Attachment_II-A06-Drawings-Specifications_revised_0001.pdf
PDF 8 MB Posted
- Attached to
- PAVEMENT MAINTENANCE NCTC Federal contract opportunity
- Solicitation number
- 140F0421R0025
About this file
This solicitation is for a pavement maintenance project at the National Conservation Training Center in Shepherdstown, West Virginia. Work includes asphalt overlays, repairs, and restriping of various roads and parking lots on site. Key project elements are overlay and repairs to Baird Drive, the Red Parking Lot, Entry Parking Lots, Blue Parking Lot, Green Parking Lot, Orange Parking Lot, Yellow Parking Lot, and Day Care Parking Lot. Optional bid items include work on Captain Hendrix Drive and the Grey Parking Lot. The period of performance is 120 calendar days. The solicitation was issued by the U.S. Fish and Wildlife Service and responses are due by June 15, 2021.
View the file
Other files for this federal contract opportunity
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEX OF DRAWINGS
SHEET SHEET TITLE
1 TITLE SHEET
2 NCTC PAVEMENT MAINTENANCE - OVERVIEW
3 OVERLAY & REPAIR PLAN - BAIRD DRIVE
4 STRIPING PLAN - BAIRD DRIVE
5 OVERLAY, REPAIR & STRIPING PLANS - RED LOT & DAYCARE LOT
6 OVERLAY, REPAIR & STRIPING PLANS - ENTRY LOTS & YELLOW LOT
7 OVERLAY, REPAIR & STRIPING PLAN - BLUE LOT
8 OVERLAY, REPAIR & STRIPING PLAN - ORANGE LOT & GREEN LOT
9 OVERLAY, REPAIR & STRIPING PLAN - CAPTAIN HENDRIX DRIVE
10 OVERLAY, REPAIR & STRIPING PLAN - GREY LOT, EXISTING CURB DETAILS
11 DETAILS
NATIONAL CONSERVATION TRAINING CENTER
698 CONSERVATION WAY, SHEPHERDSTOWN, WV
PAVING MAINTENANCE - 2021
PROJECT SUMMARY:
WORK GENERALLY CONSISTS OF PROVIDING ALL LABOR, EQUIPMENT, SUPPLIES AND MATERIALS TO PERFORM THE FOLLOWING, IN ACCORDANCE WITH THE PLANS AND
SPECIFICATIONS. WORK INCLUDES, BUT IS NOT LIMITED BY:
BASE BID
010 - REPAIR, OVERLAY AND STRIPE BAIRD DRIVE AS INDICATED IN THE CONTRACT DOCUMENTS. WORK ALSO INCLUDES REPLENISHING GRAVEL SHOULDER.
020 - REPAIR, OVERLAY AND STRIPE THE RED PARKING LOT AS INDICATED IN THE CONTRACT DOCUMENTS 030 - REPAIR, OVERLAY AND STRIPE THE ENTRY PARKING LOTS AS INDICATED IN THE CONTRACT DOCUMENTS 040 - REPAIR, OVERLAY AND STRIPE THE BLUE PARKING LOT AS INDICATED IN THE CONTRACT DOCUMENTS 050 - REPAIR, OVERLAY AND STRIPE THE GREEN PARKING LOT AS INDICATED IN THE CONTRACT DOCUMENTS 060 - REPAIR, OVERLAY AND STRIPE THE ORANGE PARKING LOT AS INDICATED IN THE CONTRACT DOCUMENTS 070 - REPAIR, OVERLAY AND STRIPE THE YELLOW PARKING LOT AS INDICATED IN THE CONTRACT DOCUMENTS 080 - REPAIR, OVERLAY AND STRIPE THE DAYCARE PARKING LOT AS INDICATED IN THE CONTRACT DOCUMENTS
BID OPTIONS
090 - REPAIR, OVERLAY AND STRIPE CAPTAIN HENDRIX DRIVE AS INDICATED IN THE CONTRACT DOCUMENTS. WORK ALSO INCLUDES REPLENISHING GRAVEL SHOULDER.
100 - REPAIR, OVERLAY AND STRIPE THE GREY PARKING LOT AS INDICATED IN THE CONTRACT DOCUMENTS
E
T
PHYSICAL
TRAINING
CARSON LODGE
(H3)
MURIE LODGE (H4)DARLING
LODGE
(H2)
LEOPOLD
LODGE
(H1)
CENTRAL
PLANT
INSTRUCTIONAL WEST INSTRUCTIONAL EAST
KREATE
DAYCARE
WEST POND
OFFICE
SUPPORT
SERVICES
GUARD
HOUSE
CONSERVATION WAY
SH
EP
HE
RD
G
RA
DE
R
D
TO SHEPHERDSTOWN
3.3 MILES
COMMONS
CAPTAIN HENDRIX DR
ROOSEVELT RD
BAIRD DR
SITE MAP
SCALE: 1:5,000
0 100' 200' 500'
ENTRY AUD.
LAB
GENERAL PROJECT NOTES:
1. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS SHOWN ON THE DRAWINGS AND REPORT
TO THE CO ANY ERROR OR INCONSISTENCY WITH THE ACTUAL CIRCUMSTANCES IN THE FIELD.
2. THE CONTRACTOR SHALL PROVIDE REQUIRED TRAFFIC CONTROL (PEDESTRIAN AND VEHICULAR TRAFFIC).
ALL TRAFFIC CONTROLS SHALL BE IN ACCORDANCE WITH THE MOST CURRENT MANUAL ON UNIFORM TRAFFIC
CONTROL (MUTCD) REQUIRMENTS AND THE APPROVED TRAFFIC CONTROL PLAN.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR WORK SITE SAFETY.
4. CARE SHALL BE TAKEN TO PROTECT ALL EXISTING SURFACES AND STRUCTURES TO REMAIN, INCLUDING
VEGETATED AND LANDSCAPED AREAS. ANY AREAS DAMAGED DUE TO THE WORK OF THIS PROJECT SHALL BE
REPAIRED AT THE CONTRACTOR'S EXPENSE.
5. ALL SAWCUTS SHALL BE STRAIGHT AND EVEN. JAGGED EDGES WILL NOT BE ACCEPTED.
6. IN NO CASE SHALL EMPLOYEES OF THE GENERAL CONTRACTOR (GC) OR SUBCONTRACTOR BE IN AREAS OF
THE BUILDING OR THE CAMPUS THAT ARE UNNECESSARY FOR THE COMPLETION OF THE PROJECT.
7. IF APPLICABLE, THE CONTRACTOR SHALL NOT LEAVE DISTURBED SOILS EXPOSED WHEN PRECIPITATION IS IN
THE FORECAST. DISTURBED AREAS SHALL BE STABILIZED AS WORK PROGRESSES.
