This is a solicitation for septic pumping services for restrooms located in campgrounds on the Inyo National Forest. The Forest Service seeks a contractor to pump vault toilets, pit toilets, portable toilets, and septic tanks at various recreation sites on the Mammoth and Mono Lake Ranger Districts. Services are required on an as-needed basis from April 1, 2020 through December 1, 2020 with potential for four additional one-year option periods. The contractor will be responsible for emptying and cleaning toilets, pressure washing interiors, adding water, and disinfecting areas. All waste must be disposed of according to federal, state and local regulations at approved sites. The solicitation number is 129JGP20Q0038 and offers are due by March 26, 2020. The requirement is set aside for small businesses with a $8 million size standard.

View the file

Other files

File Type Posted
129jgp20q0038_amend1.pdf PDF
ScheduleB_2020.pdf PDF
Mono Lake Toilet Map-2.pdf PDF
129jgp20q0038.pdf PDF
mariposa wage determination.docx DOCX document
Rainbow Falls and June Lake Beach.pdf PDF
Mono Lake Toilet Map-1.pdf PDF
2020 clauses.docx DOCX document
WD Inyo County.docx DOCX document
Mammoth Toilet Map.pdf PDF
mono wage determination.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION C – PBSC

3-1-03

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

PERFORMANCE WORK STATEMENT

C.1 The intent of this contract is to procure toilet septic pumping of vault, pit, and portable toilets and septic tanks at various developed recreation sites located on the Mammoth & Mono Lake Ranger Districts of the Inyo National Forest. The award will be a fixed-price service contract for the 2020 season. Estimated period of performance for this year is April 1, 2020 through December 1, 2020.

C.1-1 Contractor Responsibility:

The Contractor shall provide everything--including, but not limited to, all equipment, supplies, transportation, labor, and supervision--necessary to complete the project, except for that which the contract clearly states is to be furnished by the Government.

C.1-2 Project Location & Description

Location: The project is located on the Inyo National Forest, Mammoth & Mono Lake Ranger Districts.

Description: Vault Toilet, pit toilet, portable toilet service and septic tank pumping will be performed at the following recreation sites on the Mammoth & Mono Lake Ranger Districts:

Mammoth Ranger District Hot Creek Geologic Interpretive Site (6 – 1200 Gallon Vaults): On Hot Creek Road approximately 7 miles from its junction with Highway 395, which is approximately 4 miles south of US 395/Highway 203 junction.

Earthquake Fault (2 – 1000 Gallon Vaults): Follow state highway 203 through Mammoth Lakes turning right at the traffic signal at Minaret Road (Highway 203) toward Mammoth Mountain Ski Area Main Lodge. Toilet is on the right side approximately .75 miles past the intersection of Highway 203 and the Scenic Loop Road. Turn right at the Earthquake Fault site sign, toilet is in the rear of the parking lot.

Minaret Vista (2 – 1000 Gallon Vaults): Approximately 3.3 miles past the Earthquake Fault site.

Turn right just before the Minaret Vista Fee Station, toilet is in the parking area.

Rainbow Falls Trailhead (2 - 1000 Gallon Vaults): Follow Highway 203 to the Minaret Vista Fee Station, the road continues past the station as FS Road 3S11 (Reds Meadow Road). This is a steep downhill grade and narrow road with turnouts for 3 miles. Continue straight for roughly another 5 miles once the road becomes two full lanes and take a right hand turn where you see signs for Rainbow Falls Trailhead, (just before the entrance to reds meadow Resort.)

Agnew High Trail Trailhead (2 – 1000 Gallon Vaults): Follow Highway 203 to the Minaret Vista Fee Station, the road continues past the station as FS Road 3S11 (Reds Meadow Road). This is a steep downhill grade and narrow road with turnouts for 3 miles. At the bottom of the grade turn right at the first road, signed as Agnew Meadows Pack Station, Campground, and Trailhead. The toilet is on a gravel road, past the pack station approximately .5 miles from Reds Meadow Road.

Agnew Shadow Lake Trailhead (2 – 1000 Gallon Vaults): This toilet is located past the Agnew High Trail toilet another .1 miles in the parking area.

