Thermal Blanket For Large Ballast Tank
Solicitation number
1333ND21QNB610065
Issued by

View the file

Other files

File Type Posted
Q-A Amend 0003.docx DOCX document
Questions and Responses.docx DOCX document
CSS Draft.docx DOCX document
Pic Tank1.jpg JPG image
Pic Tank2.jpg JPG image

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ IFB RFP

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER PAGE OF

2. CONTRACT NO. 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODEFACILITY

CODE

CODE

TELEPHONE NO.

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

29. AWARD OF CONTRACT: REF.

DATED . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

OFFER

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

17a CONTRACTOR/

OFFEROR.

CODE

8 (A)

SIZE STANDARD:

NAICS:

% FOR:SET ASIDE:UNRESTRICTED OR

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

10. THIS ACQUISITION IS

EDWOSB

SMALL BUSINESS PROGRAM

STANDARD FORM 1449 (REV. 2/2012) BACK

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

40. PAID BY

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

PARTIAL FINAL

37. CHECK NUMBER

38. S/R ACCOUNT NO. 39. S/R VOUCHER NUMBER

36. PAYMENT

COMPLETE PARTIAL FINAL

SCHEDULE Continued

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 Thermal Blanket for Large Ballast Tank of Unit 3 Cold

Source, in accordance with the attached statement of work.

PR NUMBER: NB610010-21-00424

SHIP TO:

NATIONAL INST OF STDS AND TECHNOLOGY

BUILDING 301 SHIPPING AND RECEIVING

100 BUREAU DRIVE

GAITHERSBURG MD 20899-0001

FOB : Destination

1.00 EA

PAGE 3 OF 71 1333ND21QNB610065

Table of Contents

Statement of Work

NIST Tank and Manifold Drawings.pdf

NIST Safety and Health Plan Guidelines

52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2018)

52.204-13SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)

52.204-16COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (AUG 2020)

52.204-17OWNERSHIP OR CONTROL OF OFFEROR (AUG 2020)

52.204-18COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG 2020)

52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)

52.204-20PREDECESSOR OF OFFEROR (AUG 2020)

52.204-24REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT

(OCT 2020)

52.209-2 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS-REPRESENTATION (NOV 2015)... 50

52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX LIABILITY OR A FELONY CONVICTION UNDER

ANY FEDERAL LAW (FEB 2016)

52.212-1INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS (JUN 2020)

52.212-3OFFEROR REPRESENTATIONS AND CERTIFICATIONS--COMMERCIAL ITEMS (NOV 2020)

52.212-4 CONTRACT TERMS AND CONDITIONS--COMMERCIAL ITEMS (OCT 2018)

52.212-5CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS--COMMERCIAL

ITEMS (NOV 2020)

52.222-25 AFFIRMATIVE ACTION COMPLIANCE (APR 1984)

52.223-6 DRUG-FREE WORKPLACE (MAY 2001)

52.225-4 BUY AMERICAN--FREE TRADE AGREEMENTS--ISRAELI TRADE ACT CERTIFICATE (MAY 2014)

52.225-25PROHIBITION ON CONTRACTING WITH ENTITIES ENGAGING IN CERTAIN ACTIVITIES OR TRANSACTIONS RELATING

TO IRAN--REPRESENTATION AND CERTIFICATIONS (JUN 2020)

52.232-8 DISCOUNTS FOR PROMPT PAYMENT (FEB 2002)

52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUNE 2013)

52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (DEC 2013)

52.242-13 BANKRUPTCY (JUL 1995)

52.247-34 F.O.B. DESTINATION (NOV 1991)

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

1352.201-70 CONTRACTING OFFICER?s AUTHORITY (APR 2010)

1352.209-73 COMPLIANCE WITH THE LAWS (APR 2010)

1352.209-74 ORGANIZATIONAL CONFLICT OF INTEREST (APR 2010)

1352.233-70 AGENCY PROTESTS (APR 2010)

1352.233-71 GAO AND COURT OF FEDERAL CLAIMS PROTESTS (APR 2010)

1352.246-70 PLACE OF ACCEPTANCE (APR 2010)

NIST LOCAL-53CONTRACT PERFORMANCE DURING CHANGES IN NIST OPERATING STATUS

NIST LOCAL-54ELECTRONIC BILLING INSTRUCTIONS

Evaluation Criteria

NIST Covid Delivery Protocols

PAGE 4 OF 71 1333ND21QNB610065

CLAUSES

Statement of Work

PAGE 5 OF 71 1333ND21QNB610065

STATEMENT OF WORK

Title: Insulative Thermal Blanket with Heaters and a Solar Reflector Requesting Lab: National Institute of Standards & Technology (NIST) Center for Neutron Research (NCNR)

I. INTRODUCTION/BACKGROUND

The Department of Commerce and the National Institute of Standards and Technology (NIST) have developed a major national facility for neutron scattering.

The NIST Center for Neutron Research (NCNR) is a user facility serving the needs of over 900 visiting researchers per year who come to perform neutron scattering experiments.