LEGEND & ABBREVIATIONS
C&G CURB & GUTTER
DTL DETAIL
NIC NOT IN CONTRACT
SIM SIMILARLY
SOW STATEMENT OF WORK
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
TITLE PAGE
SHEET 1 OF 11T-1A
NCTC PAVEMENT MAINTENANCE - 2021
MAY 2021
National Conservation Training Center (NCTC) Shepherdstown, West Virginia
00/00/00 0 XXX
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text E
AutoCAD SHX Text
SERVICE
AutoCAD SHX Text
FISH & WILDLIFE
AutoCAD SHX Text
PA
AutoCAD SHX Text
DE
AutoCAD SHX Text
RT
AutoCAD SHX Text
NT
AutoCAD SHX Text
ME
AutoCAD SHX Text
TH
AutoCAD SHX Text 0F
AutoCAD SHX Text U.S.
AutoCAD SHX Text
TE
AutoCAD SHX Text
IN
AutoCAD SHX Text
OR
AutoCAD SHX Text
RI
GREEN LOT
YELLOW LOT
ORANGE
LOT
PT
BUILDING
COMMONS CENTRAL
PLANT
INSTRUCTIONAL EAST
TRAINING LAB
INSTRUCTIONAL WEST
ENTRY AUDITORIUM
CREATIVE
RESOURCES
ALDO LEOPOLD
LODGE
DING DARLING
LODGE
MUIRE
LODGE
RACHEL
CARSON LODGE
CONSERVATION WAY
BAIRD DRIVE
ROOSEVELT RD
ROOSEVELT ROAD
TWIN LEAF TRAIL
(NATURAL SURFACE)
BAIRD DRIVE
CAPTAIN HENDRIX DR.
GRAY LOT
RED LOT
DAYCARE LOT
ENTRY VISITOR LOT
BAIRD DR
SHEETS 3 & 4
RED LOT
SHEET 5
DAYCARE LOT
SHEET 5
ENTRY VISITOR
LOT SHEET 6
ENTRY
MAINTENANCE
LOT SHEET 6
YELLOW
LOT SHEET 6
EXTENDED BLUE
LOT SHEET 7
BLUE LOT
SHEET 7
GREEN LOT
SHEET 8
ORANGE LOT
SHEET 8
CPT. HENDRIX
DR. SHEET 9
GRAY LOT
SHEET 10
BAIRD DR
SHEETS 3 & 4
BLUE LOT
SHEET 2 OF 11MAY 2021NCTC - PAVEMENT MAINT. - OVERVIEW
1 - OVERVIEW - PAVEMENT MAINTENANCE PLAN
NTS
GENERAL NOTES:
1. SEE SPECS, SECTION 01 14 00, FOR WORK
COORDINATION REQUIREMENTS
2. SPECIFICATIONS ARE BASED ON THE WEST VIRGINIA
DIVISION OF HIGHWAYS 2017 STANDARD
SPECIFICATIONS FOR ROADS AND BRIDGES AND
SUPPLEMENTAL SPECIFICATIONS.
3. TYP PARKING SPACE DIMENSIONS: 9' X 20'
4. EXISTING WHEEL STOPS SHALL BE REMOVED AND
RE-INSTALLED BY THE CONTRACTOR
5. DRAWINGS INCLUDE COPIES OF ORIGINAL
CONSTRUCTION DESIGN DRAWINGS FOR LAYOUT
INFO.
5.1. SINCE THE ORIGINAL CONSTRUCTION, NCTC
ROAD NAMES HAVE CHANGED AS FOLLOWS:
CONSERVATION WAY = MAIN ENTRY DR
BAIRD DR = WEST DR
ROOSEVELT RD = EAST DR
CAPTAIN HENDRIX DR = SERVICE ACCESS DR
5.2. CURB TYPE DETAILS FROM THE ORIGINAL
CONSTRUCTION ARE INCLUDED ON SHEET 9 FOR
REFERENCE.
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
X
SHEET 3 OF 11MAY 2021OVERLAY & REPAIR PLAN - BAIRD DRIVE
NOTES:
1. SEE OVERLAY DETAILS SHEET 11.
2. MANHOLES & VALVE BOXES NOT SHOWN. SEE SOW
FOR BAIRD DRIVE SITE SPECIFIC SCOPE OF WORK.
3. WORK ON CONCRETE LOADING DOCK NORTH OF THE
LAB IS NIC.
4. BAIRD DRIVE HAS APPROXIMATELY 880 LF OF C&G OR
OTHER ADJACENT STRUCTURE. ALL OTHER ROAD
EDGES NEED MIN 1" GRAVEL SHOULDER
REPLENISHMENT. DETAILS, SHEET 11.
4 STANDARD STALLS & 3 HC
STALLS (1 VAN) WITH
ASSOCIATED HATCHING
AND ADA SYMBOL
CROSSWALK FOR TRAIL
CROSSING OVER ROADWAY
CROSSWALK
440 LF OF 18" WIDE YELLOW LINE
WITH 18" LETTERS "NO PARKING"
PAINTED EVERY 40 FEET.
40 LF OF 18" WIDE YELLOW
LINE WITH 18" LETTERS
"NO PARKING"
3 ADA PARALLEL
PARKING SPACES 3 PARKING SPACES, 19'
LONG, 8.5' WIDE. TWO
3' WIDE PEDESTRIAN
CROSS HATCH
PARKING BORDERS.
SHEET 4 OF 11MA7 2021STRIPING PLAN - BAIRD DRIVE
1 - STRIPING LAYOUT -BAIRD DRIVE
NTS
NOTES:
STRIPING ON BAIRD DRIVE INCLUDES THE FOLLOWING,
WHICH ARE NOT SHOWN:
· STOP BAR AT JUNCTION WITH CONSERVATION
WAY.
STRIPING DETAILS, SHEET 11.
125'
.5'
20' 20'
27.9'
19.5'
36'
BAIRD DR
RED LOT ACCESS
ROAD
RED LOT
BAIRD DRIVE
WORK NOTES - THIS PROJECT - DAYCARE LOT
DAYCARE LOT AND ENTRANCE
1. LAYOUT SHOWN, DTL 2, IS FROM AERIAL
PHOTO OF EXISTING CONDITIONS
2. WORK INCLUDES ENTRANCE TO PARKING
LOT FROM BAIRD DRIVE
3. PROVIDE 2" OVERLAY WITH APPLICABLE
TRANSITIONS AT ALL INTERSECTIONS
AND C&G (DTLS SHEET 11).
