Q_A_0002.pdf
PDF 92 KB Posted
- Attached to
- HVAC PROJECT - CHINCOTEAGUE VA Federal contract opportunity
- Solicitation number
- 140F0222R0040
About this file
This document contains questions and answers regarding federal solicitation number 140F0222R0040 for an HVAC project at the Chincoteague National Wildlife Refuge. The solicitation is for a one year period of performance with potential extensions if materials lead times require it. Bidders must provide in-house commissioning and inspection capabilities, and the onsite superintendent and quality control manager cannot be the same person. Price quotes should follow the CSI division format. Local permits are not required but all local code requirements must be met. Bids are expected to fall within the range stated in the original solicitation issued by the Department of the Interior Fish and Wildlife Service.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140F0222R0040_Amd_0002.pdf | ||
| Sol_140F0222R0040_Amd_0001.pdf | ||
| B03_Wage_Rates__pdf.pdf | ||
| Bid_Schedule.pdf | ||
| Sol_140F0222R0040.pdf | ||
| Chincoteague_100__(Final)_Drawings.pdf | ||
| Chincoteague_100__(Final)_Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Please give a reasonable expectation of period of performance and if there is a "not to exceed" period of performance that must be met. How flexible is the Refuge willing to be?
2. THE SOLICITATION INDICATES A ONE YEAR PERIOD OF PERFORMANCE. IF
MATERIALS LEAD TIME IS EXCESSIVE, AN EXTENSION WOULD BE GRANTED
AFTER AWARD OF THE CONTRACT.
3. I would assume, same person
4. THE ONSITE SUPERINTENDENT AND QUALITY CONTROL MANAGER CANNOT BE
THE SAME PERSON.
5. Do you have a qualified person as your Project Manager who could perform inspections if you are unable to?
6. A THIRD PARTY INSPECTOR IS NOT REQUIRED UNDER THIS CONTRACT. THE
GOVERNMENT EXPECTS THE CONTRACTOR TO HAVE THEIR OWN IN HOUSE
COMMISSIONING AND INSPECTION CAPABILITIES.
7. Rachel, do you remember if a Quote Schedule was provided in the solicitation attachments?
8. PROVIDE PRICE BREAKDOWN IN STANDARD CSI DIVISION FORMAT.
5. I assume the permitting requirement was clarified in the scope?
6. GENERALLY, LOCAL BUILDING PERMITS ARE NOT REQUIRED ON FEDERAL
PROJECTS, HOWEVER ALL LOCAL BUILDING REQUIREMENTS MUST BE MET. THE
CONTRACTOR IS RESPONSIBLE FOR BECOMING FAMILIAR WITH AND MEETING
ALL LOCAL CODE REQUIREMENTS.
7. Not sure what "previous proposal" this is referencing?
8. THE GOVERNMENT IS EXPECTING THE BIDS TO FALL WITHIN THE RANGE
STATED IN THE SOLICITATION.