A06_Vernon_Siding_Specifications.pdf
PDF 701 KB Posted
- Attached to
- BLM VERNON BUNKHOUSE WINDOW & SIDING REPLACEMENT
- Solicitation number
- 140L5718Q0042
About this file
A06 Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B03_Construction_Wage_Determinations_UT180057.pdf | ||
| A06_Vernon_Siding_Drawings.pdf | ||
| A21_Vendor_Response_Form.docx | DOCX document | |
| Sol_140L5718Q0042.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY JULY 2018
VERNON SIDING REPLACEMENT 011000-1
SECTION 011000 – SUMMARY
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Project information.
2. Work covered by Contract Documents.
3. Work phases.
4. Work under other contracts.
5. Use of premises.
6. Public use of site.
7. Occupancy requirements.
8. Work restrictions.
9. Specification formats and conventions.
1.2 PROJECT INFORMATION
A. Project Identification: Vernon Siding and Window Replacement
1. Project Location: Vernon Administrative Site, 450 North Silver Sage Road, Vernon, Utah 84080.
1.3 WORK COVERED BY CONTRACT DOCUMENTS
A. The Work consists of the following:
1. The Work includes the removal and replacement of windows and siding.
1.4 USE OF PREMISES
A. Limit use of premises to work in areas indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.
1. Limits: Confine constructions operations to the exterior areas of the bunkhouse as shown on the drawings
2. Government Occupancy: Allow for Government occupancy of Project site. Government personnel will be continuously occupying areas of the building. Conduct work in a manner that will minimize needs for disruption of normal Government operations.
Provide minimum 48 hours advance notice to Contracting Officer of activities that will impact normal Government operations.
SUMMARY JULY 2018
VERNON SIDING REPLACEMENT 011000-2
B. Use of Existing Building: Maintain existing building in a weathertight condition throughout construction period. Repair damage caused by construction operations. Protect building and its occupants during construction period.
1.5 WORK RESTRICTIONS
A. On-Site Work Hours: Work shall be generally performed during normal business working hours of 7:30 a.m. to 6:00 p.m., Monday through Friday, except when otherwise indicated.
B. Work on Saturdays, Sundays, Federal holidays or at night may not be performed without prior consent from the Contracting Officer.
C. Smoking is not permitted within the building or within 25 feet of entrances, operable windows, or outdoor air intakes.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 011000
JULY 2018 PROJECT MANAGEMENT AND COORDINATION
VERNON 013100-1
SECTION 013100 – PROJECT MANAGEMENT AND COORDINATION
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:
1. Definitions.
2. Informational submittals.
3. Project meetings.
4. Requests for Interpretation (RFIs).
B. See Division 01 Section "Execution Requirements" for procedures for coordinating general installation and field-engineering services, including establishment of benchmarks and control points.
1.2 DEFINITIONS
A. Request for Interpretation (RFI): Request from Contractor seeking interpretation or clarification of the Contract Documents.
1.3 INFORMATIONAL SUBMITTALS
A. Subcontract List: Prepare a written summary identifying individuals or firms proposed for each portion of the Work, including those who are to furnish products or equipment fabricated to a special design. Include the following information in tabular form:
1. Name, address, telephone number, and email address of entity performing subcontract or supplying products.
2. Number and title of related Specification Section(s) covered by subcontract.
1.4 PROJECT MEETINGS
A. General: Schedule and conduct meetings and conferences at Project site, unless otherwise indicated.
1. Attendees: Inform participants and others involved, and individuals whose presence is required, of date and time of each meeting. Notify Contracting Officer of scheduled meeting dates and times.
B. Preconstruction Conference: Schedule a preconstruction conference before starting construction, at a time convenient to Contracting Officer, but no later than 15 days after execution of the Agreement. Hold the conference at Project site or another convenient location.
JULY 2018 PROJECT MANAGEMENT AND COORDINATION
VERNON 013100-2
Conduct the meeting to review responsibilities and personnel assignments, review required work, project drawings, specifications, construction schedules, payroll, payments, and administrative provisions of the Contract. Be prepared to summarize and explain procedures planned for the project and present specified preconstruction submittals.
1.5 REQUESTS FOR INTERPRETATION (RFIs)
A. Procedure: Immediately on discovery of the need for interpretation of the Contract Documents, and if not possible to request interpretation at Project meeting, prepare and submit an RFI in the form specified.