4. RE-STRIPE TO MATCH EXISTING
WORK NOTES - THIS PROJECT - RED LOT
RED LOT AND RED LOT ACCESS ROAD
1. LAYOUT SHOWN (DTL 1) IS FROM
ORIGINAL CONSTRUCTION
DRAWINGS
2. BOTH THE RED LOT AND ACCESS
ROAD TO RECEIVE OVERLAY
3. SEE AERIAL PHOTO (DTL 3 THIS
SHEET) FOR FAILURE REPAIRS &
HOW STRIPING HAS CHANGED SINCE
ORIGINAL CONSTRUCTION
4. PROVIDE 2" OVERLAY WITH
APPLICABLE TRANSITIONS AT ALL
INTERSECTIONS AND C&G (DTLS
SHEET 11)
5. RE-STRIPE TO MATCH EXISTING
STRIPING FOR 4 SPACES
REMOVED & 9 ADDED TO
WEST END OF LOT
REPAIR RUTTED PAVEMENT - REMOVE 4'
FROM C&G, 12 SPACES. REPAIR/ADD
BASE, REPAVE. SIM. DTL 2, SHEET 11
REPAIR RUTTED PAVEMENT - REMOVE 4' FROM C&G,
REPAIR/ADD BASE, REPAVE. SIM. DTL 2, SHEET 11
REPAIR RUTTED PAVEMENT -
REMOVE, REPAIR/ADD BASE,
REPAVE. DTL 3, SHEET 11
SHEET 5 OF 11MAY 2021OVERLAY & STRIPING PLANS - RED LOT, DC LOT & ENTRY LOTS
2 - DAYCARE PARKING LOT - LAYOUT AND STRIPING PLAN
NTS
1 - RED PARKING LOT - LAYOUT AND STRIPING PLAN
NTS
3 - RED LOT - AERIAL OF EXISTING CONDITIONS
NTS
ENTRY VISITOR LOT
ENTRY LOADING/MAINTENANCE
LOT AND ACCESS ROAD
140'
122'
30'
6'
WORK NOTES - THIS PROJECT - YELLOW LOT
YELLOW LOT AND ENTRANCE
1. LAYOUT SHOWN (DTL 3) IS FROM AERIAL
PHOTO OF EXISTING CONDITIONS
2. WORK INCLUDES ENTRANCE TO PARKING
LOT FROM ROOSEVELT RD
3. PROVIDE 2" OVERLAY WITH APPLICABLE
TRANSITIONS AT ALL INTERSECTIONS
AND C&G (DTLS SHEET 11)
4. RE-STRIPE TO MATCH EXISTING
REPAIR RUTTED PAVEMENT - REMOVE 6'
FROM N. EDGE, REPAIR/ADD BASE,
REPAVE. DTL 2, SHEET 11
REPAIR RUTTED PAVEMENT - REMOVE 6'
FROM N. EDGE, REPAIR/ADD BASE,
REPAVE. DTL 2, SHEET 11
ADDITIONAL PARKING
SPACE & STRIPING
WORK NOTES - THIS PROJECT - ENTRY LOTS
ENTRY LOTS AND ACCESS ROAD
1. LAYOUT SHOWN (DTL 1) IS FROM
ORIGINAL CONSTRUCTION DRAWINGS
2. THE LOTS AT ENTRY TO RECEIVE
OVERLAY INCLUDE THE VISITOR LOT,
SOUTH OF ENTRY AUDITORIUM, AND
THE MAINTENANCE LOT DIRECTLY EAST
OF THE BUILDING.
3. SEE AERIAL PHOTO (DTL 2 THIS SHEET)
FOR HOW PAVEMENT AND STRIPING
HAVE CHANGED SINCE THE ORIGINAL
CONSTRUCTION.
4. WORK INCLUDES ENTRANCE AND/OR
ACCESS ROAD TO EACH PARKING LOT
5. PROVIDE 2" OVERLAY WITH
APPLICABLE TRANSITIONS AT ALL
INTERSECTIONS AND CURB & GUTTER
(DTLS SHEET 11).
6. RE-STRIPE TO MATCH EXISTING
SHEET 6 OF 11MAY 2021OVERLAY & STRIPING PLANS - ENTRY LOTS & YELLOW LOT
3 - YELLOW PARKING LOT - LAYOUT AND STRIPING PLAN
NTS
1 - ENTRY PARKING LOT - LAYOUT AND STRIPING PLAN
NTS
2 - YELLOW PARKING LOT - LAYOUT AND STRIPING PLAN
PRIMARY
BLUE LOT
EXTENDED BLUE
LOT
WORK NOTES - THIS PROJECT - BLUE LOTS
PRIMARY BLUE LOT & EXTENDED BLUE LOT
1. LAYOUTS SHOWN (DTLS 1 AND 2) ARE
FROM ORIGINAL CONSTRUCTION
DRAWINGS OF EACH LOT. THE PRIMARY
BLUE LOT WAS CONSTRUCTED IN 1994
WITH THE ORIGINAL CAMPUS
CONSTRUCTION. THE EXTENDED BLUE
LOT SECTION WAS ADDED IN 2001.
2. SEE AERIAL PHOTO (DTL 3 THIS SHEET)
FOR HOW PAVEMENT AND STRIPING HAS
CHANGED SINCE ORIGINAL
CONSTRUCTION.
3. WORK INCLUDES ENTRANCES TO
PARKING AREAS FROM ROOSEVELT
ROAD (EAST DR) AND ACCESS ROAD
BETWEEN THE TWO LOTS.
4. PROVIDE 2" OVERLAY WITH APPLICABLE
TRANSITIONS AT ALL INTERSECTIONS
(DTLS SHEET 11)
5. RE-STRIPE TO MATCH EXISTING
ISLANDS PAVED OVER &
STRIPED. TYP. OF 4
TRENCH DRAINS ADDED &
PAVEMENT EXPANDED APPROX
3.5' TO DRAINS ON EAST END OF
PARKING LOTS. TYP OF 3.
CURB ADDED - EAST SIDE
OF ACCESS ROAD
CURB TYPE #1PEDESTRIAN PATH - NORTH OF LOT -
INCLUDED IN WORK. 6' WIDTH.
DEEP, OPEN CRACK THRU PAVEMENT
SECTION & FULL WIDTH OF LOT. FULL
DEPTH REPAIR PRIOR TO OVERLAY.
MIN 3' WIDE. DTL 3, SHEET 11
SHEET 7 OF 11MAY 2021OVERLAY, REPAIR & STRIPING PLAN - BLUE LOTS
1 - EXTENDED BLUE LOT - LAYOUT AND STRIPING PLAN
NTS
2 - PRIMARY BLUE LOT - LAYOUT AND STRIPING PLAN
NTS
3 - AERIAL OF EXISTING CONDITIONS - BLUE LOTS
GREEN LOT
ROOSEVELT RD
(EAST DR)
ROOSEVELT RD
(EAST DR)
ORANGE LOT
ORANGE LOT
ENTRANCE
WIDENED 5'
ENTRANCE
WIDENED 5'
PEDESTRIAN PATH - NORTH
OF LOT - 6' WIDE - ADDED TO
LOT FROM ORIGINAL
ADDITONAL PARKING SPACE AND
CROSSHATCH STRIPING ADDED
TO LOT FROM ORIGINAL, 20'X9'
REPAIR RUTTED PAVEMENT - 11 SPACES,
REMOVE PAVEMENT 5' WIDTH, REPAIR/ADD
BASE, REPAVE. DTL 3, SHEET 11
ISLANDS PAVED OVER &
STRIPED. TYP. OF 2 - ADDED
TO LOT FROM ORIGINAL
PEDESTRIAN PATH - 6'
WIDE - ADDED TO LOT
FROM ORIGINAL
PEDESTRIAN PATH -
4.5' WIDE - ADDED TO
LOT FROM ORIGINAL
COLD PATCH - 3 SPACES, REMOVE
PATCH MIN 3' WIDTH, REPAIR/ADD BASE
IF NEEDED, REPAVE. DTL 3, SHEET 11
REPAIR RUTTED PAVEMENT - 16
SPACES, REMOVE PAVEMENT 8'
WIDTH, REPAIR/ADD BASE IF
NEEDED, REPAVE. DTL 3, SHEET 11
REPAIR FAILED PAVEMENT - ONE
PARKING SPACE SIZE, REMOVE
PAVEMENT, REPAIR/ADD BASE IF
NEEDED, REPAVE. DTL 3, SHEET 11
WORK NOTES - THIS PROJECT - GREEN LOT
GREEN LOT AND ENTRANCES
1. LAYOUT SHOWN (DTL 3) IS FROM ORIGINAL CONSTRUCTION DRAWINGS
2. SEE AERIAL PHOTO (DTL 4, THIS SHEET) FOR HOW PAVEMENT AND
STRIPING HAVE CHANGED SINCE ORIGINAL CONSTRUCTION.