The majority of all research conducted at the NCNR today uses cold neutrons, which form when neutrons from the reactor pass through a cryogenic moderator chamber, or “cold source.” The liquid hydrogen in the cold source requires a large expansion volume to ensure safety when the system is shut down. Efforts are currently underway to upgrade the cold source to a larger model based on deuterium that will require a significantly greater expansion volume. A large deuterium ballast tank with an internal helium jacket has already been procured and is now located outdoors near the Guide Hall. To minimize pressure transients due to weather variations, it is desirable to provide a thermal control system for the large ballast tank (LBT).

II. DESCRIPTION

A quantity of one (1) insulative thermal blanket with heaters and a solar reflector to regulate the temperature of the large ballast tank.

III. SCOPE

The Contractor shall provide and install one insulative thermal blanket with heaters and a solar reflector to regulate the temperature of the large ballast tank inclusive of FOB Destination delivery terms and two (2) year extended warranty.

IV. MINIMUM REQUIREMENTS

The Contactor shall submit a firm fixed-price quotation for each line item identified below. The Contractor shall provide a system that meets salient characteristic identified below. All items must be new. Used or remanufactured equipment will not be considered for award. Experimental, prototype, or custom items will not be considered. The use of “gray market” components not authorized for sale in the

PAGE 6 OF 71 1333ND21QNB610065

U.S. by the Contractor is not acceptable. All line items shall be shipped in the original manufacturer’s packaging and include all original documentation and software, when applicable.

LINE 0001

DESCRIPTION: Insulative Thermal Blanket with Heaters and A Solar Reflector QUANTITY: One (1)

A. Technical Specifications

a. Heating System Properties a.i. The exterior face of the large ballast tank vessel must be controlled to 70-100 F during all four seasons. NOTE: For weather purposes the zip code for where the insulative thermal blanket will be located is 20899 (Gaithersburg, MD).

a.ii. The heating system must incorporate three parallel elements that can be controlled independently for efficiency and redundancy.

a.iii. The heating system must be self-contained; any heat exchangers or electrical transformers must be included in the installation.

a.iii.1. 277/480 V (3 ph) or 120/208 V (1 ph) power must be routed from within the adjacent building.

a.iii.2. The contractor is responsible for all electrical work.

Controllers shall be compatible with standard PLC hardware (4-20 mA signals or similar).

a.iv. Supply an equation, pseudo-code, or PID settings that describe a control scheme for the elements based on measured outdoor temperature.

a.iv.1. PLC connections and programming to be provided by NIST.

a.iv.2. Outdoor temperature measurement to be provided by NIST.

a.v. The system must not conflict with the installation of protective concrete bollards around the LBT.

a.vi. The insulation on the bottom face of the valve box must facilitate the future installation of connecting piping with contiguous insulation.

a.vi.1. The connecting piping insulation is not required as a part of this order.

PAGE 7 OF 71 1333ND21QNB610065

B. Design Parameters

Description Units Minimum Acceptable Value

Maximum Acceptable Value

Controlled temperature range of LBT vessel exterior surface (all seasons)

F 70 100

Number of independently controlled heating elements

Available power supplies VAC 120/208 277/480 Solar reflector emissivity 0.1 Thermal blanket insulation rating R 30

LINE ITEM 0002:

DESCRIPTION: Installation Quantity: One (1) Job

V. PERIOD OF PERFORMANCE

Delivery is No Later Than (NLT) Twenty-six (26) weeks after receipt of award (ARO). There will be a four (4) week period after delivery for a live demonstration.

Due to the current COVID-19 pandemic, access to the NIST Campus is restricted. Due to the access restrictions, the Government is not able to set a start date at this time. When restrictions are lifted the Government will issue a Notice to Proceed (NTP). The contractor shall start work no later than 30 days after receipt of the NTP.

VI. PLACE OF PERFORMANCE

Insulative Thermal Blanket with Heaters and A Solar Reflector is to be manufactured at the Contractor’s facility.

Installation will occur at NIST located at 100 Bureau Drive Gaithersburg, MD 20899

VII. DELIVERABLES

Description Quantity Format Due Date

Conceptual Design Documents and Drawings 1 PDF Due with Request for Quote (RFQ) response

Preliminary Design Documents and Drawings. Must include temperature sensor information such as sensor type, tolerances, location of installation, and curves.

1 PDF Due no later than six (6) weeks after receipt of award

(ARO)

PAGE 8 OF 71 1333ND21QNB610065

Thermal Analysis Report. The thermal analysis must 1) demonstrate that the thermal blanket design can maintain the tank surface temperature in a 30 F band throughout all normal seasonal and daily temperature variations, including solar heating in summer and snowfall in winter, and 2) provide necessary physical constants, PID setpoints, or pseudo-code to describe the intended heater control scheme

1 PDF Due no later than six (6) weeks ARO

Final Design Documents and Drawings 1 PDF Due no later than twelve (12) weeks ARO

Conduct Bi-Weekly Status and Planning Meetings from award of contract to completion of the contract.

NOTE: meetings may be completed via conference or video call

Bi-weekly with modifications allowable by mutual agreements by both parties

Installation One (1) Job

N/A Due no later than twenty-six

(26) weeks ARO

Installation Report 1 PDF Due no later than twenty-six

(26) ARO

Live Demonstration N/A XX 4-week live demonstration to commence.

The date will be mutually agreed upon by both parties.

The NIST Technical Point of Contact (TPOC) will review and approve conceptual, preliminary and final design proposals no more than thirty (30) days after receipt.

