This document is an amendment to a Request for Quotes (RFQ) for woodland raptor surveys in Colorado, solicitation number 140L1724Q0009. The purpose of this amendment is to record pre-bid conference notes, answer questions, add attachments, and update the points of contact.

The solicitation is for furnishing labor, equipment, supplies, and materials to complete surveys for woodland raptors in the Tres Rios and Gunnison Field Offices, covering approximately 16,735 acres with 1,541 raptor call stations. The period of performance is May 1, 2024 to August 31, 2024. This is a Total Small Business Set-Aside under NAICS code 541620, with a $19M size standard. Award will be made on a Firm-Fixed-Price basis considering price and other factors, with price approximately equal to technical merit and past performance. Key deliverables include GPS tracks, call location data, nest locations, photos, and completed data forms. Offerors must submit a signed SF-1449 and technical response by April 5, 2024.

View the file

Other files

File Type Posted
Attachment_5_-_Gunnison_Sage_Grouse_Road_Closures_0001.pdf PDF
Attachment_4_-_KMZ_Files_0001.zip ZIP file
Attachment_2_-_Maps.pdf PDF
Sol_140L1724Q0009.pdf PDF
Attachment_1_-_SOW.pdf PDF
Attachment_3_-_Wage_Determination.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140L1724Q0009 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

LRA

Lakewood CO 80225 Building 40 Denver Federal Center

COLORADO STATE OFF

03/28/20240001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

03/22/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

BLM-CO - Woodland raptor surveys - 16,735 acres - Amend 1

The purpose of this amendment is to record the pre-bid virtual conference notes, answer questions, add attachments and update the POC list. Contracting Specialist Amy Bondy is moving on. The only POC at this time is Contracting Officer Robert Hall for further questions and solicitation responses. Please acknowledge all amendments by signing and returning a copy with your solicitation response.

This is an RFQ for woodland raptor surveys in accordance with the Attachments.

POC: Contracting Officer Robert Hall - rhall@blm.gov - 762-329-0002

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Robert Hall

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 5

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140L1724Q0009/0001

Period of Performance: 05/01/2024 to 08/31/2024

REMINDER: All invoices must be submitted directly to www.ipp.gov and include a matching invoice attachment.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

140L1724Q0009 BLM - CO Raptor Surveys

BLM: Robert Hall – Contracting Officer; Nathaniel West – Contracting Officer Representative

Attendees: Amy Gaddy, Ben Eddy, Bryce Marshall, Chris Jones, Corinna Photos, Eric Webb, Jarrod Hill, Katherine Barnes, Kirstie Lawson, Katheryn Albrecht, Logan McConnell

Notes:

Meeting started at 10:01 am MST.

Nathaniel West COR reviewed the Contract Administration. The Google Earth KMZ files for call points was presented and viewed in Google earth to provide a general location/orientation of the overall project area.

Questions:

A question was asked about the topography of the project areas. The project area is extremely varied and contractors should do what research they can to determine how that will impact their bid. The BLM will post Google earth KMZ files of the call points.

A question was asked about cross-country travel on ATVs. In the Tres Rios Field Office all motorized travel is limited to existing routes. In the Gunnison Field Office all motorized travel is limited to designated routes.

Are there any seasonal closures in place? There are not seasonal closures that will impact the Tres Rios

Field Office. Seasonal closures in the Gunnison Field Office for Gunnison Sage-grouse are from March

15-May15, see map.

There were no further questions.

Notes:

Robert Hall discussed the contract submission time frame and requirements. Robert reminded everyone that a signed SF-1449 and technical response is due by April 5th.

Q1. What are the data accuracy requirements for points, lines, and/or polygons collected based on field observations? Our cost can vary depending on the required accuracy and our equipment needs may change based on the need for sub-meter or better accuracy.

A1. Cell phone accuracy collected using Field Maps, Avenza, Survey 1,2,3, or whatever app you choose is sufficient. It really only needs to be within 30 feet or so, easily attainable with a cell phone.

Q2: Based on the August 31st deadline and the quick turnaround I am wondering what the expectations for the deliverables on the backend are? Looking at the RFQ, it looks like we are only providing weekly updates, spatial data, field forms, and photo documentation of findings. Do you have an expectation or desire for any technical reports that detail the project(s) and the findings?

This has the potential to impact our price point significantly.

A2: The Government does not require your analysis of the data, all I need is to be able to verify that you went to all the points, the response or lack thereof at each point and any nests/nest searches. The statement of work identifies the deliverables.

The Contractor shall provide all materials and labor to conduct woodland raptor surveys and record gps tracks and locations. GPS data deliverable requirements include:

• GPS tracks of nest searches for all positive call responses,

• GPS call locations and data attributes for all locations (see point data survey requirements table),

• nest locations, photos, and completed nest data forms.

All GIS data needs to be provided in the form of an ESR .shp file UTM NAD 83 Zone 13. The contractor will provide data forms for all call points and nest locations in paper and/or electronic formats (excel, word, or PDF). Nest site photos need to be electronic .jpg or .tiff files.

File details come from the government source that posted it. Updated .