Revised Section 28 31 00
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 129AD619Q0008_Amd_0001.pdf | ||
| Questions_and_Answers.pdf | ||
| 129AD619Q0008_Solicitation.pdf | ||
| Attachment_02_-_Specifications.pdf | ||
| Attachment_01_-_Statement_of_Work.pdf | ||
| Attachment_04_-_Wage_Determination.pdf | ||
| Attachment_00_-_Schedule_of_Items.pdf | ||
| Attachment_03_-_Drawings.pdf | ||
| Attachment_05_-_Experience_Information_Sheet.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PSW Riverside Fire Alarm System Amendment 1
July 2019 Fire Detection and Alarm 28 31 00 - 1/11
REVISED SECTION 28 31 00
FIRE DETECTION AND ALARM
*Supersedes Section 28 31 00 of the Project Specifications*
1. PART 1 - GENERAL
1.01 SUMMARY
A. This Section covers fire alarm systems, including initiating devices, notification appliances, controls, and supervisory devices.
B. Work covered by this section includes the furnishing of labor, equipment, and materials for the complete installation and testing of the fire alarm system as indicated on the drawings and specifications. Work also includes any required design, including drawings, calculations and material submittals, O&M manual preparation, and training.
C. The Fire Detection and Alarm System shall consist of all necessary hardware equipment and software programming to perform the following functions:
1. Fire alarm and detection operations in Building 1, 2, and 3 of the Pacific Southwest Research Station (PSW) – Riverside.
2. Monitoring and control of Building HVAC system shutdowns and other equipment as indicated in the drawings and specifications.
3. Fire sprinkler system monitoring in Building 3.
1.02 PROJECT DESCRIPTION
A. Installation of one new fully addressable fire alarm detection and notification system in Buildings 1 & 2 of the PSW – Riverside.
B. Expansion of the existing fire alarm detection and notification system in Building 3 of the PSW – Riverside.
C. Duct smoke sensors (supply and return) shall be installed on all existing HVAC systems in Buildings 1, 2, and 3, and shall be monitored and alarmed. In addition, duct smoke sensors shall be integrated with existing HVAC control systems to shutdown all operational capacities of the air distribution system upon activation.
D. Monitoring of the fire sprinkler system in Building 3 via waterflow detection connected to the existing fire alarm detection and notification system.
E. Existing equipment (smoke sensors, duct smoke sensors, pull station, notification devices) to remain in service shall be connected to the new equipment and tested for proper functionality.
1.03 RELATED DOCUMENTS
A. Statement of Work
B. Drawings incorporated by attachment
C. The work covered by this section is to be coordinated with related work as specified elsewhere in the specifications.
D. The system and all associated operations shall be installed in accordance with the following current versions of:
1. CA Title 24, all applicable sections
July 2019 Fire Detection and Alarm 28 31 00 - 2/11
2. NFPA 20, Standard for installation of Stationary pumps for fire protection
3. NFPA 72, National Fire Alarm Code
4. NFPA 70, National Electrical Code
5. NFPA 101, Life Safety Code
6. NFPA 90A, Standard for the Installation of Air Conditioning and Ventilating Systems
7. Other applicable NFPA standards
8. Local Jurisdictional Adopted Codes and Standards
9. ADA Accessibility Guidelines
1.04 GOVERNMENT FURNISHED PROPERTY
A. The Government will furnish the project floor plans in AutoCAD format for use in making the Fire alarm system permit drawings and submittal drawings. Contractor shall field verify dimensions.
1.05 INITIAL SUBMITTALS
A. Contractor shall submit the following for approval before commencing work:
1. Product Data:
a. Manufacturer data sheets for all major system components.
b. Provide a Materials list spreadsheet (XLS) showing all equipment descriptions, quantities, model numbers, and ratings in hard copy and xls format.
2. Certification that system will be installed by NICET certified personnel Level II or above.
3. Shop Drawings: Comply with NFPA 72 requirements.
a. Provide existing floor plans showing existing devices, type, and ratings.
