1333MF-23-Q-NFFM-0005_SF1449_REQUEST FOR QUOTE.pdf

PDF 4 MB Posted

Attached to
DOCKSIDE REPAIRS TO NOAA R/V GLORIA MICHELLE
Solicitation number
NF-FM7700-23-00376
Issued by

View the file

Other files

File Type Posted
03_Attachment A - Past Performance Template.docx DOCX document
02_INSTRUCTION TO OFFERORS Services-Site Visit-SF1449.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ IFB RFP

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER PAGE OF

2. CONTRACT NO. 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODEFACILITY

CODE

CODE

TELEPHONE NO.

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

29. AWARD OF CONTRACT: REF.

DATED . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

OFFER

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

17a CONTRACTOR/

OFFEROR.

CODE

8 (A)

SIZE STANDARD:

NAICS:

% FOR:SET ASIDE:UNRESTRICTED OR

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

10. THIS ACQUISITION IS

EDWOSB

SMALL BUSINESS PROGRAM

STANDARD FORM 1449 (REV. 2/2012) BACK

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

40. PAID BY

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

PARTIAL FINAL

37. CHECK NUMBER

38. S/R ACCOUNT NO. 39. S/R VOUCHER NUMBER

36. PAYMENT

COMPLETE PARTIAL FINAL

SCHEDULE Continued

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 Services, Non-personal, to provide all labor, materials, equipment, transportation, and supervision (unless otherwise provided herein) necessary to: Complete alongside repairs on the research vessel, Gloria Michelle, in the homeport location of Woods Hole, MA. Work required is: (per the attached, incorporated Statement of Work):

A. Replace Aft Deck Gantry $_______ B. Install Deck Hatch $_______ C. Install Fixed Fire Detection System $________ D. Replace Boiler Plumbing $_____________ E. Hydraulic Controls - Deck Control Station F. Load Test Boom $ ___________ G. Replace Bilge Piping Manifold and Plumbing $ H. Refresh Paint $ ___________ I. Refresh Forward Pilothouse Window Seams $

Period of Performance: work must be completed no later than 03/10/2023.

PR NUMBER: NF-FM7700-23-00376

DELIVERY DATE: 03/10/2023

SHIP TO:

NMFS/NE FISHER SCI

CTR/F/NECX2,PRCH OFF

166 WATER ST

WOODS HOLE MA 02543

FOB : Destination Period of Performance: 01/30/2023 to 03/10/2023

1.00 JB

OPT

0002 Optional: Services, Non-personal, to provide all labor, materials, equipment, transportation, and supervision (unless otherwise provided herein) necessary to: LABOR RATE for growth work, if necessary

PR NUMBER: NF-FM7700-23-00376

DELIVERY DATE: 03/10/2023

SHIP TO:

NMFS/NE FISHER SCI

CTR/F/NECX2,PRCH OFF

166 WATER ST

WOODS HOLE MA 02543

FOB : Destination Period of Performance: 01/30/2023 to 03/10/2023

0.00 EA

OPT

0003 Optional: Services, Non-personal, to provide all labor, materials, equipment, transportation, and supervision (unless otherwise provided herein) necessary to:

MATERIAL MARKUP for growth work, if necessary

PR NUMBER: NF-FM7700-23-00376

DELIVERY DATE: 03/10/2023

SHIP TO:

NMFS/NE FISHER SCI

CTR/F/NECX2,PRCH OFF

166 WATER ST

0.00 EA

PAGE 3 OF 152 1333MF23QNFFM0005

SCHEDULE Continued

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

WOODS HOLE MA 02543

FOB : Destination Period of Performance: 01/30/2023 to 03/10/2023

PAGE 4 OF 152 1333MF23QNFFM0005

Table of Contents

STATEMENT OF WORK

Appendix A: NOAA AMC-000-3C General Requirements

Appendix B: NOAA MOC-631-2D Coating Systems

Appendix C: NOAA C-661 Stability Report

DOL WAGE DETERMINATION 2014-4045 REV-23

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

52.252-6AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)

52.204-13SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)

52.204-18COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG 2020)

52.212-4CONTRACT TERMS AND CONDITIONS--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021)

52.223-3 IHAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (FEB 2021)-- ALTERNATE I (JUL 1995)108

52.223-3HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (FEB 2021)

52.232-40PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (NOV 2021)

52.246-1 CONTRACTOR INSPECTION REQUIREMENTS (APR 1984)

52.247-34 F.O.B. DESTINATION (NOV 1991)

1352.201-70 CONTRACTING OFFICER´s AUTHORITY (APR 2010)

1352.209-73 COMPLIANCE WITH THE LAWS (APR 2010)

1352.209-74 ORGANIZATIONAL CONFLICT OF INTEREST (APR 2010)

52.212-5CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS--COMMERCIAL

PRODUCTS AND COMMERCIAL SERVICES (OCT 2022)

52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

52.219-1SMALL BUSINESS PROGRAM REPRESENTATIONS (OCT 2022)

52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 2014)

1352.237-75 KEY PERSONNEL (APR 2010)

1352.270-70 PERIOD OF PERFORMANCE (APR 2010)

1352.271-72 ADDITIONAL ITEM REQUIREMENTS (AIR) - GROWTH WORK (APR 2010)

1352.271-73 SCHEDULE OF WORK (APR 2010)

1352.271-74 FORESEEABLE COST FACTORS PERTAINING TO DIFFERENT SHIPYARD LOCATIONS (APR 2010)

1352.271-75 DELIVERY AND SHIFTING OF THE VESSEL (APR 2010)

1352.271-76 PERFORMANCE (APR 2010)

1352.271-77 DELAYS (APR 2010)

