Statement Of Work

For

Security Camera System Upgrade At the Northeast Fisheries Science Center Milford Laboratory 212 Rogers Avenue Milford, CT 06460-6499 June 6, 2019

DESCRIPTION

A. The NMFS Laboratory is located at 212 Rogers Dr. Milford, RI 06460-6499. All inquiries are to the attention of Ronald Guilmette, 401-782-3291 office phone or E-mail at ron.guilmette@noaa.gov B. The National Marine Fisheries Service (NMFS), a part of the National Oceanic and Atmospheric Administration (NOAA) of the Department of Commerce (DOC), is a governmental agency charged with the mission of stewardship for living marine resources.

C. The contractor shall be fully knowledgeable of all requirements of the contract documents and shall make themselves aware of all job site conditions that will affect their work. Contractor to verify all dimensions prior to submitting quotation.

D. The contractor shall provide and install a network video recorder (NVR) and IP security cameras at locations provided in the contract documents.

E. The contractor shall provide IP camera licenses as well as SSA licenses.

Site Location:

Project Location:

Main Laboratory Building Building # 2

PRE-BID SITE VISIT

A site visit is highly recommended prior to submitting a quote in order to view site conditions and verify measurements, locations and equipment. Contact the COR to schedule a site visit between the hours of 7:30 AM– 4:00 PM, Monday through Friday. Coordinate site visits at least two working days in advance of intended site visit.

GENERAL

A. The contractor shall be fully knowledgeable of all requirements of the contract documents and shall make themselves aware of all job site conditions that will affect their work.

B. The contractor shall comply with all applicable codes and other published instructions for the installation of specified products, and installation requirements per the contract documents.

C. The contractor is responsible for his/her own security arrangements including subcontractor’s materials, tools, equipment, and personnel.

D. Work in Progress: The contractor shall be responsible for the protection and safe keeping of all work in progress prior to final acceptance by the Government.

E. All methods, materials and workmanship provided by the contractor under this contract shall be performed in accordance with professional industry standards and shall comply with applicable codes for construction. Professional agencies, associations, councils, institutes, codes, and standards as required or referenced by law, statue or manufactures recommendation including those listed in Appendix #3 are part of the contract requirements.

F. Appendix 1: Equipment Details and Locations.

G. Appendix 2: List of Acronyms.

H. Appendix 3: Professional agencies, associations, councils, institutes, codes, and standards

SPECIFIC TASKS

A. The Contractor shall communicate and coordinate with government IT personnel before working with network equipment and shall seek permissions to access the network.

B. The contractor shall provide all labor, equipment, tools and materials required for the installation, integration, programming, licensing and testing to ensure proper operation of the security NVR and camera system.

C. The Contractor shall install fourteen (14) mini dome cameras and all necessary wiring, cabling, hardware and mounting brackets.

D. The contractor shall integrate the newly installed cameras into the contractor installed NVR and client software.

E. The contractor shall provide all necessary IP camera licenses for new and existing cameras as well as all software updates.

F. The contractor shall provide and install software support agreement (SSA) for the contractor installed NVR client software.

G. Contractor to program all system component as required.

H. CAT 6 Wiring, IT drops and conduit are completed for camera installation in the main laboratory building. Some adjustments for adding conduit and connection may be required.

I. Cat 6 wirings, conduit, coring, boxes, supports; connections is required for building # 2. Cat 6 cabling/conduit shall be installed from camera locations to the Fiber Optic Switch (FOS) located in room #1, first floor, Building #2.

J. The contractor shall install all braces, bracket, supports, hardware, clamps, and conduit as required to complete installation.

K. The contractor shall take proper precautions and protection to maintain the integrity of the existing security camera system during installation and minimize system down time.

L. The contractor shall notify the COR when disarming and rearming the security camera system.

M. Remove existing cameras and dispose.

N. Provide 2 hours of on-site training.

ACCESS TO WORK SITE

A. All persons employed within the boundaries of the property or restricted-access areas therein, and all persons permitted to enter such property and areas shall comply with the security regulations for the NEFSC Milford Laboratory.

B. The Government reserves the right to close down the job site and order contractor personnel off the premises in the event of a national emergency or a shut-down, for as long as security problems persist. The contractor may only return to the site with verbal approval from the COR.

C. The Government reserves the right to exclude or remove from the site or building any employee of the contractor or a subcontractor whom the Government deems incompetent, careless, insubordinate or otherwise objectionable, or whose continued employment on the work is deemed by the Government to be contrary to the public interest.

