A04 - SOW - Updated 02.18.2021_0002.pdf
PDF 215 KB Posted
- Attached to
- HELIUM PIPELINE RECTIFIER AND GROUND BED INSTALL Federal contract opportunity
- Solicitation number
- 140L0621Q0010
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L0621Q0010_Amd_0002.pdf | ||
| Solicitation Questions with Responses - FINAL_0002.pdf | ||
| Sol_140L0621Q0010_Amd_0001.pdf | ||
| A18 - Brand Name or Equal_0001.pdf | ||
| B08 - Attachment 1 - Additional INformation.pdf | ||
| B08 - Attachment 2 - Wage Determination 2015-5213 Rev 12.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
i
STATEMENT OF WORK
RECTIFIERS AND GROUND BEDS
Cathodic Protection System Upgrade
Bureau of Land Management (BLM) Updated February 18, 2021 ii
TABLE OF CONTENTS
TABLE OF CONTENTS ................................................................................................................ ii
1. PROJECT INTRODUCTION
1.1. INTRODUCTION
1.2. LOCATION
1.3. BACKGROUND
1.4. SCOPE (PROJECT DESCRIPTION)
2. GENERAL REQUIREMENTS
2.1. NON-PERSONAL SERVICES
2.2. SUBCONTRACT MANAGEMENT
2.3. CONTRACTOR QUALIFICATIONS
3. PERFORMANCE REQUIREMENTS
3.1. RECTIFIERS
3.1.1. RECTIFIERS SHALL BE UNIVERSAL BRAND
3.1.2. RECTIFIER SPECIFICATIONS (UNIVERSAL RECTIFIER CODE:
ADAI 30-15 ABCHR):
3.1.3. LOCATIONS:
3.2. GROUND BEDS
3.2.1. GROUND BED DESIGN CRITERIA
3.2.2. DEEP WELL GROUND BED PLACEMENT
3.2.3. PERMITS
3.2.4. INSTALLATION
3.2.5. DEBRIS DISPOSAL
3.2.6. FINAL INSPECTION AND ACCEPTANCE
4. SPECIAL REQUIREMENTS
4.1. SECURITY AND SAFETY
4.2. GOVERNMENT FURNISHED MATERIALS
5. BLM Points of Contact and Delivery Addresses
D-1
1. PROJECT INTRODUCTION
Project Name: Rectifiers and Ground Beds
1.1. Introduction
The Bureau of Land Management (BLM) Federal helium operations facility is responsible for varied engineering, technical, and administrative activities related to the underground crude helium storage activities for the Amarillo Field Office.
The division’s activities include complex engineering services relating to installation, operation, and maintenance of gas production and injection well surface equipment, gas gathering and helium injection pipelines, cross-country natural gas and helium transmission pipelines, crude helium enrichment unit, and other physical plant facilities operated and maintained by the division.
The Engineering Support and Gas-field & Pipeline Operations teams are responsible for the design/implementation and operation/maintenance of the pipeline cathodic protection system.
1.2. Location
See section 3.1.4
1.3. Background
The Bureau of Land Management (Amarillo Field Office) operates a High-pressure Interstate Crude Helium Pipeline System and the Bush Dome Pipeline Gathering System located northwest of Amarillo, TX used for the injection/delivery of helium and other gases for the Crude Helium Pipeline System. The CHPS begins at the Cliffside plant and runs to Bushton, KS. The CHPS shares a rectifier with the BDPGS at the takeoff point from Cliffside.
The Crude Helium Pipeline encompasses approximately 420 miles of interstate piping, including three lateral pipelines (SherHan Gas Plant, National Helium, Jayhawk). Multiple sites exist for the injection/delivery of a gaseous helium product. The high pressure (high limit 1600 psig) product is non-flammable. In the original installation (1958-1962), the pipeline was built to a high-quality engineering standard gas transfer piping system with 39 mainline safety control break valves (mainline valves), cathodic protection test points (approximately 400) and eight (8) rectifier stations. In addition, road casings were placed on the pipeline at many crossings to address the load bearing on the pipeline at those locations. The pipeline is coated with coal-tar enamel wrap. The pipeline also has a 50-foot right-of-way which is 25 feet on either side.
