This document is an amendment to a solicitation for the Wilson Lake Site Improvements project. The amendment provides answers to questions from a site tour, clarifying that hip style roofs are required for steel structures, and that Additive 1 is for the purchase and installation of one vault toilet while Additive 4 is for transport and installation of a second government furnished toilet. Workers are permitted to stay onsite in personal RVs during construction, and the campsite will be closed. A drawing with installation details is attached for fire rings to be furnished by the government but installed by the contractor. The closing date of May 3, 2023 at 10:00 am Mountain Time for receipt of quotes remains the same, and offerors must acknowledge receipt of this amendment. The period of performance is from June 1, 2023 to December 29, 2023. The solicitation is issued by the Bureau of Land Management Idaho Region for site improvements at Wilson Lake.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B11_Wilson_Prebid_0001.pdf | ||
| Fire_rings_0001.pdf | ||
| Wilson_Lake_Drawings.pdf | ||
| SF-24_Bid_Bond.pdf | ||
| ADDENDUM.pdf | ||
| Sol_140L2623R0005.pdf | ||
| Wilson_Lake_Specs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140L2623R0005 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
LDA
BOISE ID 83709
1387 S. VINNELL WAY
BLM ID STATE OFC HR&ADMN (ID953)
LDA
BOISE ID 83709
1387 S. VINNELL WAY
BLM ID-STATE OFC HR&ADM SVC (ID953)
04/28/20230001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/11/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
LIST OF CHANGES:
1. This Amendment is being issued to provide the Questions and Answers from the Site Tour, which was held Wednesday, April 19, 2023.
Q1. For the steel structures, the specs say gable roof, yet the drawings say hip roof.
Which style roof is wanted for the structures?
A1. Hip style roof.
Q2. For the vault-toilets, there are drawings and specifications showing a single-vault, Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Patricia Fort
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140L2623R0005/0001 but I don't see the specific model that is requested for the project. Also in regards to the toilets, will there be two that are needed because Additive 1 calls for 1 LS Vault toilet yet Additive 4 calls for the transport and install of 1 EA vault toilet. I just wanted clarification on this as the verbiage wasn't clear in the specifications.
A2. The toilet model is CXT Gunnison or approved equal. Additive 1 is for the purchase and installation of 1 toilet and Additive 4 for is for the transport of a government furnished toilet to be installed.
Q3. Are workers allowed to stay on site in their personal RV's and will the whole park be closed for the duration of the project?
A3. The workers are allowed to stay on the BLM site during construction, and the campsite will be closed during construction.
Q4. I see that the fire rings are furnished by the Government and it's up to the contractor to supply the materials and labor, but there is no typical drawing for the installation or a model number for the fire rings so it's not as easy to bid that line item without measurements that translate to materials we'll need.
A4. The Typical Installation Drawing for the Fire
Rings is attached.
2. The closing date and time of Wednesday, May 3, 2023, at 10:00 am MT remains the same.
3. Quoters must acknowledge receipt of this amendment by completing blocks 8, and 15 (A) through (C) and returning a copy to the office listed in block #6.
Period of Performance: 06/01/2023 to 12/29/2023