A04_140P1224Q0055_Amendment_One_Repaint_SOW_0001.pdf

PDF 175 KB Posted

Attached to
Q11 REPAINTING - CARE Federal contract opportunity
Solicitation number
140P1224Q0055
Issued by
Department of the Interior National Park Service Intermountain Region

About this file

This document is a Scope of Work (SOW) for a contract to repaint the interior of House Q11, located in the historic Fruita neighborhood of Capitol Reef National Park in Torrey, Utah. The work includes prepping, priming, and repainting the 1,326 square foot home, caulking the tubs and sinks in the bathroom, and minimizing disturbance and contaminants to the surrounding area. The contractor will provide the labor, while the agency will provide the necessary supplies. The project is to be completed by August 30, 2024. The contractor must comply with applicable building codes, federal/state regulations, NPS policies, and OSHA requirements. A final inspection and acceptance will be performed by the agency representative upon project completion.

The related federal contract opportunity is Solicitation Number 140P1224Q0055, titled "Q11 REPAINTING - CARE", issued by the Department of the Interior National Park Service Intermountain Region. The solicitation is for the interior repainting of House Q11 in Capitol Reef National Park.

View the file

Other files for this federal contract opportunity

Other files attached to Q11 REPAINTING - CARE, newest first.
File Type Posted
Bedroom_2_1_0002.jpg JPG image
Bedroom_2_2_0002.jpg JPG image
Entryway_1_0002.jpg JPG image
Hallway_0002.jpg JPG image
Kitchen_3_0002.jpg JPG image
Kitchen_LivingRoom_1_0002.jpg JPG image
Pantry_0002.jpg JPG image
Washing_Room_0002.jpg JPG image
Kitchen_1_0002.jpg JPG image
Kitchen_LivingRoom_2_0002.jpg JPG image
Bathroom_2_2_0002.jpg JPG image
Bedroom_1_3_0002.jpg JPG image
Bathroom_2_1_0002.jpg JPG image
Sol_140P1224Q0055_Amd_0002.pdf PDF
Bedroom_2_3_0002.jpg JPG image
Entryway_2_0002.jpg JPG image
Kitchen_2_0002.jpg JPG image
Bathroom_1_1_0002.jpg JPG image
Bathroom_1_2_0002.jpg JPG image
Bedroom_1_1_0002.jpg JPG image
Bedroom_1_2_0002.jpg JPG image
B03_B09_40665952_WD_0001.pdf PDF
Sol_140P1224Q0055_Amd_0001.pdf PDF
A04_140P1224Q0055_Repaint_SOW.pdf PDF
Sol_140P1224Q0055.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140P1224Q0055

SCOPE OF WORK

Building Q11

Interior Repainting Capitol Reef National Park

Project Information:

House Q11 is in the historic neighborhood of Fruita in Capitol Reef National Park. Address:

93 E. Fruita Lane, Fruita, CO 81521. Torrey UT 84775. It is part of the Mission 66 homes and was built in 1964. The most recent tenants had lived in the house since 2018. It has been a while since any repainting has taken place.

Project Scope of Work:

Work and Components will include:

a. Prep & Paint 1326 sq foot home Q11, Tape, Roll Paint

b. Priming and repainting the interior walls in most of the rooms.

c. Caulking the tubs and sinks before painting begins in the bathroom.

Specific Tasks:

Contractor shall:

a. Provide the manpower and labor. CARE will provide all the supplies needed for the project.

b. Contractor will inform park staff each day of arrival and departure of the site.

c. Minimal disturbance of the area and zero contaminants to surrounding area will be ensured by contractor.

Sequence and Period of Performance: Project to be completed by August 30, 2024.

Project Identification:

Site Conditions: Contractor will be responsible for making sure the inside and the outside of the house remain as clean as possible during and after the painting occurs. Empty paint cans and other supplies shall be disposed of properly by the contractor.

Codes and Regulations: Contractor shall maintain work area in accordance with the contract specification, applicable Uniform Building Codes, Federal and State Code and Regulations, NPS Policies and guidelines and OSHA requirements.

Amendment One changes address to Torrey UT 84775

BThomas Cross-Out

BThomas Highlight

Contractor Generated Refuse: All contractor generated refuse and waste shall be cleaned up and remove daily from work site and park. Refuse disposal shall comply with the current disposal and environmental requirements. The work site will be kept neat, orderly, and safe for workmen at all times.

Inspection and Acceptance: CARE representative will perform a final inspection and acceptance at end of project.

File details come from the government source that posted it. Updated .