D. Personnel may be subject to inspection of their personal effects when entering and leaving the facility. In addition, unscheduled inspections of personnel may be made when entering or while on site.

FINAL ACCEPTANCE AND INSPECTIONS

A. Inspection of work to be performed by the COR. Any corrective action required as a result of the inspection will be accomplished prior to final billing.

B. The contractor may be notified of deficiencies in performance in writing by the COR. Oral deficiency notifications will be confirmed in writing. Prompt corrective action shall be taken by the contractor upon notice of deficiency.

C. The contractor shall advised that the Government when all work is completed. The Government will not accept the work until it determines that all work has been satisfactorily completed within the terms of the contract.

EXISTING CONDITIONS

If discrepancies are discovered between the existing conditions and those noted on the SOW/drawings, immediately notify the Contracting Officer (CO). Upon receipt of Bidding Documents verify documents are complete. Notify CO if documents are incomplete. Immediately notify CO upon finding discrepancies or omissions in Bidding Documents.

JOB SITE PROTECTIONS

A. It shall be the responsibility of the contractor to protect the property of others as well as his/her own property, and to repair or replace any property damaged by the contractor in fulfilling this project. The contractor shall keep the area clean and upon completion of the project, the contractor shall clean up the work area and remove all debris from the job site in a timely and legally acceptable manner so as to not detract from the aesthetics or the functions of the building. Government dumpsters will not be available for contractor use. The contractor shall repair or be responsible for costs to repair all property damaged during the performance of work.

B. The contractor shall take precautions to prevent the spread of dust, moisture and debris. The contractor shall provide labor and materials to construct, maintain and remove necessary temporary enclosures to prevent dust or debris in the construction area(s) from entering the remainder of the building.

SUBMITTALS

The contractor shall submit the following:

· Manufacture cut sheets (10 days after NTP)

· Schedule (5 days after NTP)

· Safety Data Sheets (SDS) (10 days after NTP)

· Safety Plan (5 days after NTP)

PLACE OF PERFORMANCE

National Marine Fisheries Service 212 Rogers Avenue Milford, CT 06460-6499

DELIVERY, STORAGE, HANDLING, AND PROTECTION

A. Deliver materials to the job site in the manufacturer’s original, unopened containers or wrappings with the manufacturer’s name, brand name and installation instructions intact and legible. Deliver in sufficient quantity to permit work to continue without interruption.

B. Comply with the manufacturer’s written instructions for proper material storage.

C. Any materials which are found to be damaged shall be removed and replaced at the contractor’s expense.

D. Care shall be exercised to provide protection of surrounding structures, parking lot, and hallways and buildings structure.

QUALITY CONTROL

A. The contractor shall submit manufacture cut sheets and other specification literature for all materials to be installed.

B. All work described in the Statement of Work shall comply with the manufacturers installation guidelines.

C. The contractor shall furnish all labor, materials, tools, transportation, services and supplies as stated in this requirement.

D. Work is required to be completed in accordance with the construction industry standards and codes.

E. The contractor shall supply the COR with the onsite supervisor contact information and any other key personnel.

WARRANTY

The contractor shall provide a manufactures written warranty for equipment and one (1) year written warranty for service including labor and materials from the date of startup with no dollar limitation. The contractor shall provide next business day on-site for troubleshooting and repairs.

USE OF THE PREMISES

Before beginning work, the contractor shall secure approval from the COR for the following:

A. Contact the COR for parking information and facility access.

B. Access to the site.

C. Areas permitted for storage of materials and debris.

D. Security: Obey the government’s requirements for personnel identification, inspection and other security measures.

E. The NEFSC is a smoke free campus. The Contractor and its employees shall adhere to all applicable rules and regulations regarding maintenance of a smoke free environment on the job site.

F. Use of Government facilities

1. Water and electricity for construction purposes are available at the work site.

2. Contractor shall provide storage for tools and materials. The Government is not responsible for providing storage or security of materials, tools, or equipment.

G. The premises will be occupied during the performance of the work. Contractor to coordinate work with the COR to accommodate the work schedule, continuing access and completion date.

H. Working hours shall be 7:30 AM – 4 PM (M-F). Contractor shall observe all federal holidays.

WORKMANSHIP

All work shall be of highest quality and in strict accordance with the manufacturer’s published specifications and to the building owner’s satisfaction, most recent codes and standards.