Sotcher Lake Picnic (2 – 1000 Gallon Vaults): Continue on the Reds Meadow Road past the Agnew Meadow turnoff approximately 7 miles. The toilet is on the left side of the road in the parking area.

Lake Maime (1 – 1000 Gallon Vault): From the intersection of Highway 203 (Minaret Road) and Lake Mary Road (second traffic signal on Highway 203) proceed up Lake Mary Road for approximately 4 miles. Toilet is on the right side past the top of Twin Lakes Falls.

Lake Mary (1 – 1000 Gallon Vault): On Lake Mary Road take the first left past Lake Mary (toward Lake George). Turn left at the T intersection, FS Road 4S09. Toilet is at the end of the road in parking lot on the right side as the one-way road exits the parking area.

Lake George (1 – 1000 Gallon Vault): On Lake Mary Road, take the first left after Lake Mary.

Turn right at the T intersection, FS Road 4S09. Toilet is at the end of the road in the parking lot on the right side as the one-way road exits the parking area.

Inyo Craters (2 – 1000 Gallon Vaults): From intersection of US 395 and Mammoth Scenic Loop Road, travel southwest on the Scenic Loop Road approximately 3 miles to FS Road 3S30 (gravel), Inyo Craters Road. Travel approximately 1.5 miles on 3S30 to Inyo Craters. Toilet is on the right side at the north parking area.

Sherwin Creek Trailhead (2 – 1000 Gallon Vaults): From State Highway 203, turn left at the intersection of Old Mammoth Road (First traffic light entering the town of Mammoth Lakes).

Travel approximately 1 mile after crossing Mammoth Creek, turn left onto FS Road 4S08 (gravel), Sherwin Creek Road. Travel approximately 4 miles on Sherwin Creek Road, turn right at FS Road 4S088 signed as Sherwin Creek Trailhead and Motocross. Toilet is approximately 1 mile up on left in trailhead parking area.

Mono Lake Ranger District Lundy Lake Trailhead (1 – 750 Gallon Vault): Located at the head of Lundy Canyon at the intersection of Highway 395 and State Route 167. Travel west approximately 6.5 miles to the end of the road.

Mono Basin Scenic Area Visitors Center (Two Septic Tanks – One 10,000 Gallon Septic System – One 2000 Gallon Septic System). Located on the North end of the town of Lee Vining on the East side of Highway 395.

South Tufa (4 – 1000 Gallon Vaults): From the Intersection of Highway 395 and State Highway 120 East, travel east on SR120 approximately 4.5 miles to the junction of 1N52/1N51, follow the signs for approximately one mile to parking area.

Navy Beach Day Use Site (1 – 400 Gallon Mobile Low Flush Toilet): Same directions as South Tufa.

From intersection of State Highway 120 and 1N52/1N51, follow signs approximately 1.5 miles to parking area.

Walker Lake Trailhead (1 – 1000 Gallon Vault): From the north entrance of State Highway 158 and Highway 395 travel approximately 1.5 miles west to the Parker/Walker Lake turnoff. At approximately .5 miles turn right on 1S28. Travel approximately .6 miles to the T intersection and turn right. Travel approximately .5 miles to 1S23 and turn left. Travel approximately 3 miles to the end of the road.

Hartley Springs Campground (4 – 1000 Gallon Vaults): From US 395 north of Mammoth Lakes, go west on Obsidian Dome Road, then north on Forest Road 2S48

Glass Creek Campground (10 -1000 Gallon Vaults): From the intersection of Highway 395 and Crestview CalTrans Station, turn west on 2S49 travel approximately .5 miles to the campground.

Upper & Lower Deadman Campground (2 – 1000 Gallon Vaults): From the intersection of Highway 395 and 2S05 (approximately .5 miles south of the Crestview CalTrans Station) travel west approximately 3.5 miles. Campgrounds are on the left.

Obsidian Flat Group Campground (2 – 750 Gallon Vaults): Same as Deadman Campground. Take road 3S26B across from the entrance to Upper Deadman Campground. Travel north approximately 1 mile. Campground is on the right.

Big Springs Campground (2 – 1000 Gallon Vaults): From the intersection of Highway 395 and Owens River Road, travel east on Owens River Road for approximately 2.5 miles. Campground is on the left at 2S04 junction.

