Sol_140P1422R0007_Amd_0001.pdf
PDF 89 KB Posted
- Attached to
- GOSP-ENGINEHOUSE ROOF REPLACEMENT Federal contract opportunity
- Solicitation number
- 140P1422R0007
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P1422R0007_Amd_0006.pdf | ||
| Attachment_1-_Revised_Specifications_8-23-22_0005.pdf | ||
| Sol_140P1422R0007_Amd_0005.pdf | ||
| Attachment_2_-_Revised_Drawings_8-23-2022_0005.pdf | ||
| Sol_140P1422R0007_Amd_0004.pdf | ||
| Sol_140P1422R0007_Amd_0003.pdf | ||
| Asbestos_Test_Results_0003.pdf | ||
| Sol_140P1422R0007_Amd_0002.pdf | ||
| Attachment_4_-Past_Performance_Questionnaire.doc | DOC document | |
| Attachment_1_-_Engine_House_Refoof_Specifications_(1).pdf | ||
| Attachment_2_-_Engine_House_Drawings.pdf | ||
| Attachment_3_-_Wage_Determination.pdf | ||
| Sol_140P1422R0007.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P1422R0007 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PIR
Yellowstone NP WY 82190 Mammoth Supply Center / 22 Stable St PO Box 168 NPS, IMR - Northern Rockies MABO
07/27/20220001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/22/2022
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Amendment 0001 to Solicitation #140P1422R0007 is issued to answer questions received in response to this solicitation, correct the period of performance on page 8 of 40 and to extend the date proposals are due. Additionally, the National Park Service will conduct asbestos testing of the roof. Results will be provided upon completion via another solicitation amendment.
QUESTION 1: Once the existing gravel has been removed will the gravel need to be reinstalled?
RESPONSE 1: The existing gravel will NOT be re-installed and will need to be hauled away.
QUESTION 2: Do you have the existing fan size and capacity of the fan that is being
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Stacy Vallie
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P1422R0007/0001 replaced?
RESPONSE 2: The existing exhaust fan is a 1000
RPM, 340 SCFM, 1/6 HP, 120 v 1 Phase, centrifugal roof vent with adjustments for 4500ft altitude
(this information is taking from existing drawings).
Proposals are now due no later than 1:00 p.m. MDT on August 10, 2022.
The new Period of Performance is September 1, 2022, through June 30, 2023
END OF AMENDMENT 0001
Period of Performance: 09/01/2022 to 06/30/2023
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110