Past_Performance_Questionnaire.pdf
PDF 371 KB Posted
- Attached to
- Switchboard Material for NOAA Ship Fairweather Federal contract opportunity
- Solicitation number
- 1305M219QNMAN0145
About this file
Attachment 1- Past Performance Questionnaire
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_3_1305M219QNMAN0145.pdf | ||
| Switchboard_Specification_NOAA_FAIRWEATHER_Revision_B.pdf | ||
| Amendment_2_1305M219QNMAN0145.pdf | ||
| Amendment_1_1305M219QNMAN0145.pdf | ||
| Switchboard_Specification_NOAA_FAIRWEATHER.pdf | ||
| Past_Performance_Information_Form_(RFQ).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation #: 1305M219QNMAN0145
Attachment: 1
Source Selection Information
PAST PERFORMANCE QUESTIONNAIRE
REFERENCE CONTRACT #: ___________________________(Contract number of the Past
Performance this information is based on)
Send Completed Questionnaire to Contract Specialist, Bridget Cofo no later than May 15, 2019, 4:00 pm Eastern Time:
bridget.cofo@noaa.gov
1. QUALITY OF SERVICE
Assess the contractor’s performance to contract requirements, specifications, and standards of good workmanship (e.g. commonly accepted technical, professional, or environmental standards).
(Check the appropriate rating box.)
RATING ADJECTIVAL
RATING
DEFINITION
EXCEPTIONAL
Performance meets contractual requirements and exceeds many to the Government’s benefit. The element being assessed was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective.
VERY GOOD
Performance meets contractual requirements and exceeds some to the Government’s benefit. The element being assessed was accomplished with some minor problems for which corrective actions taken by the Contractor were effective.
SATISFACTORY
Performance meets contractual requirements. The element being assessed contains some minor problems for which corrective actions taken by the Contractor appear or were satisfactory.
MARGINAL
Performance does not meet some contractual requirements. The element being assessed reflects a serious problem for which the
Contractor has not yet identified corrective actions.
UNSATISFACTORY
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The element being assessed contains a serious problem(s) for which the
Contractor’s corrective actions appear or were ineffective.
Comments:
2. SCHEDULE
Assess the timeliness of the contractor against the completion of the contract, task orders, milestones, delivery schedules, and administrative requirements (e.g. efforts that contribute to or affect the schedule variance).
to the Government’s benefit. The element being assessed was to the Government’s benefit. The element being assessed was being assessed contains some minor problems for which corrective actions taken by the Contractor appear or were satisfactory.
MARGINAL
Performance does not meet some contractual requirements. The recovery is not likely in a timely manner. The element being
3. COST CONTROL
Assess the contractor’s effectiveness in forecasting, managing, and controlling cost.
to the Government’s benefit. The element being assessed was to the Government’s benefit. The element being assessed was being assessed contains some minor problems for which corrective actions taken by the Contractor appear or were satisfactory.
MARGINAL
Performance does not meet some contractual requirements. The recovery is not likely in a timely manner. The element being
4. MANAGEMENT
Assess the integration and coordination of all activities needed to execute the contract, specifically the timeliness, completeness and quality of problem identification, corrective action plans, proposal submittals, the contractor’s history of reasonable and cooperative behavior, and customer satisfaction.
to the Government’s benefit. The element being assessed was to the Government’s benefit. The element being assessed was being assessed contains some minor problems for which corrective actions taken by the Contractor appear or were satisfactory.
MARGINAL
Performance does not meet some contractual requirements. The recovery is not likely in a timely manner. The element being
ADDITIONAL COMMENTS, IF ANY:
Rater’s Name: ___________________________
Rater’s Signature: ________________________
Date: ____________________________________
Send Completed Questionnaire to Contract Specialist, Bridget Cofo no later than May 15, 2019, 4:00 pm Eastern Time:
bridget.cofo@noaa.gov mailto:bridget.cofo@noaa.gov
File details come from the government source that posted it.