Exhibit_1_Monitoring_Worksheet.pdf

PDF 238 KB Posted

Attached to
Conservation Easement Monitoring using Unmanned Aircraft Systems
Solicitation number
12FPC119Q0010
Issued by

About this file

Monitoring Worksheet

View the file

Other files

File Type Posted
Scope_of_Work.docx DOCX document
170_GM_Part_402_Subpart_B_.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Department of Agriculture NRCS-CPA-1251 Natural Resources Conservation Service October 2018

ANNUAL MONITORING WORKSHEET

Easement Number:

Landowner(s):

State: County/Parish:

Phone:

Monitoring Date:

Email: Monitoring Event ID:

Monitor(s): Affiliation if other than NRCS:

Date of Imagery Examined: Source of Imagery Examined:

Methods of Monitoring - Questions to answer for each monitoring method

Offsite A review of the most recent aerial photography and answer questions 1, 3, and 4 of this worksheet.

Include a map marking the location of any observations.

Onsite At a minimum; a review of available aerial photography, easement deed, management plans, landowner authorizations, as applicable, a field visit, and answer all questions on this worksheet.

Include a map marking the location of any observations. Additionally, photography and GPS points should be attached to this worksheet.

1. A. Landowner Contact (attempted) Date: Verification Method:

B. Was current land ownership verified? Yes No

Date of verification: Verifier’s Name:

C. Is there is a new landowner? Yes No

New landowner(s) name (if applicable):

New landowner(s) contact information:

D. Followup requested by landowner:

Verification Notes:

Yes No

Easement Type: RCPP _____________ ACEP-WRE EWPP-FPE EWRP FRPP GRP WRP HFRP OSL

This table is a list of possible action items that can be taken to address concerns or violations discovered during the monitoring event. Use this list as a reference when answering the monitoring questions that ask for action items to be listed. Some of the action items listed in this table are not applicable to all programs or all questions.

Action Items

(1) NRCS action needed (FA contract)

(2) NRCS action needed (third-party contract)

(3) Entity action needed (4) Landowner action needed

(5) CUA needed

(6) Plan needs to be developed/updated

(7) O&M plan needs to be developed/updated

(8) NRCS enforcement action needed

(9) Other

2) Was the landowner or decision maker present during the review? (Onsite monitoring only) Yes No

3) A. Are the terms and conditions of the easement deed being met? Yes No

(e.g., no encroachment, dumping, unauthorized uses, etc.)

Select observed unauthorized uses (if applicable):

Mining (includes peat/gravel) Aquaculture

Commercial seed production

Dumping

Cropping

Impervious surfaces

Hydrology alteration

Burning

Infrastructure projects (phone, gas, etc.)/energy production

Illegal activities Haying Grazing

Encroachment

Structures Mowing Trails

Installation/maintenance of acceptable structures

Timber harvest/cutting Pest management Food plots

Maintenance of private drainage

Carbon sequestration activities Parked vehicles/equipment Road(s)

Unauthorized easement subdivision

Tree/shrub planting Livestock Other

List the “other” unauthorized activities (if applicable):

B. Can unauthorized uses be resolved with a compatible-use authorization (CUA)? (not applicable to FRPP or GRP)

Yes No N/A

If applicable, list which unauthorized uses may be resolved with a CUA.

If the unauthorized use(s) will not be resolved with a CUA, list the applicable action items:

4) Is there evidence of a spill or release of hazardous substances, petroleum products, or other potential environmental hazards on the property that need to be addressed? Yes No

If yes, describe and indicate the location(s) on a property/site map. Consult with all appropriate administrative, technical, and legal staff to take required actions. List required action items:

Offsite Monitoring Observations:

5) A. Select current CUAs and enter their expiration dates (not applicable to GRP, FRPP, or OSL):

CUA Type Expiration Date CUA Type Expiration Date

Maintenance of private drainage

Carbon sequestration

Haying Trails

Management/maintenance activities

Food plots

Installation/maintenance of acceptable structures

Pest management

Developed hunting/fishing Grazing

Mowing Other

List the “other” items (if applicable):

B. Are compatible-use authorizations being followed? Yes No N/A

6) A. Is the easement accessible by a legally described route? Yes No

B. If there is no recorded access or the recorded access is not being used, is the easement accessible by an alternative route?

List action items and reasons why the recorded access is not being used.

