Updated SOW Concrete Pad Install.pdf
PDF 3 MB Posted
- Attached to
- AMENDED BUILD/FINISH CONCRETE PAD
- Solicitation number
- 1305M2-23-Q-00803
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A-23-0001.pdf | ||
| General Decision Number VA20220007.gov.pdf | ||
| CONSTRUCTION MATRIX.pdf | ||
| Solicitation.pdf | ||
| SOW Concrete Pad Install.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE
CLIN Description Quantity Unit Unit Price Total Price 0001 Build/Install concrete pad to support the necessary structural and electronic components for the new NWLON Tide Station in Kiptopeke, VA in accordance with the "Statement of Work”
Period of Performance:
Date of Award through thirty (30) days
1 EA $ $
STATEMENT OF WORK
NATIONAL OCEAN SERVICE
BUILD/FINISH CONCRETE PAD
Date of Award through thirty (30) days
1 Task 1 – Concrete Pad Install
Under this scope of work, a concrete pad will be installed within the Kiptopeke State Park on the south end of the Kiptopeke Fishing Pier (See Figure 1). This concrete pad will be the future long-term location of NOAA’s Kiptopeke, VA Tidal/Meteorological Station. The exact location for the concrete pad installation will be marked by NOAA field personnel prior to the start. Access to the facility must be coordinated with the Park Rangers in advance of the initial site visit and planned work.
NOAA NOS/CO-OPS Page 1 of 2
NOAA NOS/CO-OPS Page 2 of 2
Figure 1.
The Contractor shall verify all dimensions shown in within the drawing “STATION UPGRADE 8632200 Kiptopeke, VA (SHEET S-01 to S-03).” The contractor shall verify and provide ‘red-lined as-built drawings’ to CO-OPS/FOD after the concrete pad has been installed. The Contractor shall not substitute, modify or alter GFE components in any way without prior authorization from the Government.
2 Government Furnished Equipment
• N/A
3 Contractor Supplied Equipment
• All tools, equipment and consumable materials required
4 Period of Performance
• The contractor shall complete all work herein within 30 calendar days from the date in which the contract is awarded.
5 Government Point of Contact
• Chris Metzger – Lead Physical Scientist, Cell (757) 651-5871, Email: Chris.Metzger@noaa.gov
6 Construction References At a minimum, all materials and construction practices shall conform to the following standards:
1.1. All applicable State and Local building codes
1.2. American Concrete Institute ACI 31/-05 “Building Code Requirements for Structural Concrete and Commentary”
1.3. American National Standards Institute/American Institute of Steel Construction 350-05
“Specification for Structural Steel Buildings”
1.4. American Welding Society:
1.4.1. AWS-D1.1/D1.1M: 2010 “Structural Welding Code – Steel 22nd Edition”
1.4.2. AWS-D1.4/D1.4M: 2005 “Structural Welding Code – Reinforcing Steel – 6th Edition”
1.4.3. AWS-D1.5/D1.5M: 2002 “Bridge Welding Code”
1.4.4. AWS-D1.6/D1.6M: 2007 “Structural Welding Code – Stainless Steel 2nd Edition”
1.5. American Society of Civil Engineers (ASCE):
1.5.1. ASCE 7-10 “Minimum Design Loads for Buildings and Other Structures”
1.5.2. Manuals and Reports on Engineering Practice No. 50 “Planning and Design Guidelines for Small Craft Harbors” 2000 Revised Edition
1.6. The Aluminum Association “Aluminum Design Manual”
mailto:Chris.Metzger@noaa.gov
8632200 KIPTOPEKE UPGRADE.DWG
STATION UPGRADE
8632200 KIPTOPEK, VA
DRAWING INDEX
National Ocean Service Center for Operational
Oceanographic Products and Services
DESIGN BY LG 12/15/2022
DRAWN BY LG
APPROVED BY
REVISION
A
PERCENT COMPLETE
100%
CS-01
SHEET 01 OF 11
KI
PT
O
PE
KE
, V
IR
G
IN
IA
ST
AT
IO
N
U
PG
R
AD
E
C O
VE
R
S H
EE
T
SHEET DWG NO TITLE
01 CS-01 COVER SHEET
02 G-01 PROJECT LOCATION
03 G-02 GENERAL ARRANGEMENT
04 G-03 GENERAL ARRANGEMENT - ELEVATION VIEWS
05 G-04 GENERAL ARRANGEMENT - TRANSITION STATION
06 G-05 INSTALL PLAN
07 G-06 INSTALLATION PLAN - TRANSITION STATION
08 G-07 ITEM LIST
09 S-01 FOUNDATION PLAN
10 S-02 TOP LAYER REBAR LAYOUT
11 S-03 FOUNDATION ELEVATIONS
PROJECT LOCATION EXISTING STATION
N
G-01
SHEET 02 OF 11
KI
PT
O
PE
KE
, V
IR
G
IO
N
U
PG
R
AD
E
PR
O
JE
C
T
LO
C
AT
IO
NEW WIND BIRD
TO REPLACE THE
EXISTING ONE
NEW KIOSK WITH ENCLOSURE,
SOLAR PANELS, GOES, ETC.