The pipeline corrosion control system centers on a standard impressed current (rectifier & anode beds) system. This system includes 8 active tie-in locations. The BLM uses Code of Federal Regulations (CFR) Part 192, Transportation of Natural and Other Gas by Pipeline: Minimum Federal Safety Standards as a guideline for the implementation of the corrosion program.
Although the product is not-flammable, the high pressure & possible breathing hazard make this pipeline a potential safety hazard. Additionally, other corrosion control techniques such as
D-2
Direct Current (DC) Mapping and Close Interval Survey (CIS) are used to find & locate potential hot spots on the pipeline.
The current BLM impressed current system is spread thin and large sections of pipeline are not being protected. These areas are experiencing natural occurring coating breakdown. Given the age of the coating it is imperative that these areas receive more current to achieve separation of the “on” and “off” potential readings at test location.
1.4. Scope (project description)
The intent of this project is to increase the impressed current along the pipeline to mitigate corrosion. In order to achieve this the BLM will need the following:
1. Installation of four rectifiers at specified locations.
2. Installation of four corresponding deep well ground beds.
2. GENERAL REQUIREMENTS
2.1. Non-Personal Services
The Government shall neither supervise contractor employees nor control the method by which the contractor performs the required tasks. Under no circumstances shall the Government assign tasks to, or prepare work schedules for, individual contractor employees. It shall be the responsibility of the contractor to manage its employees and to guard against any actions that are of the nature of personal services or give the perception of personal services. If the contractor believes that any actions constitute, or are perceived to constitute personal services, it shall be the contractor’s responsibility to notify the Contracting Officer (CO) immediately.
2.2. Subcontract Management
The contractor shall be responsible for any subcontract management necessary to integrate work performed on this requirement and shall be responsible and accountable for subcontractor performance on this requirement. The prime contractor will manage work distribution to ensure there are no Organization Conflict of Interest (OCI) considerations. Contractors may add subcontractors to their team after notification to the CO and the Contracting Officer Representative (COR)
2.3. Contractor Qualifications
The contractor shall accomplish the requirements of this contract by employing and utilizing personnel with NACE certification and/or training on impressed current cathodic protection systems.
3. PERFORMANCE REQUIREMENTS
Note: All final connections for the positive and negative terminals shall be made so that the system is operating as designed.
D-3
3.1. Rectifiers
3.1.1. Rectifiers shall be Universal brand.
3.1.2. Rectifier Specifications (Universal Rectifier code: ADAI 30-15 ABCHR):
1. Rectifiers will be manual control, constant current unit.
2. The units will be single phase with an AC input of 115/230 volts.
3. 15 amperes at 30 volts maximum
4. The units will be air cooled and capable of operating at rated output voltage and current continuously in ambient temperatures of up to 45 degrees centigrade.
5. The units will have input and output lightning arresters.
6. The units will have 115-volt convenience outlet.
7. The units will have integrated circuit controls and silicon control rectifiers (SCR).
The SCRs shall be controlled by commands from plug in type electronic printed circuit boards (cards).
8. The units will have two separate meters: voltmeter and ammeter. The meter movement shall be D'arsonval type or equivalent. Meter switches to keep the meters disconnected while not in use will be standard. The meters will be accurate to within 2% of full scale. The ammeter will be connected to an external shunt having an accuracy of at least 1% and clearly stamped with the current and millivolt ratings (preferably 50 mv = 10 amps).
9. The rectifier enclosure shall be weatherproof with proper ventilation for outdoor use and shall be constructed of no less than 11-gauge hot dipped, galvanized steel.
10. The BLM will approve the final design of the rectifiers before purchase or manufacture by the contractor or subcontractor.
3.1.3. Locations: The locations below have been chosen to be within 100 feet of existing power lines and the helium pipeline.
1. South of Etter, TX- Moore County 35°59'47.18"N 102° 3'55.10"W
2. North East of Elkhart, KS-Morton County 37° 2'30.97"N 101°46'21.21"W
3. North East of Hugoton, KS- Stevens County 37°15'26.45"N 101°18'19.06"W
4. North of Cliffside Plant, TX – Potter County 35°21'17.91"N 101°59'35.11"W (Note:
BLM will run power to this location.)
