CD_Amendment_062018.pdf
PDF 376 KB Posted
- Attached to
- GOIS REPLACE ROOF ON PARK HQ 107
- Solicitation number
- 140P4318R0032
About this file
Addendum to SOW
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A06_GOIS_Replace_Roof_Bldg_107_Drawings_(1).pdf | ||
| General_Decision_Number.pdf | ||
| GOIS_Bldg__107_Roofing_Contract_Price_Schedule.xlsx | XLSX spreadsheet | |
| A04_GOIS_Replace_Roof_Bldg_107_SOW_(1).pdf | ||
| Sol_140P4318R0032.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GOVERNORS ILSAND NATIONAL MONUMENT
Building #107 Roof Replacement
PMIS #178442
AMENDENTMENT #1
Date: May 30, 2018
PURPOSE: The purpose of this amendment is to clarify and modify certain sections of the Project Manual (Specifications and Drawings). All clarifications and/or modifications stated in the Amendment shall be incorporated into the requirements of this contract.
A. CLARIFICATIONS:
1. DATE CLARIFICATION: The date for Solicitation for this contract is June, 2018. Other dates on drawings and specifications shall be disregarded.
2. DESCRIPTION OF WORK CLARIFICATION: This Contract includes a Base Bid and two
(2) Options.
THE BASE BID FOR THIS CONTRACT SHALL INCLUDE:
a. Removal of existing membrane and asphalt shingle roofing, flashing, gutters, downspouts and select roof accessories;
b. Removal and salvage of select roof accessories;
c. Providing new membrane and asphalt shingle roofing and all associated membrane and sheet metal flashings;
d. Providing new copper gutters and downspouts;
e. Providing new roof accessories and reinstalling salvaged roof accessories.
OPTIONS FOR THIS CONTRACT SHALL INCLUDE:
Option 1:Provide dark bronze anodized aluminum gutter, downspouts, downsput brackets, gutter brackets adn screns/covers etc. with new mill finish aluminum flahing at valley, cricket, drip edge and step flashings.
Option 2: Salvage and re-use existing copper gutters, downspouts etc. with new copper flashings at valley, cricket, drip edge and step flashings. Allow for 10% gutterscreen replacement and incidental replacement of damaged copper dowspouts near grade.
See specifications and drawings for specific requirement.
See attached Contract Price Schedule of Bid Breakdown requirements.
B. MODIFICATIONS:
1. PROJECT SUBMITTAL REQUIREMENTS MODIFICATION:
All documents and submittals shall be electronically transmitted directly to the Contracting Officer (CO) and the Contracting Officer’s Representative (COR) by the Contractor. All submittals shall be accompanied by a CM-16 Transmittal (see attached).
Disregard all references in the specifications to use of the Denver Service Center (DCS) Sharepoint site for submittal of any project documents.
GOVERNORS ILSAND NATIONAL MONUMENT
Building #107 Roof Replacement
PMIS #178442
AMENDENTMENT #1
Date: May 30, 2018
2. SPECIFICATION SECTION 01 40 00, 3.3.A MODIFICATION:
The requirement to submit Daily Test Report Information Sheets and Accessibility Inspection Reports shall be deleted from this contract. Quality Control Daily Reports shall be submitted on a form similar to, and containing all of the information shown on, the attached form.