TO REPLACE THE EXISTING
DUAL MASTER ENCLOSURE
NEW CONCRETE
FOUNDATION
TO REPLACE THE
EXISTING ONE
GENERAL NOTES:
1. TO MEET CO-OPS SURVIVABILITY'S
REQUIREMENTS, THIS PROJECT IS TO INSTALL:
1.1. A KIOSK WITH ELECTRONIC ENCLOSURE,
SOLAR PANELS, GOES;
1.2. A SHAKESPEARE POST WITH TWO WIND
BIRD SENSORS;
1.3. A NEW 9'-0"X6'-6"X15" CONCRETE
FOUNDATION FOR KIOSK AND AND
SHAKESPEARE POST;
1.4. A HYDRO STAND A NEW MWWL SENSOR
AND A DCP, GOES AND TWO SOLAR
PANELS.
2. THE NEW FOUNDATION AND KIOSK WILL BE AT
THE SAME LOCATION AS THE EXISTING
STATION'S.
NEW MWWL SENSOR
ON HYDRO STAND
CT WELL EXISTING AQUATRAK
GENERAL ARRANGEMENT - ISO VIEW
G-02
SHEET 03 OF 11
G
EN
ER
AL
A R
R
AN
G
EM
EN
T
MW SENSOR EL = 4.91m
ENCLOSURE EL = 4.60±m
SHAKSPEARE POLE HYDRO STAND
WITH MW SENSOR
NEW KIOSK
TIDE STATION
GOES
T/EXIST BULKHEAD EL = 4.00m
SLOSH CAT 1 @ HIGH TIDE
EL = 3.73m
MAX. OBS. WL EL = 3.26m
MHHW EL = 2.00m
MSL EL = 1.54m
MLLW EL = 1.11m
MIN. OBS. WL EL = 0.33m
CT WELL
EXISTING BUBBLER SENSOR
EXISTING AQUATRAK SIDE ELEVATION
NOTES:
FRONT ELEVATION
1. ALL ELEVATIONS ARE REFER TO
STATION DATUM.
2. ELEVATIONS ARE IN METERS. G-03
KI
PT
O
PE
KE
, V
IR
G
IO
N
U
PG
R
AD
E
G
EN
ER
AL
A R
R
AN
G
EM
EN
T
- E
LE
VA
TI
O N
V
IE
W S
SHEET 04 OF 11
EXISTING AQUATRAK
DCP
SOLAR PANEL
MW SENSOR
GENERAL ARRANGEMENT - TRANSITION STATION G-04
SHEET 05 OF 11
KI
PT
O
PE
KE
, V
IR
G
IO
N
U
PG
R
AD
E
G
EN
ER
AL
A R
R
AN
G
EM
EN
T-
TR
AN
SI
TI
O N
S
TA
TI
O
HYDRO STAND
AND WL SENSOR
(REMAIN)
ANTENNAS
FROM TEMP
STATION
FUTURE 65W 12
SOLAR PANEL
(MINIMUM EMBEDMENT 6") 1
INSTALLATION PLAN
G-05
14 SHEET 06 OF 11
KI
PT
O
PE
KE
, V
IR
G
IO
N
U
PG
R
AD
E
IN
ST
AL
LA
TI
O
N P
LA
23 32
26 22
INSTALLATION PLAN
TRANSITION STATION G-06
SHEET 07 OF 11
KI
PT
O
PE
KE
, V
IR
G
IO
N
U
PG
R
AD
E
IN
ST
AL
LA
TI
O
N P
LA
N
TR
N
SI
TI
O
N S
TA
TI
O
G-07
SHEET 08 OF 11
KI
PT
O
PE
KE
, V
IR
G
IO
N
U
PG
R
AD
E
IT
EM
L
IS
T
ITEM LIST
ITEM QTY DESCRIPTION REMARKS
WIND BIRD ASSEMBLY
1 1 HINGE BASE PLATE BUILD TO PRINT- FOR DETAILS SEE DRAWING "SHAKESPEARE
LIGHT POLE HINGED BASE PLATE"
