Attachment_G_-_Questions_and_Answers.pdf
PDF 90 KB Posted
- Attached to
- NCTC-CAMPUS WIDE ELECTRICAL METER REPLACEMENT - WE Federal contract opportunity
- Solicitation number
- 140F0919B0003
About this file
Attachment G - Questions & Answers
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140F0919B0003_Amd_0001.pdf | ||
| B08_-_Attachment_C_-_Wage_Determination.pdf | ||
| Sol_140F0919B0003.pdf | ||
| B08_-_Attachment_A_-_Specifications.pdf | ||
| B08_-_Attachment_F_-_DI-137_-_DOI_Release_of_Claims.pdf | ||
| B08_-_Attachment_E_-_SF25_Performance_Bond.pdf | ||
| B08_-_Attachment_B_-_Drawings.pdf | ||
| B08_-_Attachment_D_-_SF25_Payment_Bond.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IFB 140F0919B0003
Attachment G – Questions and Answers
1. Which room and building in panel “IE-EL-1” located in? This is for meter “EM-AF”.
The schedule on drawing E-001 tells us it’s in LAB electrical room G10L but the Electrical metering diagram on drawing EP501 shows it beside and tells us to mount it beside “IE-EL-1”.
Answer: Panel IE-EL-1 is located in Instructional East Ground Floor, Room G11IE. Mount meter in Instructional East Ground Floor, Room G11IE. This meter is not included on Drawing EP501, Detail 1 Electrical Meter Quantities. Actual quantity IS 32
2. Which room and building in meter “EM-R” located in? This meter is for switchboard “LB-ED-1”. The schedule on drawing E-001 tells us it’s in LAB electrical room G10L but the Electrical metering diagram on drawing EP501 shows it in LAB ELEC ROOM G091.
Answer: Meter EM-R is located in Lab Building Ground Floor, Room G09L.
3. With the questions above being said. Do the new meters and new METASYS IOM panels get wired to the existing DDC panel (JCI/METASYS N2) in the building where the meter is mounted? For example the meters for the COMMONS and PHYSICAL TRAINING buildings are mounted in CP ELEC ROOM, do these get wired to the existing DDC panel (JCI/METASYS N2) in these buildings they are metering or the building where the meter is mounted.
Answer: New meters get connected/wired into the closest JCI/Metasys panel.
4. Drawing EP501 shows 2 meters with the same name (EM-H). This is shown in WT BACK ELEC ROOM and WT ELEC ROOM. Please clarify? This would make 32 meters that are getting installed for this project.
Answer: The EM-H in WT Electrical Room is an existing meter to be replaced. The EM-H in WT Back Electrical Room is a new meter. The name of this new meter is to be determined.
Actual quantity IS 32