Industry_Day_Presentation_0001.pdf
PDF 3 MB Posted
- Attached to
- Multiple Award Task Order Contract (MATOC) for Des Federal contract opportunity
- Solicitation number
- 140F0521R0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_0002.pdf | ||
| Revised_Sections_L_and_M_A2_0002.pdf | ||
| Sol_140F0521R0004_Amd_0002.pdf | ||
| Questions_and_Answers_0001.pdf | ||
| Revised_Sections_L___M_0001.pdf | ||
| Revised_Geographical_Location_Selection_Form_0001.xlsx | XLSX spreadsheet | |
| Design_Build_Location_Factor_Spreadsheet_0001.xlsx | XLSX spreadsheet | |
| Design_Build_TEAMS_Presentation_Link_0001.docx | DOCX document | |
| Revised_Price_Schedule_0001.pdf | ||
| Industry_Day_Attendance_List_0001.xlsx | XLSX spreadsheet | |
| Sol_140F0521R0004_Amd_0001.pdf | ||
| Geographical Location Selection Form.xlsx | XLSX spreadsheet | |
| Industry Day Flyer.pdf | ||
| Price Schedule.pdf | ||
| Design Build General Requirements.pdf | ||
| Past Performance Questionnaire.pdf | ||
| Quick Entry Data Form.pdf | ||
| Sample Design Build Project.pdf | ||
| Sol_140F0521R0004.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESIGN/BUILD
MULTIPLE AWARD TASK ORDER CONTRACT
MAY 27, 2021
Solicitation # 140F0521R0004 – Design/Build MATOC.
Due: June 18, 2021
Submit questions in the chat.
Q&A at end of presentation.
Introductions
Before we get started…
Recording of this presentation and registration information will be posted
Purpose1
What is a MATOC?22
Design/Build Scope33
How to ensure compliance with the solicitation44
Location selections55
Technical Evaluation Factors and Pricing66
Task orders77
Purpose1
15% up to $285M
5% up to $95M
5% up to $95M
5% up to $95M
70% up to $1.3B
• Established the National Parks and Public Land Legacy Restoration Fund to support deferred maintenance on Federal lands
• For FY2021-FY2025, there shall be deposited into the fund an amount equal to 50% of all Federal revenues from the development of oil, gas, coal, or alternative or renewable energy on Federal lands and waters.
• The fund must be used for priority deferred maintenance projects – not to exceed $1.9 Billion per year for 5 years
Great American Outdoors Act (GAOA)
• Establish pool of highly qualified firms for all Design/Build requirements
• Ensure full coverage
• Expedite acquisition process
Quality and Efficiency
What is a MATOC?22
Multiple Award Task Order Contract
Indefinite-Delivery/Indefinite Quantity
Awarded to multiple Contractors from single solicitation
Fair opportunity to be considered for each task order issued over life of contract (5 years)
Use All DOI Bureaus and Forest Service
Satisfy all Design/Build requirements including GAOA, disaster recovery, routine deferred maintenance, and new construction
180 contracts will be awarded by 09/30/21
Benefits The ability to quickly deliver infrastructure and construction projects
Streamlined acquisition process which will reduce solicitation timelines
Reduction in administrative workload
“Vetted” Contractor pool
Contribution to meeting Small Business participation and Competition goals
Design/Build Scope33
Typical work will include:
Interior and Exterior Building Renovations
• Heating, Ventilation and Air Conditioning
• Controls, electrical, mechanical, plumbing, fire suppression, fire and security systems
• Asbestos and lead abatement
• Mold and limited soil remediation
New Construction • Site work
• Millwork
• Landscaping
• Fencing
• Masonry
• Concrete
• Asphalt paving
• Storm drainage
How to ensure compliance with the solicitation44
Active registration in www.beta.sam.gov or www.sam.gov
Submit questions by email to 140F0521R0004@fws.gov. Deadline for submitting questions is 7 days prior to proposal due date.