3. WORK INCLUDES ENTRANCES TO PARKING LOT FROM ROOSEVELT RD.
4. PROVIDE 2" OVERLAY WITH APPLICABLE TRANSITIONS AT ALL
INTERSECTIONS AND C&G (DTLS SHEET 11).
5. RE-STRIPE TO MATCH EXISTING AS SHOWN IN AERIAL PHOTO, DTL 4.
WORK NOTES - THIS PROJECT - ORANGE LOT
ORANGE LOT AND ENTRANCES
1. LAYOUT SHOWN (DTL 1) IS FROM
ORIGINAL CONSTRUCTION DRAWINGS
2. SEE AERIAL PHOTO (DTL 2, THIS SHEET)
FOR HOW PAVEMENT AND STRIPING HAS
CHANGED SINCE ORIGINAL
CONSTRUCTION
3. WORK INCLUDES ENTRANCES TO
PARKING LOT FROM ROOSEVELT RD.
4. PROVIDE 2" OVERLAY WITH APPLICABLE
TRANSITIONS AT ALL INTERSECTIONS
AND C&G (DTLS SHEET 11).
5. RE-STRIPE TO MATCH EXISTING AS
SHOWN IN AERIAL PHOTO, DTL 2.
SHEET 8 OF 11MAY 2021OVERLAY, REPAIR & STRIPING PLAN - GREEN & ORANGE LOTS1 - ORANGE LOT - ORIGINAL LAYOUT AND STRIPING PLAN
NTS
2 - ORANGE LOT - AERIAL OF EXISTING CONDITIONS
NTS
3 - GREEN LOT - ORIGINAL LAYOUT AND STRIPING PLAN
NTS
4 - GREEN LOT - AERIAL OF EXISTING CONDITIONS
GRAVEL ROAD. NIC.
EXTEND REPAIR & OVERLAY WORK TO 5'
EAST OF GATE. SEE DTL 1, SHEET 10.
WORK NOTES - THIS PROJECT - CPT HENDRIX DR
CAPTAIN HENDRIX DR - BID OPTION
1. LAYOUT SHOWN IS FROM ORIGINAL
CONSTRUCTION DRAWINGS
2. PROVIDE 2" OVERLAY ON CAPTAIN HENDRIX
DR WITH APPLICABLE TRANSITIONS AT ALL
INTERSECTIONS AND C&G (DTLS SHEET 11)
3. RE-STRIPE TO MATCH EXISTING
4. REPLENISH GRAVEL SHOULDER, MIN 1",
THE FIRST 100 FEET FROM THE
INTERSECTION OF CONSERVATION WAY,
EACH SIDE.
SHEET 9 OF 11MAY 2021OVERLAY, REPAIR & STRIPING PLAN - CAPTAIN HENDRIX DR
WORK NOTES - THIS PROJECT - GREY LOT
GREY LOT AND ENTRANCES - BID OPT
1. LAYOUT SHOWN (DTL 1) IS FROM ORIGINAL CONSTRUCTION DRAWINGS
2. SEE AERIAL PHOTO (DTL 2 THIS SHEET) FOR HOW PAVEMENT AND STRIPING HAVE CHANGED SINCE THE ORIGINAL CONSTRUCTION.
3. WORK INCLUDES ENTRANCES TO PARKING LOT FROM CPT. HENDRIX DR.
4. PROVIDE 2" OVERLAY WITH APPLICABLE TRANSITIONS AT ALL INTERSECTIONS AND C&G (DTLS SHEET 11).
5. RE-STRIPE TO MATCH EXISTING
ISLANDS PAVED OVER &
STRIPED. TYP. OF 4 - ADDED
TO LOT FROM ORIGINAL
ISLANDS PAVED OVER &
STRIPED. TYP. OF 4 - ADDED
TO LOT FROM ORIGINAL
REPAIR FAILED PAVEMENT - REMOVE PAVEMENT FULL
WIDTH OF ROAD X 15' LENGTH. REPAIR/ADD BASE,
REPAVE. GRADE TO DRAIN TO INLET. DTL 3, SHEET 11
REPAIR PAVEMENT - STRESS CRACKS AT CORNERS
OF PREVIOUS ASPHALT WORK. TYP. OF 3. REMOVE
PAVEMENT, TOTAL DIMENSIONS APPROX 60' X 2'.
REPAIR/ADD BASE, REPAVE. DTL 3, SHEET 11
END CPT. HENDRIX WORK 5' INSIDE GATE TO REPAIR
FAILED PAVEMENT. REMOVE PAVEMENT WIDTH OF ROAD X
5' LENGTH. REPAIR/ADD BASE, REPAVE. DTL 3, SHEET 11
SHEET 10 OF 11MAY 2021OVERLAY, REPAIR & STRIPING PLAN - GREY LOT. CURB DETAILS
1 - GREY LOT - ORIGINAL LAYOUT AND STRIPING PLAN
NTS
2 - GREY LOT - AERIAL OF EXISTING CONDITIONS
NTS
3 - EXISTING CURB TYPES FROM ORIGINAL CAMPUS CONSTRUCTION
SHEET 11 OF 11MAY 2021DETAILS
VA
RI
ES
S
EE
P
LA
N
4''
TYP.
4'' TYP.
2'- 0"
6'-0"
45°
5 - TYP CROSSWALK STRIPING PATTERN
NTS
4 - TYP ADA PARKING LAYOUT (WV DOH STANDARD DETAILS - TEM-5)
NTS
3 - NEWLY PAVED AREAS AND FULL DEPTH REPAIRS
1 - OVERLAY & TRANSITION AT C&G OR OTHER STRUCTURES
NTS 2 - OVERLAY TRANSITION AT INTERSECTING ROADWAYS & PARKING AREAS
NTS
6 - OVERLAY & TRANSITION AT GRAVEL SHOULDERS
NTS
AutoCAD SHX Text
AGGREGATE BASE COURSE
AutoCAD SHX Text
OVERLAY
AutoCAD SHX Text
EXISTING ASPHALT
AutoCAD SHX Text
5' MIN
AutoCAD SHX Text 2.5'
AutoCAD SHX Text 1"
AutoCAD SHX Text SAWCUT & REMOVE EXISTING ASPHALT OR MILL TO 2" DEPTH. REPLACE WITH NEW ASPHALT & TRANSITION TO FULL OVERLAY.