The TPOC will arrange for access to the NCNR including the experiment (work) areas for electrical work. Each person which is anticipated to need access to NIST must attend and successfully complete the NCNR Radiation Safety Training prior to being granted on-site access. The training is a half-day class. It has not yet been determined if this class will virtual or on-site due to COVID restrictions. The TPOC will inform the Contractor of the training date, time and location at least seven (7) working days prior to the training start date.

VIII. DELIVERY TERMS

Delivery shall be F.O.B Destination and shall occur in accordance with the delivery due dates provided in the above table.

PAGE 9 OF 71 1333ND21QNB610065

FOB Destination means: The contractor shall pack and mark the shipment in conformance with carrier requirements, deliver the shipment in good order and condition to the point of delivery specified in the purchase order, be responsible for any loss of and/or damage to the goods occurring before receipt and acceptance of the shipment by the consignee at the delivery point specified in the purchase order;

and pay all charges to the specified point of delivery. The contractor shall deliver all Line Items to:

The National Institute of Standards and Technology 100 Bureau Drive, Building 235 Gaithersburg, MD 20899-1640

***Due to ongoing limited site access of the NIST facilities, the Awardee SHALL confirm with the Designated Government Official and the Contracting Officer prior to ANY shipment to NIST***

IX. INSTALLATION

The system shall be installed by the Contractor and meet contract specifications no later than twenty-six (26) weeks ARO. Installation, at a minimum, shall include uncrating/unpackaging of all equipment, rigging, set-up and hook-up of the system, demonstration of all specifications, performing the set-up installation, on-site testing and removal of trash. The Contractor must route electrical power from the adjacent building. Onsite installation and demonstration shall be done at NIST, Gaithersburg, MD- Building 235.

There will be a 4-week live demonstration. The date will be mutually agreed upon by both parties.

X. INSPECTION & ACCEPTANCE

In addition to the inspection and acceptance terms articulated in FAR 52.212-4, the Government reserves the right to perform such performance tests and evaluations as defined below to verify specified system performance. Such tests and evaluations, if performed, shall be conducted within the environment that the system is to be operated. The Contractor has the right to be present during the tests and evaluations, if performed, at the Contractor’s expense.

Performance Tests

1. Installation Testing Report

a. Contractor must document a live test of the R-value using the installed heaters and temperature sensors

PAGE 10 OF 71 1333ND21QNB610065

b. Report must include by extrapolation that the control scheme described in the Thermal Analysis Report is feasible for the as-built system

NIST may choose, at its discretion, to forego acceptance testing

A visual inspection of the equipment will be performed by the NIST TPOC to identify surface defects or any form of indication that any equipment was damaged during transport to NIST. The Government shall have sole discretion to require repair or replacement of damaged and/or nonconforming supplies at no cost to the Government. The Government at any time prior to acceptance shall reject the equipment due to defects and/or nonconformance. The vendor is responsible for latent defects discovered any time after final inspection. However, the extent of its liability shall be prorated over the useful life of the equipment.

Ownership (title) of the equipment shall transfer to NIST upon acceptance by the Government.

Due to the COVID 19 pandemic, the Government will test, inspect, and accept or reject the equipment as soon as possible after installation of the equipment unless otherwise indicated above. The Government reserves the right to conduct quality assurance testing to confirm that a given instrument(s) meets the manufacturer’s and/or the Government’s performance specifications. It is anticipated that the equipment will meet all manufacturer’s specifications and/or the Government’s performance specifications identified in the most recent operations and maintenance manual for each piece of equipment and/or in this document.

XI. WARRANTY

The contractor shall warrant the entire system for a period of a minimum of one (1) year after receipt of the equipment and shall be in accordance with terms in FAR 52.212-4. The warranty shall cover:

1. All deliverables, parts and labor.

2. Telephone technical assistance

3. Site visits as required.

4. Software updates for compliance with operating system, and

5. Contractor must respond to all warranty requests within 24 hours of the request.

Warranty shall commence upon acceptance of the system by the Government.

XII. PAYMENT SCHEDULE

The Contractor shall be paid, in accordance with Net 30-day payment terms, upon receipt and acceptance of a proper invoice, in accordance with the following schedule:

1. 100% after installation and acceptance by the TPOC of fully installed system, AND

PAGE 11 OF 71 1333ND21QNB610065

2. After the successful completion of the testing requirements set forth in this document under section “VI. Inspection and acceptance” set forth in this document, AND

3. After successful demonstration by the instrumentation that it performs IAW the technical requirements set forth in this document under section “ III.

Minimum Requirements” AND

4. After receiving an invoice submitted properly, IAW the purchase order terms and conditions.

NOTE: Partial shipments and partial invoices will not be accepted, unless otherwise requested and accepted by the Contracting Officer prior to award offer.

Proposed payment schedules shall be submitted with vendor’s response to the RFQ for consideration.