2 16 1/2 WASHER, SS316
3 8 1/2-13UNC NUT, SS316
4 8 1/2-13UNC X 11 LG, ANCHOR ROD HAS-R, SS316 HILTI PART NO:2045005 OR EQUIVALENT, 6" EMBEDMENT, UNLESS OTHERWISE NOTED
5 16 1/2 HEAVY WASHER, 1-1/2 OD X 0.14 THK, SS316 MCMASTER-CARR PART NO: 91525A337
6 1 25' MET MAST SHAKESPEARE PART NO: AH25-02N7
7 1 DOUBLE ANEMOMETER MASTHEAD
8 2 ANEMOMETER
KIOSK ASSEMBLY
9 1 KIOSK ASSEMBLY BUILD TO PRINT- FOR DETAILS SEE DRAWING "NOAA KIOSK
TIDE STATION"
10 28 3/4 WASHER, SS316
11 28 3/4 HEAVY WASHER, 2-1/4 OD X 0.192 THK, SS316 MCMASTER-CARR PART NO: 91525A421
12 14 3/4-10UNC X 16 LG, ANCHOR ROD HAS-R, SS316 HILTI PART NO:2045012 OR EQUIVALENT, MINIMUM OF 9"
EMBEDMENT, UNLESS OTHERWISE NOTED
13 14 3/4-10UNC NUT, SS316
14 18 HYBRID MORTAR, HIT-HY200-R HILTI PART NO:2022793 OR EQUIVALENT
MICROWAVE & SUPPORTING MEMBERS
15 1 HYDRO STAND BUILD TO PRINT - FOR DETAIL SEE DRAWING "HS_24X30"
16 1 30 INCH FIXED ARM BUILD TO PRINT- FOR DETAILS SEE DRAWING "30 INCH FIXED
ARM"
17 1 GEODETIC LEVELING COLLAR ASSEMBLY FOR DETAILS SEE DRAWING "GEODETIC LEVELING COLLAR
FOR MICROWAVE WATER LEVEL SENSOR, REV D"
18 1 MWWL, WATERLOG
19 6 1/2-13UNC X 2-1/4 LG, FULLY THREADED HEX HD SCREW,
SS316
20 12 1/2 WASHER, SS316
21 6 1/2-13UNC NUT, SS316
22 1 24X30 DCP
ITEM LIST
ITEM QTY DESCRIPTION REMARKS
SOLAR PANEL & SUPPORTING MEMBERS
23 2 40W SOLAR PANEL AMERESCO PART NO: BSP40-12
24 2 HARDENED SOLAR PANEL FRAME BUILD TO PRINT- FOR DETAILS SEE DRAWING "HARDENED
SOLAR PANEL FRAME 55, REV B"
25 2 1-1/2 NPS SCH 80, THREADED ONE END ONLY, 6061-T6 AL
26 2 WEATHERHEAD FOR 1-1/2 NPS PIPE
27 4 U-BOLT, 3/8-16UNC THREAD X 2 ID, SS316
28 8 3/8-16UNC NUT, SS316
29 8 3/8 WASHER, SS316
ANTENNA
30 1 GOES ANTENNA
31 1 IP ANTENNA
32 1 GPS ANTENNA
FOUNDATION
33 1 CAST-IN-PLACE CONCRETE FOUNDATION REFER TO FOUNDATION DESIGN
14.25
FUTURE SOLAR PANEL
BASE PLATE
15.00
SHAKESPEARE BASE PLATE
KIOSK COLUMN
CENTER, TYP
KIOSK BASE PLATE
29.25
Center for Operational
78.00 19.50
18.00
14.25 66.00 11.25 SHEET NOTES:
1. ALL DIMENSION ARE IN INCHES,
UNLESS OTHERWISE NOTED.