AutoCAD SHX Text
EDGE OF EXISTING GUTTER OR CURB WHEN NO GUTTER
AutoCAD SHX Text 2"
AutoCAD SHX Text
TACK COAT
AutoCAD SHX Text
TACK
AutoCAD SHX Text
COAT
AutoCAD SHX Text
EDGES
AutoCAD SHX Text
AGGREGATE BASE COURSE
AutoCAD SHX Text
OVERLAY/SURFACE COURSE
AutoCAD SHX Text
EXISTING ASPHALT
AutoCAD SHX Text
5' MIN
AutoCAD SHX Text 2.5'
AutoCAD SHX Text
EDGE OF ROADWAY
AutoCAD SHX Text
BEING OVERLAID/PAVED
AutoCAD SHX Text 1"
AutoCAD SHX Text SAWCUT & REMOVE EXISTING ASPHALT OR MILL TO 2" DEPTH. REPLACE WITH NEW ASPHALT & TRANSITION TO OVERLAY AREA.
AutoCAD SHX Text 2"
AutoCAD SHX Text
TACK COAT
AutoCAD SHX Text
TACK
AutoCAD SHX Text
COAT
AutoCAD SHX Text
EDGES
AutoCAD SHX Text
OR NEW 3" ASPHALT BASE IN THE CASE OF NOTED REPAIR WORK
AutoCAD SHX Text
EXISTING AGGREGATE BASE
AutoCAD SHX Text
NEW BITUMINOUS SURFACE COURSE
AutoCAD SHX Text
NEW BITUMINOUS BASE COURSE
AutoCAD SHX Text 3"
AutoCAD SHX Text 2"
AutoCAD SHX Text 6"
AutoCAD SHX Text
APPROX.
AutoCAD SHX Text
TACK COAT
AutoCAD SHX Text
AGGREGATE BASE COURSE
AutoCAD SHX Text
OVERLAY
AutoCAD SHX Text
EXISTING ASPHALT
AutoCAD SHX Text
5' MIN
AutoCAD SHX Text 2.5'
AutoCAD SHX Text 1"
AutoCAD SHX Text SAWCUT & REMOVE EXISTING ASPHALT OR PROVIDE EDGE MILLING TO 2" DEPTH. REPLACE WITH NEW ASPHALT & TRANSITION TO FULL OVERLAY.
AutoCAD SHX Text
EDGE OF EXISTING PAVEMENT
AutoCAD SHX Text 2"
AutoCAD SHX Text
TACK COAT
AutoCAD SHX Text
TACK
AutoCAD SHX Text
COAT
AutoCAD SHX Text
EDGES
REPLENISH EXISTING GRAVEL SHOULDER WITH 1" DEPTH BY 18" WIDE GRAVEL
ATTACHMENT “A”
SPECIFICATIONS AND DRAWINGS
NCTC Pavement Maintenance - 2021
NATIONAL CONSERVATION TRAINING CENTER (NCTC)
SHEPHERDSTOWN, WV
May 2021
TABLE OF CONTENTS
Description Section Pages
Construction Specifications
Summary of Work 01 11 00 2 Work Restrictions 01 14 00 4 Administrative Requirements 01 30 00 3 Submittals 01 33 00 10
01 33 00 Insert: ENG Form 4025 2 01 33 00 Insert: Submittal Register 1
Demolition 02 41 00 4
Technical Project Requirements (Based on 2017 WV DOH Standard Specifications for Roads & Bridges)
Earthwork, Aggregate Base & Bituminous Paving 4
Site Specific Scopes of Work
Baird Drive 2 Red Lot 1 Entry Lots 1 Blue Lot 1 Green Lot 1 Orange Lot 1 Yellow Lot 1 Daycare Lot 1 Captain Hendrix Drive – Bid Option 1 Grey Lot – Bid Option 1
Contract Drawings/Sketches 11
NCTC
Pavement Maintenance ‐ 2021
Section 01 11 00 Summary of Work Page 1
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Facility Description
The National Conservation Training Center (NCTC) is an active training facility for the U.S. Fish and Wildlife Service. The NCTC site is a campus setting with multiple buildings, which include lodges, offices, training rooms, a large auditorium, a laboratory, dining facilities, gymnasium, operations support, a central plant and self‐contained water and wastewater treatment facilities. The majority of the buildings on campus were constructed between 1994 and 1997.
1.1.2 Project Description
This is a construction contract for which the contractor shall provide all supervision, labor, and materials necessary to provide asphalt overlay on specified roads and parking areas, re‐construct subbase where specified, provide new shoulders where specified, correct specified drainage deficiencies and restore work areas
Perform all work as described in these documents, including all attachments.
The project consists of the following groupings of the work, per Contract Line Items (CLIN) in the bid schedule:
BASE BID
CLIN 010: Baird Drive – Pavement Repairs, Overlay and Shoulder Work CLIN 020: Red Parking Lot – Pavement Repairs and Overlay CLIN 030: Entry Parking Lot – Pavement Repairs and Overlay CLIN 040: Blue Parking Lot – Pavement Repairs and Overlay CLIN 050: Green Parking Lot – Pavement Repairs and Overlay CLIN 060: Orange Parking Lot – Pavement Repairs and Overlay CLIN 070: Yellow Parking Lot – Pavement Repairs and Overlay CLIN 080: Day Care Parking Lot – Pavement Repairs and Overlay
BID OPT 1
CLIN 090: Hendrix Drive – Pavement Repairs, Overlay and Shoulder Work
BID OPT 2
CLIN 100: Grey Parking Lot – Pavement Repairs and Overlay
Section 01 11 00 Summary of Work Page 2
1.1.3 Location
The work is located on the campus of the National Conservation Training Center, 698 Conservation Way, Shepherdstown, WV, as indicated.
1.2 OCCUPANCY OF PREMISES
Building(s) will be occupied during performance of work under this Contract.
Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways. See Section 01 14 00 Work Restrictions, for more information on coordination requirements.
1.3 EXISTING WORK
In addition to "FAR 52.236‐9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":
A. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which will remain.
B. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
‐‐ End of Section ‐‐
Section 01 14 00 Work Restrictions Page 1
SECTION 01 14 00
WORK RESTRICTIONS
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD‐01 Preconstruction Submittals
Sequence of Work; G
Personnel List (Access Roster); G
1.2 GENERAL FACILITY HOURS, ACCESS AND COORDINATION
1.2.1 Business Hours: NCTC is an active training campus. Normal facility business hours are between
8:00 am and 5:00 pm, Monday through Friday, excluding Government holidays.
1.2.2 Access: The Contractor, subcontractor, and all employees shall stop and check in with the guard on duty at the Guard Station every time they enter the campus.
1.2.3 The schedule and sequencing of all work shall be closely coordinated with the Contracting
Officer.