XIII. ATTACHMENTS

1. Schematic of large ballast tank

2. Two (2) photographs of the Work Environment

3. NIST Safety and Health Plan Guidelines

NIST Tank and Manifold Drawings.pdf

PAGE 12 OF 71 1333ND21QNB610065

PAGE 13 OF 71 1333ND21QNB610065

PAGE 14 OF 71 1333ND21QNB610065

PAGE 15 OF 71 1333ND21QNB610065

PAGE 16 OF 71 1333ND21QNB610065

NIST Safety and Health Plan Guidelines

PAGE 17 OF 71 1333ND21QNB610065

SAFETY INSTRUCTIONS (April 2011)

Outline of a NIST Safety and Health Plan for a Specific Contract

The Contractor shall provide their Job-Specific Safety and Health Plan for both the prime and all subcontractors.

The following areas are typically addressed in a job -specific safety and health plan. The job-specific safety and health plan shall also address any unusual or unique aspects of the project or activity for which it is written.

1. SIGNATURE SHEET.

Title, signature, and phone number of the following:

a. Plan preparer (qualified person such as corporate safety staff person, QC).

b. Plan must be approved, by company/corporate officers authorized to obligate the company (e.g., owner, company president, regional vice president, etc.).

c. Plan concurrence (e.g., Chief of Operations, Corporate Chief of Safety, Corporate Industrial Hygienist, project manager or superintendent, project safety professional, project QC) (provide concurrence of other applicable corporate and project personnel (Contractor)).

2. BACKGROUND INFORMATION. List the following:

a Contractor;

b. Contract number;

c. Project name;

d. Brief project description, description of work to be performed, and location on NIST Gaithersburg site.

e. Contractor and sub-contractor accident experience (provide 2 years OSHA

300 Forms, corporate safety trend analyses); and any OSHA/STATE citations.

3. RESPONSIBILITIES AND LINES OF AUTHORITIES.

a. Identification and accountability of personnel responsible for safety - at both corporate and project level. (Contracts specifically requiring safety or industrial hygiene personnel should include a copy of their resume. The COTR will review the qualifications for acceptance.)

b. Lines of authority to include sub-contractors.

4. SUBCONTRACTORS AND SUPPLIERS.

Provide the following:

a. Identification of subcontractors and suppliers (if known);

b. Means for controlling and coordinating subcontractors and suppliers; and

PAGE 18 OF 71 1333ND21QNB610065

c. Safety responsibilities of subcontractors and suppliers.

5. TRAINING.

a. List subjects to be discussed with employees in safety indoctrination.

b. List mandatory training and certifications that are applicable to this project (e.g., explosive actuated tools, confined space entry, crane operator, excavation, certification, NFPA 70E, PPE) and any requirements for periodic retraining/recertification.

All applicable training certifications shall be submitted to NIST prior to work proceeding.

c. Outline requirements (who attends, when given, who will conduct, etc.) for supervisory and employee safety meetings.

6. SAFETY AND HEALTH INSPECTIONS.

Provide details on:

a. Who will conduct safety inspections (e.g., PM, safety professional, QC, supervisors, employees), when inspections will be conducted, how the inspections will be recorded, deficiency tracking system, follow-up procedures, etc.

Copies of safety reports shall be submitted to the NIST COTR for review.

b. The names of competent and/or qualified person(s) and proof of competency/ qualification to meet specific OSHA competent/qualified person(s) requirements must be attached.

7. SAFETY AND HEALTH EXPECTATIONS, INCENTIVE PROGRAMS, AND COMPLIANCE.

a. The company's written safety program goals, objectives, and accident experience goals for this contract should be provided.

b. A brief description of the company's safety incentive programs (if any) should be provided.

c. Policies and procedures regarding noncompliance with safety requirements

(to include disciplinary actions for violation of safety requirements) should be identified.

d. Provide written company procedures for holding managers and supervisors accountable for safety.

PAGE 19 OF 71 1333ND21QNB610065

Appendix A

ACCIDENT PREVENTION PROVISIONS FOR CONTRACTORS

1. Purpose. This appendix prescribes guidelines and requirements for implementing the Accident Prevention provisions for construction/service contracts and identified government activities.

2. Policy and Scope. This policy is applicable to all Contractor workforces within the NIST Gaithersburg and NIST Boulder Campus. The accident prevention provisions for NIST are essential to ensure applicable safety requirements are adhered to during contract operations. The prevention provisions for Contractor workforces are as much a part of the contract as any other provision set forth in the contract for control of work. After signing the contract, it is mandatory that the Contractor vigorously comply with all pertinent safety requirements during the duration of the contract.

3. General. The administration of the Safety and Accident Prevention requirements is necessary to ensure that NIST Contractor employees doing work within the NIST Campus provide controls for the protection of life and health of their employees, prevention of property damage, and for the avoidance of work interruptions in the performance of their work requirements. For contracts involving construction and dismantling, demolition, or removal of improvements, special attention is called to the contract clause 52.236-13 (Accident Prevention, Alternate I), which requires Architect/Engineer and other services contracts involving work of a long duration or of a hazardous character to comply with the applicable provisions of 29 CFR 1910 (OSHA industrial standards), 29 CFR 1926 (OSHA construction standards), guidance on developing an Accident Prevention Plan is located in Appendix B.

4. Contract Specifications. The specifications for all identified government activities and contract work will include such additional requirements as are necessary to insure a high standard of physical protection and safety performance by those individuals performing these operations.

