Attch1_SOW_ConcretePadPrefabBldg_3pp.pdf

PDF 167 KB Posted

Attached to
VA-FWS BMGR ASSEMBLE/INSTALL PREFAB METAL BLDG
Solicitation number
140FC124R0029
Issued by

About this file

This request for proposal solicits general contractor services for the assembly and installation of a prefabricated metal building and concrete pad at the Barry M. Goldwater Refuge in Gila Bend, Arizona. The selected contractor will coordinate site preparation including excavation, grading, and concrete work. An existing prefabricated metal building structure measuring 25 feet wide by 40 feet long will be assembled and installed on a concrete pad. Additional requirements include electrical installation, lighting, and compliance with local building codes. The anticipated performance period is six months. This total small business set-aside opportunity has a project magnitude between $25,000 to $100,000. Proposals are due by February 28, 2024 and the award will be made based on best value considering technical capabilities, experience, and price.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP 140FC124R0029

02/07/2024

Attachment 1-1

STATEMENT OF WORK

NWRS-Refuge Law Enforcement, Region 2, Zone 2-Southwest AZ, Barry M Goldwater Refuge, Air Force

1. General:

Summary:

• General Contractor to coordinate and complete Assembly and Installation of prefab metal building, to include site preparation, grading for drainage, concrete pad and extensions to specified sizes (in Scope), electrical, building permits (as applicable) and meet applicable codes for Maricopa County, AZ (Gila Bend). Metal building assembly includes provided roll up door and pedestrian door. As well as, making electrical connections, providing and installing LED lights, receptacle outlets, and 200 amp panel tied to transformer. Contractor must be able to provide all materials, labor, necessary equipment/tools, machinery, etc., to complete project.

• Metal Building -Prefab metal building is being provided by Absolute Steel, and includes delivery to building site. All metal framing, construction, and installation to be completed by contractor.

Mohave BLDG Dimensions:

o 25' Wide x 40' Long x 12' Eave Height Sierra style building o Includes 5' on-center frame system, exterior roof & wall panels, complete trim package and ground or concrete anchors.

o 1 - 18' wide x 10' high gable-end roll-up/sectional door frame-out o 1 - 3068 pedestrian door frame-out o 1 - 18' Wide x 10' High Steel Rollup Door - Series 5000 - Color Choice o 1 - Standard steel pedestrian door o 6 - rolls of SolarGuard Radiant Barrier Insulation (500 sq ft rolls)

Who:

BMGR AFAF, 2008 Front St, Gila Bend, AZ 85337 DRLE R2/Z2, 3201 E. Universal Way, Tucson, AZ 85756 DRLE R2, 500 Gold Ave SW, Albuquerque, NM 87103

What:

Construction and Prefabricated metal building Installation services.

Where:

Luke Airforce Base-BMGR AFAF, 2008 Front St, Gila Bend, AZ 85337-Approximate Address, exact building site is different and has no address.

Attachment 1-2

Why:

This is for a prefabricated metal building to be installed on the BMGR Airforce Auxiliary Airfield (AFAF), specifically to house equipment, trailers, and vehicles. This garage/storage space is specifically needed to keep government equipment stored out of the sun and elements, and to provide a space to house equipment. There is currently no covered/shaded or protected storage area for the LE program to utilize. Since the USFWS has taken on the Conservation Law Enforcement on several Airforce bases, including Barry M. Goldwater Range – East (BMGR), we have not been provided adequate facilities at all installations.

This project is being funded out of the MIPR. FWS has coordinated with received approval from the Luke Airforce Base Commander, Facilities, and ES office to complete this project at the selected site.

Where:

Luke Airforce Base-BMGR AFAF, 2008 Front St, Gila Bend, AZ 85337-Approximate Address, exact building site is different and has no address.

When: Between MAR 2024 to SEP 2024.

Acceptable working Hours: Normal duty hours, can work 7 days a week, 7:00 a.m. – 5:00 p.m.

Non duty hours: Nights, and Government holidays.

3. Scope

• Site preparation-Excavation, and preparation for concrete and building, including removal of soil for footings/elevation, setting forms for concrete. Includes and ABC materials/compaction needs. Leftover soil/ABC materials can be spread around building area. Necessary grading for drainage around building.

• Concrete Pad and Extensions-Pour 25’W x 40’-2’’L structural pad (Rebar reinforced);

25’W x 30’L concrete extension off garage door, and standard concrete sidewalk (approx.

200 sft) from side pedestrian door to concrete extension.

• Metal Building Installation on slab-Prefab metal building is being provided by Absolute Steel, and includes delivery to building site. All metal framing, construction, and installation to be completed by contractor.

Mohave BLDG Dimensions:

o 25' Wide x 40' Long x 12' Eave Height Sierra style building o Includes 5' on-center frame system, exterior roof & wall panels, complete trim package and ground or concrete anchors.

o 1 - 18' wide x 10' high gable-end roll-up/sectional door frame-out o 1 - 3068 pedestrian door frame-out o 1 - 18' Wide x 10' High Steel Rollup Door - Series 5000 - Color Choice o 1 - Standard steel pedestrian door o 6 - rolls of SolarGuard Radiant Barrier Insulation (500 sq ft rolls)

Attachment 1-3

• Electrical-Installation of conduit with wire from transformer to 200 amp residential panel

(provided by contractor). Include supply and installation of a minimum of 6 - 4’ LED tube style shop ceiling lights in building with 2 light switches at pedestrian door (inside/outside light control), minimum of 8 receptacles (2 on each wall), and 2 LED exterior lights/at pedestrian door and roll up door.

• Contractor must be able to meet applicable current building codes to complete the following project in Maricopa County, AZ. Contractor can coordinate directly with Technical Coordinator regarding any issues/inspections/specifics.

• Contractor must be able to provide all materials, labor, necessary equipment/tools, machinery, etc., to complete project.

• Contractor must meet with Technical Coordinator or backup no less than, 3 times on site prior to work starting, in the mid phase of installation, and at the end for final inspections.

• Contractor and employees therof will be required to get temporary gate pass access onto the Luke Airforce Base, Gila Bend Auxiliary Airfield. This will be coordinated once contract is awarded between the Technical Coordinator, Airfield Facilities office, and Security.

• Contractor must be ROC licensed and insured/or bonded.

• Contractor must obtain permits as required in Maricopa County, AZ.

4. Deliverables and/or Delivery Schedule:

• Absolute Steel Mohave Metal Building and supplies.

• Building has already been delivered and received. It’s sitting about 100 yards from building site awaiting assembly.

5. Technical Coordinator/and backup:

Primary-CPT Thomas Sylvester; Phone: 760-201-5437 ; Email: Thomas_Sylvester@fws.gov Backup-FWO Angelo Gonzales; Phone: 520-993-5391; Email: Angelo_Gonzales@fws.gov mailto:Thomas_Sylvester@fws.gov mailto:Angelo_Gonzales@fws.gov

STATEMENT OF WORK
1. General:
Where:
Luke Airforce Base-BMGR AFAF, 2008 Front St, Gila Bend, AZ 85337-Approximate Address, exact building site is different and has no address.
When: Between MAR 2024 to SEP 2024.
Acceptable working Hours: Normal duty hours, can work 7 days a week, 7:00 a.m. – 5:00 p.m.
Non duty hours: Nights, and Government holidays.
3. Scope
4. Deliverables and/or Delivery Schedule:
Absolute Steel Mohave Metal Building and supplies.
Building has already been delivered and received. It’s sitting about 100 yards from building site awaiting assembly.

File details come from the government source that posted it. Updated .