1.2.4 Closed Weekend: A Closed Weekend is when no guests are scheduled to be on‐site and there are no events planned through a weekend. Closed weekends typically mean that the Contractor will have full use of the work site from 5:00 pm on a Friday until 11 a.m. on the following Sunday in housing units and until 6:30 a.m. on the following Monday in educational buildings and offices. Closed weekends can be confirmed generally two weeks prior to when they occur.
1.2.5 Preparation: Have materials, equipment, and personnel required to perform the work at the site prior to the commencement of the work.
1.2.6 Unless noted otherwise, buildings will remain in operation during the entire construction period.
The Contractor must conduct his operations so as to cause the least possible interference with normal operations of the activity.
Work Restrictions Page 2
1.2.7 Any work that involves loud or continuous noise shall be scheduled so as to create the least disturbance to guests, i.e. work creating loud noises near or within the educational buildings shall be performed outside of normal business hours as defined above; work creating loud noises near or within the lodges will not be permitted to be performed while guests will most likely be in their rooms, including nonclosed weekends. This could include activities such as excavation, saw cutting, compaction, demolition hammers, mortar mixers close to the work areas, etc. Work of this type is to be coordinated with the Contracting Officer
1.3 SPECIAL SCHEDULING REQUIREMENTS & COORDINATION OF WORK
1.3.1 Sequence of Work:
The Contractor shall submit for review and approval, a Sequence of Work that breaks down the work of this project into the proposed sequence of work and associated duration, at a minimum per parking lot and per roadway. The sequence shall take into account the schedule restrictions noted below and elsewhere in the specifications. The Sequence of Work shall be coordinated with the Traffic Control Plan and the Construction Schedule.
1.3.2 Parking Lots: Parking Lot work shall be closely coordinated with the CO
Parking Lots shall be closed in their entirety for the work of this project. Unless work is occurring when the campus is closed, only one parking lot may be closed at a time.
Exception: The Blue Lot will be separated into the primary Blue Lot and the Extended Blue Lot and only one lot will be closed at a time.
1.3.3 Road Work:
One paved traffic lane shall be kept open from 0600 to 1700 hours on weekdays and approved, closed weekends; two lanes shall be placed in service at all other times.
Baird Drive, Section Behind the Lab: Work on this section of Baird Drive will block access to the Lab loading dock. This work shall be coordinated with the CO.
1.4 CONTRACTOR ACCESS AND USE OF PREMISES
1.4.1 Activity Regulations
Ensure that Contractor personnel employed on the project become familiar with and obey NCTC regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for identification.
Access Roster: Submit a personnel list (access roster). Access will be granted based on the access roster and an official photo identification via a state issued driver's license or other means
Work Restrictions Page 3 of identification as approved by the Contracting Officer. The Contractor shall provide the Contracting Officer with an updated access roster as necessary.
Vehicle Identification: The Contractor and subcontractor(s) shall have signage (magnetic ok) on each side of vehicles, clearly identifying the associated company.
No Smoking Policy: Smoking is prohibited within and outside of all buildings at NCTC, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. The Contracting Officer will identify designated smoking areas.
1.4.2 Contractor Work Outside of Normal Business Hours
Any work to be completed outside of normal business hours shall be closely coordinated with the Contracting Officer.
1.4.3 Special Requirements
Facility Events: From time‐to‐time there are various public events held at the facility. The Contractor shall adjust his work schedule and work areas as directed by the Government.
The dining facility and other amenities are not available for Contractor use.
No parking in fire lanes. Fire lanes can be used for access into the building for the delivery of material only. Vehicles shall be removed immediately after the delivery is complete.
Drive and park only on paved roads and pathways.
Parking: Employees shall park at the Support Services parking lot. Generally, only one (1) vehicle, such as a foreman's vehicle, shall be permitted to park near the worksite.
1.4.4 Storage and Staging Areas:
There is a contractor staging area that is adjacent to Support Services. Storage trailer(s) can be parked here, in area(s) designated by the Contracting Officer.
Overnight storage for pavers, rollers and similar equipment will be in areas designated by the
COR.
There shall be no driving or parking on the grass shoulders.
1.5 JOB CONDITIONS
1.5.1 Water for paving operations will be made available for the contractor’s use. Coordinate with the CO.
Work Restrictions Page 4
1.5.2 No facility amenities are available to the contractor. The contractor shall provide and maintain restroom facilities for their employee’s use.
Not Used
PAVEMENT MAINTENANCE ‐ 2021
Section 01 30 00 Administrative Requirements Page 1
SECTION 01 30 00
ADMINISTRATIVE REQUIREMENTS
1.1 SUPERVISION
1.1.1 Minimum Communication Requirements
Have at least one qualified superintendent, or competent alternate, capable of reading, writing, and conversing fluently in the English language, on the job‐site at all times during the performance of contract work. The Superintendent shall have the authority to act on behalf of the Contractor in all areas, to include schedule and price.
1.1.2 Superintendent Qualifications
The project superintendent shall have a minimum of 5 years experience in construction with at least 2 of those years as a superintendent on projects similar in size and complexity. The individual must be familiar and have experience in the areas of hazard identification and safety compliance. The individual must be capable of interpreting a critical path schedule and construction drawings. The qualification requirements for the alternate superintendent are the same as for the project superintendent. The Contracting Officer may request proof of the superintendent's qualifications at any point in the project if the performance of the superintendent is in question.
1.1.2.1 Duties
The project superintendent is primarily responsible for managing and coordinating day‐to‐day production and schedule adherence on the project. The superintendent or qualified alternative must be on‐site at all times during the performance of this contract until the work is completed and accepted.
1.1.3 Non‐Compliance Actions
The Project Superintendent is subject to removal by the Contracting Officer for non‐compliance with requirements specified in the contract and for failure to manage the project to insure timely completion. Furthermore, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to such stop orders is acceptable as the subject of claim for extension of time for excess costs or damages by the Contractor.
1.2 PRECONSTRUCTION
Once the contract has been awarded, but prior to the start of work at the site, the Contractor shall attend a pre‐work meeting to discuss the schedule and details of the construction. As a minimum, Administrative Requirements Page 2 attendance shall be the contractor’s project manager, and designated site superintendent, the testing company, a technical representative from the asphalt pavement supplier and the Contracting Officer’s Representative (COR). The agenda shall include:
Review of the schedule & sequence of construction
Traffic control
Material Submittals & Product Data
Testing Plan
Coordination Issues & after hours work
1.3 PROGRESS & COORDINATION MEETINGS
Coordination meetings shall be held as requested by either the Government or the Contractor. The intent of the meeting shall be to discuss the progress of work, schedule, work hours, potential changes, etc.
The Government may choose to schedule recurring progress/coordination meetings on a weekly or biweekly basis.
1.4 HOUSEKEEPING
1. The General Contractor and all subcontractors are to remove dust, debris and other waste from the job site on a daily basis.
2. Waste is to be properly bagged and stored for removal in a timely manner.
3. A wetting agent is to be used to suppress dust where possible.
4. All interior absorptive materials are to be protected from moisture and inspected for signs of moisture damage prior to installation.
1.5 VEGETATION RESTORATION
General: It is not expected that the Contractor will need to restore any vegetated areas during this contract, but if damage to vegetation occurs, the Contractor shall proceed with restoration at their own expense.