3.2. Ground Beds
3.2.1. Ground Bed Design Criteria
The Contractor is not restricted to a specific type or manufacturer but shall meet the following criteria and consider the existing site conditions:
1. Ground bed shall have current output of 15 amps.
2. Total system resistance must be less than 2 ohms.
3. The design life of the ground bed is 15 years.
4. Coverage of the pipe is approximately 40 miles.
5. The coating of the pipe is coal tar enamel.
6. The diameter of the pipe is 8 inches.
7. The average depth of the pipeline is 4 feet.
D-4
The Contractor shall provide BLM the design for a deep well ground bed that meets these criteria, including, but not limited to, the type, size and number of anodes, estimated amount of carbon backfill, well bore dimensions, junction box, vent pipe, length of cables, installation configuration, etc. The Contractor may proceed to the installation of the ground bed once the design is approved by the BLM.
3.2.2. Deep Well Ground Bed Placement
The Contractor shall provide BLM with the best possible placement of the deep well ground bed.
The Contractor shall perform any geological survey and testing or utilize existing geological data in the area to determine the best spot to install the ground bed. The placement of the ground bed shall be as close as possible to the existing rectifier and shall be within the right of way of BLM’s crude helium pipeline.
3.2.3. Permits
The Contractor shall be responsible for obtaining necessary permits for drilling of the deep well ground bed. The Contractor shall be responsible for calling the applicable one-call system before the excavation. A copy of all permits and authorizations shall be provided to BLM prior to the installation.
3.2.4. Installation
The Contractor shall provide all supervision, labor, administrative support, materials, tools, parts, supplies, equipment, transportation and applicable certificates, licenses and permits necessary to perform the installation. The Contractor shall comply with all federal, state, county and municipal laws, codes, and/or regulations in connection with the performance of this contract.
The deep well ground bed shall be installed as per industry standards. The Contractor shall log the anode resistance before, during and after the carbon backfill to provide proof of proper carbon settlement.
3.2.5. Debris Disposal
The Contractor is responsible for the disposal of all debris resulting from construction. The Contractor shall conform to all applicable federal, state, and local regulations regarding disposal of debris.
3.2.6. Final Inspection and Acceptance
Upon completion of installation, the Contractor shall conduct a final inspection on the deep well ground bed in the presence of the Contracting Officer Representative (COR) to ensure the new system is fully functional and meets the design criteria listed in this section. The inspection will consist of powering up the system and measuring the potential, current, and resistance of the system at the rectifier. The Contractor shall remove, replace, or repair any work that is not in conformance with the design specifications at no additional cost to BLM.
D-5
4. SPECIAL REQUIREMENTS
4.1. Security and Safety
OSHA regulations shall be strictly adhered to.
4.2. Government Furnished Materials
The Government will not furnish any materials or equipment for the performance of this contract.
5. BLM POINTS OF CONTACT AND DELIVERY ADDRESSES
Contracting Officer (CO):
BLM National Operations Center co/ David Slade Bldg. 50, Denver Federal Center Denver, CO 80225-0047
(303) 236-4079 dslade@blm.gov mailto:mhutchison@blm.gov
| TABLE OF CONTENTS |
| 1. PROJECT INTRODUCTION |
| 1.1. Introduction |
| 1.2. Location |
| 1.3. Background |
| 1.4. Scope (project description) |
| 2. GENERAL REQUIREMENTS |
| 2.1. Non-Personal Services |
| 2.2. Subcontract Management |
| 2.3. Contractor Qualifications |
| 3. PERFORMANCE REQUIREMENTS |
| 3.1. Rectifiers |
| 3.1.1. Rectifiers shall be Universal brand. |
| 3.1.2. Rectifier Specifications (Universal Rectifier code: ADAI 30-15 ABCHR): |
| 3.1.3. Locations: The locations below have been chosen to be within 100 feet of existing power lines and the helium pipeline. |
| 3.2. Ground Beds |
| 3.2.1. Ground Bed Design Criteria |
| 3.2.2. Deep Well Ground Bed Placement |
| 3.2.3. Permits |
| 3.2.4. Installation |
| 3.2.5. Debris Disposal |
| 3.2.6. Final Inspection and Acceptance |
| 4. SPECIAL REQUIREMENTS |
| 4.1. Security and Safety |
| 4.2. Government Furnished Materials |
| 5. BLM Points of Contact and Delivery Addresses |
File details come from the government source that posted it. Updated .