Attachment_02_-_Specifications.pdf
PDF 384 KB Posted
- Attached to
- Riverside Fire Alarm Federal contract opportunity
- Solicitation number
- 129AD619Q0008
About this file
Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 129AD619Q0008_Amd_0001.pdf | ||
| Revised_Section_28_31_00.pdf | ||
| Questions_and_Answers.pdf | ||
| Attachment_01_-_Statement_of_Work.pdf | ||
| 129AD619Q0008_Solicitation.pdf | ||
| Attachment_04_-_Wage_Determination.pdf | ||
| Attachment_00_-_Schedule_of_Items.pdf | ||
| Attachment_03_-_Drawings.pdf | ||
| Attachment_05_-_Experience_Information_Sheet.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. FOREST SERVICE
PACIFIC SOUTHWEST RESEARCH STATION
RIVERSIDE
FIRE ALARM SYSTEM UPGRADES
PROJECT SPECIFICATIONS
June 2019
The requirements contained in these specifications are hereby made a part of this solicitation and any resultant contract
PSW Riverside Fire Alarm System Project Specifications
June 2019 Table of Contents TOC - 1/1
TABLE OF CONTENTS
01 10 00 Summary of Work
02 41 13 Selective Site Demolition
07 84 00 Firestopping Systems
09 90 00 Painting
28 31 00 Fire Detection and Alarm
June 2019 Summary of Work 01 10 00 - 1/3
SECTION 01 10 00
SUMMARY OF WORK
PART 1 – GENERAL
1.1 PROJECT DESCRIPTION
This project consists of the removal of existing fire alarm equipment and the installation / upgrade of fire alarm systems in Buildings 1, 2, and 3 at the PSW Riverside site. The project involves two unique fire alarm systems: (1) Building 1 & 2 fire alarm system, and (2) Building 3 fire alarm system.
A. Building 1 & 2 Fire Alarm System work shall include the following:
a. Removal and disposal of existing equipment as indicated on the drawings
b. Installation of a new fully addressable fire alarm system, including a control panel, remote annunciator(s), detectors, pull stations, and notification appliances as indicated on the drawings.
c. Installation and modification of addressable duct smoke detectors.
d. Programming and testing of all equipment.
e. Procurement of a fire alarm system permit from the local fire authority on behalf of the
USDA Forest Service (includes all fees, document preparation, management, and inspections to obtain the permit).
f. O&M Manual preparation and submittal.
g. Training of onsite personnel for new fire alarm system.
B. Building 3 Fire Alarm System work shall include the following:
a. Installation of new detectors, pull stations, notification appliances, and increased backup battery capacity (if necessary) to the existing fire alarm system.
b. Installation and modification of addressable duct smoke detectors.
c. Installation of waterflow detector(s) for monitoring of the existing fire sprinkler system by the fire alarm system.
d. Programming and testing of all equipment.
e. Procurement of a fire alarm system permit from the local fire authority on behalf of the
USDA Forest Service (includes all fees, document preparation, management, and inspections to obtain the permit).
f. O&M Manual preparation and submittal.
C. All fire alarm system work (including installation, testing, shutdown, etc.) shall be coordinated with the existing fire alarm monitoring service Contractor, Protection One: (951)782-6900.
D. Contractor shall be responsible for any and all incidental work in order to provide complete and fully functional fire alarm systems as described herein and within the drawings and specifications.
E. The contract requires code / Authority having Jurisdiction (AHJ) compliant detector and notification appliance installation and coverage in the rooms and corridors shown on the Project Drawings. The Contractor shall determine the appropriate device locations and quantities for these specific rooms and corridors per manufacturer's instruction, NFPA, ADA, & the Authority Having Jurisdiction. The
June 2019 Summary of Work 01 10 00 - 2/3
Contractor is responsible for providing and installing all devices to meet these requirements. Any additional coverage in areas of the buildings not indicated on the drawings to receive such devices required by the AHJ as a means of acquiring the permit shall be added through contract modification. The fire alarm systems in this project are not required by code and are voluntarily installed to achieve specific fire safety objectives.