1. The Contractor shall provide screened topsoil that has been properly amended for growing turf grass. The Contractor shall have the topsoil tested to determine the quantity and type of amendment required for lawn type grasses.
2. All areas to be seeded shall be fine graded. The finished grade shall be uniform and free of irregularities or waterpockets. The finished grade shall be free of weed and plant growth, stones over 1 inch in diameter, or other debris. Immediately prior to seeding, all areas shall be cultivated to provide a reasonably firm but friable seedbed. The depth of tillage shall be 3 inches. Limestone as required and fertilizer as specified shall be worked into the upper 3 inches of the seedbed before seeding.
Administrative Requirements Page 3
3. Seed Mixture:
Kentucky 31 Fescue: 45 lbs per acre RedFescue (Pennlawn): 20 lbs per acre Kentucky Bluegrass: 25 lbs per acre
4. Damaged trees shall be addressed on a case‐by‐case basis.
Section 01 33 00 Submittal Procedures Page 1
SECTION 01 33 00
SUBMITTAL PROCEDURES
1.1 SUMMARY
The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections.
Units of weights and measures used on all submittals are to be the same as those used in the contract drawings.
Each submittal is to be complete and in sufficient detail to allow ready determination of compliance with contract requirements.
The Contractor shall check and approve all items prior to submittal and stamp, sign, and date indicating action taken. Proposed deviations from the contract requirements are to be clearly identified. Include within submittals items such as: Contractor's, manufacturer's, or fabricator's drawings; descriptive literature including (but not limited to) catalog cuts, diagrams, operating charts or curves; test reports; test cylinders; samples; O&M manuals (including parts list); certifications;
warranties; and other such required submittals.
Submittals requiring Government approval are to be scheduled and made prior to the acquisition of the material or equipment covered thereby. Pick up and dispose of samples not incorporated into the work in accordance with manufacturer's Material Safety Data Sheets (MSDS) and in compliance with existing laws and regulations.
1.2 DEFINITIONS
1.2.1 Submittal Descriptions
Submittal requirements are specified in the technical sections. Submittals are identified by Submittal Description (SD) numbers and titles as follows:
SD‐01 Preconstruction Submittals (PS)
Submittals which are required prior to the start of construction.
SD‐02 Shop Drawings (SD)
Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work.
Submittal Procedures Page 2
Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project.
Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.
SD‐03 Product Data (PD)
Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work.
Samples of warranty language when the contract requires extended product warranties.
SD‐04 Samples (SM)
Fabricated or unfabricated physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged.
Color samples from the manufacturer's standard line (or custom color samples if specified) to be used in selecting or approving colors for the project.
Field samples and mock‐ups constructed on the project site establish standards by which the ensuring work can be judged. Includes assemblies or portions of assemblies which are to be incorporated into the project and those which will be removed at conclusion of the work.
SD‐05 Design Data (DD)
Design calculations, mix designs, analyses or other data pertaining to a part of work.
SD‐06 Test Reports (TR)
Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. Unless specified in another section, testing must have been within three years of date of contract award for the project.
Report which includes findings of a test required to be performed by the Contractor on an actual portion of the work or prototype prepared for the project before shipment to job site.
Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.
Submittal Procedures Page 3
SD‐07 Certificates (CT)
Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that the product, system, or material meets specification requirements. Must be dated after award of project contract and clearly name the project.
Document required of Contractor, or of a manufacturer, supplier, installer or Subcontractor through Contractor. The document purpose is to further promote the orderly progression of a portion of the work by documenting procedures, acceptability of methods, or personnel qualifications.
Text of posted operation instructions.SD‐08 Manufacturer's Instructions (MI)
Preprinted material describing installation of a product, system or material, including special notices and (MSDS)concerning impedances, hazards and safety precautions.
SD‐09 Manufacturer's Field Reports (MF)
Documentation of the testing and verification actions taken by manufacturer's representative at the job site, in the vicinity of the job site, or on a sample taken from the job site, on a portion of the work, during or after installation, to confirm compliance with manufacturer's standards or instructions. The documentation must be signed by an authorized official of a testing laboratory or agency and state the test results; and indicate whether the material, product, or system has passed or failed the test.SD‐10 Operation and Maintenance Data (OM)
Data that is furnished by the manufacturer, or the system provider, to the equipment operating and maintenance personnel, including manufacturer's help and product line documentation necessary to maintain and install equipment. This data is needed by operating and maintenance personnel for the safe and efficient operation, maintenance and repair of the item.
This data is intended to be incorporated in an operations and maintenance manual or control system.
SD‐11 Closeout Submittals (CS)
Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism.
Special requirements necessary to properly close out a construction contract. For example, Record Drawings and as‐built drawings. Also, submittal requirements necessary to properly close out a major phase of construction on a multi‐phase contract.
Submittal Procedures Page 4
1.2.2 Approving Authority
Office or designated person authorized to approve submittal.
1.3 SUBMITTALS
accordance with this section.
Submittal Register; G
1.4 SUBMITTAL CLASSIFICATION
Submittals are classified as follows:
1.4.1 Government Approved Submittals (G)
Within the terms of the Contract Clause 52.236‐21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION, these are considered to be "shop drawings."
1.4.2 For Information Only Submittals (FIO)
These are not considered to be "shop drawings" within the terms of the Contract Clause referred to above.
1.5 PREPARATION
1.5.1 Transmittal Form
Use the sample transmittal form, (ENG Form 4025‐R), at the end of this specification section, for submitting both Government approved and for information only submittals.
1.5.2 Electronic File Format
Provide submittals in electronic format, with the exception of material samples required for SD‐04 Samples items. Compile the submittal file as a single, complete document, to include the Transmittal Form described above. Name the electronic submittal file specifically according to its contents, coordinate the file naming convention with the Contracting Officer. Electronic files must be of sufficient quality that all information is legible. Use PDF as the electronic format, unless otherwise specified or directed by the Contracting Officer. Index and bookmark files exceeding 30 pages to allow efficient navigation of the file. When required, the electronic file must include a valid electronic signature, or scan of a signature.
Submittal Procedures Page 5
Email electronic submittal documents fewer than 10MB to an email address as directed by the Contracting Officer. Provide electronic documents over 10MB on an optical disc, or through a secure electronic file sharing system.
1.6 QUANTITY OF SUBMITTALS
1.6.1 Number of Samples SD‐04 Samples
1. Submit one sample, or one set of samples showing range of variation, of each required item. The sample or set of samples will be retained by approving authority.
2. Submit one sample panel or provide one sample installation where directed. Include components listed in technical section or as directed.
3. Submit one sample installation, where directed.
4. Submit one sample of non‐solid materials.
1.6.2 Number of Copies of SD‐10 Operation and Maintenance Data
Submit four copies of O&M Data to the Contracting Officer for review and approval.
1.7 INFORMATION ONLY SUBMITTALS
Normally submittals for information only will not be returned. Approval of the Contracting Officer is not required on information only submittals. The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract. This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work; and does not relieve the Contractor of the requirement to furnish samples for testing by the Government laboratory or for check testing by the Government in those instances where the technical specifications so prescribe.
