B09 Amend001 QA_0001.doc

DOC document 24 KB Posted

Attached to
SHAFTER FENCE CONSTRUCTION & REPAIR
Solicitation number
140L3921Q0027
Issued by

View the file

Other files

File Type Posted
Sol_140L3921Q0027_Amd_0001.pdf PDF
A06 Drawings.pdf PDF
Bid Schedule.doc DOC document
A04 SOW.doc DOC document
A06 Maps.pdf PDF
Sol_140L3921Q0027.pdf PDF
Wage Determination.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Number 140L3921Q0027 Shafter Fence Questions & Answers

Q1) In the bid schedule, it refers to the Echo jobs are "repair" in the solicitation it says it's just removal and rebuilding, which is correct? Also, I didn't see where it specified if the materials were furnished by the government or the contractor and what is to be done with the materials that are removed ( if posts, wire, gates become contractor property or need to be brought to the Elko BLM office) A1) In the maps and the bid schedule it references 8860 LF at Echo that requires removal and replacement. The remaining portion of work is removing wood burned corners and replacing with steel corners.

All materials will be supplied by the government. Transport of the materials is the contractor's responsibility.

The contractor is responsible for disposing of all burned material removed and must be disposed of properly.