F. Project buildings are known to contain hazardous materials. See Section 02 41 13, “Selective Site
Demolition,” and the Project Drawings for more information.
1.2 LOCATION
A. Work areas are located in Riverside County, CA, at the USDA Forest Service Pacific Southwest Research Station - Riverside: 4955 Canyon Crest Drive, Riverside, CA 92507.
1.3 METHOD OF MEASUREMENT
A. Units: There will be no separate measurement for individual items of work done under this Contract.
1.4 BASIS OF PAYMENT
A. Payment: Payment will be made at the Contract price, as indicated in the Schedule of Items, and will include full compensation for the work described in the Contract including all incidentals. Payment will be made under:
B. See the Statement of Work for a description of the Pay Items.
1.5 USE OF PREMISES
A. General: Contractor shall have partial use of premises for construction operations, including use of Project site, during construction period. Contractor's use of premises is limited only by the Government's right to perform work or to retain other contractors on portions of Project.
B. Contractor shall at all times conduct his operations to ensure the least inconvenience to the public and employees.
C. Confine storage of materials to areas as approved by the Contracting Officer.
D. Contractor shall provide adequate signing and barricades and take necessary safety measures to protect the public during all construction operations. Contractor shall minimize disturbance of all undisturbed areas.
E. Preservation of Natural Features: Confines all operations to work limits of the project.
June 2019 Summary of Work 01 10 00 - 3/3
1. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, the Contractor shall repair the utility at no additional expense to the Government.
2. Interruption of Existing Utility Service: Notify CO, 48 hours in advance of any interruption of existing utilities.
1.6 FIELD VERIFICATION
A. Field verify all new and existing dimensions affecting the work of this contract before ordering products.
2. PART 2 – PRODUCTS
Not Applicable
3. PART 3 – EXECUTION
3.1 REQUIREMENTS OF REGULATORY AGENCIES
A. All work performed shall comply with health, safety and fire codes, OSHA regulations, and/or applicable regulations established by local, county and state codes.
4. END OF SECTION
June 2019 Selective Site Demolition 02 41 13 - 1/7
SECTION 02 41 13
SELECTIVE SITE DEMOLITION
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes demolition and removal of the following:
1. Selected portions of a building or structure AS INDICATED ON THE DRAWINGS.
2. Selected site elements.
3. Repair procedures for selective demolition operations.
1.2 DEFINITIONS
A. Remove: Detach items from existing construction and legally dispose of them off-site, unless indicated to be removed and salvaged or removed and reinstalled.
B. Remove and Salvage: Detach items from existing construction and deliver them to Govern-ment.
C. Remove and Reinstall: Detach items from existing construction, prepare them for reuse, and reinstall them where indicated.
D. Existing to Remain: Existing items of construction that are not to be removed and that are not otherwise indicated to be removed, removed and salvaged, or removed and reinstalled.
1.3 MATERIALS OWNERSHIP
A. Except for items or materials indicated to be reused, salvaged, reinstalled, or otherwise indi-cated to remain Government property, demolished materials shall become Contractor's proper-ty and shall be removed from Project site.
1.4 SUBMITTALS
A. Proposed Control Measures: Submit statement or drawing that indicates the measures pro-posed for use, proposed locations, and proposed time frame for their operation. Identify op-tions if proposed measures are later determined to be inadequate. Include measures for the following:
1. Dust control.
2. Noise control.
B. Schedule of Selective Demolition Activities: Indicate detailed sequence of selective demoli-tion and removal work, with starting and ending dates for each activity, interruption of utility services, use of elevator and stairs, and locations of temporary partitions and means of egress.
C. Predemolition Photographs or Videotape: Show existing conditions of adjoining construction and site improvements that might be misconstrued as damage caused by selective demolition operations. Submit before Work begins.
June 2019 Selective Site Demolition 02 41 13 - 2/7
D. Landfill Records: Indicate receipt and acceptance of hazardous wastes by a landfill facility li-censed to accept hazardous wastes.
E. Hazardous Materials Remediation Plan (if applicable): See Hazardous Materials description in this section.
1.5 QUALITY ASSURANCE
A. Demolition Firm Qualifications: An experienced firm that has specialized in demolition work similar in material and extent to that indicated for this Project.