1352.271-78 MINIMIZATION OF DELAY DUE TO GOVERNMENT FURNISHED PROPERTY (APR 2010)

1352.271-79 LIABILITY AND INSURANCE (APR 2010)

1352.271-80 TITLE (APR 2010)

1352.271-81 DISCHARGE OF LIENS (APR 2010)

1352.271-82 DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH STANDARDS FOR SHIP REPAIR (APR 2010). 121

1352.271-83 GOVERNMENT REVIEW, COMMENT, ACCEPTANCE AND APPROVAL (APR 2010)

1352.271-84 ACCESS TO THE VESSEL (APR 2010)

1352.271-85 DOCUMENTATION OF REQUESTS FOR EQUITABLE ADJUSTMENT (APR 2010)

1352.271-86 LAY DAYS (APR 2010)

1352.271-87 CHANGES - SHIP REPAIR (APR 2010)

1352.271-88 GUARANTEES (APR 2010)

1352.271-89 TEMPORARY SERVICES (APR 2010)

1352.271-90 INSURANCE REQUIREMENTS (APR 2010)

1330-52.222-70NOAA SEXUAL ASSAULT AND SEXUAL HARASSMENT PREVENTION AND RESPONSE POLICY (MAY 2018).. 125

1330-52.222-71NOAA SEXUAL ASSAULT AND SEXUAL HARASSMENT PREVENTION AND RESPONSE POLICY APPLICABLE TO

CREW MEMBERS OF VESSELS UNDER NOAA CONTRACT OR ORDER (MAY 2018)

1330-52.270-304NOAA ACQUISITION AND GRANTS OFFICE OMBUDSMAN (OCT 2022)

1352.233-70 AGENCY PROTESTS (APR 2010)

1352.233-71 GAO AND COURT OF FEDERAL CLAIMS PROTESTS (APR 2010)

PAGE 5 OF 152 1333MF23QNFFM0005

Table of Contents

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

52.252-5AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)

52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2018)

52.204-16COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (AUG 2020)

52.204-22 ALTERNATIVE LINE ITEM PROPOSAL (JAN 2017)

52.212-1INSTRUCTIONS TO OFFERORS--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021)

52.237-1 SITE VISIT (APR 1984)

52.204-24REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT

(NOV 2021)

52.204-26COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES--REPRESENTATION (OCT 2020)

52.212-2EVALUATION--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021)

52.212-3OFFEROR REPRESENTATIONS AND CERTIFICATIONS--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (OCT

2022)

1330-52.237-70CONTRACTOR COMMUNICATIONS

1330-52.237-72CONTRACTOR ACCESS TO NOAA FACILITIES (SEPT 2017)

1330-52.243-70REQUESTS FOR EQUITABLE ADJUSTMENT (OCT 2017)

INSTRUCTIONS TO OFFERORS

TEMPLATE FOR PAST PERFORMANCE

PAGE 6 OF 152 1333MF23QNFFM0005

CLAUSES

STATEMENT OF WORK

PAGE 7 OF 152 1333MF23QNFFM0005

STATEMENT OF WORK (SOW)

for

NOAA R/V Gloria Michelle (F7201) Dockside Repairs

NF-FM7700-23-00376

1.0 Background. The National Oceanic and Atmospheric Administration (NOAA), National Marine Fisheries Service (NMFS), Northeast Fisheries Science Center (NEFSC) is the research arm of NOAA Fisheries in the region. The Center plans, develops, and manages a multidisciplinary program of basic and applied research. The requirement will support operations of the NOAA Research Vessel Gloria Michelle.

2.0 General Requirements

2.1 Scope of Work. Services Non-Personal. Contractor will furnish all plant, supervised labor, equipment, materials and transportation necessary to satisfy this requirement. This requirement calls for repair services and modifications for NOAA R/V Gloria Michelle (F7201). Tasks required under this contract will be referred to from this point forward as “work”. Contractor shall provide all labor, material, equipment and transportation to inspect, repair, modify, and paint the Gloria Michelle Vessel. Tasks include, but are not limited to: Replace aft deck gantry, install deck hatch, install fixed fire detection system, replace boiler plumbing, replace engine room bilge piping and manifold, install boom hydraulics, replace hydraulic joysticks, OSHA SWL test boom, refresh forward pilothouse window seams, refresh paint.

A. REPLACE AFT DECK GANTRY

1. Remove existing gantry

a) Measure existing gantry to include block height and position and cleat positions.

b) Remove entire gantry structure to flush with the deck.

2. Design and fabricate new gantry

a) The Master shall approve the final design before construction begins.

b) Design a new system for attaching the gantry to the deck.

(1) Gantry shall be welded directly to the deck in a manner that is durable and easy to paint.

c) New gantry shall be constructed as one continuous piece. Include cleats and other attachment points as they exist on the current structure.

d) Hangers for trawl blocks shall be the same height above the deck, the same width apart, and the same distance forward of the stern as the existing hangers.

PAGE 8 OF 152 1333MF23QNFFM0005

(1) Existing flange connections near the trawl blocks are not necessary and should not be included in the final design.

e) All steel should be identical in thickness and weight as the old gantry to ensure the existing stability profile of the vessel is maintained.

3. Install new gantry frame

a) Install new gantry frame in the same position as the current structure.

4. Paint

a) All surface preparation and painting shall be in accordance with

Attachment D: MOC-631-2D Coating Systems for Steel Surfaces

(1) Surfaces shall be cleaned to bare metal and painted with system

STL-2

b) Paint new gantry frame, deck, and any other bare steel associated with installation of new structure.