5. Contractor's Accident Prevention Plan and Preconstruction Conference.

a. Upon award of a contract, the Contracting Officer will forward a letter to the Contractor calling his attention to the 52.236-13, Alternate I clause in the contract, which requires a written proposal for carrying out the accident prevention provisions of the contract. The letter will stress the importance of the contractual safety obligations of the contract. Special attention is called to Appendix B (Guide for preparation of Accident Prevention Plan) and Appendix C (Guide for preparation of an Activity Hazard Analysis), Appendix D (Sample Activity Hazard Analysis), and AMD Safety Form-04 (Contract Safety Analysis)

b. The Contractor will be informed when and where the proposed plan is to be submitted and with whom those arrangements should be made for the Preconstruction Conference. The Contractor must use the AMD- Safety-04 Form (Contract Safety Anaylsis) as the cover page of their Accident Prevention Plan. The Contractor’s written Accident Prevention Plan will be carefully reviewed by the CO, COTR and COSR before the Conference.

PAGE 20 OF 71 1333ND21QNB610065

Following the review, prior to initiation of work, the preconstruction conference will be held. The Contractor must be prepared to discuss the Accident Prevention Plan, inherent and specific hazards of the contemplated activities, and other aspects of the contracted work as necessary. Written minutes containing the understanding reached at the Preconstruction Conference will be furnished to the Contractor and a copy will be provided to the Safety, Health and Environment Division (SHED). The Contractor will keep a copy of said minutes on file and readily available at the work site.

c. The SHED will be informed of all Preconstruction Conferences in sufficient time to permit their attendance.

d. The Preconstruction Conference agenda should be developed to meet the specific problems and unusual features of the job. The following safety topics are suggested for the agenda where applicable.

(1) Identification and accountability of Contractor personnel responsible for accident prevention.

(2) The establishment of a mutual understanding relating to the purpose and function of an activity hazard analysis.

(3) A review and discussion of the hazards and remedies the Contractor, leading to an agreement upon the methods used in recognition, evaluation, and methods to control the hazards.

(4) Purpose and advantages of the Safety Program.

(5) A review of the Accident Prevention clause in the contract and the General and Special Conditions of the specifications with special emphasis on the Contractor’s regular safety inspections and records required by General and Special Provisions of the contract.

(6) A list of local site specific requirements with which the contractor must comply (noise control, traffic problems, etc.).

(7) How the Contractor proposes controlling and coordinating work of his subcontractors.

(8) Discussion of overstatements, omissions, and irrelevant items in the Contractors proposed plan. Where not clearly indicated in the proposed plan, the following items should be developed as a minimum:

(a) Method(s) to be implemented by the Contractor to enforce safety on the construction site.

(b) Plans for dust control.

(c) Methods that the Contractor, or activity, proposes using to control and coordinate work with others having operations at the same location.

(d) Plans for layout of temporary construction buildings and facilities, including how Contractor plans to control those of his subcontractors.

(e) Plans for initial indoctrination and continued safety education for all employees.

PAGE 21 OF 71 1333ND21QNB610065

(f) Plans for traffic control and marking of hazards to cover haul roads, highways, intersections, railroads, utilities, bridges, restricted areas, etc.

(g) Plans for maintaining continued job cleanup.

(h) Plans for fire protection and dealing with emergencies (ambulance service, fires, man overboard, etc.)

(i) Arrangements for providing adequate lighting, ventilation, personal protective equipment, and medical care.

(j) Plans for inspection of the job site by competent persons including reports to be kept, results of the inspections, and corrective actions taken.

(k) Plans for prompt action by the Contractor to correct deficiencies reported by Government representatives.

6. Activity Hazard Analysis (AHA).

a. A supplemental Activity Hazard Analysis (AHA) will be developed at the beginning of any "major phase" of construction that previously has not been reviewed with the Contractor and been documented. The AHA will be submitted to the Contracting Officer’s Safety Representative (COSR) for inclusion in the official contract safety file. The purpose of the activity hazard analysis will be to review the specific hazards anticipated and the specific measures planned to eliminate the hazard.

Guidance for developing an AHA is provided in Appendix C.

b. "Major Phase" pertains to items of work such as drilling, land clearing, excavation, tunneling, road relocations, pile driving, concrete placement, quarrying, building construction, installation of equipment, steel erection, use of hazardous materials, electrical work, installation of heating, ventilating and air conditioning, demolition, paving, use of explosives, cableway operations, etc.

7. Contract Safety Files.

a. The Acquisition Management Division (AMD) is required to maintain the official contract files within NIST. Copies of contract files relating to Safety and the Accident Prevention Program will be maintained by the COTR and COSR.

b. Safety and Accident Prevention Program documents to be maintained in the Contract Safety Files include, but are not limited to, notices of contract award, notice to proceed, contract changes, or modifications having implications on previously confirmed safety procedures or devices, correspondence to Contractor’s relating safety inadequacies or deficiencies, and Contractor Accident Prevention Plan submittals with any changes thereto and any documents changing or accepting the submitted plan.

8. Safety Inspection Checklist. The Safety Inspection Checklist, as appropriate, will be completed by the NIST COSR. Use the AMD Safety Form-07.

9. Use of "Stop Work Order." If all attempts to secure voluntary compliance with safety requirements are not successful, the COTR or CO may issue a "Stop Work Order”. It is important that the order applies only to that portion of

PAGE 22 OF 71 1333ND21QNB610065

the work that is affected by the actions of or lack of actions by the Contractor and that all of the facts of the proceedings be documented in writing; including notation of uncorrected safety violations. The Contractor shall be informed in writing of the extent of the stoppage of the work, the date and hour work should stop, the reason for the action, and the conditions under which work may proceed again.

10. Responsibility for Enforcement. Full and complete responsibility for enforcement of the safety provisions of all contracts rest within the Contracting Officer, COTR, COSR and SHED.

11. Responsibility of the Contractor’s Safety Representative in Cases of Immediate Hazard.

a. Whenever the Contractor’s Officer Safety Representative observes that a condition or work situation is being performed at the risk of life or limb, the Contractor’s Safety Representative will immediately take the following measures:

(1) Immediately remove workers from the area of danger and refrain from the dangerous practices.

(2) Inform the CO, COTR and COSR immediately.

(3) See that work is not resumed in the area of danger and the defective methods, SOPs, equipment, tools, scaffolds, etc., are not used further until recommended corrective action is taken.

(4) Immediately report any of the above actions and any noncompliance with his recommendations to his immediate supervisor and document actions on the AMD Safety Form-06 “Immediate Hazard Report”.

12. Reckless Employees. When a Contractors employee endangers his/her own well-being, or the well-being of others, by flagrant disregard of safety regulations, the Contractor will be requested to discharge the offender or to place the employee on work where his/her action will not constitute a hazard.

13. Forms. The following forms will be used by NIST and all contractors.

a. AMD Safety Form-01, Weekly Construction Safety Meeting

b. AMD Safety Form-02, Contractor’s Safety Meeting

c. AMD Safety Form-03, Safety Planning Sign-Off (THIS FORM CAN BE FOUND AT

THE END OF APPENDIX D (SAMPLE AHA)

d. AMD Safety Form-04, Contract Safety Analysis

e. AMD Safety Form-05, Contractor Accident Report

f. AMD Safety Form-06, Immediate Hazard Report

g. AMD Safety Form-07, Safety Inspection Log Sheet

PAGE 23 OF 71 1333ND21QNB610065

Appendix B

GUIDE FOR PREPARATION OF ACCIDENT PREVENTION PLANS

1. Instruction and Training. Set forth initial indoctrination and continuing training, such as "tool boxll safety meetings. Such meetings to be recorded on reverse side of AMD Safety Form-03.

2. Accident Reporting.

a. The Plan must state that all OSHA recordable injuries, lost time injuries, claims exceeding $250, and property damage accidents (excluding on-the-road vehicle accidents) in which the property damage exceeds $2,000 will be reported to the COTR within 8 hours of the accident/incident, using the AMD Safety Form-05 “Contractor Accident Report”.

b. The Plan must also state that in the event of an employee being sent to the doctor for treatment, a release will be obtained from the doctor on the date of treatment stating either: (1) employee not fit for duty; (2) employee fit for light duty; or (3) employee fit for duty. Copy of this release must accompany accident report.

c. The following reporting procedures apply to all Contractors and their employees performing at NIST Gaithersburg or NIST Boulder.

(1) In the event of an accident which results in a lost work day or in property damage, an AMD Safety Form-05 will be completed and submitted within five (5) workdays.

(2) The following signature chain is to be used on the AMD Safety Form-05 on Construction accidents. After each signature the name must be typed or printed legibly.

(a) Superintendent

(b) COSR

(c) COR

(3) All AMD Safety Forms are included with the solicitation identified as an Attachment.

3. Sanitation.

a. The Plan must set forth where drinking water will be obtained, type of dispenser, and provisions for receptacle for disposable cups.

b. The Plan must include what type of toilets, how many will be provided and how will they be kept clean.

4. Medical Facilities.

a. The Plan must set forth name, address, and telephone number for doctor, hospital, and ambulance service to be used. These emergency numbers must be posted on the bulletin board. This information will be provided to the Contractor by the COSR.

PAGE 24 OF 71 1333ND21QNB610065

b. First aid requirements for the Plan should show type and number of first aid kits and set forth requirement that at least two employees on each shift and at each differing location, will be qualified to administer First Aid and CPR (Cardiopulmonary Resuscitation). The minimum qualification for these employees is a current certification from American Red Cross, United States Bureau of Mines, or equivalent training that can be verified by documentary evidence.

5. Emergency Plans. The Plan must set forth provisions for preparation of action in the event of severe weather, i.e., hurricane, blizzard, high seas, etc.

6. Personal Protective Equipment.

a. The Plan must set forth requirement for all employees to wear a "T-shirt" as minimum on upper part of body. Shorts are not permitted. No sleeveless shirts, tennis/athletic shoes or sandals are permitted.

b. Hard hats must meet requirements for Type A or Type B as defined by American National Standards Institute. (No metal hard hats or bump caps.) How you plan to mark HARD HAT AREAS.

c. Provisions for other protective equipment.

7. Housekeeping.

a. Daily job site cleanup required. Large amounts of debris or debris that blocks aisle and exists are required to be removed immediately.

b. Nails must be pulled out or knocked down so they don’t protrude from scrap lumber.

c. All stairways, passageways, gangways, and access-ways must be kept free of material, supplies, and obstructions at all times.

8. Fire Prevention. The Plan must cover use of fire extinguishers, cleanup, heating devices, and flammable and combustible liquids (including safety cans and precautions to be taken with bulk gasoline storage).