1. RFIs shall originate with Contractor. RFIs submitted by entities other than Contractor will be returned with no response.
2. Coordinate and submit RFIs in a prompt manner so as to avoid delays in Contractor's work or work of subcontractors.
B. Content of the RFI: Include a detailed, legible description of item needing interpretation.
C. Contracting Officer's Action: Contracting Officer will review each RFI, determine action required, and return it. Allow 5 calendar days for Contracting Officer's response for each RFI.
RFIs received after 1:00 p.m. will be considered as received the following working day.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 013100
JULY 2018 EXECUTION
VERNON 017340-1
SECTION 017340 – EXECUTION
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes general procedural requirements governing execution of the Work including, but not limited to, the following:
1. General installation of products.
2. Progress cleaning.
3. Correction of the Work.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 EXAMINATION
A. Existing Conditions: The existence and location of site improvements, utilities, and other construction indicated as existing are not guaranteed. Before beginning work, investigate and verify the existence and location of mechanical and electrical systems and other construction affecting the Work.
3.2 PREPARATION
A. Field Measurements: Take field measurements as required to fit the Work properly. Recheck measurements before installing each product. Where portions of the Work are indicated to fit to other construction, verify dimensions of other construction by field measurements before fabrication. Coordinate fabrication schedule with construction progress to avoid delaying the Work.
3.3 INSTALLATION
A. General: Locate the Work and components of the Work accurately, in correct alignment and elevation, as indicated.
1. Make vertical work plumb and make horizontal work level.
B. Comply with manufacturer's written instructions and recommendations for installing products in applications indicated.
VERNON 017340-2
C. Install products at the time and under conditions that will ensure the best possible results.
Maintain conditions required for product performance until Substantial Completion.
D. Conduct construction operations so no part of the Work is subjected to damaging operations or loading in excess of that expected during normal conditions of occupancy.
E. Joints: Make joints of uniform width. Where joint locations in exposed work are not indicated, arrange joints for the best visual effect. Fit exposed connections together to form hairline joints.
F. Hazardous Materials: Use products, cleaners, and installation materials that are not considered hazardous.
3.4 PROGRESS CLEANING
A. General: Clean Project site and work areas daily, including common areas. Coordinate progress cleaning for joint-use areas where more than one installer has worked. Enforce requirements strictly. Dispose of materials lawfully.
B. Site: Maintain Project site free of waste materials and debris.
C. Work Areas: Clean areas where work is in progress to the level of cleanliness necessary for proper execution of the Work.
1. Remove liquid spills promptly.
2. Where dust would impair proper execution of the Work, broom-clean or vacuum the entire work area, as appropriate.
3. Provide progress cleaning to minimize sources of food, water, and harborage available to pests.
D. Installed Work: Keep installed work clean. Clean installed surfaces according to written instructions of manufacturer or fabricator of product installed, using only cleaning materials specifically recommended. If specific cleaning materials are not recommended, use cleaning materials that are not hazardous to health or property and that will not damage exposed surfaces.
1. Utilize non-toxic cleaning materials and methods.
E. Waste Disposal: Burying or burning waste materials on-site will not be permitted. Washing waste materials down sewers or into waterways will not be permitted.
F. During handling and installation, clean and protect construction in progress and adjoining materials already in place. Apply protective covering where required to ensure protection from damage or deterioration at Substantial Completion.
G. Environmental Considerations: Excavate areas of fuel or oil spills occurring during Work to depth of 12 inches beyond contaminated material and remove from the work location. Observe prescribed measures to prevent water pollution to nearby water resources.
VERNON 017340-3
3.5 CORRECTION OF THE WORK
A. Repair or remove and replace defective construction. Do not initiate repair of damage to new [or existing] construction and equipment resulting from construction procedures, prior to notification of Contracting Officer. Restore damaged substrates and finishes. Comply with requirements in Division 01 Section "Cutting and Patching."
1. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating equipment.