QUALITY ASSURANCE

A. Unless otherwise noted in the contract documents, contractor shall comply with the manufacturer’s current specifications and details.

B. The contractor shall provide adequate number of experienced workmen regularly engaged in this type of work who are skilled in the application techniques of the materials specified.

C. There shall be a site superintendent on the job site at all times while work is in progress. The site superintendent must be an employee of the general contractor and on the site all times during the course of any ongoing work.

D. There shall be no deviations made from this specification or the approved shop drawings (if any) without the prior written approval of the COR. Any deviation from the manufacturer’s installation procedures must be supported by a written certification on the manufacturer’s letterhead and presented to the COR for consideration.

E. All substitution requests for products, equipment, materials and methods described within the contract documents shall be submitted to the COR. Substitutions request are not permitted prior to the Notice to Proceed. Substitute products will be considered when the request is submitted in writing to the COR. The COR will have seven (7) working days to approve/disapprove substitution request. Substitution request shall not result in schedule extensions.

FACILITIES AND CONTROLS

A. The contractor shall remove and dispose of all debris and trash from the job site in a timely and legally acceptable manner so as to not detract from the aesthetics or the functions of the building.

B. Contractor shall comply with all applicable Federal, State, and local laws and regulations concerning environmental pollution prevention control and waste disposal.

C. Contractor shall immediately inform the COR of any environmentally hazardous situations that may arise as well as contact required regulatory agencies.

D. Perform daily clean-up to collect all wrappings, empty containers, paper, and other debris from the project site. Upon completion, all debris must be disposed of in a legally acceptable manner. The contractor shall ensure that the project area and areas adjacent to the project area are maintained in a clean and safe condition.

SAFETY

A.The contractor shall be responsible for all means and methods as they relate to safety and shall comply with all applicable OSHA, NEC, NFPA, and EPA, local, state and federal requirements. Safety shall be the responsibility of the general contractor. All related personnel shall be instructed daily to be mindful of the full time requirement to maintain a safe environment for the facility’s occupants including staff, visitors, customers and the occurrence of the general public on or near the site.
B.The Contractor shall comply with the requirements of 29 CFR, Part 1910: Occupational Safety and Health Administration (OSHA) General Industry and Health Standards and Health Standards and 29 CFR, part 1926 Construction Standards. The Contractor shall promptly correct any non-complying work or conditions. Contractor shall be responsible to ensure their work does not affect the safety of the public or employees of the Government. Neither the Government nor its representatives shall bear any responsibility for safety precautions at the project work site. If, however, in the opinion of the COR a life-threatening condition exists, the COR will orally (to be confirmed in writing) require the Contractor to immediately suspend work in the affected area until the condition is corrected. Whenever Contractor’s operations may create a hazardous condition, it shall at its sole expense, furnish, install and maintain such guards, fences, barricades, railing, light, signs, or other devices necessary to prevent accident, injury or damage to people or equipment.
C.Five days prior to start of work contractor shall submit a safety plan. To include but not limited, open flames, welding, debris, cleanup, work place safety methods, and emergency procedures. The Safety Plan must be available on site at all times and must be reviewed with all subcontractors working under this contract for the duration of the contract project.

E. It is the contractor’s responsibility to ensure all employees; sub-contractors, venders, and other company representative adhere to all safety rules, regulations, policies and practices.

F. Contractor shall observe lock/out tag/out regulations and as required by OSHA.

G. The contractor shall keep the project site in a neat and orderly condition at all times.

JOB CONDITIONS, CAUTIONS, AND WARNINGS

A. Safety Data Sheets (SDS) must be on location at all times during the transportation, storage and application of materials. A separate set shall be given to the COR five (5) days prior to starting of the work.

B. The contractor shall not cause or permit any hazardous material to be brought upon, kept or used in or about the premises by its agents, employees, or subcontractors without the prior consent of the COR.

C. As used herein, the term “Hazardous Material” means any hazardous or toxic substance, material, or waste, including but not limited to, those substances, materials, and wastes listed in the Department of Transportation Hazardous Material Table (49 CFR 172.101) or by the Environmental Protection Agency as hazardous substances (40 CFR Part 68.130) and amendments thereto, petroleum products, or such other substances, material, and wastes that are or become regulated under any applicable local, state, or Federal law.

PERSONNEL

A. The contractor shall provide proof that all on-site employees are US citizens or legal aliens.

B. The contractor shall not employ personnel with felony convictions, or with a record of narcotics use, for work at the Milford Laboratory.