9. Ropes, Slings, and Chains. The Plan must cover condition of same and usage; when slings and chains will be replaced, etc.

11. Floor and Wall Openings. If your contract covers erection, maintenance, or alteration of buildings, then your Plan must set forth precautions you will take to guard floor, wall or roof openings.

12. Noise Control. The Plan should include protection from loud noise (90 decibels or greater).

13. Hot Substances. Set forth measures to be used with tar kettles (temperature gauges, etc.).

14. Welding, Cutting and Grounding of Machinery. Cover precautions to be used in these operations (fire extinguishers, shields, grounding of electric welders, insulation of welding leads, etc.).

15. Electrical.

a. All temporary electrical work must be done in accordance 20 CFR 1926, Subpart K (special emphasis on weekly inspection, use of NEMA configuration on all plugs and connections, and type extension cords).

b. Portable generators must be grounded as required by the National Electric

PAGE 25 OF 71 1333ND21QNB610065

Code (NEC).

c. The use of GFCls is required in addition to appropriate grounding.

16. Hand Tools and Power Tools. Cover condition of same and use safety lashing on pneumatic lines; and authorization for use of explosive actuated tools.

17. Compressed Gas Cylinders. The Plan must set forth the precautions you will utilize to prevent accidents from these cylinders.

a. Separation of different gases.

b. Protection of cylinders.

c. Utilization of valve caps.

d. Securing cylinders in upright position.

18. Ramps, Runways, Platforms, and Scaffolds. Include in this section of your Plan those items in that apply to work under your contract. Include requirements of 29 CFR 1926, Subpart L. This will include, but not be limited to:

a. Safety factors of all such devices.

b. Use of ladders as working platforms.

c. Method of erecting, supporting, and using scaffolding.

d. Means of access to working surfaces--climbing of end pieces of scaffolds is prohibited.

e. Roofing devices and practices

19. Excavations. If there will be excavation (footings, trenches, etc.) as part of your contract, then set forth procedures you will follow in accordance with 29 CFR 1926, Subpart P.

20. Clearing. The Plan must set forth actions you will take to assure safe operation of chain saws and other clearing devices.

21. Material Handling, Storage and Disposal. The Plan should address the location of storage facilities, compatibility of materials, and disposal of materials.

22. Hazardous Materials. The Plan should state method of providing workers with access to Material Safety Data Sheets, method of disposal, and compliance with federal, state, and local laws and regulations.

25. General. It is probable that all of the above areas will not apply to your contract. No attempt has been made to cover all eventualities. This guide is intended only to serve as just that -- a guide to assist you in preparing an Accident Prevention Plan that will be acceptable for work to be performed under your contract.

PAGE 26 OF 71 1333ND21QNB610065

Appendix C

GUIDE FOR PREPARATION OF AN ACTIVITY HAZARD ANALYSIS (AHA)

1. Purpose. Provides guidance in preparing an Activity Hazard Analysis (AHA).

2. Applicability. This applies to all contracts for NIST Gaithersburg and NIST Boulder.

3. Policy. An AHA for each major phase of work is required. This analysis, utilized correctly, will have favorable effects on your safety record. This section provides guidance for preparing an AHA through a step-by-step procedure giving an example, explanations, and definitions. By showing this procedure, we hope to increase your understanding of how and why the analysis is used.

4. Overview.

a. An AHA is a procedure used to review job methods and identify hazards.

These hazards may have been overlooked from the start or they may have developed after production work has started. Once the hazards are known, the best solution or control can then be developed.

b. The person best suited to develop the analysis is the Contractor’s Superintendent. The Superintendent is best suited to develop the AHA because he is likely to have 5-10 years of experience doing the work to be analyzed. He has made the mistakes, seen the hazards, and probably has the best suggestions on how to make the job safer and most beneficial. In addition, he is best qualified to break the job down into successive steps.

c. Once the analysis' rough draft is completed, we recommend that it be reviewed by a safety person – someone within the organization that has safety responsibilities within their job duties. The safety person should review the analysis on a technical level, check to see that no hazards were overlooked, and examine the control measures to see that the most effective measures are being used.

5. Procedures.

A. Step 1 - Selecting An Activity To Analyze.

(1) An activity is a sequence of separate steps that together accomplish a work goal. Some activities can be too broadly defined in general terms of what is accomplished. Building a new dorm, , are examples.

Such broadly defined activities are not suitable for an activity hazard analysis. Similarly, an activity can be too narrowly defined in terms of a single action. Pulling a switch, tightening a screw, pushing a button are examples. Such narrowly defined activities are also not suitable for an AHA.

(2) Activities suitable for a hazard analysis are those assigned generally to a line supervisor and related to a particular phase of

PAGE 27 OF 71 1333ND21QNB610065

work. Erecting block walls, placing a roof and painting are good subjects for an activity hazard analysis.

(3) Once an activity or major phase has been selected we recommend completing the analysis using the format in Appendix D, “Sample Activity Hazard Analysis (AHA)”. Note that the activity chosen for the example is Interior Demolition of the US Army Reserve Center.

