B09_Comments_From_Site_Visit_0001.docx

DOCX document 14 KB Posted

Attached to
AL-DH NRDA-REST-FL DUNES PLANTING
Solicitation number
140FNR23Q0004
Issued by

View the file

Other files

File Type Posted
Sol_140FNR23Q0004_Amd_0001.pdf PDF
Attachment_5_Past_Experience_Questionnaire_1622755364278.doc DOC document
Attachment_1_Performance_Work_Statement.docx DOCX document
Sol_140FNR23Q0004.pdf PDF
Attachment_4_WD__15-4531.txt TXT text file
Attachment_2_ESRI_Plot_Summaries.xlsx XLSX spreadsheet
Attachment_3_East_SRI_Restoration_Plan_April2022_(1).docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Comments From Site Visit

1. USFWS will be able to share shapefiles with the selected contractor to facilitate site layout.

2. If the selected contractor coordinates with USFWS with sufficient lead time prior to the planting, the Government Plant Inspectors may be available to stake out planting areas to facilitate site layout.

3. If the bidder would like to utilize an alternative access route besides those specified in the Restoration Plan, they will need to include that in their submitted workplan. Any proposed changes to the access routes in the Restoration Plan will require review and approval by USFWS.

4. Anticipated coordination between USFWS (and USFWS partners) and the selected contractor will be greater during the summer planting of the Gulf Blue Stem due to the presence of nesting shorebirds.

5. Certain fence posts may be removed to allow for truck and UTV access to the project site. Fence post removal will need to be coordinated with USFWS and Eglin Air Force Base. Removal and reinstallation of fence posts for site access will need to be done as close in time to the planting efforts as possible to reduce the likelihood of sensitive dune areas being disturbed by the public.

6. Some areas of the dunes contain abandoned encampments and there may still be some unauthorized human occupation in other areas of the dunes. The selected bidders should be aware of this concern and adjust their plans for equipment storage and staging accordingly.

File details come from the government source that posted it. Updated .