DRAWINGS*

Main Laboratory

First FloorDrawing # 1
Roof & PenthouseDrawing # 3
Ground FloorDrawing # 4

Building #2

First FloorDrawing # 1
Roof & AtticDrawing # 3

*Drawing # 2 (second floor) Main Laboratory not applicable –not provided *Drawing # 2 (second floor) Building # 2 not applicable –not provided

REFERENCE DRAWINGS

Main Laboratory

First FloorDrawing # 1030283
Roof & PenthouseDrawing # 1030285
Ground FloorDrawing # 1030282

APPENDIX 1

Equipment Details and Locations

A. Shall be acquired from authorized vendors that possess a robust and sustainable patch and mitigation program. Vendors must have a proven history of addressing discovered vulnerabilities in a timely manner.

B. Shall be capable of using, at a minimum, Server Message Block (SMB) version 2 (SMBv2) or higher if required.

C. Have the ability to disable unneeded services, management protocols (i.e. SNMP, HTTPS) and ports either though a front panel display or administrative interface.

D. Has upgradable firmware and is able to run the latest vendor firmware.

E. Shall have the ability to change default passwords for services such as SNMP.

F. Cameras has the capability to comply with complex password policies (14 characters in length).

G. Should be capable of management over network connections that are separate from the business use of the network (i.e. management network).

H. Shall be enterprise class devices which allows (where appropriate): Scalability and the ability to evolve as requirements change. The ability to set an approved login banner. SSH version 2 if remote access is required. Remote logging capability.

I. Must be able to meet the requirements of FIPS 140-2 Security Requirements.

illustra Flex 3MP Indoor MiniDome:IFS03D1ICWTT(or an approved equivalent).

illustra Flex 3MP MiniDome, 2.8-12mm, indoor vandal, clear, white, TDN, TWDR

(3) Main Laboratory Building.

(2) Building 2 illustra Flex 3MP Outdoor MiniDome: IFS03D1OCWIT (or an approved equivalent).

Illustra Flex 3MP MiniDome, 2.8-12mm, outdoor, vandal, clear, white, TDN w/IR, TWDR

(7) Main Building

(2) Building 2

ExacqVision: IP04-08T-F2A (or approved equivalent). MUST BE COMPATIBLE WITH C-CURE 9000. IP 2U Front Accessible recorder with 4 IP cameras licenses (64 max). ExacqVision Professional or Enterprise server, client, web/mobile software pre-installed with 3 years software upgrades and hardware warranty. Win10 or Ubuntu Linux 16.04 on SSD. HDMI, DVI-D, DisplayPort, VGA (2 max simultaneous) Keyboard, mouse and rackmount included.

