About this file
This document is an amendment to a solicitation for the Jupiter Lighthouse Restroom Renovation project. The amendment changes the date and time of the mandatory site visit from April 23, 2021 at 9:00 a.m. EST to April 28, 2021 at 10:30 a.m. EST, and provides clarified coordinates for the site visit location. It also modifies the questions due date from April 27, 2021 at 2:00 p.m. MST to April 30, 2021 at 2:00 p.m. MST. The amendment incorporates revised continuation pages and specifications that supersede prior versions. Updates to the specifications include removing references to new concrete walls and modifying references to ADA access and the roof material. The solicitation is being conducted by the Department of the Interior Bureau of Land Management National Office for a restroom renovation at the Jupiter Lighthouse.
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140L0621R0010 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
DENVER CO 80225
LNC
POB 25047
BLDG. 50
DENVER FEDERAL CENTER
BLM OC-NOC CONST A&E SEC(OC664)
04/21/20210001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/16/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This Amendment (0001) changes the following:
1. The Site Visit time has been changed FROM: April 23, 2021 at 9:00 a.m. Eastern Standard
Time, TO: April 28, 2021 at 10:30 a.m. Eastern Standard Time.
2. The Government is further clarifying the location of the site visit listed on Page 33 of the solicitation. The site visit will be held at the following coordinates: 26.951581, -80.082166 or can be found at the following link:
https://www.google.com/maps/dir/26.9323604,-80.1487565/26.9517291,-80.082234/@27.0015679,-80
.2248713,12z/data=!4m2!4m1!3e0.
3. The Questions due date listed on page 34 of the solicitation has been changed FROM:
April 27, 2021 at 2:00 p.m. Mountain Standard Time, TO: April 30, 2021 at 2:00 p.m.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Jeane E. Steed
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140L0621R0010/0001
Mountain Standard Time.
4. Incorporates Attachment 6 Revised SF1442
Continuation Pages 4 - 40 of the Solicitation, 36 pages. Changes 1 - 3 discussed above, were added to this document and are identified with red text and a change bar in the left-hand column. These revised Continuation Pages supersedes the previous documents provided in their entirety.
5. Incorporates a revised Attachment 1
Specifications, 677 Pages. These revised
Specifications supersedes the previous
Specifications provided in their entirety. The
Specifications have been changed as follows:
- Front Cover o Date updated to April 2021 to differentiate versions.
- Page 011000-1 and 011000-2, 1.4 Summary, Section 1 Work Covered by Contract Documents. A.
1.
o Text removed: "New concrete missionary screen walls are to be constructed."
o Text "A new ADA ramp will be constructed at the main entrance of the building" modified to
"ADA access will be constructed on the north-side of the building and to the restroom doors on the east side of the structure."
o Text "General Contractor to replace existing roof with a new standing seam metal roof."
Modified to "General Contractor to replace existing roof with a new asphalt shingle roof."
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .