Attachment_G_-_Questions_and_Answers.pdf

PDF 90 KB Posted

Attached to
NCTC-CAMPUS WIDE ELECTRICAL METER REPLACEMENT - WE Federal contract opportunity
Solicitation number
140F0919B0003
Issued by
Department of the Interior Fish and Wildlife Service Region 9 Headquarters

About this file

Attachment G - Questions & Answers

View the file

Other files for this federal contract opportunity

Other files attached to NCTC-CAMPUS WIDE ELECTRICAL METER REPLACEMENT - WE, newest first.
File Type Posted
Sol_140F0919B0003_Amd_0001.pdf PDF
B08_-_Attachment_C_-_Wage_Determination.pdf PDF
Sol_140F0919B0003.pdf PDF
B08_-_Attachment_A_-_Specifications.pdf PDF
B08_-_Attachment_F_-_DI-137_-_DOI_Release_of_Claims.pdf PDF
B08_-_Attachment_E_-_SF25_Performance_Bond.pdf PDF
B08_-_Attachment_B_-_Drawings.pdf PDF
B08_-_Attachment_D_-_SF25_Payment_Bond.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IFB 140F0919B0003

Attachment G – Questions and Answers

1. Which room and building in panel “IE-EL-1” located in? This is for meter “EM-AF”.

The schedule on drawing E-001 tells us it’s in LAB electrical room G10L but the Electrical metering diagram on drawing EP501 shows it beside and tells us to mount it beside “IE-EL-1”.

Answer: Panel IE-EL-1 is located in Instructional East Ground Floor, Room G11IE. Mount meter in Instructional East Ground Floor, Room G11IE. This meter is not included on Drawing EP501, Detail 1 Electrical Meter Quantities. Actual quantity IS 32

2. Which room and building in meter “EM-R” located in? This meter is for switchboard “LB-ED-1”. The schedule on drawing E-001 tells us it’s in LAB electrical room G10L but the Electrical metering diagram on drawing EP501 shows it in LAB ELEC ROOM G091.

Answer: Meter EM-R is located in Lab Building Ground Floor, Room G09L.

3. With the questions above being said. Do the new meters and new METASYS IOM panels get wired to the existing DDC panel (JCI/METASYS N2) in the building where the meter is mounted? For example the meters for the COMMONS and PHYSICAL TRAINING buildings are mounted in CP ELEC ROOM, do these get wired to the existing DDC panel (JCI/METASYS N2) in these buildings they are metering or the building where the meter is mounted.

Answer: New meters get connected/wired into the closest JCI/Metasys panel.

4. Drawing EP501 shows 2 meters with the same name (EM-H). This is shown in WT BACK ELEC ROOM and WT ELEC ROOM. Please clarify? This would make 32 meters that are getting installed for this project.

Answer: The EM-H in WT Electrical Room is an existing meter to be replaced. The EM-H in WT Back Electrical Room is a new meter. The name of this new meter is to be determined.

Actual quantity IS 32