END OF SECTION 017340
JULY 2018 FIBER-CEMENT SIDING
VERNON 074646 - 1
SECTION 074646 - FIBER-CEMENT SIDING
PART 1 - GENERAL
1.1 SECTION REQUIREMENTS
A. Submittals: Product Data, Samples, and ICC-ES evaluation reports.
B. Warranties: Manufacturer's standard form in which siding manufacturer agrees to repair or replace siding that fails in materials or workmanship within 30 years. Failures include, but are not limited to, cracking, deforming, or otherwise deteriorating beyond normal weathering.
1.2 SUBMITTALS
A. Manufacturer literature and installation requirements for each type of product to be installed.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Water Resistive Barrier: ASTM E 1677, Type I air Barrier/ with flame-spread and smoke-developed indexes of less than 25 and 450, respectively, when tested according to ASTM E84:
UV stabilized; and acceptable to authorities having jurisdiction.
1. Water-Vapor Permeance: Not less than 20 perms per ASTM E 96/E 96M, Desiccant
Method (Procedure A).
2. Air Permeance: Not more than 0.004 cfm/sq. ft. at 0.3 wg when tested according to
ASTM E 2178.
3. Allowable UV exposure time: Not less than three months.
B. Building-Wrap Tape: Pressure sensitive plastic tape recommended by building-wrap manufacturer for sealing joints and penetrations in building wrap.
C. Flexible Flashing: Rubberized-Asphalt Flashing, composite, self-adhesive, flashing product consisting of a pliable, rubberized-asphalt flashing
D. Fiber-Cement Siding: ASTM C 1186, Type A, Grade II, fiber-cement board, noncombustible when tested according to ASTM E 136; with a flame-spread index of 25 or less when tested according to ASTM E 84.
1. Labeling: Provide fiber-cement siding that is tested and labeled according to
ASTM C 1186.
2. Horizontal Pattern: Boards 9-1/4 to 9-1/2 inches (235 to 241 mm) wide in plain style with wood-grain texture.
3. Panel Pattern: 48-inch- (1219-mm-) wide sheets with smooth texture.
JULY 2018 FIBER-CEMENT SIDING
VERNON 074646 - 2
E. Decorative Accessories: Provide the following fiber-cement decorative accessories as indicated:
1. Corner trim 4” wide wood grain.
2. Door and window trim 4” wide wood grain.
F. Flashing: Provide aluminum flashing at window and door heads as required by manufacturer.
Finish for aluminum flashing: Siliconized polyester coating or high-performance organic finish.
G. Fasteners:
1. For fastening to wood, use ribbed bugle-head screws of sufficient length to penetrate a minimum of 1 inch into substrate.
2. For fastening fiber cement, use hot-dipped galvanized fasteners.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Remove existing metal siding and building wrap from vertical surfaces. Protect soffit and fascia from damage.
B. Remove fixtures, vents, down spouts and other accessories that attach to the metal siding and replace after new siding is installed and painted.
C. Apply new building wrap according to manufacturer’s requirements.
D. Apply flexible flashing around all windows and doors per manufacturer’s requirements.
E. Install fiber-cement siding, trim, and related accessories.
1. Install fasteners no more than 24 inches (600 mm) o.c. per manufacturer’s requirements
2. Install flashing and other components per manufactures requirements.
3. Install joint sealants to produce a weathertight installation.
END OF SECTION 074646
JULY 2018 VINYL WINDOWS
VERNON 085313 - 1
SECTION 085313 - VINYL WINDOWS
PART 1 - GENERAL
1.1 SECTION REQUIREMENTS
A. Submittals: Product Data, and color Samples.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Product Standard: AAMA/WDMA/CSA 101/I.S.2/A440.
1. Window Certification: WDMA certified with label attached to each window.
2. Performance Class: LC.
3. Performance Grade: 25.
B. Thermal Transmittance: NFRC 100 maximum whole-window U-factor of 0.35 Btu/sq. ft. x h x deg F (2.0 W/sq. m x K).
C. Solar Heat-Gain Coefficient (SHGC): NFRC 200 maximum whole-window SHGC of 0.30.
D. Windborne-Debris Resistance: Windows pass basic-protection testing requirements in ASTM E 1996 when tested according to ASTM E 1886.
