01-prebid conference record_1510-56 (3)_0001.pdf

PDF 322 KB Posted

Attached to
LSR BOAT RAMP IMPROVEMENTS PHASE 2
Solicitation number
140L2621R0004
Issued by

About this file

This record documents a pre-bid conference for a federal construction contract. The Lower Salmon River Boat Ramp Improvements Phase 2 project involves repair and replacement of boat ramps and surrounding structures at three sites along the Lower Salmon River in Idaho. Work includes replacing the bottom thirty feet of the existing ramp and installing new concrete aprons and footings at the Old Lucile Recreation Site, installing new footings and concrete aprons to improve the boat ramp at Slate Creek, and replacing an undermined section of the existing ramp that is unstable at Lucile. Bidders were advised that #4 rebar spaced at nine inches may be used for precast footings instead of #6 rebar, and the spacing of rebar in apron areas should be changed to eighteen inches to match the boat ramp. The pre-bid conference provided an opportunity for questions and any necessary clarifications regarding the solicitation and project details.

View the file

Other files

File Type Posted
Sol_140L2621R0004_Amd_0001.pdf PDF
Drawing Book_final drawing set_0001.pdf PDF
SF 24 Bid Bond.pdf PDF
Sol_140L2621R0004.pdf PDF
LSR Boat Ramps Phase 2 drawings 1Feb21.pdf PDF
LSRBR SCRs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Form 1510-56 (December 1985)

UNITED STATES

DEPARTMENT OF THE INTERIOR

BUREAU OF LAND MANAGEMENT

SITE INSPECTION TOUR / PREBID CONFERENCE RECORD

1. Solicitation Number: 140L2621R0004 4. Meeting Place: White Bird Gravel Pit

2. Title: LSR Boat Ramp Improvements Phase II 5. Conducted by: Ken Donley

3. Date and Time: April 15, 2021, 9:00 am

Attended by:

Name and Firm Address (include zip code) Phone (include area code) Ken Donley (BLM, COTR) 1387 South Vinnell Way Boise ID 83709 (208) 373-3857

Joseph O’Neill (BLM) Cottonwood Field Office (208) 962-3683

Dwane McLaughlin (D&D McLaughlin)

28219 Goldner Rd Lapwai, ID 83540 d4mclaughlin@gmail.com

(208) 790-1415

Joe Thyne (Cook and Sons Construction)

11 Lamb Lane Grangeville, ID 83554 Joe@cookandsonsconstruction.com

(208) 507-1340

Greg Ranniger (NNAC, Inc.)

3901 W. Schreiber Way Coeur d’ Alene, ID 83815 Greg.ranniger@nnacinc.com

(208) 635-5400

By (Name) Kenneth D Donley

Title Civil Engineer

Date April 20, 2021

1. If precast footings are used, the #6 rebar is difficult to bend? Can we use #4 rebar on the footings?

Answer: Yes. #4 rebar at 9” spacing may be used on the footings.

2. Should rebar spacing on the aprons and ramp be similar to facilitate tying?

Answer: Yes. Change spacing of #4 rebar in apron areas to 18” rather than 12”

3. The existing ramp at Lucile is undermined and the concrete is not stable. It is likely to crumble while drilling for rebar placement. Should we replace the bottom section of the ramp that will be encapsulated by the new aprons?

Answer: Yes. Replace the bottom 30’ of the existing ramp at Old Lucile Rec Site. Use the same specifications and detail drawings provided for ramp construction.

4. The top of ramp at Slate Creek is above the high water mark and not likely to scour. Do we need to place footings all the way to top?

Answer: No. Provide footings to within 30’ of the top of Slate Creek Ramp.