Tioga Lake Overlook (2 – 1000 Gallon Vaults): From the intersection of Highway 395 and SR 120 West travel west approximately 11.5 miles. The overlook is on the left. State Highway 120 west is a steep grade.

Saddlebag Lake Day Use (2 – 1000 Gallon Vaults): Same directions as Tioga Lake Overlook – travel west on SR 120 West approximately 10 miles, turn right at Saddlebag Lake Road, travel approximately 2 miles to parking area at Saddlebag Marina.

Gull Meadow Cartop Boat Launch (2 – 1000 Gallon Vaults): From the junction of Highway 395 and State Highway 158 at south junction, travel 3.7 miles to dirt road marked by a forest service site sign – Gull Meadow Cartop Boat Launch and Picnic Area on right side just before June Mountain Ski Area. Travel to end of the road approximately .3 miles.

June Lake Beach (8 – 1000 Gallon Vaults): From the junction of Highway 395 and State Highway 158 at south junction, travel on 158 and then take a right on N. Shore Drive. Stay on N. Shore Drive until signs for June Lake Beach & Oh Ridge! Campground are reached. Take a left onto June Lake Beach Road. Stay on this road until the entrance station for Oh Ridge! Campground is passed…then take a right onto Pine Cliff Road. Follow this road to the two restroom sites.

Aspen Campground* (1 – 1000 Gallon Vault): From the junction of Highway 395 and State Highway 120 west – travel west approximately 3.5 miles. Turn left to Poole Power Plant Road.

Turn right and travel 1.4 miles to Aspen Campground.

*It is anticipated that a maximum of 8 chemical toilets will be rented with twice weekly & once weekly service made part of this contact. There should be two line items for once weekly & Twice weekly servicing of 8 portos.

Lower Lee Vining Campground* (1 – 1000 Gallon Vault): From the junction of Highway 395 and State Highway 120 West – travel 2 miles, turn left, then right at the T intersection, .2 miles to campground entrance.

* It is anticipated that a maximum of 8 chemical toilets will be rented with twice weekly & once weekly service made part of this contact. There should be two line items for once weekly & Twice weekly servicing of 8 portos.

Moraine Overflow Campground (5 Chemical Toilets – Rental and weekly servicing TBD): Follow directions to Lower Lee Vining Campground but turn left off of 120W onto 21E, stay straight. It is anticipated that a maximum of 5 chemical toilets will be rented with twice weekly & once weekly service made part of this contract. There should be two line items for once weekly & Twice weekly servicing of 5 portos. There are currently no permanent facilities on site.

Cattleguard Campground (1-2 Chemical Toilets – Rental and weekly servicing TBD) (1 Hand wash Station – rental and weekly servicing TBD): Follow directions to Lower Lee Vining Campground but turn left off of 120W onto 21E, turn right. It is anticipated that a maximum of 2 chemical toilets & 1 wash station will be rented with service made part of this contract. There are currently no permanent facilities on site.

Campground Host RV Pumping – Aspen, Moraine, Lower Lee Vining, Hartley Springs, Glass Creek, Big Springs and Upper/Lower Deadman Campgrounds as needed. Locations described above.

Exclusions (non-work areas): Not Applicable.

Accessibility: Paved and maintained gravel roads open to two wheel drive vehicles.

Any prospective contractor desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing from the Contracting Officer soon enough to allow a reply to reach all prospective contractors before the solicitation closing date. Oral explanations or instructions given before the award of a contract will not be binding.

C.1-3 Maps

Maps showing the general vicinity and/or specific work areas are included in Section J. Maps are general in nature and are not to be considered as definitively identifying locations. If descriptions are not sufficient, maps are available upon request.

C.1-4 Estimated Start Date & Contract Time

Start: May 24, 2019

Time: Work is on an as needed basis. The COR will contact the vendor as needed to request pumping. Request can be made by e-mail, fax, or phone. Verbal requests will be documented by the COR.

See also Section F

C.1-5 Restrictions on Work

Work may be performed at any time during the period of the contract, except as outlined here.