APPENDIX 2

List of Acronyms

ACRONYMS

Above Ground Storage Tank
AST
Air Movement and Control Association International , Inc
AMCA
Air-Condition and Refrigeration Institute
ARI
American Bearing Manufactures Association
ABMA
American Concrete Institute
ACI
American Institute of Steel Construction
AISC
American Ladder Institute
ALI
American National Standards Institute
ANSI
American Plywood Association
APA
American Society for Testing and Materials
ASTM
American Society of Civil Engineers
ASCE
American Society of Mechanical Engineers
ASME
American Welding Society
AWS
American Wood Preserve Bureau
AWPB
American Wood Protection Association
AWPA
Amperage
AMP
Asbestos Containing Material
ACM
Automatic Transfer Switch
ATS
Best Management Practices
BMP
Building Officials and Code Administrators
BOCA
California Roof Rating Council
CRRC
Chain Link Fence Manufacturing Institute
CLFMI
Chromated Copper Arsenate
CCA
Clean Air Act
CAA
Clean Water Act
CWA
Code of Federal Regulation
CFR
Concrete
Conc
Concrete Masonry Unit
CMU
Contracting Officer
CO
Contracting Officers Representative
COR
Contracting Officers Technical Representative
COTR
Cubic Feet per Minute
CFM
Demarcation point
DEMARC
Demolition
Demo
Department of Environmental Protection
DEP
Drawing
Dwg
Electronic Industries Alliance
EIA
Elevation
Elev
Encased Burial
EB
Environmental Protection Agency
EPA
Ethylene Propylene Diene Monomer
EPDM
Factory Mutual
FM
Feet
Ft
Fiberglassed Reinforced Product
FRP
Finish Floor
FF
Fire Rated
FR
Gallons per Minute
GPM
Gauge
Ga
General Contractor
GC
Gypsum
GYP
Gypsum Association
GA
High Efficiencies Particulate Air
HEPA
Inch
In
Information Technology
IT
Institute of Electrical and Electronic Engineers
IEEE
International Organization for Standardization
ISO
Leadership in Energy and Environmental Design
LEED
Linear Feet
LF
Material Safety Data Sheets
MSDS
Maximum
MAX
Maximum Allowable Working Pressure
MAWP
Mean High Water
MHW
Mean Low Water
MLW
Metal Lath/Steel Framing Association
ML/SFA
Mile Per Hour
MPH
National Electric Code
NEC
National Electric Manufactures Association
NEMA
National Fire Protection Association
NFPA
National Institute of Standards and Technology
NIST
National Santiation Foundation
NSF
No Added Urea Formaldehyde
NAUF
Not To Scale
NTS
Not To Scale
NTS
Notice To Proceed
NTP
Occupational Safety and Health Act
OSHA
On Center
OC
Ounce
OZ
Outside Diameter
OD
Parts Per Billion
PPB
Parts Per Million
PPM
Polyvinyl Chloride
PVC
Pounds
lbs
Pounds per Square Inch
PSI
Professioanl Engineer
PE
Programmable Logic Controllers
PLC
Resource Conservation and Recovery Act
RCRA
Safety Data Sheets
SDS
Schedule
Sch
Solar Reflectance Index
SRI
Sound Transmission Class
STC
Square
Sq
Square Feet
SF
Statement Of Work
SOW
Steel Door Institute
SDI
Telecommunication Industry Association
TIA
Thick
Thk
Typical
Typ
Underground Storage Tank
UST
Underwriters Laboratories
UL
Uniform Construction Code
UCC
United States Green Building Council
USGBC
United States Army Corps of Engineers
USACE
United States Coast Guard
USCG
Vennered Faced Panel Products
HPVA
Vinyl Asbestos Floor Tile
VAT
Volatile Organic Carbon
VOC
Welded Wire Fabric
WWF
Western Wood Products Association
WWPA

APPENDIX 3

Professional agencies, associations, councils, institutes, codes, and standards

PROFESSIONAL AGENCIES, ASSOCIATIONS, CODES, COUNCILS, INSTITUTES, AND STANDARDS

Air-Condition and Refrigeration Institute
ARI
Air Movement and Control Association International , Inc
AMCA
American Bearing Manufactures Association
ABMA
American Concrete Institute
ACI
American Ladder Institute
ALI
American Institute of Steel Construction
AISC
American National Standards Institute
ANSI
American Plywood Association
APA
American Society of Civil Engineers
ASCE
American Society for Testing and Materials
ASTM
American Society of Mechanical Engineers
ASME
American Welding Society
AWS
American Wood Preserve Bureau
AWPB
American Wood Protection Association
AWPA
Building Officials and Code Administrators
BOCA
California Roof Rating Council
CRRC
Clean Air Act
CAA
Clean Water Act
CWA
Chain Link Fence Manufacturing Institute
CLFMI
Code of Federal Regulation
CFR
Concrete Reinforcing Steel Institute
CRSI
Construction Specification Institute
CSI
Department of Environmental Protection
DEP
Electronic Industries Alliance
EIA
Environmental Protection Agency
EPA
Gypsum Association
GA
International Organization for Standardization
ISO
Institute of Electrical and Electronic Engineers
IEEE
Leadership in Energy and Environmental Design
LEED
Metal Lath/Steel Framing Association
ML/SFA
National Asphalt Pavement Association
NAPA
National Association of Corrosion Engineers
NACE
National Electric Code
NEC
National Fire Protection Association
NFPA
National Institute of Standards and Technology
NIST
National Sanitation Foundation
NSF
National Society of Professional Engineers
NSPE
Occupational Safety and Health Act
OSHA
National Electric Manufactures Association
NEMA
Plastic Pipe Institute
PPI
Portland Cement Association
PCA
Precast/Prestressed Concrete Institute
PCI
Resource Conservation and Recovery Act
RCRA
Steel Door Institute
SDI
Telecommunication Industry Association
TIA
Uniform Construction Code
UCC
Underwriters Laboratories
UL
United States Army Corps of Engineers
USACE
United States Coast Guard
USCG
United States Green Building Council
USGBC
Western Wood Products Association
WWPA
Western Wood Preservation Institute
WWPI