(1) Gantry paint shall be black

(2) Deck paint shall be gray and extend to the black tile decking

B. INSTALL DECK HATCH

1. Install government furnished deck hatch on the aft deck.

2. Hatch position shall be determined by the master of the vessel.

3. Remove insulation in fish hold space in position of the hatch prior to installation.

4. Remove the minimum amount of tar tiles. Remaining tiles should terminate in a straight line as near the deck hatch as practicable. Tar residue shall be completely removed and the deck shall be prepared and painted to the edge of the tile.

5. Reinstall insulation on the underside of the hatch in the fish hold space after installation.

6. Paint deck hatch and surrounding deck gray. All surface preparation and painting shall be in accordance with Attachment D: MOC-631-2D Coating Systems for Steel Surfaces

a) Surfaces shall be painted in accordance with system STL-2

(1) The master may determine if the existing coat of primer on the hatch may be substituted for coat one (Attachment D: 3.3.2.a)

7. Install tar tiles on hatch to match surrounding deck.

8. Perform test of watertight integrity of hatch.

C. INSTALL FIXED FIRE DETECTION SYSTEM

1. Source and install Fireboy-Xintex FBD-MZ Conventional Fire Detection System, to include seven (7) smoke detectors, one (1) heat detector, and six

(6) carbon monoxide detectors.

PAGE 9 OF 152 1333MF23QNFFM0005

a) Display unit shall be installed in the pilothouse in a location determined by the master of the vessel.

b) Control module shall be installed in the wiring cabinet aft of the pilothouse in a position to be determined by the master of the vessel.

c) Install seven (7) smoke detectors in positions to be determined by the master of the vessel.

(1) Three (3) in lower lab/berthing space (fish hold).

(2) One (1) in upper berthing space

(3) One (1) in galley

(4) One (1) in pilothouse

(5) One (1) in aft storage compartment

d) Install one (1) heat detector in engine room in position to be determined by the master of the vessel.

e) Install six (6) carbon monoxide detectors in positions to be determined by the master of the vessel

(1) Three (3) in lower lab/berthing space (fish hold).

(2) One (1) in upper berthing space

(3) One (1) in galley

(4) One (1) in pilothouse

f) Install 2 audible/visible alarms to be installed in the lower berthing space and main cabin. Alarms shall meet 46 CFR 76.27-20 that shall activate upon any alarm activation throughout the vessel

g) Wiring of all detectors shall follow existing wire runs. Watertight integrity of all bulkheads shall be retained.

h) System and all detectors shall be tested upon completion of installation.

System shall be fully operational upon completion.

D. REPLACE BOILER PLUMBING

(approximately 70 linear feet of pipe)

1. Replace all corroded plumbing as determined by the master of the vessel, to include plumbing from the boiler to distribution manifold and radiator circulation plumbing. New plumbing shall be of like material and diameter as existing pipe. Corrosion resistant material shall be used in all areas.

2. Piping shall be permanently braced at intervals not to exceed 10 ft.

3. Piping shall be coated, lagged, and labeled to indicate flow direction

a) All surface preparation and painting shall be in accordance with Attachment D: MOC-631-2D Coating Systems for Steel Surfaces

(1) Surfaces shall be painted in accordance with system STL-2

4. Pressure test new plumbing to 30 PSI

E. HYDRAULIC CONTROLS - DECK CONTROL STATION

1. Install hydraulic joystick and lines for articulating boom.

2. Replace all hydraulic joysticks at the deck control station with new, stainless steel joysticks

PAGE 10 OF 152 1333MF23QNFFM0005

3. Inspect all flexible hydraulic lines and fittings under the deck control station

a) Replace any lines and fittings that show signs of wear, including cracking rubber or rusted fittings.

4. Test all hydraulic controls to ensure functionality.

5. Prepare and paint any bare steel or damaged paint associated with new or replaced hydraulic lines or joysticks.

6. Prepare and paint all steel surfaces of the deck control station

a) Include the deck area under the control station, including the fittings for the hydraulic lines that penetrate the deck. The paint shall extend along the deck to straight tape lines at least six inches beyond the edge of the control station.

b) All surface preparation and painting shall be in accordance with Attachment D: MOC-631-2D Coating Systems for Steel Surfaces

(1) Areas where scale is identified shall be power tool cleaned to bare metal (Attachment D: Section 3.2.4)

(2) Surfaces shall be painted in accordance with system STL-2

F. LOAD TEST BOOM

1. Perform a load test on the aft boom in the center, port, and starboard positions.

Working Load Limit (WLL) shall be set at 2500 pounds, load test shall be conducted with a weight at 125% of this limit.

2. Weight shall be suspended from the boom winch.

3. Load test shall be performed in the presence of an OSHA certified individual and OSHA load test documentation shall be provided to the vessel.

4. Mark the boom with the WLL on the port and starboard side. Marking shall be of white paint and large enough to be clearly visible from the back deck, minimum 4 inch lettering.

G. REPLACE BILGE PIPING MANIFOLD AND PLUMBING

(approximately 70 linear feet of pipe)

1. Remove and replace bilge manifold and plumbing within the engine room.

a) Piping and manifold shall be in accordance with 46 CFR 182.510

b) All pipe and valves must be not less than 1.5 inches nominal pipe size

c) New pipe, fittings, and valves shall be composed of Galvanized Steel

2. Stop valves shall be on all manifold lines.

a) Stop valves shall be located as close to the manifold as practicable, fully accessible and operable without lifting deck plates or manipulating other equipment.

b) Valves shall be ¼ turn ball valves.

3. Check valves shall be added on all bilge lines on the bilge side of the stop valve.

a) Locate check valves as close to the stop valves as practicable on all bilge lines.

b) Orient check valves to prevent water being pumped into the bilge from the manifold.