Clearly identify areas where detector or audible and visible alarm spacing does not comply with NFPA 72. Provide revised floor plans showing devices and types. Show size and route of new cable and conduits.
b. System riser diagram with new and existing conduit sizes, cable and wire types and sizes.
c. Batteries: Size calculations.
d. Wire Voltage Drop: Submit calculations showing voltage drop through each new circuit.
1.06 ADDITIONAL REQUIREMENTS
A. It is the responsibility of the Contractor to determine the extent of all interconnections to other building systems such as fire sprinkler system if any, communication systems, electrical circuits, and HVAC system for shutdown.
1.07 QUALITY ASSURANCE
A. All items of the Fire Alarm System shall be listed as a product of a single fire alarm system manufacturer under the appropriate category by Underwriters Laboratories, Inc. (UL), and shall bear the "UL" label.
B. Performance: Comply with NFPA 72 and the authority having jurisdiction (AHJ).
July 2019 Fire Detection and Alarm 28 31 00 - 3/11
2. PART 2 – PRODUCTS
2.01 GENERAL
A. All equipment must be California State Fire Marshall (CSFM) approved.
2.02 FIRE ALARM CONTROL PANEL (FACP)
A. Silent Knight IntelliKnight 6808 addressable fire alarm control panel or approved equal.
2.03 REMOTE ANNUNCIATOR PANEL
A. Silent Knight model #5860 remote annunciator or approved equal.
1. For hallways and common areas, use gray annunciator panel and flush mount install.
2. For mechanical / utility areas, use red annunciator panel with red trim ring and surface mount.
2.04 ADDRESSABLE SMOKE SENSORS (DETECTORS)
A. General: Comply with UL 268, "Smoke Detectors for Fire Protective Signaling Systems."
Include the following features:
1. Factory Nameplate: Serial number and type identification.
2. Plug-In Arrangement: Sensor and associated electronic components are mounted in a module that connects to a fixed base with a twist-locking plug connection. Removal of the detector head shall interrupt the supervisory circuit of the fire alarm detection loop and cause a trouble signal at the control unit.
3. Sensors include a communication transmitter and receiver in the mounting base having a unique identification and capability for status reporting to the FACP. Sensor address shall be located in base to eliminate false addressing when replacing sensors.
4. Removal of the sensor head for cleaning shall not require the setting of addresses.
B. Smoke Sensor:
1. Provide Silent Knight SK-PHOTO or approved equal for Building 1 & 2.
2. Provide Silent Knight SD505-PHOTO or approved equal for Building 3.
3. Smoke sensors shall be of the photoelectric or combination photoelectric / heat type.
4. Smoke sensors shall be addressable.
C. Duct Smoke Sensor (Detector):
1. Provide addressable duct smoke sensor (with relay) that is compatible with new and existing fire and HVAC equipment capable of communicating conditions with the FACP and shutting down all operational capacities of the air distribution system upon activation.
a. For existing duct smoke sensors, the Contractor shall provide all necessary equipment (relays or other) and programming necessary to allow the existing sensors to communicate with the FACP and shut down all operational capacities of the air distribution system.
b. Contractor shall be responsible for field verifying all existing HVAC equipment.
2. Provide duct detectors for all HVAC system as required by Code for existing HVAC systems.
July 2019 Fire Detection and Alarm 28 31 00 - 4/11
3. Photoelectric type, with sampling tube of design and dimensions as recommended by the manufacturer for the specific duct size and installation conditions where applied.
Sensor includes relay as required for fan shutdown.
4. Environmental compensation, programmable sensitivity settings, status testing, and monitoring of sensor dirt accumulation for the duct sensor shall be provided by the
FACP.
5. The Duct Housing shall provide a supervised relay driver circuit for driving up to 15 relays with a single "Form C" contact rated at 7A@ 28VDC or 10A@ 120VAC. This auxiliary relay output shall be fully programmable. Relay shall be mounted within 3 feet of HVAC control circuit.