2.2 VINYL WINDOWS
A. Window Types: As indicated on Drawings.
B. Window Color: selected from manufactures standard.
C. Provide nylon sash rollers for sliding windows.
D. Equip units with vinyl-coated, glass-fiber mesh insect screens at operable sashes.
E. Glaze units with low-E-coated, argon-filled, sealed insulating glass.
JULY 2018 VINYL WINDOWS
VERNON 085313 - 2
PART 3 - EXECUTION
3.1 INSTALLATION
A. Schedule work so that no window opening is left un-covered for longer than 2 hours. The new window shall be on site prior to removal of existing window.
B. Set units level, plumb, and true to line, without warp or rack of frames and panels. Provide proper support and anchor securely in place.
C. For installation procedures and requirements not addressed in manufacturer's written instructions, comply with installation requirements in ASTM E 2112.
D. Set sill members in bed of sealant or with gaskets, as indicated, to provide weathertight construction.
E. Seal interior frame to gyp board.
F. Adjust operating panels, screens, and hardware to provide a tight fit at contact points and weather stripping for smooth operation and weathertight closure. Lubricate hardware and moving parts.
G. Clean glass and vinyl surfaces immediately after installing windows. Remove nonpermanent labels from glass surfaces within 48 hours of installation.
END OF SECTION 085313
JULY 2018 EXTERIOR PAINTING
VERNON 099113 - 1
SECTION 099113 - EXTERIOR PAINTING
PART 1 - GENERAL
1.1 SECTION REQUIREMENTS
A. Submittals:
1. Product Data: Include printout of MPI's "MPI Approved Products List" with product highlighted.
2. Samples for initial selection.
3. Samples for verification.
a. Submit Samples on rigid backing , 8 inches square
b. Step Coats on Samples to show each coat of required for system.
c. Label each coat of each Sample.
B. Extra Materials: Deliver to Owner 1 gal. (3.8 L) of each color and type of finish-coat paint used on Project, in containers, properly labeled and sealed.
1.2 FIELD CONDITIONS
A. Apply paints only when temperature of surfaces to be painted and ambient air temperatures are between 50 and 95 deg F.
B. Do not apply paints in snow, rain, fog, or mist; when relative humidity exceeds 85 percent; at temperatures less than 5 deg F above the dew point; or to damp or wet surfaces.
C. Do not apply paints when wind exceeds 15 mph.
PART 2 - PRODUCTS
2.1 PAINT
A. MPI Standards: Provide materials that comply with MPI standards indicated and listed in its "MPI Approved Products List."
1. Primer, Alkali Resistant, Water Based: MPI #3.
2. Latex, Exterior Flat (Gloss Level 1): MPI #10.
B. Material Compatibility: Provide materials that are compatible with one another and with substrates.
1. For each coat in a paint system, provide products recommended in writing by manufacturers of topcoat for use in paint system and on substrate indicated.
VERNON 099113 - 2
C. Colors: As selected.
PART 3 - EXECUTION
3.1 PREPARATION
A. Comply with recommendations in MPI's "MPI Architectural Painting Specification Manual" applicable to substrates indicated.
B. Remove hardware, lighting fixtures, and similar items that are not to be painted. Mask items that cannot be removed. Reinstall items in each area after painting is complete.
C. Clean and prepare surfaces in an area before beginning painting in that area. Schedule painting so cleaning operations will not damage newly painted surfaces.
3.2 APPLICATION
A. Comply with recommendations in MPI's "MPI Architectural Painting Specification Manual" applicable to substrates indicated.
B. Protect work and other trades against damage from paint application. Correct damage to work of other trades by cleaning, repairing, replacing and refinishing, as approved by Government, and leave in an undamaged condition.
C. Paint exposed surfaces unless otherwise indicated.
1. Do not paint prefinished items, items with an integral finish, operating parts, and labels unless otherwise indicated.
D. Apply paints according to manufacturer's written instructions.
1. Use brushes only where the use of other applicators is not practical.
E. Apply paints to produce surface films without cloudiness, spotting, holidays, laps, brush marks, roller tracking, runs, sags, ropiness, or other surface imperfections. Cut in sharp lines and color breaks.
1. If undercoats or other conditions show through topcoat, apply additional coats until cured film has a uniform paint finish, color, and appearance.
