporary during actual work, not allowed to drape/tarp for entire POP
8. Question: Will site mobilization (approved draping, tarping) be allowed to remain overnight or will all work areas have to return to the original condition?
Answer: Yes, see answer to #7
9. Question: Will the COR be on site each day?
Answer: There may be days when the COR is not physically at the job site but will be accessible by cell phone.
10. Question: Will the contractor receive a complete list of submittal requests upon award?
Answer: Yes
11. Question: Will the Contractor be able to install temporary fencing in the parking lot with the approximate size of 15’x25’?
Answer: Yes. Contractor to propose for approval by park.
12. Question: Will the Contractor be allowed to submit progress payments?
13. Question: “Copper roof boots shall be standard to the industry to match existing, sized correctly for the roof penetration.” – Roof SOW pg. 5. Can you please define the specs for the copper roof boots as well as the quantity required?
Answer: From Scope: install copper roof boots at all penetrations of the roof, approximately one. Photo provided below to assist bidders in determining what is required.
14. Question: “Pressure treated exterior grade plywood, thickness to match existing.” – Roof
SOW pg. 5. Can you please provide the dimensions of the existing sheathing?
Answer: See Working Drawings provided to contractors with Amendment 0001.
15. Question: Page 3 of the solicitation states that this solicitation is issued as a total small business set aside as well as a woman owed small business set aside. Can you please clarify the set aside?
Answer: This solicitation is set aside 100% for Woman Owned Small Businesses
16. Question: The site visit was held on May 3rd, 2021 and our subcontractor was not able to attend. Can our subcontractor visit the project location on their own or do they need to be escorted?
Answer: Subcontractor can visit the project location on their own but the building may not be open at time of visit.
17. Question: Upon submission of the proposal, will a digital copy of the bid guarantee suffice while the CO awaits the sealed copy being delivered via FEDEX?
18. Question: “Exterior dimensional lumber to match existing species, shape and dimensions and be pressure-treated for ground contact.” Roof SOW pg. 5. Can you provide the dimensions and specifications of the structural lumber?
Answer: See Working Drawings provided to contractors with Amendment 0001.
19. Question: In speaking with Dan Struebing, Northeast District Management for Cedar Shake &
Shingle Bureau (401-320-0488) their authorized supplier of the Red Cedar Shake, required in this solicitation, is Capital Forest Products. In speaking with their V.P. of Sales, Curt McLeod (781-740-3182 this product is currently not available due to demand and systemic supply shortages throughout the industry. Furthermore the product cost and delivery date will remain unknown until supply chain is restored. Given this critical impediment, will the solicitation allow for a substitution of another product that is currently commercially available or delay the project start date to coincide with product availability. If the later, will the offeror be able to submit for a price modification to account for any additional cost increase once product is commercially available.
Answer: This week, the contractor on another park roof project was able to secure the exact same material for a confirmed set price and a 6-8 week lead time from a local Cape Cod building material company. That project start was delayed to allow for the material delivery. The park will allow for the same delay on this project.