6. Duct Sensor Housing shall provide a relay control trouble indicator LED.
7. Compact Duct Housing shall have a transparent cover to monitor for the presence of smoke.
8. Duct Housing shall provide two (2) Test Ports for measuring airflow and for testing.
These ports will allow aerosol injection in order to test the activation of the duct smoke sensor.
9. Duct Housing shall provide a magnetic test area and sensor status LED.
10. For maintenance purposes, it shall be possible to clean the duct housing sampling tubes by accessing them through the duct housing front cover.
2.05 ADDRESSABLE HEAT SENSORS (DETECTORS)
A. Provide Silent Knight SK-HEAT or approved equal in Building 1 & 2.
B. Provide Silent Knight SD505-HEAT or approved equal for Building 3, compatible with existing system.
2.06 WATERFLOW DETECTORS
A. Provide System Sensor WFDN series waterflow detector or approved equal.
2.07 PULL STATIONS
A. Silent Knight SK-Pull-DA dual action manual pull station or approved equal.
2.08 NOTIFICATION APPLIANCES
A. Indoor Combination Audible / Visible Notification Device (Horn/Strobe): The horn strobe shall be a System Sensor SpectrAlert Advance Model P2R or approved equal, listed to UL 1971 and UL 464 and shall be approved for fire protective service.
1. The horn strobe shall be wired as a primary-signaling notification appliance and comply with the Americans with Disabilities Act requirements for visible signaling appliances, flashing at 1 Hz over the strobe’s entire operating voltage range.
2. The strobe light shall consist of a xenon flash tube and associated lens/reflector system. The horn shall have three audibility options and an option to switch between a temporal three pattern and a non-temporal (continuous) pattern. These options are set by a multiple position switch.
B. Indoor Visible Notification Device (Strobe): The horn strobe shall be a System Sensor SpectrAlert Advance Model SR or approved equal, listed to UL 1971 and UL 464 and shall be approved for fire protective service. Match strobe used in the combination horn/strobe.
Where multiple strobe units are visible from a single location and the potential visible flash
July 2019 Fire Detection and Alarm 28 31 00 - 5/11 rate is 5 hz or more, provide synchronizing modules and strobes compatible for synchronizing as required. Provide additional wiring, conduit, and power supplies as necessary.
C. Exterior Weatherproof Combination Audible / Visible Notification Device (Horn/Strobe):
The horn strobe shall be a System Sensor SpectrAlert Advance Model P2RK or approved equal, listed to UL 1971 and UL 464 and shall be approved for fire protective service.
1. The horn strobe shall be wired as a primary-signaling notification appliance and comply with the Americans with Disabilities Act requirements for visible signaling appliances, flashing at 1 Hz over the strobe’s entire operating voltage range.
2. The strobe light shall consist of a xenon flash tube and associated lens/reflector system. The horn shall have three audibility options and an option to switch between a temporal three pattern and a non-temporal (continuous) pattern. These options shall be set by a multiple position switch.
3. The horn strobe must be installed with its weatherproof back box in order to remain outdoor approved per UL. The horn strobe shall be suitable for use in wet environments.
2.09 FIRE ALARM WIRING
A. General: UL listed and labeled, insulated, solid copper conductors. Sizing and type shall be as recommended by the equipment manufacturer and in compliance with NEC. As a minimum, wiring shall adhere to the following:
1. Signaling Line Circuits: Twisted, shielded pair, minimum No. 18 AWG.
2. General Alarm and Accessory Circuits: Minimum 14-gauge, 2 conductor, with jacket color different than signaling line circuit wire.
3. Accessory Circuits: Minimum 14-gauge, 2 conductor, with jacket color different than signaling line circuit and general alarm circuit wire.