3.3 EXTERIOR PAINT APPLICATION SCHEDULE
A. Fiber Cement Substrates:
1. Latex System MPI EXT 3.3A
a. Prime Coat: by manufacturer
b. Intermediate Coat: Latex, exterior, matching topcoat
VERNON 099113 - 3
c. Topcoat: Latex, Exterior, flat (MPI Gloss Level 1), MPI #10
END OF SECTION 099113
| 011000 Summary -Vernon |
| PART 1 - GENERAL |
| 1.1 SUMMARY |
| A. Section Includes: |
| 1. Project information. |
| 2. Work covered by Contract Documents. |
| 3. Work phases. |
| 4. Work under other contracts. |
| 5. Use of premises. |
| 6. Public use of site. |
| 7. Occupancy requirements. |
| 8. Work restrictions. |
| 9. Specification formats and conventions. |
| 1.2 PROJECT INFORMATION |
| A. Project Identification: Vernon Siding and Window Replacement |
| 1. Project Location: Vernon Administrative Site, 450 North Silver Sage Road, Vernon, Utah 84080. |
| 1.3 WORK COVERED BY CONTRACT DOCUMENTS |
| A. The Work consists of the following: |
| 1. The Work includes the removal and replacement of windows and siding. |
| 1.4 USE OF PREMISES |
| A. Limit use of premises to work in areas indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated. |
| 1. Limits: Confine constructions operations to the exterior areas of the bunkhouse as shown on the drawings |
| 2. Government Occupancy: Allow for Government occupancy of Project site. Government personnel will be continuously occupying areas of the building. Conduct work in a manner that will minimize needs for disruption of normal Government operations. Prov... |
B. Use of Existing Building: Maintain existing building in a weathertight condition throughout construction period. Repair damage caused by construction operations. Protect building and its occupants during construction period.
| 1.5 WORK RESTRICTIONS |
| A. On-Site Work Hours: Work shall be generally performed during normal business working hours of 7:30 a.m. to 6:00 p.m., Monday through Friday, except when otherwise indicated. |
| B. Work on Saturdays, Sundays, Federal holidays or at night may not be performed without prior consent from the Contracting Officer. |
| C. Smoking is not permitted within the building or within 25 feet of entrances, operable windows, or outdoor air intakes. |
| PART 2 - PRODUCTS (Not Used) |
| PART 3 - EXECUTION (Not Used) |
| 013100 Project Management and Coordination- Vernon |
| PART 1 - GENERAL |
| 1.1 SUMMARY |
| A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following: |
| 1. Definitions. |
| 2. Informational submittals. |
| 3. Project meetings. |
| 4. Requests for Interpretation (RFIs). |
B. See Division 01 Section "Execution Requirements" for procedures for coordinating general installation and field-engineering services, including establishment of benchmarks and control points.
| 1.2 DEFINITIONS |
| A. Request for Interpretation (RFI): Request from Contractor seeking interpretation or clarification of the Contract Documents. |
| 1.3 INFORMATIONAL SUBMITTALS |
| A. Subcontract List: Prepare a written summary identifying individuals or firms proposed for each portion of the Work, including those who are to furnish products or equipment fabricated to a special design. Include the following information in tabula... |
| 1. Name, address, telephone number, and email address of entity performing subcontract or supplying products. |
| 2. Number and title of related Specification Section(s) covered by subcontract. |
| 1.4 PROJECT MEETINGS |
| A. General: Schedule and conduct meetings and conferences at Project site, unless otherwise indicated. |
| 1. Attendees: Inform participants and others involved, and individuals whose presence is required, of date and time of each meeting. Notify Contracting Officer of scheduled meeting dates and times. |
B. Preconstruction Conference: Schedule a preconstruction conference before starting construction, at a time convenient to Contracting Officer, but no later than 15 days after execution of the Agreement. Hold the conference at Project site or anothe...
