This amendment to solicitation 140L1223Q0056 provides additional clarification to contractors. It specifies that the groundwater well inventory survey for the Bureau of Land Management California Region should plan for monitoring of thirty wells, rather than the one hundred fifty listed in cost worksheets. Contractors have the flexibility to either collect baseline monitoring data during well identification or to separate those tasks between field mobilizations, whichever is more efficient. The amendment answers two additional questions clarifying the well selection process and timing of data collection. The period of performance for the contract is from September 1, 2023 through September 30, 2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B08_Attachment_1_Performance_Work_Statement-PWS_2August2023_0003.docx | DOCX document | |
| B08_Attachment_2_Price_Schedule_0823_0003.xlsx | XLSX spreadsheet | |
| Sol_140L1223Q0056_Amd_0003.pdf | ||
| Sol_140L1223Q0056_Amd_0001.pdf | ||
| Sol_140L1223Q0056.pdf | ||
| B08_Attachment_2_Price_Schedule.xlsx | XLSX spreadsheet | |
| B08_Attachment_3_Wage_Determination_2015-5629.pdf | ||
| B08_Attachment_1_Performance_Work_Statement-PWS.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140L1223Q0056 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
LCA
SACRAMENTO CA 95825
2800 COTTAGE WAY, SUITE W-1834
BLM CA-STATE OFC BUS SVC BR (CA944)
06/29/20230002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/29/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose to amendment 2 is answer additional questions.
Q: Task 2: Monitoring. The cost work sheet provided specifies a unit cost for 150 wells, but the text of the solicitation say that 30 wells should be assumed. Which should we price for?
A: Thirty is our best estimate for the number of either monitoring wells or abandoned supply wells without pumps -- the types do the Government expect to have water levels collected from. So, thirty is our best estimate for the number of "monitoring" wells to be priced.
Q: The text says that for efficiency's sake monitoring data could be collected during the
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Laurie Ehlinger
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140L1223Q0056/0002 initial survey. However, if the wells need to be carefully selected across the entire geography to provide the best understanding of groundwater conditions, then it would seem to better to collect the survey data and then select suitable wells based on construction, use, and location and not waste too much time in the field during
Task 1, other than perhaps collecting a water level. Does that sound correct?
A: That does sound reasonable-whichever way sounds most efficient to the contractor works. On one hand, in some areas it might be more efficient to be prepared to collect baseline monitoring data during the well identification phase (eg, an isolated remote well). On the other hand, collecting all the survey data first may enable more planning and efficient monitoring.
The contractor can choose whether to do the survey entirely first or to combine some of task
1 with task 2 during the same field mobilization.
POC: Laurie Ehlinger, Contracting Officer, lehlinger@blm.gov; 608-377-3532
Period of Performance: 09/01/2023 to 09/30/2025