4. Line Voltage or AC Power: As recommended by the Equipment Manufacturer and in compliance with NEC.
B. All wiring shall conform to NEC Article 760 for fire alarm detection.
C. Wiring located above the drop ceiling shall be NEC Article 760 Type FPLP shielded plenum rated wire.
D. All conductors underground shall be rated for use in conduits that may be submerged with water.
2.10 CONDUIT
A. EMT (Electrical Metallic Tubing): UL 797 electrical metallic tubing; ANSI C80.3, zinc-coated steel.
1. Fittings and Conduit Bodies: ANSI/NEMA FB 1; steel compression or set screw type.
B. Metallic surface raceway: Legrand 500/700 series or approved equal. Utilize UL listed, NEC compliant metallic colored surface raceways where wiring cannot be installed in-wall or above ceiling (i.e: brick surfaces), unless otherwise noted. Color to match adjacent surface.
1. All raceway, fittings, boxes, angles, connectors, and other accessories shall be of the same manufacturer and series.
C. Flexible Metal Conduit: UL listed, hot dip zinc galvanized.
July 2019 Fire Detection and Alarm 28 31 00 - 6/11
1. Fittings shall be steel tite-bite type with mechanical screw connection for raceways 1 inch and larger. Jake type screw-in fittings will only be allowed on raceways 3/4 inch or smaller.
D. Galvanized Rigid Steel Conduit (GRC): UL listed, hot dip galvanized.
E. Conduit Supports:
1. Conduit clamps shall be 2 hole steel or as indicated below:
a. Exposed/Exterior work shall be two-hole steel.
b. Exposed/Interior work may be two-hole stamped.
c. Concealed in attics or crawl spaces may be two-hole stamped.
d. Concealed in walls may be one-hole stamped or nail straps. Nail straps will only be allowed concealed in walls, and will not be allowed in suspended ceiling, attic or crawl spaces or for exposed work.
2. Conduit clamps shall be affixed with sheet metal screws or approved equal. Nails will only be allowed to affix nail strips in concealed locations.
2.11 FIRE ALARM SYSTEM CONDUCTORS AND CONDUIT SIZING
A. Contractor shall size all fire alarm signal and power conductors and conduit per code for all loads to meet loads on each circuit to minimize voltage drop so all devices will function at maximum load conditions, and when on battery backup with 10% spare voltage drop. Size raceways per the most stringent requirement of NEC, ANS, IEIA/TIA 568B and 569, or
NEMA VE-2.
2.12 ELECTRICAL IDENTIFICATION
A. Identification Device Colors: Use those prescribed by ANSI A13.1, NFPA 70, and these Specifications.
B. Colored Adhesive Marking Tape for Raceways, Wires, and Cables: Self-adhesive vinyl tape, not less than 1 inch wide by 3 mils thick.
C. Tape Markers for Conductors: Vinyl or vinyl-cloth, self-adhesive, wraparound type with preprinted numbers and letters.
D. Color-Coding Cable Ties: Type 6/6 nylon, self-locking type. Colors to suit coding scheme.
E. Engraved-Plastic Labels, Signs, and Instruction Plates: Engraving stock, melamine plastic laminate punched or drilled for mechanical fasteners 1/16-inch minimum thickness for signs up to 20 sq. in. and 1/8-inch minimum thickness for larger sizes. Engraved legend in black letters on white background. Minimum text height of 1/4-inch.
F. Fasteners for Nameplates and Signs: Self-tapping, stainless-steel screws or No. 10/32 stainless-steel machine screws with nuts and washers.
2.13 BATTERY BACKUP
A. Contractor shall supply rechargeable FACP manufacturer compliant sealed led acid backup battery(s) for new and upgraded fire alarm systems.
B. The battery shall be sized using manufacturer’s tools and calculators by the Contractor.
Calculations shall be provided to the CO.
July 2019 Fire Detection and Alarm 28 31 00 - 7/11
1. For existing fire alarm systems to be upgraded: Contractor must provide new calculations for existing systems when new equipment is installed. Contractor shall upgrade existing backup battery capacity if existing capacity is inadequate.