| 1.5 REQUESTS FOR INTERPRETATION (RFIs) |
| A. Procedure: Immediately on discovery of the need for interpretation of the Contract Documents, and if not possible to request interpretation at Project meeting, prepare and submit an RFI in the form specified. |
| 1. RFIs shall originate with Contractor. RFIs submitted by entities other than Contractor will be returned with no response. |
| 2. Coordinate and submit RFIs in a prompt manner so as to avoid delays in Contractor's work or work of subcontractors. |
| B. Content of the RFI: Include a detailed, legible description of item needing interpretation. |
| C. Contracting Officer's Action: Contracting Officer will review each RFI, determine action required, and return it. Allow 5 calendar days for Contracting Officer's response for each RFI. RFIs received after 1:00 p.m. will be considered as received... |
| PART 2 - PRODUCTS (Not Used) |
| PART 3 - EXECUTION (Not Used) |
| 017340 Execution - Vernon |
| PART 1 - GENERAL |
| 1.1 SUMMARY |
| A. Section includes general procedural requirements governing execution of the Work including, but not limited to, the following: |
| 1. General installation of products. |
| 2. Progress cleaning. |
| 3. Correction of the Work. |
| PART 2 - PRODUCTS (Not Used) |
| PART 3 - EXECUTION |
| 3.1 EXAMINATION |
| A. Existing Conditions: The existence and location of site improvements, utilities, and other construction indicated as existing are not guaranteed. Before beginning work, investigate and verify the existence and location of mechanical and electrica... |
| 3.2 PREPARATION |
| A. Field Measurements: Take field measurements as required to fit the Work properly. Recheck measurements before installing each product. Where portions of the Work are indicated to fit to other construction, verify dimensions of other construction... |
| 3.3 INSTALLATION |
| A. General: Locate the Work and components of the Work accurately, in correct alignment and elevation, as indicated. |
| 1. Make vertical work plumb and make horizontal work level. |
| B. Comply with manufacturer's written instructions and recommendations for installing products in applications indicated. |
| C. Install products at the time and under conditions that will ensure the best possible results. Maintain conditions required for product performance until Substantial Completion. |
| D. Conduct construction operations so no part of the Work is subjected to damaging operations or loading in excess of that expected during normal conditions of occupancy. |
| E. Joints: Make joints of uniform width. Where joint locations in exposed work are not indicated, arrange joints for the best visual effect. Fit exposed connections together to form hairline joints. |
| F. Hazardous Materials: Use products, cleaners, and installation materials that are not considered hazardous. |
| 3.4 PROGRESS CLEANING |
| A. General: Clean Project site and work areas daily, including common areas. Coordinate progress cleaning for joint-use areas where more than one installer has worked. Enforce requirements strictly. Dispose of materials lawfully. |
| B. Site: Maintain Project site free of waste materials and debris. |
| C. Work Areas: Clean areas where work is in progress to the level of cleanliness necessary for proper execution of the Work. |
| 1. Remove liquid spills promptly. |
| 2. Where dust would impair proper execution of the Work, broom-clean or vacuum the entire work area, as appropriate. |
| 3. Provide progress cleaning to minimize sources of food, water, and harborage available to pests. |
| D. Installed Work: Keep installed work clean. Clean installed surfaces according to written instructions of manufacturer or fabricator of product installed, using only cleaning materials specifically recommended. If specific cleaning materials are no... |
| 1. Utilize non-toxic cleaning materials and methods. |
| E. Waste Disposal: Burying or burning waste materials on-site will not be permitted. Washing waste materials down sewers or into waterways will not be permitted. |
| F. During handling and installation, clean and protect construction in progress and adjoining materials already in place. Apply protective covering where required to ensure protection from damage or deterioration at Substantial Completion. |
| G. Environmental Considerations: Excavate areas of fuel or oil spills occurring during Work to depth of 12 inches beyond contaminated material and remove from the work location. Observe prescribed measures to prevent water pollution to nearby water r... |
| 3.5 CORRECTION OF THE WORK |