4. Add pipe supports as necessary

PAGE 11 OF 152 1333MF23QNFFM0005

a) Secure the bilge manifold to the engine room bulkhead

b) Bilge pipe shall be supported to reduce the strain on the piping system.

Supports shall not be spaced greater than 10 ft.

c) Every pipe shall have at least one support

5. Piping shall be coated and labeled to indicate flow direction

a) All surface preparation and painting shall be in accordance with

Attachment D: MOC-631-2D Coating Systems for Steel Surfaces

b) Surfaces shall be painted in accordance with system STL-2

H. REFRESH PAINT

1. All surface preparation and painting shall be in accordance with Attachment D: MOC-631-2D Coating Systems for Steel Surfaces

a) Areas where scale is identified shall be power tool cleaned to bare metal (Attachment D: Section 3.2.4)

b) Surfaces shall be painted in accordance with system STL-2

2. Prepare and paint the following surfaces

a) Net drum, entire structure to include deck mounts

b) Cleats located along inboard gunwales

c) Upper rim/perimeter edge of house structure, to extend 6 inches on either side

d) All areas of visible corrosion on mast, aft boom, and braces.

e) Exposed steel deck aft of the house structure to forward of the new hatch, gunwale to gunwale, to include winch mounts and emergency escape hatch. (approximately 160 sq ft)

(1) Exposed deck paint shall have non-skid texture

f) Machine shop floor, including a minimum of 6” high on all the surrounding bulkheads (approximately 56 sq ft)

I. REFRESH FORWARD PILOTHOUSE WINDOW SEAMS

(approximately 10 sq ft area)

1. Strip exterior paint around all forward pilothouse windows extending up to 6 inches in all directions from window sills, including between each window.

2. Clean stripped area to bare metal, remove all scale and corrosion.

3. Refresh watertight seal around all windows.

4. Paint

a) All surface preparation and painting shall be in accordance with Attachment D: MOC-631-2D Coating Systems for Steel Surfaces

(1) Areas where scale is identified shall be power tool cleaned to bare metal (Attachment D: Section 3.2.4)

(2) Surfaces shall be painted in accordance with system STL-2

J. Optional Item 1 – Additional Item Requirement (AIR) – Labor hours. This item relates to the Labor Rate for Growth Work.

PAGE 12 OF 152 1333MF23QNFFM0005

K. Optional Item 2 – Additional Item Requirement (AIR) – Materials Markup. This item relates to the Materials Markup Rate for Growth Work. The Unit Price Column will be used throughout the life of the contract if growth work is added to the scope of the contract (reference Commerce Acquisition Regulation (CAR) clause 1352.271-72.

2.1.1 Contractor shall be fully trained and authorized to complete the required work and be fully knowledgeable of all contract requirements. Contractor shall at all times ensure Work is accomplished in accordance with the terms and conditions of the contract in a safe and professional manner. Contractor is responsible for damage to any Government equipment, supplies, or facilities caused by Contractor personnel.

2.1.2 Contractor and subcontractors shall possess all required skill sets, with any required permits current and maintained for performance under this contract.

2.1.3 Contractor shall be responsible for Quality Control. The Government is responsible for Quality Assurance. The Government will evaluate the Contractor’s performance under this contract in accordance with the tasks required of this SOW and all other terms and conditions of the contract.

2.1.4 Vessel Characteristics. R/V Gloria Michelle is a small research vessel owned and operated by the Northeast Fisheries Science Center, under the U.S. Department of Commerce, National Oceanic and Atmospheric Administration (NOAA).

Vessel Characteristics:

− LOA: 72 feet − Beam: 20 feet − Draft: 9.5 feet

− Gross Registered Tonnage:

96.2GRT

− Displacement Tonnage: 160 Tons − Hull Material: Steel

− Permanent Crew: 2 Commissioned Officers

− Homeport: 166 Water Street, Woods Hole, MA 02543

2.2 Place of Performance. The place of performance shall be alongside at the vessel’s homeport. Vessel’s homeport:

NOAA/NMFS/NEFSC,

166 Water Street Woods Hole, MA 02543 (Refer to Appendix B Worksite Location)

2.3 Period of Performance. Work shall begin on or after January 30, 2023 and shall be completed no later than March 10, 2023

PAGE 13 OF 152 1333MF23QNFFM0005

2.4 Hours of Operation. Contractor shall perform Work on a weekday from Monday to Friday, inclusive, between the hours of 7:00AM – 4:00PM Eastern Standard Time (EST). Work shall not be scheduled on a recognized United States (U.S) Federal Holidays, or when the Government facility/installation is closed due to local or national emergencies, adverse weather, administrative closings, or similar Government directed facility/installation closings. The Federal Holiday home page can be found at www.opm.gov/fedhol. (Appendix

A, Useful Websites)

2.5 Contractor shall accomplish all work in accordance with all interstate, federal, state, and local laws and regulations utilizing the latest technology, products, equipment, industry practices, and specifications in order to achieve the quality and performance standards required.

2.6 Contractor shall provide NOAA Corps officers access to the vessel during all work.

3.0 Security Requirements. Security Clearances are not required. The Government reserves the right to deny access to Government facilities/property at any time, for any reason. The Government will not be held liable for any delays or breach of contract caused by refusal to allow entry.

3.1 Contractor employees and associated subcontractors performing under this contract MUST be U.S. citizens or MUST have established and maintain legal residence in the U.S., and be authorized by the US Government to work in the United States (i.e. Green card, worker authorization, etc.). All Contractor employees and all associated subcontractors performing under this contract MUST have at least one form of US Government issued photo identification (driver’s license, US passport, US work visa, etc.) for entry to the Government facility/property.

Contractor shall provide the TPOC and CO a list identifying the names of all personnel performing Work under this contract.

