1305M325R0002 - Attachment 4 - Cost and Price Breakdown.xlsx
XLSX spreadsheet 237 KB Posted
- Attached to
- Phased Array Radar (PAR) Test Article Federal contract opportunity
- Solicitation number
- 1305M325R0002
About this file
This is a pricing template spreadsheet (Attachment 4) for solicitation 1305M325R0002 that provides detailed cost breakdown tables for contractors to complete. The template includes sections for Cost and Price Detail covering CLINs 1001-3001 (CPFF contract type) and 5101-5501 (T&M contract type), with pre-populated values showing $9.8M total for the T&M support/maintenance option periods across 5 years ($800K-$2.4M per year).
The spreadsheet contains detailed cost element breakdowns for direct labor rates, indirect costs, materials, subcontracts, and other costs across three contract years, with sections for fringe benefits, overhead, G&A, and fee calculations. It includes separate tabs for historical/proposed rates and indirect expense schedules. The template requires offerors to adjust cost elements and formulas to match their accounting systems and proposed costs for the Phased Array Radar Test Article project.
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table of Contents 1305M325R0002 - Attachment 4 - Cost and Price Breakdown
Cost and Price Detail
Table of Contents
| TAB NAME | EXHIBIT TITLE |
| Total Proposed Cost/Price | Summary of Total Proposal |
| Total of Cost CLINs | CLIN Cost Element Breakdown |
| CLIN 1001 | Cost breakdown for CLIN 1001 |
| CLIN 2001 | Cost breakdown for CLIN 2001 |
| CLIN 3001 | Cost breakdown for CLIN 3001 |
| Task Five (CLIN 5X0X) Labor Rates | Labor Rates for Optional T&M CLINs |
| Exhibit 001 | Historical/Proposed Rates Summary Schedule |
| Exhibit 002 | Indirect Expense Schedules |
Attachment 5 - Cost Sheet
TOTAL PROPOSED COSTPRICE
Total Proposed Price (All CLINs)
| CLIN | Task | Task | Period of Performance | Contract Type | Fixed Fee | Cost/Price |
| 1001 | One (1) | RTA | Three (3) year base period | CPFF | $ - 0 | $ - 0 |
| 2001 | Two (2) | RTF (including construction) | CPFF | $ - 0 | $ - 0 | |
| 3001 | Three (3) | Installation and Integration of RTA | CPFF | $ - 0 | $ - 0 | |
| 4001 | Four (4) | Documentation & Training | FFP | $ - 0 | ||
| 5101 | Five (5) | Support and Maintenance - Option Period One | Five (5) one-year options | T&M | $ 800,000.00 | |
| 5201 | Five (5) | Support and Maintenance - Option Period Two | $ 2,100,000.00 | |||
| 5301 | Five (5) | Support and Maintenance - Option Period Three | $ 2,200,000.00 | |||
| 5401 | Five (5) | Support and Maintenance - Option Period Four | $ 2,300,000.00 | |||
| 5501 | Five (5) | Support and Maintenance - Option Period Five | $ 2,400,000.00 | |||
| Total Price | $ 9,800,000.00 |
Total of Cost CLINs
Total Proposal Contract Value Summary (CLINs 1001, 2001, 3001)
| ELEMENT OF COST | CY01 | CY02 | CY03 | TOTAL | ||||||||
| Labor Hours | Rate | Dollars | Labor Hours | Rate | Dollars | Labor Hours | Rate | Dollars | Labor Hours | Rate | Dollars | |
| DIRECT LABOR | ||||||||||||
| Direct Labor Rate 1 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 |
| Direct Labor Rate 2 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 |
| Direct Labor Rate 3 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 |
| Total Direct Labor | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 |
| INDIRECT COSTS | ||||||||
| Fringe | 0% | $0.00 | 0% | $0.00 | 0% | $0.00 | 0% | $0.00 |
| Labor Overhead 1 | 0% | $0.00 | 0% | $0.00 | 0% | $0.00 | 0% | $0.00 |
| Labor Overhead 2 | 0% | $0.00 | 0% | $0.00 | 0% | $0.00 | 0% | $0.00 |
| Labor Overhead 3 | 0% | $0.00 | 0% | $0.00 | 0% | $0.00 | 0% | $0.00 |
