WhitetailDam_Drawings_Final_R1_0001.pdf

PDF 35 MB Posted

Attached to
WHITETAIL DAM RECONSTRUCTION Federal contract opportunity
Solicitation number
140L3621R0001
Issued by
Department of the Interior Bureau of Land Management

About this file

This solicitation document outlines requirements for the reconstruction of Whitetail Dam located in Montana. The Bureau of Land Management (BLM) is seeking proposals for repair work including dewatering the reservoir, excavating portions of the dam, reconstructing the embankment with compacted fill and riprap, constructing a new principal spillway and outlet works, installing a stilling basin and conduit, and performing final reclamation. Offerors must submit fixed-price proposals by May 19, 2021. BLM intends to award a contract by June 16, 2021, requiring work commencement within 10 days of notice and completion within 167 calendar days. Eligible contractors must be registered in the System for Award Management and able to submit invoices electronically through the Invoice Processing Platform. The estimated price range is $500,000 to $1,000,000 and the project will be set aside for total small business.

View the file

Other files for this federal contract opportunity

Other files attached to WHITETAIL DAM RECONSTRUCTION, newest first.
File Type Posted
Sol_140L3621R0001_Amd_0001.pdf PDF
Site Tour Notes 4-28-21 - Typed_0001.pdf PDF
13E - Past Performance Questionnaire_0001.pdf PDF
Questions and Answers_0001.pdf PDF
Site Tour Access Map_0001.pdf PDF
Sol_140L3621R0001.pdf PDF
140L3621R0001 Solicitation Package (Issued).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WHITETAIL DAM RECONSTRUCTION

406-656-6399

222 N. 32nd Street, #700

Billings, Montana 59101

WWW.DOWL.COM

WHITETAIL DAM

LOCATION MAP

GREAT FALLS

BOZEMAN

MONTANA

DILLON

BUTTE

KALISPELL

MISSOULA

HELENA

SHELBY

HARDIN

BILLINGS

GLASGOW

LEWISTOWN

HAVRE

MILES CITY

SIDNEY

GLENDIVE

WINNETT

JORDAN

MALTA

WHITETAIL DAM

INSET MAP

VICINITY MAP

LAND OWNERSHIP

BLM

STATE

PRIVATE

Driving Directions:

FROM US HWY. 212, APPROXIMATELY 27.4 MILES NW OF ALZADA, MT, GO NORTH ON HAMMOND RD. FOR 17.1 MILES TO A TWO

TRACK ROAD. TURN LEFT (NW) AND GO 3.4 MILES TO DAM

406-656-6399

222 N. 32nd Street, #700

Billings, Montana 59101

WWW.DOWL.COM

PROJECT

LOCATION

HAMMOND

GCP

CP-4

TP-2

CP-5

CP-1CP-2

CP-6

CP-3

GCP

GCP

GCP

GCP

GCP

GCPGCP

GCP

TP-1

TP-3

TP-4

CP-1 (RCP)

N 58227.819 E 96674.270

ELEV. = 3464.535

CP-2 (RCP)

N 58230.156 E 96523.692

ELEV. = 3445.918

CP-3 (RCP)

N 59173.894 E 96501.283

ELEV. = 3425.770

SURVEY CONTROL POINTSLEGEND

BASIS OF SURVEY DATUM

This project uses a custom local coordinate system designed for the Whitetail Dam project site. Control marks for this project is included herein. The coordinate system started as the Montana State Plane Coordinate System, but was brought to ground at CP-1 with a ground scale factor of 1.0003815920. To avoid confusion with true SPC coordinates, project coordinates were truncated 400,000 in the Northing and 3,100,000 in the Easting. The geodetic datum is NAD 1983 (2011). The vertical datum is NAVD88 as determined by GEOID12B. Horizontal units are international feet. Vertical units are survey feet.

For the purposes of this project, mapping grid values and distances are equal to true ground distances. The convergence angle at CP-1 is +3°30'02"; the convergence angle at point CP-5 is +3°29'42".

DOWL established project control with an OPUS position at CP-1. Values for points CP-2 through CP-6 were determined by RTK GPS observations from CP-1.

POINT CP-1 OPUS POSITION

STATE PLANE COORDINATES:

N: 458,227.818 E: 3,196,674.272

ELEV.: 3464.535

CP-4 (RCP)

N 59626.593 E 95605.251

ELEV. = 3437.592

CP-5 (RCP)

N 59163.741 E 94607.761

ELEV. = 3433.313

CP-6 (RCP)

N 58432.224 E 95705.589

ELEV. = 3437.878

406-656-6399

222 N. 32nd Street, #700

SECTION

36" RCP OUTLET WORKS CONDUIT

CONCRETE TOWER TO STA. 1+00

SECTION

CONDUIT ENCASEMENT AND SAND BLANKET

STA. 1+03 TO STA. 1+60±

DETAIL

PRECAST CONCRETE

PIPE SUPPORT BLOCK

FOR 36" RCP PIPE

DETAIL

36" RCP OUTLET WORKS CONDUIT

406-656-6399

SECTION

SPILLWAY TOWER

SECTION

TOWER FOUNDATION

DETAIL

DEFLECTOR PLATE

DETAIL

WATERSTOP AND VENT PIPE DEFLECTOR

SECTION

SPILLWAY TOWER

406-656-6399

PLAN

CONICAL TRASH RACK

DIAGRAM FOR a RODS

BENDING AND CONSTRUCTION

d c b a d c b b c d a

SECTION

CONICAL TRASH RACK

TRASH RACK FABRICATION NOTES

a b c d

406-656-6399

PROFILE

PLAN

INLET TO SPILLWAY TOWER

PLAN AND PROFILE

PLAN VIEW

INLET

SECTION

INLET

SECTION

INLET

SECTION

INLET APPROACH GRADING

GRATING SUPPORT LEDGE

DETAIL

STOP LOG GUIDES

PLAN DETAIL

406-656-6399

®DETAIL

STILLING BASIN HEADWALL MATERIALS

406-656-6399

222 N. 32nd Street, #700 Billings, Montana 59101

RIPRAP BASIN EXCAVATION PLAN

RIPRAP BASIN FINISHED GRADING PLAN

DETAIL

RELIEF DRAIN WEEP

406-656-6399

G1
G2
C1
C2
C3
EX1
EX2
EX3
EX4
OW1
OW2
OW3
OW4
OW5
OW6
OW7
OX1
SB1
SB2

File details come from the government source that posted it. Updated .