Text version
(x)
140P1121Q0015 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PHF
Harpers Ferry WV 25425 IDC Building 67 Mather Place NPS, HFC - Acquisition Management
PWA
Denver CO 80225 P.O.Box 25287 MS WCP NPS, WASO - WCP Contracting
04/14/20210001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
03/29/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Everglades National Park
The purpose of this amendment is to respond to questions received by the date and time specified in the solicitation with the attached Description of Amendment consisting of four
(4) pages.
Legacy Doc #: NPS
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Sheila Spring
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Request for Quote 140P1121Q0015 Amendment Number 0001 Everglades National Park Wayside Design Build of Exhibits
DESCRIPTION OF AMENDMENT
The purpose of this amendment is to respond to questions received by the date and time specified in Solicitation Number 140P1121Q0015 – Everglades National Park – Design/Build of Wayside Exhibits.
1. Will it be required to provide the tactile maps (i.e. 3D layer) referencing exh. 260 or is it limited to the digital files?
RESPONSE: Provide production files (i.e. 3D layer) and cost estimates for tactile map for Ex 260. The files are to be fabrication ready. Fabrication of tactile map is not required.
2. Will we need to source a sculptor/fabricator for items similar to exh 261 Bronze Alligator, or is it limited to the digital files?
RESPONSE: A source is not required for the Bronze Alligator. Design drawings, reference package, and cost estimate are required.
3. I am hoping to find out if there is an incumbent contractor currently performing these services, if similar services have been performed in the past, or if this is a new requirement.
If this is a follow-on requirement, could you please provide the previous contract or task order number?
RESPONSE: This is a new requirement.
4. Please confirm that this is a design-only RFP and that fabrication of the graphic panels, structures, sculptures and interactive elements is not part of the scope of work.
RESPONSE: Correct
5. Please confirm that fabrication detailing is only required for the four interactives and that all other graphics will use standard NPS-style bases and structures.
RESPONSE: Correct
6. Please confirm that the scope of work for the alligator nest sculpture includes submittal of a reference package for the sculpture, design drawings for mounting the sculpture and creating the base and text panel, and production-ready graphic file for the braille text panel, but does not include the actual artistic creation of the three dimensional alligator nest sculpture.
RESPONSE: Correct
Everglades National Park Wayside Design Build of Exhibits
7. Please confirm that a work plan and/or project schedule is not required for this proposal. If a work plan is required, are there milestone dates for the phases of work and how much time is needed for review of design deliverables?
RESPONSE: 2.1.2 requires a project schedule to be provided seven working days prior to the post award meeting. Milestones are listed in 4.1.
8. Please confirm that Schedule D reflects the scope of work in terms of number and size of waysides.
RESPONSE: Attachment D - Yes.
9. Are the contemporary images available on the Park’s Flickr site free of charge and of sufficient resolution for a wayside?
RESPONSE: Images on Park’s flicker account are free of charge. Contractor shall determine if size is of sufficient resolution for use.
10. Is it acceptable to include as work samples examples of outdoor wayside programs that are associated with museums and visitor centers, but are not in a park?
RESPONSE: Yes, outdoor interpretation only.
11. Page 7 "3.4 Interactives: Design and provide fabrication cost estimates for the following..."Does Everglades National Park have an established relationship with a sign manufacturer and/or a fabrication company that the Park would like to keep working with for this project?
RESPONSE: No
12. Page 12, 5. Period of Performance "All work, including review and approval, shall be completed on or before December 20, 2022."
Is there an anticipated start date?
RESPONSE: Start date shall beginning immediately after award.
13. Page 13 "Upon completion and acceptance of the following deliverables, the contractor shall be paid a firm-fixed-price as shown below:" Are you able to tell us the amount of funding available for this project?
RESPONSE: Funding amount will not be released.
Everglades National Park Wayside Design Build of Exhibits
14. Page 25 of 64, 13.4 Volume IV Past Performance With regards to past performance, if a subcontractor is named as key personnel, must their past performance have been completed with the Prime contractor?
RESPONSE: No
May illustration examples be provided that are subject matter relevant (wetlands, intertidal, ecosystems), but were not created for wayside exhibits?
RESPONSE: See 13.1, Sub-Factor 1. The sample projects shall demonstrate the ability of the proposed personnel to manage, plan, and design outdoor exhibits.