3.1.1 National Agency Check with Inquiries (NACI). Not required. This is a low risk non IT service contract of less than 180 days. Government employees will be present on site during the actual performance of Work. It has been determined that NACI for personnel performing under this contract will not be required.

3.1.2 Contractor employees and associated subcontractor personnel, vehicles, and property under their control are subject to search upon entering or exiting the installation, or at any point while on the installation. Any vehicles or personnel found in possession of prohibited items will be removed, and/or barred, from the installation and released to the appropriate civil authorities.

3.1.3 Government reserves the right to exclude or remove from the site any Contractor employee of the Contractor or associated subcontractor whom the Government deems

PAGE 14 OF 152 1333MF23QNFFM0005

incompetent, careless, insubordinate, or otherwise objectionable, or whose continued employment on the contract is deemed by the Government to be contrary to the public interest.

3.1.4 Government reserves the right to close down the job site and order Contractor employees and associated subcontractors off the premises in the event of a national emergency or a shut-down, for as long as security problems persist. A written notification will be provided as soon as possible. Contractor may only return to the site with written approval from the TPOC/CO.

4.0 Government Roles.

4.1 The Contracting Officer (CO) is the only individual with the authority to authorize changes within this contract that will have an effect on the scope, and monetary values (increase or decrease) of contract.

4.2 The Technical Point of Contact (TPOC) is the individual designated and authorized in writing by the CO at contract award to perform administrative functions on the contract. The key role of the TPOC is to observe, document, and communicate Contractor performance to both the CO and Contractor. All coordination and correspondence should be forwarded through the TPOC to the CO. TPOC and alternate TPOC (if applicable) will be responsible for the inspection and acceptance of performance and any deliverables under the contract.

4.2.1 The TPOC does NOT have authority to change the terms and conditions of the contract. When, in the opinion of the Contractor, the TPOC requests efforts outside the existing scope of the contract, the Contractor shall promptly notify the CO in writing. Contractor under such direction shall take no action until the CO has resolved the issue or has otherwise issued a modification to the contract. TPOC information is identified as: TO BE

DETERMINED AT TIME OF AWARD

4.2.2 In the absence of the TPOC (due to reasons such as leave, illness, and official travel), all responsibilities and functions assigned to the TPOC shall be the responsibility of the CO until an alternate TPOC is assigned.

4.2.3 Technical Point of Contact (TPOC) will notify the Contractor of Government facility/installation closures on an event-by-event basis. Contractor shall maintain an adequate workforce for the uninterrupted performance of all tasks defined within this SOW when the Government facility/installation is not closed for the above reasons.

5.0 Government Responsibilities:

5.1 The Government is responsible for quality assurance of Work.

PAGE 15 OF 152 1333MF23QNFFM0005

5.2 The Government will inspect the Work performed under this contract. Any corrective action required as a result of the inspection will be accomplished prior to final monthly billing.

Government will document instances of deficiencies.

5.3 Contractor may be notified of deficiencies in performance in writing by the TPOC/CO.

Oral deficiency notifications will be confirmed in writing by the TPOC/CO. Contractor shall take prompt corrective action upon notice of deficiency. Prompt is defined as within 24 hours of notification.

5.4 Government personnel other than COs and the authorized TPOC, may, with CO coordination, observe Contractor operations. However, these personnel may not interfere with Contractor performance or make any changes to the contract.

5.5 Government Furnished Property, Materials, Equipment and Services (GFP/M/E/S). The government will make the vessel available at the agreed place and time. The government shall not furnish any other materials, services, equipment, labor or facilities to fulfill this contract, except as otherwise indicated. Government dumpsters will not be used by Contractor.

5.6 The Government is not responsible for damage to Contractor’s equipment due to trash, debris or uneven terrain.

6.0 Contractor Key Roles. Site Manager as assigned at the discretion of the Contractor (can be identified as the same individual) assumes all applicable duties and responsibilities as a binding authority of the Contractor for performance of Work. Site Manager shall be on the Work site while Work is being performed. Contractor shall provide to the TPOC and CO a signed document identifying the Site Manager.

6.1 Contractor shall provide a Site Manager. Site Manager shall conduct overall management of Contractor employees and associated subcontractor(s) on site. Site Manager shall be the central point of contact with the Government for performance of all work under this contract. The Site Manager shall be authorized to receive any notices of deficiency in contract performance. The notices may include but not be limited to the following: Non-performance of work, Deficiencies in work performed, and Notices of proposed payment deductions due to the above. Site Manager shall be available weekdays between the hours of 8:00 a.m. and 3:00 p.m. and available within 2 hours to discuss problem areas. Contractor shall provide to the TPOC and CO a signed document identifying the Site Superintendent.

6.2. Contractor shall identify all personnel performing Work under this contract at the government location. Contractor shall submit this list to TPCO and CO prior to the commencement of Work on this contract.

7.0 Contractor Responsibilities.

PAGE 16 OF 152 1333MF23QNFFM0005

7.1 Contractor Furnished Property, Materials, Equipment and Services (GFP/M/E/S).

Contractor shall provide all plant, trained labor, equipment, materials, supervision, transportation, permits, insurance, and quality control necessary to successfully provide the Work identified in this contract. Government dumpsters shall not be used by the contractor.

7.1.1 Contractor shall be fully knowledgeable of all requirements of the contract documents and shall make themselves aware of all job site conditions that will affect their performance.

7.1.2 Contractor shall maintain an adequate workforce trained to safely and satisfactorily perform under this contract. OSHA certificates must be made available to the CO and TPOC upon request.