1.8 SUBMITTAL REGISTER
Attached at the end of this specification section is a submittal register showing items of equipment and materials for which submittals are required by the specifications. Prepare and maintain the submittal register, as the work progresses. Do not change data which is output in columns (c), (d), (e), and (f) as delivered by Government; retain data which is output in columns (a), (g), (h), and (i) as approved. This list may not be all inclusive and additional submittals may be required. The Government will provide the initial submittal register in electronic format with the following fields completed, to the extent that will be required by the Government during subsequent usage.
Column (c): Lists specification section in which submittal is required.
Submittal Procedures Page 6
Column (d): Lists each submittal description (SD No. and type, e.g. SD‐02 Shop Drawings) required in each specification section.
Column (e): Lists one principal paragraph in specification section where a material or product is specified. This listing is only to facilitate locating submitted requirements. Do not consider entries in column (e) as limiting project requirements.
Thereafter, the Contractor is to track all submittals by maintaining a complete list, including completion of all data columns, including dates on which submittals are received and returned by the Government.
1.8.1 Use of Submittal Register
Submit submittal register. Submit project schedule. Verify that all submittals required for project are listed and add missing submittals. Coordinate and complete the following fields on the register submitted with the QC plan and the project schedule:
Column (a) Activity Number: Activity number from the project schedule.
Column (g) Contractor Submit Date: Scheduled date for approving authority to receive submittals.
Column (h) Contractor Approval Date: Date Contractor needs approval of submittal.
Column (i) Contractor Material: Date that Contractor needs material delivered to Contractor control.
1.8.2 Contractor Use of Submittal Register
Update the following fields with each submittal throughout contract.
Column (b) Transmittal Number: Contractor assigned list of consecutive numbers.
Column (j) Action Code (k): Date of action used to record Contractor's review when forwarding submittals to QC.
Column (l) List date of submittal transmission.
Column (q) List date approval received.
1.8.3 Approving Authority Use of Submittal Register
Update the following fields in the program utilized by Contractor.
Column (b) Transmittal Number: Contractor assigned list of consecutive numbers.
Column (l) List date of submittal receipt.
Submittal Procedures Page 7
Column (m) through (p) List Date related to review actions.
Column (q) List date returned to Contractor.
1.8.4 Copies Delivered to the Government
Deliver one copy of submittal register updated by Contractor to Government with each invoice request.
1.9 VARIATIONS
Variations from contract requirements require Government approval pursuant to contract Clause FAR 52.236‐21 and will be considered where advantageous to Government.
1.9.1 Considering Variations
Discussion with Contracting Officer prior to submission will help ensure functional and quality requirements are met and minimize rejections and re‐submittals. When contemplating a variation which results in lower cost, consider submission of the variation as a Value Engineering Change Proposal (VECP), see clause 52.248‐3..
Specifically point out variations from contract requirements in transmittal letters. Failure to point out deviations may result in the Government requiring rejection and removal of such work at no additional cost to the Government.
1.9.2 Proposing Variations
When proposing variation, deliver written request to the Contracting Officer, with documentation of the nature and features of the variation and why the variation is desirable and beneficial to Government, including the DOR's written analysis and approval. If lower cost is a benefit, also include an estimate of the cost savings. In addition to documentation required for variation, include the submittals required for the item. Clearly mark the proposed variation in all documentation.
Check the column "variation" of ENG Form 4025 (transmittal form) for submittals which include proposed deviations requested by the Contractor. Set forth in writing the reason for any deviations and annotate such deviations on the submittal. The Government reserves the right to rescind inadvertent approval of submittals containing unnoted deviations.
1.9.3 Warranting that Variations are Compatible
When delivering a variation for approval, Contractor, including its Designer(s) of Record (DOR), warrants that this contract has been reviewed to establish that the variation, if incorporated, will be compatible with other elements of work.
1.9.4 Review Schedule Extension
Submittal Procedures Page 8
In addition to normal submittal review period, a period of 14 calendar days will be allowed for consideration by the Government of submittals with variations.
1.10 SCHEDULING
Schedule and submit concurrently submittals covering component items forming a system or items that are interrelated. Include certifications to be submitted with the pertinent drawings at the same time. No delay damages or time extensions will be allowed for time lost in late submittals.
1. Coordinate scheduling, sequencing, preparing and processing of submittals with performance of work so that work will not be delayed by submittal processing. Allow for potential resubmittal of
2. Submittals called for by the contract documents will be listed on the register. If a submittal is called for but does not pertain to the contract work, the Contractor is to include the submittal in the register and annotate it "N/A" with a brief explanation. Approval by the Contracting Officer does not relieve the Contractor of supplying submittals required by the contract documents but which have been omitted from the register or marked "N/A."
3. Re‐submit register and annotate monthly by the Contractor with actual submission and approval dates. When all items on the register have been fully approved, no further re‐submittal is required.
4. Carefully control procurement operations to ensure that each individual submittal is made on or before the Contractor scheduled submittal date shown on the approved "Submittal Register."
1.11 GOVERNMENT APPROVING AUTHORITY
When approving authority is Contracting Officer, the Government will:
1. Note date on which submittal was received.
2. Review submittals for approval within scheduling period specified and only for conformance with project design concepts and compliance with contract documents.
3. Identify returned submittals with one of the actions defined in paragraph REVIEW NOTATIONS and with markings appropriate for action indicated.
Upon completion of review of submittals requiring Government approval, stamp and date submittals.
Two copies of the submittal will be retained by the Contracting Officer and zero copies of the hard copy submittals will be returned to the Contractor, unless additonal hard copies have been provided for this purpose.
1.11.1 Review Notations
Contracting Officer review will be completed no later than 30 calendar days after receipt by the Government. Submittals will be returned to the Contractor with the following notations:
Submittal Procedures Page 9
1. Submittals marked "approved" or "accepted" authorize the Contractor to proceed with the work covered.
2. Submittals marked "approved as noted" or "approved, except as noted, resubmittal not required," authorize the Contractor to proceed with the work covered provided he takes no exception to the corrections.
3. Submittals marked "not approved" or "disapproved," or "revise and resubmit," indicate noncompliance with the contract requirements or design concept, or that submittal is incomplete. Resubmit with appropriate changes. No work shall proceed for this item until resubmittal is approved.
4. Submittals marked "not reviewed" will indicate submittal has been previously reviewed and approved, is not required, does not have evidence of being reviewed and approved by Contractor, or is not complete. A submittal marked "not reviewed" will be returned with an explanation of the reason it is not reviewed. Resubmit submittals returned for lack of review by Contractor or for being incomplete, with appropriate action, coordination, or change.
1.12 DISAPPROVED OR REJECTED SUBMITTALS
Make corrections required by the Contracting Officer. If the Contractor considers any correction or notation on the returned submittals to constitute a change to the contract drawings or specifications;
notice as required under the FAR clause entitled CHANGES, is to be given to the Contracting Officer.
Contractor…
This is the start of the file's text. The full file is on GovTribe.