B. Regulatory Requirements: Comply with governing EPA notification regulations before be-ginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.
C. Standards: Comply with ANSI A10.6 and NFPA 241.
D. Predemolition Conference: Conduct conference at Project site.
1.6 PROJECT CONDITIONS
A. Government will occupy portions of building immediately adjacent to selective demolition ar-
ea. Conduct selective demolition so Government operations will not be disrupted. Provide not less than 72 hours' notice to CO of activities that will affect Government operations.
B. Maintain access to existing walkways, corridors, and other adjacent occupied or used facili-ties.
1. Do not close or obstruct walkways, corridors, or other occupied or used facilities with-out written permission from authorities having jurisdiction.
C. Government assumes no responsibility for condition of areas to be selectively demolished.
1. Conditions existing at time of inspection for bidding purpose will be maintained by
Government as far as practical.
D. Hazardous Materials: Hazardous materials are present in building(s) to be selectively demol-ished and are indicated on the drawings. A report on the presence of hazardous materials is on file for review and use. Examine report to become aware of locations where hazardous materi-als are present.
1. Hazardous material remediation shall be performed per all applicable local, state, and federal regulations; where there is a conflict between applicable regulations, the most stringent shall apply. Remediation shall be performed by individuals trained and certi-fied to perform such work. Contractor shall submit copies of current applicable licenses and certifications prior to commencement of remediation work.
2. All work, including the handling of hazardous materials or the disturbance or disman-tling of structures containing hazardous materials shall comply with the applicable re-quirements of 29 CFR 1910 and 29 CFR 1926. Work involving the disturbance or dis-mantling of asbestos or asbestos containing materials; the demolition of structures con-
June 2019 Selective Site Demolition 02 41 13 - 3/7 taining asbestos; and/or the disposal and removal of asbestos, shall also comply with the requirements of 40 CFR 61.
3. Do not disturb hazardous materials or items suspected of containing hazardous materi-als. Where disturbance is necessary for the execution of contract work, the Contractor shall prepare and follow a hazardous materials Remediation Plan that describes who will perform the remediation, where remediation will take place, and how it will be per-formed. The Remediation Plan must be approved by the CO prior to commencement of remediation activities.
4. Contractor shall be responsible for the remediation of any known hazardous materials indicated on the drawings that is necessary for the execution of contract work. If other materials suspected of containing hazardous materials are encountered, do not disturb;
immediately notify Contracting Officer (CO). Other unknown hazardous materials may be removed by Government under a separate contract or under this contract through contract modification.
5. The Contractor shall be responsible for any required notifications and permits from lo-cal, state and federal authorities prior to remediation of hazardous materials.
E. Storage or sale of removed items or materials on-site will not be permitted.
F. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.
1. Maintain fire-protection facilities in service during selective demolition operations.
1.7 WARRANTY
A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or dam-aged during selective demolition, by methods and with materials so as not to void existing warranties.
1. If possible, retain original Installer or fabricator to patch the exposed Work listed below that is damaged during selective demolition. If it is impossible to engage original In-staller or fabricator, engage another recognized experienced and specialized firm.
PART 2 – PRODUCTS
2.1 REPAIR MATERIALS
A. Use repair materials identical to existing materials.
1. If identical materials are unavailable or cannot be used for exposed surfaces, use mate-rials that visually match existing adjacent surfaces to the fullest extent possible.
2. Use materials whose installed performance equals or surpasses that of existing materi-als.
PART 3 – EXECUTION
June 2019 Selective Site Demolition 02 41 13 - 4/7
3.1 EXAMINATION
A. Verify that utilities have been disconnected and capped.
B. Survey existing conditions and correlate with requirements indicated to determine extent of selective demolition required.
C. Inventory and record the condition of items to be removed and reinstalled and items to be re-moved and salvaged.
D. When unanticipated mechanical, electrical, or structural elements that conflict with intended function or design are encountered, investigate and measure the nature and extent of conflict.
Promptly submit a written report to CO.