7.1.3 Contractor shall accomplish all tasks to meet the requirement of the SOW.

7.1.4 Contractor shall perform in accordance with professional industry standards.

7.1.5 Contract shall ensure work is performed in accordance with all applicable local, state, federal codes and laws, complying with United States Coast Guard (USCG) and Occupational Safety and Health Administration (OSHA) standards.

7.1.6 Contractor shall ensure all Contractor employees, and all associated subcontractor(s) are experienced in the type of work involved and familiar with the specifications of this contract. Contractor is responsible for damage to any Government equipment, supplies, or facilities caused by Contractor personnel. Government will not provide instruction or oversight.

7.1.7 Contractor shall be responsible for all contractor security arrangements including subcontractor’s materials, tools, equipment, and personnel.

7.1.8 Written and verbal communications concerning this contract shall be conducted between the Contractor and the authorized government team (Technical Point of Contact, Contracting Specialist, and Contracting Officer) only.

7.1.9 Contractor shall handle corrective action(s) without dependence upon Government direction. Contractor shall resolve all discrepancies noted (by the government team) within 24hrs of identification.

7.1.10 Contractor shall ensure Contractor’s employees and all associated Subcontractor(s) performing under this contract, are notified of all deficiencies in their area of responsibility to ensure that deficiencies do not reoccur.

7.1.11 Contractor shall be available on site within 2 hours of notification as required by the government for issues that cannot be resolved by telephone to the government’s

PAGE 17 OF 152 1333MF23QNFFM0005

satisfaction. Contractor is responsible for understanding the site condition, complexity, volume and quality of services required.

7.1.12 Contractor Equipment. The Government may inspect Contractor’s equipment at any time. Contractor’s equipment shall be subject to approval by the TPOC. Contractor shall service or replace at no cost to the Government any equipment found to be defective, unsafe, or unsuitable.

7.1.13 APPROVAL FOR WELDING ON VESSEL: Due to the presence of sensitive electronics onboard, WELDING SHALL NOT PROCEED until a NOAA field technician has made all equipment safe for welding and approval to proceed has been granted by the TPOC.

8.0 Contractor Liability: Except as otherwise provided by law, the Government will not be responsible for the loss of, or damage to, the Contractor’s equipment, property, or death of or injury to the Contractor’s employees or associated subcontractors performing under this contract, resulting from the Contractor’s negligent performance under this contract. Contractor shall be responsible the repair and expenses for all damages to persons or property that occurs as a result of Contractor’s faulty equipment, fault or negligence of Contractor personnel/employees or associated subcontractors performing Work on this contract.

9.0 Contractor Insurance Requirements. Contractor shall at its sole expense insure its activities in connection with the Work under this contract and shall obtain, keep in force, and maintain insurance in accordance with FAR clause 52.228-5, Insurance—Work on a Government Installation. The Contractor shall provide a copy of the Insurance Certificate to the CO and TPOC prior to the commencement of Work on this contract.

10.0 Job Site Protection. Contractor shall protect the property of others as well as his/her own property. Contractor shall repair or replace any property damaged by the Contractor during performance under this contract. Contractor shall take precautions to prevent the spread of dust, moisture and debris. Contractor shall keep the area clean and upon completion of the project, the Contractor shall clean up the work area and remove all debris from the job site in a timely and legally acceptable manner so as to not detract from the aesthetics or the functions of the facility.

11.0 Specific Tasks. Contractor shall identify and submit condition found report (CFR) for any other areas beyond acceptable limits. Contractor shall complete tasks to its original design condition using materials that are same as the original equipment manufacturer (OEM) product.

All products and services shall be of commercial grade and meet or exceed OEM. Where OEM product is no longer available, the closest most similar product that meets or exceeds original design specifications and performance shall be approved in advance by the TPOC and must not change the terms and conditions of the contract. Contractor shall perform the following tasks:

12.0 Drawings, Photographs and Related Documents. The following NOAA Standard Specifications apply to this project and shall be followed as applicable.

PAGE 18 OF 152 1333MF23QNFFM0005

12.1 Attachment A: Useful Websites

12.2 Attachment B: Mooring Location

12.3 Attachment C: NOAA Standard Specification AMC-000-3C, “General Requirements for Small Contract Ship Repairs”

12.4 Attachment D: NOAA Standard Specification MOC-631-2D “Coating System for Steel Surfaces”

12.5 Attachment E: R/V “GLORIA MICHELLE” O.N. 556572 INTACT STABILITY

BOOKLET

13.0 Submittals: No less than five (5) business days prior to the start of work, the Contractor shall submit the below documents to the TPOC and CO. These documents must be maintained/updated/current during the lifecycle of this contract.

13.1 List of Subcontractors

13.2 List of Qualified Welders

13.3 List of Key Personnel (Site Manager)

13.4 List of Emergency Phone Numbers

13.5 Certificate of Insurance

14.0 Condition Found Reports (CFR): Contractor shall notify the TPOC in writing of any conditions found which may impact the performance of the work or administration of the contract, including a detailed description of the condition and any proposed or requested solutions. No changes to the statement of work are authorized without written approval from the Contracting Officer.

15.0 Interferences/Obstructions. The Contractor shall remove all interferences and obstructions necessary to complete the required work without regard to whether interferences are indicated under specification work items. This may include the removal of machinery, piping, ducts, wiring, insulation, structure and anything else which interferes with the successful accomplishment of the Work. While awaiting reinstallation and restoration, the Contractor shall maintain and protect interferences. Unless otherwise authorized by NOAA, upon completion of required work, the Contractor shall reinstall/restore interferences to their original configuration and condition.

PAGE 19 OF 152 1333MF23QNFFM0005

16.0 Safety, Security, Fire Protection, Environmental Controls, Conservation of Utilities, and Compliance with Laws and Regulations.