| Total Indirect | $0.00 | $0.00 | $0.00 | $0.00 |
| MATERIAL | ||||||||
| Direct Material | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Direct Material Escalation | 0% | 0% | 0% | 0% | ||||
| Total Material | $0.00 | $0.00 | $0.00 | $0.00 |
| SUBCONTRACTS | ||||||||||||
| Subcontractor 1 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 |
| Subcontractor 2 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 |
| Subcontractor 3 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 |
| Subcontractor 4 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 |
| Subcontractor 5 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 |
| Subcontractor 6 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 |
| Total Subcontracts | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 |
| OTHER COSTS | ||||
| Other Direct Costs | $0.00 | $0.00 | $0.00 | $0.00 |
| Total Other Costs | $0.00 | $0.00 | $0.00 | $0.00 |
SubTotal Costs $0.00 $0.00 $0.00 $0.00
G&A 0% $0.00 0% $0.00 0% $0.00 0% $0.00
Subtotal Fee Bearing Cost $0.00 $0.00 $0.00 $0.00
FCCOM 0% $0.00 0% $0.00 0% $0.00 0% $0.00
Total FCCOM $0.00 $0.00 $0.00 $0.00
Total Estimated Cost Less Fee $0.00 $0.00 $0.00 $0.00
Fixed Fee (See Solicitation Section L) 0.000% $0.00 0.000% $0.00 0.000% $0.00 0.000% $0.00
Total Fee $0.00 $0.00 $0.00 $0.00
Total Hours 0 0 0 0
GRAND TOTAL Price $0.00 $0.00 $0.00 $0.00
| NOTES: |
| The Offeror must adjust the specific cost elements and its formulas to reflect their accounting system and proposed costs. |
CLIN 1001
Cost Sheet - CLIN 1001 Cost Element Breakdown
| CLIN 1001 | ||||||||||||
| ELEMENT OF COST | CY01 | CY02 | CY03 | TOTAL | ||||||||
| Labor Hours | Rate | Dollars | Labor Hours | Rate | Dollars | Labor Hours | Rate | Dollars | Labor Hours | Rate | Dollars | |
| DIRECT LABOR | ||||||||||||
| Direct Labor Rate 1 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 |
| Direct Labor Rate 2 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 |
| Direct Labor Rate 3 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 |
| Total Direct Labor | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 |
| INDIRECT COSTS | ||||||||
| Fringe | 0% | $0.00 | 0% | $0.00 | 0% | $0.00 | 0% | $0.00 |
| Labor Overhead 1 | 0% | $0.00 | 0% | $0.00 | 0% | $0.00 | 0% | $0.00 |
| Labor Overhead 2 | 0% | $0.00 | 0% | $0.00 | 0% | $0.00 | 0% | $0.00 |
| Labor Overhead 3 | 0% | $0.00 | 0% | $0.00 | 0% | $0.00 | 0% | $0.00 |
| Total Indirect | $0.00 | $0.00 | $0.00 | $0.00 |
| MATERIAL | ||||||||
| Direct Material | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Direct Material Escalation | 0% | 0% | 0% | 0% | ||||
| Total Material | $0.00 | $0.00 | $0.00 | $0.00 |
| SUBCONTRACTS | ||||||||||||
| Subcontractor 1 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 |
| Subcontractor 2 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 |
| Subcontractor 3 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 |
| Subcontractor 4 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 |
| Subcontractor 5 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 |
| Subcontractor 6 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 |
| Total Subcontracts | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 |
| OTHER COSTS | ||||
| Other Direct Costs | $0.00 | $0.00 | $0.00 | $0.00 |
| Total Other Costs | $0.00 | $0.00 | $0.00 | $0.00 |
SubTotal Costs $0.00 $0.00 $0.00 $0.00
G&A 0% $0.00 0% $0.00 0% $0.00 0% $0.00
Subtotal Fee Bearing Cost $0.00 $0.00 $0.00 $0.00
FCCOM 0% $0.00 0% $0.00 0% $0.00 0% $0.00
Total FCCOM $0.00 $0.00 $0.00 $0.00
