B12 Questions and Answers 3.3.21_0002.docx

DOCX document 17 KB Posted

Attached to
WA-SPRING CREEK NFH GENERATOR
Solicitation number
140F0121R0002
Issued by

About this file

This document contains questions and answers regarding a generator replacement project at the Spring Creek National Fish Hatchery. The generator replacement project involves removing the existing generator and installing a new generator by the second week of August. Contractors must ensure backup power is provided to the hatchery until the first week of May, either by supplying their own backup generator or by renting the existing on-site rental generator. After the first week of May, outages will no longer affect hatchery operations. Contractors are responsible for disposing of the existing generator and should provide a credit in their quote for any value recovered from its disposal.

View the file

Other files

File Type Posted
Sol_140F0121R0002_Amd_0002.pdf PDF
Sol_140F0121R0002_Amd_0001.pdf PDF
B03 Wage Rates.pdf PDF
A06 Specifications Bid Set Spring Creek Gen Repl.pdf PDF
Sol_140F0121R0002.pdf PDF
A06 Drawing.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140F0120R0002 Spring Creek NFH - Generator Questions & Answers (Q&A’s)

Q1. Do I have enough clearance through the doors to extract the existing generator from its current location?

Answer: A contractor has confirmed there is enough room to fit through the doors.

Q2. Do we need to bring our own backup generator?

Answer:

Need to avoid outages until the first week of May. After the first week of May, outages will not affect our operations. We will need backup power if the new generator project is not operational by the second week of August.

The contractor is responsible for providing backup power to the hatchery until the end of the first week of May.

If the new generator is not operational by the second week of August, the contractor is responsible for supplying backup power to the hatchery.

Q3. Can we use the existing Rental Generator?

Answer:

We have been renting a generator as backup power for the hatchery. We have the generator delivered the second week of August and will return it after the first week of May.

The contractor has the option to rent the existing rental generator on-site. If they would like to use the existing rental generator, they can coordinate with hatchery and initiate their own contract with United Rentals.

Q4. Are Contractors to dispose of the generator?

Answer: Yes, Contractors are to dispose of the generator, but they should show a credit for whatever value they gain from it in their quote.