SMALL BUSINESS SET-ASIDE! Ensure classification is “small” under applicable NAICS:
236220 ($39.5M)
Return all information and associated documents on time, in the correct format, to the correct location.
Submit in exact order as listed in the solicitation.
Provide completed Signature Page
Respond to all elements of the document. Provide all requested information.
Do not exceed any page limitations. Additional pages will not be considered.
http://www.beta.sam.gov/ http://www.sam.gov/
Location selections55
Geographical Location Selection Form
Select States or US territory: Minimum – (1); Maximum – (10)
Each State or US Territory will have a pool of 5-16 Contractors.
Technical Evaluation Factors and Pricing6
Technical Approach
Offeror shall submit a brief narrative to explain the general approach to design and construct the sample project.
Describe the techniques and methods for the sample project to include coordination with the design packages, projected project timelines, and coordination of work.
Describe plan to meet submittal requirements, changes, and quality control.
Describe the interaction of the design team with the construction team during construction.
Include control and approval of revisions to the design; requests for information; shop drawing and submittal reviews and approvals; Commissioning; Testing; Special Inspections; and contract completion and closeout.
Recent, Relevant Experience
Provide at least 3 and no more than 5 examples of recent experience by the prime contractor or designated subcontractor similar in size, scope, and complexity to the work detailed herein.
At a minimum 1 of the examples provided shall be a project on which the general contractor and the designer-of-record both worked, regardless if they were design-build projects.
A project is considered “recent” if it has been completed within the last five (5) years or is currently ongoing but at least 25% complete.
Design-build projects, while not required, will receive a higher rating.
Federal or state public projects will be rated higher than private or commercial projects
Past Performance
Offeror shall submit a Past Performance Questionnaire (PPQ) (see attachments) on at least 3 and no more than 3 ongoing and/or past projects within the last five (5) years that are similar in size, scope, and complexity to the work described herein.
The Contractor is solely responsible for the accuracy of information provided. The Government will not pursue inaccurate data.
Firms that have a less than satisfactory performance rating in CPARS database will be considered unsatisfactory.
PHASE 1
Design Approach Offeror shall submit a narrative along with appropriate drawings with adequate detail to explain the general approach for accomplishing all major aspects of this project including but not limited to proposed structural and foundation system, site development and landscaping, building systems, building security systems, etc.
Include a description of how the construction personnel will be involved during the design phase.
Describe interactions within the team and with the Government during the design.
Construction Management
Offeror shall submit an annotated outline of the construction management plan that provides key details on the proposed approach to:
Managing both pedestrian and vehicular traffic ensuring the safety of the general public
Identification of long lead time for key construction materials
Identification of key environmental protection challenges
Interface with the designer-of-record, and interaction with the Government.
Key Personnel and Design/Build Team Organization
Provide the resumes (not to exceed two pages each) of the following key personnel: Project Manager, Designer-of-Record, Design Quality Manager, Construction Quality Manager.
Indicate, as applicable: Previous design-build experience, Federal agency project experience, Experience working in construction and/or as an Architect/Engineer.
Price For each geographic location selected, Offerors shall provide one (1) base price with no location multipliers to complete the project. Offerors shall also provide two (2) multipliers for each state they wish to propose to work in. One multiplier is for projects outside a 100-mile radius of a town/city in which local resources are available to them and one multiplier within 100 miles.
Technical Evaluation Factors and Pricing6
PHASE 2
Task orders77
Contracting Officer will issue a Task Order Request for Proposal to all IDIQ Contractors in the pool for the location.
Task Order RFQ/RFP’s will be competed using the procedures outlined in FAR 36.3- Two-Phase Design-Build Selection Procedures. The Government may utilize performance and qualification information that is reasonably available to make an award.
Task order award made.
For each new task order requirement:
Requiring office will submit a purchase request to Contracting Office that supports acquisitions for place of performance.
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
| Slide Number 11 |
| Slide Number 12 |
File details come from the government source that posted it. Updated .