Total Estimated Cost Less Fee $0.00 $0.00 $0.00 $0.00
Fixed Fee (See Solicitation Section L) 0.000% $0.00 0.000% $0.00 0.000% $0.00 0.000% $0.00
Total Fee $0.00 $0.00 $0.00 $0.00
Total Hours 0 0 0 0
GRAND TOTAL Price $0.00 $0.00 $0.00 $0.00
| NOTES: |
| The Offeror must adjust the specific cost elements and its formulas to reflect their accounting system and proposed costs. |
CLIN 2001
Cost Sheet - CLIN 2001 Cost Element Breakdown
| CLIN 2001 | ||||||||||||
| ELEMENT OF COST | CY01 | CY02 | CY03 | TOTAL | ||||||||
| Labor Hours | Rate | Dollars | Labor Hours | Rate | Dollars | Labor Hours | Rate | Dollars | Labor Hours | Rate | Dollars | |
| DIRECT LABOR | ||||||||||||
| Direct Labor Rate 1 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 |
| Direct Labor Rate 2 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 |
| Direct Labor Rate 3 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 |
| Total Direct Labor | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 |
| INDIRECT COSTS | ||||||||
| Fringe | 0% | $0.00 | 0% | $0.00 | 0% | $0.00 | 0% | $0.00 |
| Labor Overhead 1 | 0% | $0.00 | 0% | $0.00 | 0% | $0.00 | 0% | $0.00 |
| Labor Overhead 2 | 0% | $0.00 | 0% | $0.00 | 0% | $0.00 | 0% | $0.00 |
| Labor Overhead 3 | 0% | $0.00 | 0% | $0.00 | 0% | $0.00 | 0% | $0.00 |
| Total Indirect | $0.00 | $0.00 | $0.00 | $0.00 |
| MATERIAL | ||||||||
| Direct Material | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Direct Material Escalation | 0% | 0% | 0% | 0% | ||||
| Total Material | $0.00 | $0.00 | $0.00 | $0.00 |
| SUBCONTRACTS | ||||||||||||
| Subcontractor 1 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 |
| Subcontractor 2 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 |
| Subcontractor 3 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 |
| Subcontractor 4 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 |
| Subcontractor 5 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 |
| Subcontractor 6 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 |
| Total Subcontracts | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 |
| OTHER COSTS | ||||
| Other Direct Costs | $0.00 | $0.00 | $0.00 | $0.00 |
| Total Other Costs | $0.00 | $0.00 | $0.00 | $0.00 |
SubTotal Costs $0.00 $0.00 $0.00 $0.00
G&A 0% $0.00 0% $0.00 0% $0.00 0% $0.00
Subtotal Fee Bearing Cost $0.00 $0.00 $0.00 $0.00
FCCOM 0% $0.00 0% $0.00 0% $0.00 0% $0.00
Total FCCOM $0.00 $0.00 $0.00 $0.00
Total Estimated Cost Less Fee $0.00 $0.00 $0.00 $0.00
Fixed Fee (See Solicitation Section L) 0.000% $0.00 0.000% $0.00 0.000% $0.00 0.000% $0.00
Total Fee $0.00 $0.00 $0.00 $0.00
Total Hours 0 0 0 0
GRAND TOTAL Price $0.00 $0.00 $0.00 $0.00
| NOTES: |
| The Offeror must adjust the specific cost elements and its formulas to reflect their accounting system and proposed costs. |
CLIN 3001
Cost Sheet - CLIN 3001 Cost Element Breakdown
| CLIN 3001 | ||||||||||||
| ELEMENT OF COST | CY01 | CY02 | CY03 | TOTAL | ||||||||
| Labor Hours | Rate | Dollars | Labor Hours | Rate | Dollars | Labor Hours | Rate | Dollars | Labor Hours | Rate | Dollars | |
| DIRECT LABOR | ||||||||||||
| Direct Labor Rate 1 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 |
| Direct Labor Rate 2 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 |
| Direct Labor Rate 3 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 |
| Total Direct Labor | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 |
| INDIRECT COSTS | ||||||||
| Fringe | 0% | $0.00 | 0% | $0.00 | 0% | $0.00 | 0% | $0.00 |
| Labor Overhead 1 | 0% | $0.00 | 0% | $0.00 | 0% | $0.00 | 0% | $0.00 |
| Labor Overhead 2 | 0% | $0.00 | 0% | $0.00 | 0% | $0.00 | 0% | $0.00 |