16.1 Safety Requirements. Contractor shall be responsible for safety. Contractor shall take all necessary precautions to meet proper safety standards, training, and regulations of all local, state and federal codes and regulations. (Refer to Appendix A, Useful Websites)

16.1.1 Smoking in the facility is prohibited.

16.1.2 Work under this contract must be accomplished in such a way as to minimize the potential of environmental impact by operating in an environmentally responsible manner and to the extent possible through the use of environmentally friendly procedures, services, and products. Contractor shall record and report promptly (as soon as possible but no later than, one hour of incident) to the CO and TPOC, all available facts relating to each instance of damage to Government property or injury to either Contractor or Government personnel.

16.1.3 In the event of an accident/mishap, Contractor shall take reasonable and prudent action to establish control of the accident/mishap scene, prevent further damage to persons or property, and preserve evidence until released by the authorized Government representative (i.e.

TPOC, CO).

16.1.4 If the Government elects to conduct an investigation of the accident/mishap, the

Contractor shall cooperate fully and assist government personnel in the conduct of investigation until the investigation is completed.

16.1.5 While on Government property, Contractor shall not use a cell phone while operating a vehicle or other motorized equipment unless the operator is utilizing a hands-free device as such is prohibited by Federal regulations. Motor vehicle regulations are strictly enforced and excessive violations may result in the loss of driving privileges on the Government facility.

16.2 Security. None.

16.3 Fire Protection Requirements while working within the government facility. The emergency telephone number for NEFSC, Woods Hole, Massachusetts is 911. Contractor shall report within one (1) hour of all incidents to TPOC.

16.4 Environmental Controls. This section covers the responsibility of the Contractor while performing under this contract. Work under this contract must be accomplished in such a way as to minimize the potential of environmental impact by operating in an environmentally responsible manner and to the extent possible through the use of environmentally friendly procedures, services, and products.

PAGE 20 OF 152 1333MF23QNFFM0005

16.4.1 Contractor shall immediately inform the TPOC/CO of any environmentally hazardous situations that may arise as well as contact required regulatory agencies.

16.4.2 Contractor shall be knowledgeable of and comply with all applicable interstate, federal, state, and local laws, regulations, and requirements regarding environmental protection as it pertains to the Work under this contract.

16.4.3 Conservation of Utilities. The contractor will be able to use on-site power or other utilities after informing TPOC.

17.0 IT Security. Is not applicable.

18.0 Section 508. Not applicable. Section 508 of the Rehabilitation Act of 1973 (29 U.S.C.

794d) as amended by P.L. 105-220 under Title IV (Rehabilitation Act Amendments of 1998) is not required.

19.0 Invoicing. Contractor shall provide “proper” invoices in arrears of tasks performed (and expensed) with the last invoice being submitted within 30 days of contract completion. Invoices shall be submitted (via electronic copy) no later than by the 10th day of the billing month.

1. Payments will be based on receipt of a proper invoice and satisfactory contract performance and guidelines in FAR 32.9, Prompt Payment.

2. To constitute a proper invoice, the Contractor’s invoice shall be prepared in accordance with, and contain the elements specified in FAR 52.212-4(g), “Invoices”.

3. The Government will return invoices that do not comply with FAR 52.212-4(g), “Invoices” within 7 days after the date the invoice was received along with a statement as to the reasons why it is not a proper invoice.

4. The Contractor will send invoices in accordance with the terms and conditions of this contract to the following address (electronic submission of invoices is preferred):

nmfs.nec.invoices@noaa.gov

5. Please reference the Contract/Order Number in your email subject line when submitting invoices.

PAGE 21 OF 152 1333MF23QNFFM0005

APPENDIX A

Useful Websites

Publication / Website

Mandatory or Advisory

Website

Federal Acquisition

Regulation (FAR)

Mandatory https://www.acquisition.gov/browse/index/far

Federal Holiday Home Page

Mandatory www.opm.gov/fedhol.

Occupational Safety and

Health Administration

(OSHA)

Mandatory https://www.osha.gov/

PAGE 22 OF 152 1333MF23QNFFM0005

APPENDIX B

Mooring Location

NOAA/NMFS/NEFSC

NOAA R/V Gloria Michelle Homeport 166 Water Street Woods Hole, MA 02543

Appendix A: NOAA AMC-000-3C General Requirements

PAGE 23 OF 152 1333MF23QNFFM0005

PAGE 24 OF 152 1333MF23QNFFM0005

PAGE 25 OF 152 1333MF23QNFFM0005

PAGE 26 OF 152 1333MF23QNFFM0005

PAGE 27 OF 152 1333MF23QNFFM0005

PAGE 28 OF 152 1333MF23QNFFM0005

PAGE 29 OF 152 1333MF23QNFFM0005

Appendix B: NOAA MOC-631-2D Coating Systems

PAGE 30 OF 152 1333MF23QNFFM0005

MOC-631-2D

AUGUST 2002

SUPERSEDING

AMC-631-2C

AUGUST 1995

NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA)

MARINE OPERATION CENTER, ATLANTIC

STANDARD SPECIFICATION MOC-631-2D

COATING SYSTEMS FOR STEEL SURFACES

1. SCOPE. This specification contains the general requirements for surface preparation and application of the coating systems most frequently used on the steel surfaces of NOAA steel ships and boats.