| A. Repair or remove and replace defective construction. Do not initiate repair of damage to new [or existing] construction and equipment resulting from construction procedures, prior to notification of Contracting Officer. Restore damaged substrates ... |
| 1. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating equipment. |
| 074646 - fiber-cement siding - Vernon |
| PART 1 - GENERAL |
| 1.1 SECTION REQUIREMENTS |
| A. Submittals: Product Data, Samples, and ICC-ES evaluation reports. |
| B. Warranties: Manufacturer's standard form in which siding manufacturer agrees to repair or replace siding that fails in materials or workmanship within 30 years. Failures include, but are not limited to, cracking, deforming, or otherwise deteriorati... |
| 1.2 SUBMITTALS |
| A. Manufacturer literature and installation requirements for each type of product to be installed. |
| PART 2 - PRODUCTS |
| 2.1 MATERIALS |
| A. Water Resistive Barrier: ASTM E 1677, Type I air Barrier/ with flame-spread and smoke-developed indexes of less than 25 and 450, respectively, when tested according to ASTM E84: UV stabilized; and acceptable to authorities having jurisdiction. |
| 1. Water-Vapor Permeance: Not less than 20 perms per ASTM E 96/E 96M, Desiccant Method (Procedure A). |
| 2. Air Permeance: Not more than 0.004 cfm/sq. ft. at 0.3 wg when tested according to ASTM E 2178. |
| 3. Allowable UV exposure time: Not less than three months. |
| B. Building-Wrap Tape: Pressure sensitive plastic tape recommended by building-wrap manufacturer for sealing joints and penetrations in building wrap. |
| C. Flexible Flashing: Rubberized-Asphalt Flashing, composite, self-adhesive, flashing product consisting of a pliable, rubberized-asphalt flashing |
| D. Fiber-Cement Siding: ASTM C 1186, Type A, Grade II, fiber-cement board, noncombustible when tested according to ASTM E 136; with a flame-spread index of 25 or less when tested according to ASTM E 84. |
| 1. Labeling: Provide fiber-cement siding that is tested and labeled according to ASTM C 1186. |
| 2. Horizontal Pattern: Boards 9-1/4 to 9-1/2 inches (235 to 241 mm) wide in plain style with wood-grain texture. |
| 3. Panel Pattern: 48-inch- (1219-mm-) wide sheets with smooth texture. |
| E. Decorative Accessories: Provide the following fiber-cement decorative accessories as indicated: |
| 1. Corner trim 4” wide wood grain. |
| 2. Door and window trim 4” wide wood grain. |
| F. Flashing: Provide aluminum flashing at window and door heads as required by manufacturer. Finish for aluminum flashing: Siliconized polyester coating or high-performance organic finish. |
| G. Fasteners: |
| 1. For fastening to wood, use ribbed bugle-head screws of sufficient length to penetrate a minimum of 1 inch into substrate. |
| 2. For fastening fiber cement, use hot-dipped galvanized fasteners. |
| PART 3 - EXECUTION |
| 3.1 INSTALLATION |
| A. Remove existing metal siding and building wrap from vertical surfaces. Protect soffit and fascia from damage. |
| B. Remove fixtures, vents, down spouts and other accessories that attach to the metal siding and replace after new siding is installed and painted. |
| C. Apply new building wrap according to manufacturer’s requirements. |
| D. Apply flexible flashing around all windows and doors per manufacturer’s requirements. |
| E. Install fiber-cement siding, trim, and related accessories. |
| 1. Install fasteners no more than 24 inches (600 mm) o.c. per manufacturer’s requirements |
| 2. Install flashing and other components per manufactures requirements. |
| 3. Install joint sealants to produce a weathertight installation. |
| 085313 - vinyl windows - Vernon |
| PART 1 - GENERAL |
| 1.1 SECTION REQUIREMENTS |
| A. Submittals: Product Data, and color Samples. |
| PART 2 - PRODUCTS |
| 2.1 PERFORMANCE REQUIREMENTS |
| A. Product Standard: AAMA/WDMA/CSA 101/I.S.2/A440. |
| 1. Window Certification: WDMA certified with label attached to each window. |
| 2. Performance Class: LC. |
| 3. Performance Grade: 25. |
| B. Thermal Transmittance: NFRC 100 maximum whole-window U-factor of 0.35 Btu/sq. ft. x h x deg F (2.0 W/sq. m x K). |
| C. Solar Heat-Gain Coefficient (SHGC): NFRC 200 maximum whole-window SHGC of 0.30. |
| D. Windborne-Debris Resistance: Windows pass basic-protection testing requirements in ASTM E 1996 when tested according to ASTM E 1886. |
| 2.2 VINYL WINDOWS |
| A. Window Types: As indicated on Drawings. |
| B. Window Color: selected from manufactures standard. |
| C. Provide nylon sash rollers for sliding windows. |