E. Engage a professional engineer to survey condition of building to determine whether remov-ing any element might result in structural deficiency or unplanned collapse of any portion of structure or adjacent structures during selective demolition operations.
3.2 UTILITY SERVICES
A. Existing Utilities: Maintain services indicated to remain and protect them against damage dur-ing selective demolition operations.
B. Do not interrupt existing utilities serving occupied or operating facilities unless authorized in writing by CO and authorities having jurisdiction. Provide temporary services during inter-ruptions to existing utilities, as acceptable to CO and to authorities having jurisdiction.
1. Provide at least 72 hours' notice to CO if shutdown of service is required during changeover.
C. Utility Requirements: Locate, identify, disconnect, and seal or cap off indicated utilities serv-ing areas to be selectively demolished.
1. Arrange to shut off indicated utilities with utility companies.
2. If utility services are required to be removed, relocated, or abandoned, provide tempo-rary utilities before proceeding with selective demolition that bypass area of selective demolition and that maintain continuity of service to other parts of building.
3. Cut off pipe or conduit in walls or partitions to be removed. Cap, valve, or plug and seal remaining portion of pipe or conduit after bypassing.
D. Utility Requirements: Refer to Division 15 and 16 Sections for shutting off, disconnecting, removing, and sealing or capping utilities. Do not start selective demolition work until utility disconnecting and sealing have been completed and verified in writing.
3.3 PREPARATION
A. Site Access and Temporary Controls: Conduct selective demolition and debris-removal op-erations to ensure minimum interference with roads, streets, walks, walkways, and other adja-cent occupied and used facilities.
June 2019 Selective Site Demolition 02 41 13 - 5/7
1. Do not close or obstruct streets, walks, walkways, or other adjacent occupied or used facilities without permission from CO and authorities having jurisdiction. Provide al-ternate routes around closed or obstructed traffic ways if required by governing regula-tions.
2. Erect temporary protection, such as walks, fences, railings, canopies, and covered pas-sageways, where required by authorities having jurisdiction.
3. Protect existing site improvements, appurtenances, and landscaping to remain.
B. Temporary Facilities: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
C. Temporary Enclosures: Provide temporary enclosures for protection of existing building and construction, in progress and completed, from exposure, foul weather, other construction op-erations, and similar activities. Provide temporary weathertight enclosure for building exteri-or.
D. Temporary Partitions: Erect and maintain dustproof partitions and temporary enclosures to limit dust and dirt migration and to separate areas from fumes and noise.
E. Temporary Shoring: Provide and maintain interior and exterior shoring, bracing, or structural support to preserve stability and prevent movement, settlement, or collapse of construction to remain, and to prevent unexpected or uncontrolled movement or collapse of construction be-ing demolished.
3.4 POLLUTION CONTROLS
A. Dust Control: Use water mist, temporary enclosures, and other suitable methods to limit spread of dust and dirt. Comply with governing environmental-protection regulations.
1. Wet mop floors to eliminate trackable dirt and wipe down walls and doors of demoli-tion enclosure. Vacuum carpeted areas.
B. Disposal: Remove and transport debris in a manner that will prevent spillage on adjacent sur-faces and areas.
1. Remove debris from elevated portions of building by chute, hoist, or other device that will convey debris to grade level in a controlled descent.
C. Cleaning: Clean adjacent structures and improvements of dust, dirt, and debris caused by se-lective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.
3.5 SELECTIVE DEMOLITION
A. General: Demolish and remove existing construction only to the extent required by new con-struction and as indicated. Use methods required to complete the Work within limitations of governing regulations.
1. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cut-ting methods least likely to damage construction to remain or adjoining construction.
June 2019 Selective Site Demolition 02 41 13 - 6/7
2. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.
3. Do not use cutting torches until work area is cleared of flammable materials. At con-cealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-suppression de-vices during flame-cutting operations.
4. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.
B. Existing Facilities: Comply with CO’s requirements for using and protecting elevators, stairs, walkways, loading docks, building entries, and other building facilities during selective demo-lition operations.
