B08_11-Amendment_01_0001.pdf

PDF 111 KB Posted

Attached to
(GAOA) CHOH 241449-Log Wall Remediation
Solicitation number
140P2022R0107
Issued by

About this file

This document is an amendment to a solicitation for the restoration of a canal prism and stabilization of a historic dry-laid stone wall at Chesapeake & Ohio National Historic Park.

The amendment makes four changes to the original solicitation: it changes the time of the mandatory site visit from 10:00 AM to 9:00 AM; it adds language requiring the on-site superintendent and quality control positions to be held by separate persons, with the superintendent prohibited from quality control duties; it corrects cross-references in Sections L and M to refer to Factor 6 instead of Factor 4 for small business participation; and it confirms the submission addresses for past performance questionnaires are to be sent to the points of contact provided. The related federal contract opportunity identifies the solicitation number, name of the project to restore and stabilize the stone wall, and the contracting agency as the National Park Service National Office.

View the file

Other files

File Type Posted
Sol_140P2022R0107_Amd_0008.pdf PDF
B08_27-Amendment_08_072722_0008.pdf PDF
B08_25-Amendment_07_072222_0007.pdf PDF
B08_26-CHOH_241449_-_Combined_Final_Q_A_0007.pdf PDF
Sol_140P2022R0107_Amd_0007.pdf PDF
Sol_140P2022R0107_Amd_0006.pdf PDF
B08_19-CHOH_241449_-_Pre-Proposal_Question_Responses_0006.pdf PDF
B08_18-Amendment_06_071522_0006.pdf PDF
B08_22-CHOH_241449_-_Contract_Price_Schedule_-_Rev_07-18-2022_0006.pdf PDF
B08_23-CHOH_241449_RFI_03-_Photos_of_NPS_Pedestrian_Bridges_0006.pdf PDF
B08_20-CHOH_241449_-_Combined_Revised_Specifications_-_07-18-2022_0006.pdf PDF
B08_24-CHOH_241449-RFI_06_-_Photos_of_Tributary_Culverts_0006.pdf PDF
B08_21-CHOH_241449_-_Combined_Revised_Drawings_-_07-18-2022_0006.pdf PDF
Sol_140P2022R0107_Amd_0005.pdf PDF
B08_17-Amendment_05_071122_0005.pdf PDF
B08_16-Amendment_04_063022_0004.pdf PDF
Sol_140P2022R0107_Amd_0004.pdf PDF
B08_15-Site_Visit_Sign_In_060822_0003.pdf PDF
Sol_140P2022R0107_Amd_0003.pdf PDF
B08_14-Amendment_03_062422_0003.pdf PDF
B08_12-Amendment_02_061422_0002.pdf PDF
B08_13-PreBid_SignIn_0002.pdf PDF
Sol_140P2022R0107_Amd_0002.pdf PDF
Sol_140P2022R0107_Amd_0001.pdf PDF
Sol_140P2022R0107.pdf PDF
B08_10-GenRefs_Vol_II.doc DOC document
B08_1-CHOH_241449_-_Final_Combined_Specifications.pdf PDF
B08_2-CHOH_142449_-_Final_Construction_Drawings.pdf PDF
B08_5-DBWD_MD20220020-3.pdf PDF
B08_8-PastPerf_Vol_I.docx DOCX document
B08_9-SubKPlanForm_Vol_II.doc DOC document
B08_4-PriceSched_Vol_II.xlsx XLSX spreadsheet
B08_3-CHOH_241449_-_Soils_Investigation_Report.pdf PDF
B08_7-Exp_Vol_I.docx DOCX document
B08_Solit_140P2022R0107.pdf PDF
B08_6-BidBond_Vol_II.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation: 140P2022R0107 GAOA CHOH 241449 Restore Canal Prism and Stabilize Historic Dry Laid Stone Wall at Chesapeake & Ohio National Historic Park

Amendment #1

The Following items are added or corrected to the Solicitation:

1. The Time of the Site Visit is changed from 10:00 AM EDT to 9:00 AM EDT per reference at Clause 52.236-7 on page 46. The date Wednesday June 8, 2022 remains unchanged.

2. Insert the following language in SPECIAL REQUIREMENT 2: KEY PERSONNEL on page 15:

“(d) For this project the Onsite-Superintendent cannot be responsible for or perform the Quality Control responsibilities. The person responsible for Quality Control cannot act as Superintendent but can perform the duties of On-Site Safety Manager. The persons proposed as key personnel are required to be the persons performing the work as proposed within 180 days.”

3. In Section L (page 49) and Section M (page 58) concerning FACTOR 6 – SMALL BUSINESS PARTICIPATION, cross references referring to Factor 4 in the associated sections should read Factor 6 in each for clarity.

4. Question: “In section L, Factor 7 of the solicitation, the instructions direct the offeror to complete sections A and B only of the Past Performance Quesitonnaire. However, Section E (Return) is not completed on the Past Performance Questionnaire. Please confirm that the offeror should direct their references to send the Past Performance Questionnaire to dale_brown@nps.gov and cary_atwood@nps.gov.”

Answer: Those are the correct submission addresses; the last sentence of point 1) states “Direct them to complete and submit the survey to the address and point of contact in paragraph B above …”. Paragraph B is earlier in the INSTRUCTIONS FOR THE SUBMISSION OF OFFERS portion of Section L and identifies the points of contact.

File details come from the government source that posted it. Updated .