B09_C2.39_REVISED_Amendment0003_140P2019R0029.pdf
PDF 1 MB Posted
- Attached to
- Reconstruct Cave Trails Federal contract opportunity
- Solicitation number
- 140P2019R0029
About this file
B09_C2.39 REVISED_Amendment0003_140P2019R0029.pdf
View the file
Other files for this federal contract opportunity
Show all 32
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3' 5' 7' 8' 9' 10' 10' 10' 10' 10' 10' 10' 10' 10' 10' 10' 10' 10' 10' 10'
5'6'6'6'6'
TRAV 722
NAIL SET
TRAV 723
NAIL SET
TRAV 724
NAIL SET
TRAV 725
NAIL SET
TRAV 726
NAIL SET
TRAV 727
NAIL SET
TRAV 728
NAIL SET
TRAV 700
NAIL SET
C7.06
C
C7.02
C
C7.10
A/B
C7.09
A/B
C7.08
C
C7.02
C
S4.0
C7.08
C
C7.01
D
C7.02
C/F
C7.01
E
C7.02
K
C7.03
A
C7.06
A
C7.03
A
S1.0
2/3
S3.0
C7.01
E
REPLACE
ACCESS GATE
TO WINE
CELLAR
Grand Central Station
Big Break
End: Concrete Band & Concrete Pavers N:1939071.5627 E:1548777.7357
C7.02
C/F
C7.11
A
TRAV 96
NAIL SET
VARIABLE WIDTH
SLIP RESISTANT
FINISH CONCRETE
TRAIL
3' WIDE CONCRETE TRAIL
WITH HANDRAIL LEFT SIDE
FRP STAIR SYSTEM WITH
HANDRAIL BOTH SIDES.
RESOURCE
PROTECTION FENCE
BID OPTION 1
3' WIDE CONCRETE STEPS WITH
HANDRAIL LEFT SIDE
TWO ELECTRIC
CHASE
VARIABLE WIDTH
CONCRETE TRAIL
2' TO 3' WIDE CONCRETE
STEPS WITH REMOVABLE
HANDRAIL ON RIGHT SIDE
THROUGH THIS SECTION.
BID OPTION 2
FRP TRANSITION
AND STEPS FROM
BIG BREAK
HANDRAIL BOTH
SIDES
EDGE OF EXISTING CAVE DIRT TRAIL(TYP)
3 FT. WIDE SLIP
RESISTANT FINISH
CONCRETE TRAIL
SEE CALLOUT BOX
THIS SHEET
Start: Handrail N:1938928.7999 E:1548969.3211
End: Handrail and Begin Guardrail N:1938937.8556 E:1548971.1644 End: Guardrail
N:1938930.6641 E:1548980.9700
Start: Handrail N:1938937.1317 E:1548967.3187
End: Handrail N:1938944.2769 E:1548936.9144
3' 5' 7' 8' 9' 10' 10' 10' 10' 10' 10' 10' 10' 10' 10' 10' 10' 10' 10' 10'
5'6'6'6'6'C7.10
A/B
C7.02
C
C7.02
C/F
C7.03
D
C7.02
K
S3.0
Grand Central Station
C7.06
E
S2.0
C7.08
C
C7.09
A/B
SLIP RESISTANT FINISH
CONCRETE TRAIL. TRANSITION
TO NEW YORK SUBWAY.
HANDRAIL RIGHT SIDE
CONCRETE TRAIL
FRP TRANSITION 3'
WIDE WITH STEPS
COMPOSITE & S.S. BENCH
TWO ELECTRIC
CHASES (TYP)
RETAINING WALL3' WIDE CONCRETE STEPS
WITH HANDRAIL RIGHT SIDE C7.02
B/D
CONCRETE PAVERS
S2.0
1CONCRETE
PAVER EDGEC2.39
ASTAIR CONFIGURATION (THIS SHEET)
Start: Handrail N:1938928.7999 E:1548969.3211
End: Handrail and Begin Guardrail N:1938937.8556 E:1548971.1644
GUARDRAIL
S2.0
4/5
End: Guardrail N:1938930.6641 E:1548980.9700
Start: Handrail N:1938937.1317 E:1548967.3187
End: Handrail N:1938944.2769 E:1548936.9144
FINAL CONSTRUCTION DOCUMENTS
TIMOTHY J.
S
T
A
T
E
O
F K
E
N
T
U
C
K
Y
P
R
O
F
E
S
S
I
O
N A
L
E
N
G
I
N
E
E
R
L
I
C
E
N S
E
D
26364
HOGAN
05/20/19
0 5 10 20 Feet
1. SEE SHEET 2.38 FOR FINISH MATERIALS PLAN NOTES.
Notes
Colored Concrete Trail
Slip Resistant Concrete Finish
Stair Location
Concrete Pavers
Elevated FRP Grating
At Grade FRP Grating Over Existing Concrete
Existing Concrete Trail
Overhead Clearance Constraint
Electric Chase
Existing Cave Dirt Trail
Finish Materials Legend
Emery Slip Resistant Surface