Nothing in this part shall be construed to take away any of the Government's rights under the Suspension of Work Clause (52.242-14). Restrictions are as follows:

1. In accordance with the fire plan, if included in Section J. – Not Applicable.

2. When the Contracting Officer (or designated representative) determines that adverse weather has made access too dangerous or that continued vehicular travel would cause unacceptable road damage.

C.1-6 Licenses and Insurance The contractor shall obtain the insurance and licenses listed here; (see also Section L, Notices to Offerors and Respondents).

MSPA Card (Form WH510): This contract does not require the contractor to be registered with the US Department of Labor as a Farm Labor Contractor.

Other: Workman’s Compensation Insurance

C.1-7 Camping and Housing

Camping is not permitted in US Forest Service campgrounds. Contractor will not be permitted to camp elsewhere on US Forest Service land. Camping on Forest Service land is not a right;

permission may be revoked for failure to comply with the terms of the permit.

C.2 Definitions

Sewage: Liquid, semi-liquid, and solid waste matter.

Debris: All other refuse found in vault, pit, or portable toilets. To include, but not limited to, items such as cans, bottles, rocks, sticks, clothing, plastic bags, metal products, diapers, sanitary napkins, whole toilet paper rolls, misc. trash, etc.

C.3 Primary Tasks

1. Pump all toilets to standard

2. Pressure wash interior walls of pit, vault, or septic

3. Add water to pits, vaults, and septic tanks per specifications

4. Clean up and disinfect all contaminated areas resulting from pumping process.

C.3-1 Standards:

As a minimum, each task order issued for the pumping of toilets on the Mammoth and Mono Lake Ranger Districts will guarantee the following: Two Vaults

PUMPING WHEN AN OUTSIDE MANHOLE IS AVAILABLE:

Vaults are to be emptied of sewage to a point of 2-3 inches from the bottom.

Compacting of waste material in the bottom of the vault by tamping will not be allowed. Any debris in the vault will be removed.

As long as the outside pump out access is in excess of 20 inches in diameter (or 20 inches square) the contractor shall not be allowed to remove the contents through a toilet riser.

Using a pressure washer system, wash down the interior walls of the vault before the clinging debris has a chance to dry. If at this time there is a heavy concentration of solids on the bottom of the vault, use the pressure washer system to break up and dilute the solids and then pump this diluted waste down again to the 2-3 inch level. Compacting of waste in the bottom of the vault to obtain the 2-3 inch level will not be allowed.

The flat bottom vault shall be recharged with enough water to bring the depth of water up to 10 inches. For sloped vaults, pump the waste down (at the deep end) to where the hose begins to suck air. Remove any remaining debris and then go inside the building with the pressure system and wash the remaining waste down the sloped bottom. Pump out the remaining waste until the suction hose begins to suck too much air to make pumping practical. Recharge the vault with clean fresh water so there is 10 inches of water covering the bottom under the toilet riser.

Clean up and disinfect all contaminated areas resulting from the pumping process. Either sweep or wash all waste that is deposited on the concrete surrounding the manhole cover back into the vault if possible. Avoid getting waste on the adjacent gravel or dirt.

PUMPING THROUGH THE TIOLET RISER: MANHOLE IS NOT AVAILABLE

Remove Debris and pump per above specifications. Extra care shall be taken to prevent waste spillage onto the interior wall and floor surfaces. The toilet paper dispenser and toilet riser shall be protected from damage and contamination.

During the final cleanup, the interior wall and floor surfaces contaminated by waste shall be thoroughly disinfected. Thoroughly disinfect both inside and outside of the toilet riser. The riser, door handles, and knobs shall be dry before the contractor leaves.

Each unit shall be available for immediate use after the pumping and final cleanup. The contractor shall not leave any toilet location until the final cleanup is complete.

OFFSITE DISPOSAL OF SEWAGE AND DEBRIS

The contractor shall be responsible for making disposal arrangements, including disposal of all effluent, debris, and trash and shall be responsible for payment of all fees.

Disposal shall conform to all Federal, State, and local laws and ordinances. The Contracting Office (CO) shall approve all disposal sites before dumping begins.

C.4 Public Safety

Contractor shall follow all posted speed limits within campground boundaries and on Inyo National Forest Roads.

Contractor shall ensure facilities are vacated prior to pumping.