| Labor Overhead 3 | 0% | $0.00 | 0% | $0.00 | 0% | $0.00 | 0% | $0.00 |
| Total Indirect | $0.00 | $0.00 | $0.00 | $0.00 |
| MATERIAL | ||||||||
| Direct Material | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Direct Material Escalation | 0% | 0% | 0% | 0% | ||||
| Total Material | $0.00 | $0.00 | $0.00 | $0.00 |
| SUBCONTRACTS | ||||||||||||
| Subcontractor 1 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 |
| Subcontractor 2 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 |
| Subcontractor 3 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 |
| Subcontractor 4 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 |
| Subcontractor 5 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 |
| Subcontractor 6 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 |
| Total Subcontracts | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 |
| OTHER COSTS | ||||
| Other Direct Costs | $0.00 | $0.00 | $0.00 | $0.00 |
| Total Other Costs | $0.00 | $0.00 | $0.00 | $0.00 |
SubTotal Costs $0.00 $0.00 $0.00 $0.00
G&A 0% $0.00 0% $0.00 0% $0.00 0% $0.00
Subtotal Fee Bearing Cost $0.00 $0.00 $0.00 $0.00
FCCOM 0% $0.00 0% $0.00 0% $0.00 0% $0.00
Total FCCOM $0.00 $0.00 $0.00 $0.00
Total Estimated Cost Less Fee $0.00 $0.00 $0.00 $0.00
Fixed Fee (See Solicitation Section L) 0.000% $0.00 0.000% $0.00 0.000% $0.00 0.000% $0.00
Total Fee $0.00 $0.00 $0.00 $0.00
Total Hours 0 0 0 0
GRAND TOTAL Price $0.00 $0.00 $0.00 $0.00
| NOTES: |
| The Offeror must adjust the specific cost elements and its formulas to reflect their accounting system and proposed costs. |
Task Five (CLIN 5X0X) Labor Rat
| Labor Category | Labor Category Description | On-Site Hourly Labor Rates | Off-Site Hourly Labor Rates | ||||||||
| Option Period 1 | Option Period 2 | Option Period 3 | Option Period 4 | Option Period 5 | Option Period 1 | Option Period 2 | Option Period 3 | Option Period 4 | Option Period 5 |
Exhibit 001
Cost Sheet - Exhibit 001: Historical/Proposed Rates Summary Schedule
| RATE | Proposed Rate | ||||||||
| GFY 2020 | GFY 2021 | GFY 2022 | GFY 2023 | GFY 2024 | GFY 2025 | GFY 2026 | GFY 2027 | GFY 2028 |
| Direct Labor | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| Direct Labor Escalation | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% |
| Fringe | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% |
| Overhead | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% |
| G&A | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% |
| Material Burden | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% |
| Subcontractor Burden | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% |
| FCCOM | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% |
| Material Escalation | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% |
| NOTES: |
| The Offeror must add and/or adjust specific rate categories to reflect their accounting system and proposed costs. |
Exhibit 002
Cost Sheet- Exhibit 002: Indirect Expense Schedules
| INDIRECT RATE | Historical Indirect Expense Schedules | Proposed Indirect Expense Schedules | |||||||
| CFY 2020 | CFY2021 | CFY2022 | CFY 2023 | CFY 2024 | CFY 2025 | CFY 2026 | CFY 2027 | CFY 2028 |
| Indirect Expense 1 |
| Expense Categories: |
Total Expenses: $0 $0 $0 $0 $0 $0 $0 $0 $0
| Distribution Base: |
| Amount |
| Name of Base |
Indirect Rate % 0% 0% 0% 0% -100% 0% 0% 0% 0%
| NOTES: |
| Offeror to replicate cost exhibit 002 template and submit separate exhibits for each indirect expense proposed, providing detail and basis of calculation IAW accounting system. |
File details come from the government source that posted it. Updated .