| D. Equip units with vinyl-coated, glass-fiber mesh insect screens at operable sashes. |
| E. Glaze units with low-E-coated, argon-filled, sealed insulating glass. |
| PART 3 - EXECUTION |
| 3.1 INSTALLATION |
| A. Schedule work so that no window opening is left un-covered for longer than 2 hours. The new window shall be on site prior to removal of existing window. |
| B. Set units level, plumb, and true to line, without warp or rack of frames and panels. Provide proper support and anchor securely in place. |
| C. For installation procedures and requirements not addressed in manufacturer's written instructions, comply with installation requirements in ASTM E 2112. |
| D. Set sill members in bed of sealant or with gaskets, as indicated, to provide weathertight construction. |
| E. Seal interior frame to gyp board. |
| F. Adjust operating panels, screens, and hardware to provide a tight fit at contact points and weather stripping for smooth operation and weathertight closure. Lubricate hardware and moving parts. |
| G. Clean glass and vinyl surfaces immediately after installing windows. Remove nonpermanent labels from glass surfaces within 48 hours of installation. |
| 099113 - exterior painting - Vernon |
| PART 1 - GENERAL |
| 1.1 SECTION REQUIREMENTS |
| A. Submittals: |
| 1. Product Data: Include printout of MPI's "MPI Approved Products List" with product highlighted. |
| 2. Samples for initial selection. |
| 3. Samples for verification. |
| a. Submit Samples on rigid backing , 8 inches square |
| b. Step Coats on Samples to show each coat of required for system. |
| c. Label each coat of each Sample. |
B. Extra Materials: Deliver to Owner 1 gal. (3.8 L) of each color and type of finish-coat paint used on Project, in containers, properly labeled and sealed.
| 1.2 FIELD CONDITIONS |
| A. Apply paints only when temperature of surfaces to be painted and ambient air temperatures are between 50 and 95 deg F. |
| B. Do not apply paints in snow, rain, fog, or mist; when relative humidity exceeds 85 percent; at temperatures less than 5 deg F above the dew point; or to damp or wet surfaces. |
| C. Do not apply paints when wind exceeds 15 mph. |
| PART 2 - PRODUCTS |
| 2.1 PAINT |
| A. MPI Standards: Provide materials that comply with MPI standards indicated and listed in its "MPI Approved Products List." |
| 1. Primer, Alkali Resistant, Water Based: MPI #3. |
| 2. Latex, Exterior Flat (Gloss Level 1): MPI #10. |
| B. Material Compatibility: Provide materials that are compatible with one another and with substrates. |
| 1. For each coat in a paint system, provide products recommended in writing by manufacturers of topcoat for use in paint system and on substrate indicated. |
C. Colors: As selected.
| PART 3 - EXECUTION |
| 3.1 PREPARATION |
| A. Comply with recommendations in MPI's "MPI Architectural Painting Specification Manual" applicable to substrates indicated. |
| B. Remove hardware, lighting fixtures, and similar items that are not to be painted. Mask items that cannot be removed. Reinstall items in each area after painting is complete. |
| C. Clean and prepare surfaces in an area before beginning painting in that area. Schedule painting so cleaning operations will not damage newly painted surfaces. |
| 3.2 APPLICATION |
| A. Comply with recommendations in MPI's "MPI Architectural Painting Specification Manual" applicable to substrates indicated. |
| B. Protect work and other trades against damage from paint application. Correct damage to work of other trades by cleaning, repairing, replacing and refinishing, as approved by Government, and leave in an undamaged condition. |
| C. Paint exposed surfaces unless otherwise indicated. |
| 1. Do not paint prefinished items, items with an integral finish, operating parts, and labels unless otherwise indicated. |
| D. Apply paints according to manufacturer's written instructions. |
| 1. Use brushes only where the use of other applicators is not practical. |
| E. Apply paints to produce surface films without cloudiness, spotting, holidays, laps, brush marks, roller tracking, runs, sags, ropiness, or other surface imperfections. Cut in sharp lines and color breaks. |
| 1. If undercoats or other conditions show through topcoat, apply additional coats until cured film has a uniform paint finish, color, and appearance. |
| 3.3 EXTERIOR PAINT APPLICATION SCHEDULE |
| A. Fiber Cement Substrates: |
| 1. Latex System MPI EXT 3.3A |
| a. Prime Coat: by manufacturer |
| b. Intermediate Coat: Latex, exterior, matching topcoat |
| c. Topcoat: Latex, Exterior, flat (MPI Gloss Level 1), MPI #10 |