7) Is the boundary clearly marked and identifiable? (not applicable to FRPP or OSL) Yes No N/A

Boundary not marked Corner/high-risk markers missing One to several low risk posts missing

Other

List action items, if no, and list where boundaries are not clearly marked or identifiable:

8) Are the objectives of the management plan being met (e.g., grazing plans, WRPO, conservation plan, mitigation plan, etc.)?

List action items, if no:

9) Are installed practices being properly operated and maintained (e.g., in accordance with job sheets, O&M plans, etc.)?

10) Have planned restoration or enhancement objectives been met?

11) A. Are threatened or endangered species present on or proximal to this land?

If yes, are identified habitat elements being provided to the extent possible? Yes No N/A

B. Have the appropriate consultations occurred or NEPA documentation completed? (e.g., FWS, State specialist, etc.)

12) Is acceptable hydrology present? Yes No N/A

13) Is acceptable vegetation present? Yes No N/A

14) Are there noxious plant or pest species problems that need to be addressed? (Deed, State, or local requirements)?

List action items, if yes:

15) Are deed requirements being met for cultural resource protection?

16) Are necessary water rights being maintained in accordance with the deed, contract or other agreement requirement?

17) Are there enhancements necessary to improve the site or other followup action items needed? Yes No

18) Are there areas of concern? (e.g., potential violation or encroachment, high-risk activities on or adjacent to easement area, conflicting landowner objectives, etc.) Yes No

19) Are there landowner, partner, or entity suggestions or comments? Yes No

If yes, list suggestions or comments:

Additional Notes or Observations:

ANNUAL MONITORING WORKSHEET
Methods of Monitoring - Questions to answer for each monitoring method
Action Items
Easement Number:
State: County/Parish:
Landowner(s):
Monitoring Date:
Phone:
Monitoring Event ID:
Email:
Monitor(s): Affiliation if other than NRCS:
Date of Imagery Examined: Source of Imagery Examined:
Check Box56: Off
Check Box57: Off
Check Box58: Off
Check Box59: Off
Check Box64: Off
Check Box65: Off
Check Box66: Off
Check Box67: Off
Check Box68: Off
Check Box69: Off
Check Box70: Off
Check Box83: Off
Check Box84: Off
Check Box85: Off
Check Box86: Off
Check Box87: Off
Check Box88: Off
Check Box89: Off
Check Box90: Off
Check Box91: Off
Check Box92: Off
Check Box93: Off
Check Box94: Off
Check Box95: Off
Check Box96: Off
Check Box97: Off
Check Box98: Off
Check Box99: Off
text1:
Text2:
Text3:
Text13:
Text11:
Text10:
Text9:
Text8:
Text7:
Text6:
Text5:
text14:
text15:
Check Box16: Off
Check Box17: Off
text18:
text19:
Check Box20: Off
Check Box21: Off
text22:
text23:
Check Box24: Off
Check Box25: Off
text26:
Check Box26: Off
Check Box27: Off
Check Box28: Off
Check Box29: Off
text38:
Check Box38a: Off
Check Box38b: Off
Check Box38c: Off
text39:
text40:
Check Box40a: Off
Check Box40b: Off
text41:
text42:
text43:
text44:
text45:
text46:
text47:
text48:
text49:
text50:
text51:
text52:
text53:
text54:
text55:
text62a:
text65a:
text67a:
text70a:
text73a:
text79a:
text82a:
text85a:
text88a:
text91a:
text94a:
text97a:
text99a:
text101a:
text104:
text105:
Text4:
Text12:
Check Box1: Off
Check Box2: Off
Check Box3: Off
Check Box100: Off
Check Box101: Off
Check Box102: Off
Check Box103: Off
Check Box104: Off
Check Box105: Off
Check Box106: Off
Check Box108: Off
Check Box109: Off
Check Box110: Off
Check Box111: Off
Check Box112: Off
Check Box113: Off
Check Box114: Off
Check Box115: Off
Check Box116: Off
Check Box117: Off
Check Box118: Off
Check Box119: Off
Check Box120: Off
Check Box122: Off
Check Box123: Off
Check Box124: Off
Check Box125: Off
Check Box126: Off
Check Box127: Off
Check Box128: Off
Check Box129: Off
Check Box71: Off
Check Box72: Off
Check Box73: Off
Check Box74: Off
Check Box75: Off
Check Box76: Off
Check Box77: Off
Check Box78: Off
Check Box79: Off
Check Box80: Off
Check Box81: Off
Check Box82: Off
Check Box60: Off
Check Box61: Off
Check Box62: Off
Check Box63: Off

File details come from the government source that posted it.