112.00
FOUNDATION PLAN
S-01
SHEET 09 OF 11
KI
PT
O
PE
KE
, V
IR
G
IO
N
U
PG
R
AD
E
FO
U
N D
AT
IO
N P
LA
3.00 CLR 3.00 CLR
3.00 CLR
11.69
12.00
#5 REBAR
SHEET NOTES:
1. ALL DIMENSION ARE IN INCHES,
UNLESS OTHERWISE NOTED.
2. ALL REBAR HAVE A 3" MINIMUM
COVER, UNLESS OTHERWISE NOTED.
3. REFER FOUNDATION SECTION FOR
REBAR DETAILS.
National Ocean Service Center for Operational
#5
REBAR
TYP
78.00
12.50
11.69
3.00 CLR
10.94 10.25
10.25 11.00
11.00 11.00
11.00 11.00
11.00 7.94
S-02
REBAR LAYOUT SHEET 10 OF 11
KI
PT
O
PE
KE
, V
IR
G
IO
N
U
PG
R
AD
E
R
EB
AR
L
AY
O
U T-
PL
AN
3 9.00
1 3
3.31
5.38
2.00±
T/EXISTING
GRADE
21.00
45°
9.00
3.31 45°
9.00
8.00
6.00
GRAVEL
(MAX SIZE 0.75)
GRAVEL
(MAX. SIZE 0.75)
FRONT ELEVATION SIDE ELEVATION
15.00
R1.00
8.00 3 DETAIL
SHEET NOTES:
1. ALL DIMENSION ARE IN INCHES, UNLESS OTHERWISE NOTED.
2. CONCRETE BASE REQUIRES 8 INCHES AGGREGATES.
3. CONCRETE SHALL HAVE A MINIMUM OF 3,500 PSI AT AGE OF 28 DAYS.
4. CONCRETE WORK SHALL BE IN ACCORDANCE WITH LOCAL CODES, SAFETY
REGULATION AND UNLESS OTHERWISE NOTED, THE LATEST REVISION OF ACI
318 "BUILDING CODE REQUIREMENT FOR REINFORCED CONCRETE".
5. CONCRETE MIX DESIGN REVIEW & APPROVAL REQUIRED.
6. CONCRETE MATERIALS SHALL CONFORMED TO THE APPROPRIATE STATE
REQUIREMENTS FOR EXPOSED STRUCTURAL CONCRETE.
7. FOUNDATION DESIGN ASSUMES THAT THE SOIL EXISTING CONDITIONS AT THE
SITE ARE ACCEPTABLE.
8. IF A STRUCTURAL BACKFILL IS REQUIRED, IT SHALL BE COMPACTED IN 8 INCH
MAXIMUM LAYERS TO 95% OF MAXIMUM DRY DENSITY AT OPTIMUM MOISTURE
CONTENT IN ACCORDANCE WITH ASTM D698
9. ALL REINFORCING STEEL SHALL BE ASTM A 615 GRADE 60. WELDING AND
SPLICE IN REINFORCEMENT ARE NOT ALLOWED.
S-03
SHEET 11 OF 11
KI
PT
O
PE
KE
, V
IR
G
IO
N
U
PG
R
AD
E
FO
U
N D
AT
IO
N E
LE
VA
TI
O
N S
ITEM LIST CONTINUED
ITEM QTY DESCRIPTION REMARKS
1 18 #5x106.00 LONG REBAR ASTM 615, GRADE 60
2 24 #5X72.00 LONG REBAR ASTM 615, GRADE 60
3 28 #3X29.00 LONG REBAR SEE DETAIL
3.24 CY 3500 PSI CAST-IN-PLACE CONCRETE
| 2 Government Furnished Equipment |
| 3 Contractor Supplied Equipment |
| 4 Period of Performance |
| 5 Government Point of Contact |
| 6 Construction References |
| 8632200 KIPTOPEK, VA |
| DRAWING INDEX |
| A |
| CS-01 |
| A |
| G-01 |
| A |
| G-02 |
| A |
| SIDE ELEVATION |
| FRONT ELEVATION |
| G-03 |
| A |
| G-04 |
| A |
| INSTALLATION PLAN |
| G-05 |
| A |
| INSTALLATION PLAN |
| A |
| G-07 |
| A |
| S-01 |
| A |
| S-02 |
| A |
S-03
File details come from the government source that posted it. Updated .