C. If backup batteries are too large for the FACP, the Contractor shall provide and install a remote battery box cabinet (provided from the same manufacturer as the FACP) to house the batteries.
D. At a minimum, provide sufficient battery capacity to operate the entire system upon loss of normal 120 VAC power in a normal supervisory mode for a period of 24 hours with 5 minutes of alarm operation at the end of this period. Automatically transfer to standby batteries upon power failure. Automatic battery charging and recharging.
2.14 WIRE MANAGEMENT HARDWARE
A. Cable hooks, wire ties, and mounting bases, bridal rings, brackets, clips, and other similar devices to provide support or bundling for cables. Screw or other permanently mounted system.
2.15 ADDITIONAL EQUIPMENT AND MATERIALS
A. All additional equipment and materials (relays, modules, receivers, detectors, manual actuators, notification appliances, contacts, transmitters, communicators, etc…) necessary for the proper operation of the fire alarm system as described herein shall be provided and installed by the Contractor and shall be compatible with the FACP and other equipment.
3. PART 3 - EXECUTION
3.01 INSTALLATION, GENERAL
A. Disconnect, demolish, and remove fire detection and alarm system components indicated to be removed as indicated on the plans and described below. Remove and dispose offsite.
1. Circuits to Be Removed: Remove all existing unnecessary circuits (including conductors and conduit) that will not be reused in new fire alarm system or existing fire alarm system to be upgraded. Remove portion of circuits, including conductors and conduit, indicated to be removed to source of supply. Disconnect abandoned outlets and remove devices.
2. Equipment to be removed. Remove circuit to source of supply where circuit is indicated to be removed. Temporarily terminate conductors in a safe manner where circuit will be reattached to new equipment or devices. Remove equipment.
B. Install and test system components and all associated devices in accordance with applicable NFPA Standards and manufacturer's recommendations.
C. Installer Qualifications: A factory-authorized installer is to perform the work of this section:
1. Installation personnel shall be by persons who are qualified and experienced in the installation, inspection, and testing of fire alarm systems as follows.
a. Qualified personnel shall include the following:
i. Factory trained and certified personnel and National Institute of Certification in Engineering Technologies (NICET) fire alarm level II or above certified.
ii. In addition to NICET certification all installing personnel shall be licensed or certified by state or local authority.
July 2019 Fire Detection and Alarm 28 31 00 - 8/11
D. Equipment Mounting: Install fire alarm panels and annunciators with top of cabinet not more than 72 inches above the finished floor. Annunciator panels in hallways / common areas shall be flush mounted. Annunciator panels in mechanical / utility areas shall be surface mounted.
E. Connecting to existing equipment: Verify that existing fire alarm system is operation prior to purchasing any equipment or making any modifications. Demonstrate to the Contracting Officer that the existing fire alarm system operates correctly in trouble and alarm modes and that all existing devices operate correctly.
1. Provide expansion and module cards and relays to enable new equipment to connect to existing devices.
2. Verify the manufacturer and type of devices connected to each fire alarm system undergoing modifications. Ensure that new devices and fire alarm panels integrate and operate with the existing systems components.
F. Install replacement devices in existing device locations where possible to minimize disturbing existing finishes.
G. Mount manual pull station and audible / visible notification devices per Americans with Disabilities Act (ADA) requirements.
H. Locate horn / strobes to provide adequate coverage to achieve sound levels of at least 15 dB above the average ambient noise level in all locations throughout the building. Notify the Contracting Officer if additional horn / strobes are necessary.
I. When equipment is removed on exposed surfaces, Contractor shall completely patch and repair surface to seamlessly match adjacent surface. See Section 024113, “Selective Site Demolition.”