2. REFERENCES.

(a) SSPC: The Society for Protective Coatings Paint Application Specification No. 1 (SSPC-PA 1), “Shop, Field, and Maintenance Painting” (April 1, 2000)

(b) SSPC: The Society for Protective Coatings Paint Application Standard No. 2 (SSPC-PA 2), “Measurement of Dry Coating Thickness with Magnetic Gages” (June 1, 1996)

(c) SSPC: The Society for Protective Coatings Joint Surface Preparation Standard SSPC-SP 10/NACE No. 2, “Near-White Blast Cleaning” (September 1, 2000)

(d) SSPC: The Society for Protective Coatings Surface Joint Surface Preparation Standard SSPC-SP 12/NACE No. 5, “Surface Preparation and Cleaning of Steel and Other Hard Materials by High- and Ultrahigh-Pressure Water Jetting Prior to Recoating” (1995)

(e) SSPC: The Society for Protective Coatings Surface Preparation Specification No. 3 (SSPC-SP 3), “Power Tool Cleaning” (November 1, 1982 Editorial Changes September 1, 2000)

(f) SSPC: The Society for Protective Coatings Surface Preparation Specification No. 1 (SSPC-SP 1), “Solvent Cleaning” (November 1, 1982 Editorial Changes September 1, 2000)

(g) SSPC: The Society for Protective Coatings Surface Preparation Specification No. 11 (SSPC-SP 11), “Power Tool Cleaning to Bare Metal” (November 1, 1987 Editorial Changes September 1, 2000)

(h) SSPC: The Society for Protective Coatings Joint Surface Preparation Standard SSPC-SP 7/NACE No. 4, “Brush-Off Blast Cleaning” (September 1, 2000)

PAGE 31 OF 152 1333MF23QNFFM0005

MOC-631-2D

AUGUST 2002

3. REQUIREMENTS.

3.1 General Requirements.

3.1.1 All paint application shall applied in compliance with

reference (a) as reinforced and supplemented by this specification.

3.1.2 Comply with the manufacturers' printed recommendations

and instructions for all aspects of handling, mixing, and application of the paint materials.

3.1.3 All paint shall be delivered to the jobsite in

original, unopened containers with labels intact. All containers shall remain unopened until required for use. Each container of paint shall be clearly marked or labeled to show paint identification, date of manufacture, batch number, analysis of contents, identification of all toxic substances, and special instructions.

3.1.4 Paint shall be used before its shelf life has expired.

If a paint has no stated shelf life or is more than one year old, the manufacturer must certify in writing that the paint is suitable for use.

3.1.5 All coating thicknesses are stated in dry film

thickness (DFT). All dry film thickness determinations shall be performed in accordance with reference (b).

3.1.6 Coatings shall be applied only when the following

conditions are maintained:

a. Apply paint only to dry surfaces and when there is no chance of precipitation until after the paint has cured. The steel surface temperature shall be at least five degrees Fahrenheit above the dew point. The dew point can be presumed to be satisfactory if a thin, clearly defined film of water applied to the cleaned surface with a damp cloth evaporates within 15 minutes. Otherwise, the dew point shall be measured prior to painting by taking the dry-bulb temperature of the surface and the wet-bulb temperature at the jobsite.

b. The air temperature and surface temperature must both be a minimum of 45 degrees Fahrenheit at all times, unless a lower temperature is specifically authorized by the paint manufacturer's printed instructions.

c. Painting is permitted only when the humidity is less than 95 percent.

d. When paint must be applied in damp or cold weather, the steel must be painted under cover and the surrounding air and the steel heated to establish the required conditions. The steel

PAGE 32 OF 152 1333MF23QNFFM0005

AUGUST 2002

shall remain under cover or be protected until dry or until weather conditions permit its exposure.

3.1.7 Each coat of paint shall be in a proper state of cure

or dryness before the application of the succeeding coat. Paint shall be considered dry for recoating when an additional coat can be applied without the development of any detrimental film irregularities, such as lifting, wrinkling, or loss of adhesion of the undercoat. The time interval between coating applications shall be in compliance with the manufacturer's printed instructions.

3.1.8 All paint materials shall be furnished by the

Contractor and shall be applied using spray equipment, unless otherwise specified. When applying touch-up coatings to small areas disturbed by other work, brushes and rollers may be used.

3.1.9 Comply with and enforce all safety and environmental

protection regulations relative to removal, disposal, mixing, and application of paints and other materials.

3.1.10 Mask, tape, cover, and otherwise protect all equipment, machinery, cables, piping, insulation, glass, furnishings, and other government materials from damage, overspray and contamination. Remove and reinstall parts and loose gear as necessary to avoid damage.

3.1.11 Plug, wrap, blank, cover, or mask all openings as

needed to prevent entry of blast materials into the ship or boat and to confine blast materials inside the compartment being sandblasted. Install industrial foam filter materials on the intake and exhaust of ventilation systems which will be in use.

Renew filter materials when air flow becomes restricted.

3.1.12 When surface preparation and coating of a compartment

or surface is specified, included shall be all plating, frames, longitudinals, beams, stiffeners, brackets, baffles, and other structural steel members. Steel ladders in tanks, voids, and cofferdams are also to be included.

3.1.13 Surface preparation and paint application of shell

plating and frames below the Load Waterline shall be accomplished only while the ship is in drydock, unless otherwise and specifically authorized.

3.1.14 Where colors are not specified in this specification, the color for coatings shall be as specified in other procurement documents or specifications. Where colors are not specified elsewhere, the colors shall be selected by the COTR or other NOAA representative responsible for acceptance of the work.

PAGE 33 OF 152 1333MF23QNFFM0005

AUGUST 2002

3.2 Surface Preparation.

3.2.1 Unless otherwise specified, all steel surfaces shall be prepared by sandblasting to a "near white" surface in accordance with reference (c). or prepared by "ultrahigh-pressure water jetting” to a visual surface preparation condition of WJ-2 in accordance with reference (d).

3.2.2 When other procurement documents or specifications

require "power tool clean" surface preparation, the therein…