Solicitation 129JGP20R0080 Long Barn Engine Garage Modification
Location: Long Barn Station, Long Barn, Mi-Wok Ranger District, Stanislaus National Forest Wednesday, June 10, 2020, 10 am
ATTENDEES
| Tim Hughes | USFS | timothy.hughes@usda.gov | 209-288-6329 | ||
| Kevin Lewis | National Garage Door | kevin@nationalgaragedoor.com | 916-638-4554 | ||
| Joel Plum | Plum Construction | plumconstruction@gmail.com | 209-559-8816 | ||
| James Price | JP General | james@jpgeneral.com | 775-781-4460 |
Information provided was:
1. The start work date and contract days are negotiable. All work has to be completed by October 31, 2020.
2. The method of detaching the roof from the walls is entirely up to the contractor pending CO approval. Removing the roof or just shearing off the eave bolts are both acceptable methods.
3. On the new siding along the top extension, only the major ribs require matching, the minor ribs can differ as long as they are similar.
4. Siding can be attached to the crib walls with spacers to fill the gap.
5. On the ceiling, contractor is to match existing insulation if any is damaged and is not required to meet the R-39 requirement shown on the plans.
6. A manual pull release is acceptable as an alternative to a manual pull chain (REF: Specification 08 36 13, paragraph 2.2 A, B3)
7. The top plate connection to the rafters will have to be drilled on-site.
8. The interior wall has to be braced to the raised ceiling. It does not need to be extended. Brace design shall be approved by the CO.
9. Four remote controls shall be provided. Each remote shall be capable of opening both doors.