3.02 WIRING INSTALLATION
A. System Wiring: Wire and cable shall be a type listed for its intended use by an approval agency acceptable to the Authority Having Jurisdiction (AHJ) and shall be installed in accordance with the appropriate articles from the current approved edition of NFPA 70:
National Electric Code (NEC) and NPFA 72.
B. Contractor shall obtain from the Fire Alarm System Manufacturer written instruction regarding the appropriate wire/cable to be used for this installation.
1. No deviation from the written instruction shall be made by the Contractor without the prior written approval of the Fire Alarm System Manufacturer.
C. Grounding: Ground the Fire Alarm Panel and associated circuits; comply with IEEE 1100.
Install a ground wire from main service ground to the Fire Alarm Control Panel.
D. Install wires and cables without splices. Make connections at terminal strips in cabinets or at equipment terminals. Make soldered splices in electronic circuits in control cabinets.
E. Color Coding:
1. Color-code fire alarm conductors differently from the normal building power wiring.
Use one color code for alarm initiating device circuits wiring and a different color code for supervisory circuits.
2. Color-code notification appliance circuits differently from alarm-initiating circuits.
3. Paint all fire alarm system junction boxes and covers red according to Section 099000, “Painting.”
July 2019 Fire Detection and Alarm 28 31 00 - 9/11
3.03 CONDUIT INSTALLATION
1. All wiring shall be in steel surface raceways, galvanized EMT, galvanized rigid steel conduit (GRC), or flexible metal conduit as a minimum. Conduit locations shown on drawings are not comprehensive and do not show the full extent of conduit installation required.
a. EXCEPTION: NEC Article 760 Type FPLP shielded wiring installed above the drop ceiling may be hung from rafters using wire management hardware without conduit.
b. Outdoor conduit must be galvanized rigid steel conduit (GRC).
c. Install color matched metallic surface raceways where exposed on walls or ceilings in common areas and corridors, unless otherwise noted.
d. Flexible metal conduit may only be used for branch circuits when concealed in walls, attic, or crawl spaces for the final 6 ft or less of raceway between rigid conduit and equipment / devices.
2. Conduits and raceways shall be sized to meet all applicable code requirements.
3. Install conduits and wireways parallel and perpendicular to surfaces or exposed structural members and follow surface contours where possible. Utilize sweeping bends or pull boxes when changing direction.
4. Conduits shall be supported and/or braced at intervals required by the NEC with clamps, straps or devices as specified in these Specifications.
5. Space raceways at least 12 inches from other electrical system raceways or shield to prevent EMI.
6. Mechanically fasten together metal conduits, enclosures, and raceways for conductors, to form continuous electrical conductor. Connect to electrical boxes, fittings, and cabinets to provide electrical continuity.
7. Secure conduit terminations in metal enclosures with 2 locknuts and terminate with plastic bushing. Install locknuts inside and outside enclosure.
8. Reuse existing conduits where fire detection devices are being replaced.
9. All junction and devices boxes shall be Nema 1 pressed steel.
10. Only fire alarm cables and conductors shall occupy fire alarm conduits and junction boxes.
11. Attach wire management hardware above drop ceiling to structure at 4 foot intervals unless UL listing or National Electric Code requires closer intervals. Install cabling in wire management hardware with maximum 12” sag. Install additional hardware if wire sag exceeds 12”.
12. All conduit (EMT, flexible, surface raceways or other) installed in exposed or exterior areas shall be painted to match the adjacent finished surface according to Section 099000, “Painting.” Conduit shall be cleaned/prepped, primed, and painted with appropriate paint color, coating thickness, and product. Color shall be approved by the CO.
13. Where exterior EMT conduit is installed, “water-tight” fittings shall be used. The tops of all “water-tight” EMT connectors shall be caulked with an exterior grade high temp metal compatible sealant to prevent water intrusion.
14. In the absence of site specific fire rated construction information for interior and exterior wall / floor / ceiling penetrations, seal penetrations with approved UL-listed
July 2019 Fire Detection and Alarm 28 31 00 - 10/11 fire stopping sealant and metallic sleeve / collar rated for up to 4 hours. Install fire stopping materials complete as directed by manufacturer’s installation instructions.