B. Step 2 - Break Activity Down Into Successive Steps

(1) Now the activity is broken down into its principal steps. Usually you, the line supervisor or foreman, will rely on past experience with the type of work being analyzed. You know your work goal (end point), the beginning point, and what you have to do to accomplish the work goal (steps). You should be able to visualize a logical procession step by step.

(2) Record the steps in their natural order of occurrence. Describe what is done, but not the details of how it is done. Usually three or four words are sufficient. Number the steps consecutively.

(3) In the example, our progression of principal steps include the following: remove furniture from office; remove plumbing, electrical and HVAC duct work from partitions; demolish interior; and clean up.

This shows a logical progression from point A (an old deteriorated interior) to point B (the state of final preparation for the next activity - Creating A New Interior).

C. Step 3 - Identify Hazards and Potential Accidents

(1) Once the principal steps have been identified and logged on the form, identify the potential hazards encountered in each of the principal steps listed. Once again past experience will be relied upon heavily. Also, talking with workers about past accidents or near misses will be of help to you. Checking with first aid logs or accident investigations will also help. At this point, evaluate hazards presented by other activities working adjacent to the activity being analyzed.

(2) The following is a list of questions that will also help you identify most of the hazards:

(a) Is there danger of striking against, being struck by or otherwise making injurious contact with the object?

(b) Can the employee be caught on, in, or between the object?

(c) Can the employee slip or trip? Can the employee fall on the same level or to another level?

(d) Can the employee strain themselves by pushing, pulling or lifting?

PAGE 28 OF 71 1333ND21QNB610065

(e) Is there a possibility of electrical, health, or fire hazards associated with that principal step?

(3) It is estimated that with these questions you should be able to uncover 90% of the potential hazards. What about the other 10%? The other 10% is what makes the activity hazard analysis so unique. This is why the so called "generic analysis" is so incomplete. Factors which are unique to an activity (elevation, terrain, weather, etc.)

may add to or change the potential hazards. All this must be taken into consideration when doing the analysis.

(4) In the example, we have listed most of the hazards associated with the principal steps. These are very general due to the lack of specific project information. The purpose of this is to keep the analysis simple and easy to follow. Had the Contractor’s Superintendent prepared the analysis in accordance with all the specific information available, it would be more complete and extensive.

D. Step 4 - Develop a Control for Each Hazard Identified.

(1) This is where you come up with the methods of controlling the hazards identified in Step 3 of this procedure. There may be several solutions to controlling the hazard; we want the best solution (that which is most beneficial). Ask yourself "What are the benefits to this solution?" Sometimes the solution will solve that particular problem but create a new hazard for that step or another step. Once again it is useful to ask workers for suggestions.

(2) The following are suggestions to help you come up with ideas for the best solution to your particular hazard:

(a) Change the physical conditions that create the hazard. "What change in physical condition will eliminate the hazard or prevent the accident?" A good example of this would be changing the surface in a work area to a non-slip type surface. Supplying ear muffs to a worker who must travel through an area in which noise levels exceed the standard would be another.

(b) Change the procedures of the Steps in the AHA. "What should the employee do or not do to eliminate the hazard or prevent this potential accident?" For example, "Is there another way for the employee to reach the work station other than going through the noisy area?" If there is, will it be more or less hazardous for the employee? You should consider work saving tools or equipment.

For example, say an employee must lift and carry a heavy object to a workbench. All you need to do is supply the worker with a workbench that has casters. Also, if two workers were to lift the object, you would reduce the risk of back injury.

(c) Reduce the frequency that a task must be performed. Every task has some potential for an accident to occur. Therefore, when you increase the times that the task is performed, you increase the probability of an accident occurring.

(d) Training. If none of the previous suggestions are applicable, then the answer may be training the employees to do a task safely.

Quite often we hear of accidents caused by lack of knowledge of proper safe procedures. This could mean a simple instruction from the Contractor’s Superintendent or could involve specialized

PAGE 29 OF 71 1333ND21QNB610065

training from an outside source. The latter is recommended for irregular work which may be unique.

(3) We have found that special attention should be given to newer employees (1 to 1 1/2 years). These employees have proven to be among the most likely to have an accident. This is why it is good practice for employers to give new employees good initial safety training.

(4) Once you have decided on a control for the hazard, you must put it into a positive statement; i.e. Dust respirators will be supplied to the workmen. Electricity will be locked out by a mechanical device.

In other words you will be committing yourself to perform the action you chose to control the hazard.

(5) If you now turn to Appendix D, you will find a copy of our sample completed analysis. As an exercise, go back through Step 1 through Step 4 of the analysis. See if you can come up with anything that we left out.

6. Update as Needed. It should be noted that the completed analysis is not set in stone. We all know that field changes take place every day. With these changes a new hazard may arise. Also, a delay in a different activity could have you working next to that operation. This could add numerous hazards to your job. For an Activity Hazard Analysis to be most effective it must be updated as the activity progresses.

7. Benefits.

a. A properly completed activity hazard analysis will reap many rewards.

How much does your organization spend for worker’s compensation insurance premiums? What you pay in premiums largely depends on your past accident history. If you can reduce your number of accidents using the activity hazard analysis process, then you can expect to see a reduction in your worker's compensation premiums. With lower premiums follows a lower quotation or bid. This means that your organization could be more competitive for various jobs.

b. Accidents cost money.

This is the start of the file's text. The full file is on GovTribe.