3.04 PROGRAMMING
A. Contractor shall program the new addressable fire alarm system following manufacturer’s installation / operation instructions and NFPA.
B. Each device and module shall be programmed into the control panel using a unique address.
C. Contractor shall coordinate with the Contracting Officer for module, zone, group, and point naming conventions, locations, and quantities to be programmed into the system.
3.05 IDENTIFICATION MATERIALS AND DEVICES
A. Install at locations for most convenient viewing without interference with operation and maintenance of equipment.
B. Coordinate names, abbreviations, colors, and other designations used for electrical identification with corresponding designations indicated in the Contract Documents or required by codes and standards. Use consistent designations throughout Project.
C. Self-Adhesive Identification Products: Clean surfaces before applying.
D. Nameplates: Identify panels and control points.
E. Wire Markers: Install at each end of each wire interconnecting between such items as control panels and fire detection devices. Wire markers shall correspond to control wire numbers on schematic diagrams.
3.06 TESTING
A. Notify Contracting Officer at least 48 hours before inspection or testing. Perform tests in the presence of the Contracting Officer.
B. Prepare test and inspection reports according to NFPA 72, including demonstration of sequences of operations.
C. Tests and Inspections: Perform tests and inspection on each system.
1. Visual Inspection: Conduct visual inspection prior to testing.
a. Base inspection on completed Record Drawings and system documentation required by NFPA 72 and NFPA 720 in its "Completion Documents, Preparation" Table.
2. System Testing: Comply with "Test Methods" Table in the "Testing" Section of the "Inspection, Testing and Maintenance" Chapter in NFPA 72.
a. Prepare the "Fire Alarm System Record of Completion" in the
"Documentation" Section of the "Fundamentals of Fire Alarm Systems" Chapter in NFPA 72 and the "Inspection and Testing Form" in the "Records" Section of the "Inspection, Testing and Maintenance" Chapter in NFPA 72.
D. Submit final test and inspection reports.
3.07 CLEANING AND ADJUSTING
A. Cleaning:
1. Remove paint splatters and other spots, dirt, and debris.
2. Clean unit internally using methods and materials recommended by manufacturer.
July 2019 Fire Detection and Alarm 28 31 00 - 11/11
B. Occupancy Adjustments:
1. When requested within one year of date of Substantial Completion, provide on-site assistance in adjusting sound levels and adjusting controls and sensitivities to suit actual occupied conditions.
a. Provide up to three visits to the site for this purpose.
3.08 DEMONSTRATION AND TRAINING
A. Demonstrate the system and train Owner's maintenance personnel as specified below.
1. Train Owner's maintenance personnel in the procedures and schedules involved in operating, troubleshooting, adjusting, servicing, and preventive maintenance of the system.
2. Provide a minimum of 2 hours of onsite training.
3. Schedule training with the COR at least seven days in advance.
3.09 FINAL SUBMITTALS AND O&M MANUALS
A. Provide the following information in the final operation and maintenance manual. Provide O&M manuals in 3 ring binders with project name, date, contractors name, phone number and contact information.
1. Provide four copies of the O&M manual including the following in both hard copy and electronic format on CD-ROM:
a. As-built drawings of compete system in both hard copy 11x17” and in
AutoCAD DWG and PDF formats on CD-ROM. Drawings must show locations of equipment / devices with addresses and a Fire Zone Plan showing names and locations of zones.
b. As-built materials list and spare parts list in hard copy and spreadsheet in XLS format.
c. As-built cut sheets of all materials and equipment cut sheets in hard copy and in PDF format. All equipment to be specifically identified on each cut sheets.
d. Operation and maintenance instructions in hard copy and electronic copies in MS word format.
e. Copy of complete as-built fire alarm system program on CD-ROM and hard copy printout.
END OF SECTION 28 31 00