C. Removed and Salvaged Items:
1. Clean salvaged items.
2. Pack or crate items after cleaning. Identify contents of containers.
3. Store items in a secure area until delivery to Government.
4. Transport items to Government storage area designated by CO.
5. Protect items from damage during transport and storage.
D. Removed and Reinstalled Items:
1. Clean and repair items to functional condition adequate for intended reuse. Paint equipment to match new equipment.
2. Pack or crate items after cleaning and repairing. Identify contents of containers.
3. Protect items from damage during transport and storage.
4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.
E. Existing Items to Remain: Protect construction indicated to remain against damage and soil-ing during selective demolition. When permitted by CO, items may be removed to a suitable, protected storage location during selective demolition [and cleaned] and reinstalled in their original locations after selective demolition operations are complete.
3.6 PATCHING AND REPAIRS
A. General: Promptly repair damage to adjacent construction caused by selective demolition op-erations.
B. Repairs: Where repairs to existing surfaces are required, patch to produce surfaces suitable for new materials.
1. Completely fill holes and depressions in existing masonry walls that are to remain with an approved masonry patching material applied according to manufacturer's written recommendations.
C. Finishes: Restore exposed finishes of patched areas and extend restoration into adjoining con-struction in a manner that eliminates evidence of patching and refinishing.
June 2019 Selective Site Demolition 02 41 13 - 7/7
D. Floors and Walls: Where walls or partitions that are demolished extend one finished area into another, patch and repair floor and wall surfaces in the new space. Provide an even surface of uniform finish color, texture, and appearance. Remove existing floor and wall coverings and replace with new materials, if necessary, to achieve uniform color and appearance.
E. Ceilings: Patch, repair, or rehang existing ceilings as necessary to provide an even-plane sur-face of uniform appearance.
3.7 DISPOSAL OF DEMOLISHED MATERIALS
A. General: Promptly dispose of demolished materials. Do not allow demolished materials to accumulate on-site.
B. Burning: Do not burn demolished materials.
C. Disposal: The Contractor(s) is responsible for ensuring that all materials and wastes generated during the activities of this contract are managed in compliance with Federal, state and local environmental laws and regulations. Transport demolished materials off Government property and legally disposes of them.
END OF SECTION 01732
June 2019 Firestopping Systems 07 84 00 - 1/2
SECTION 07 84 00
FIRESTOPPING SYSTEMS
PART 1 - GENERAL
1.1 DESCRIPTIONS
A. The Work includes, but is not necessarily limited to, the furnishing and installing of firestopping and related accessories as required and indicated herein.
B. Provide firestopping as required to maintain effective barrier against spread of flame, smoke and gases, and to retain integrity of time-rated construction as indicated and at the following types of locations.
1. Provide at fire rated system perimeters, and at duct, conduit, piping, and cable penetrations as required by applicable codes.
2. Review project documents and existing site conditions to ascertain extent of penetrations and methods included in other sections for maintaining fire ratings.
3. Under no circumstance shall the lack of firestopping materials in existing walls / floors / partitions be grounds for not providing firestopping materials where required by this contract.
1.2 SECTION REQUIREMENTS
A. Submit Product Data and product certificates signed by manufacturer certifying compliance with specified requirements.
B. Provide firestopping systems with fire-resistance ratings indicated by reference to UL designations as listed in its "Fire Resistance Directory," or to designations of another testing agency acceptable to authorities having jurisdiction.
C. Provide through-penetration firestopping systems with F-ratings indicated, as determined according to ASTM E 814, but not less than the fire-resistance rating of the constructions penetrated.
D. Provide through-penetration firestopping systems with T-ratings as well as F-ratings, as determined according to ASTM E 814, where indicated.
E. For exposed firestopping, provide products with flame-spread ratings of less than 25 and smoke-developed ratings of less than 450, as determined according to
ASTM E 84.
June 2019 Firestopping Systems 07 84 00 - 2/2
PART 2 - PRODUCTS
2.1 ACCEPTABLE MANUFACTURERS
A. 3M Fire Protection Products Div./3M Fire Barrier Products.
B. Specified Technologies, Inc. (STI) SpecSeal and Pensil Firestopping.
C. Hevi-Duty Nelson Unit of General Signal/Firestop Products.
D. Hilti, Corp./Hilti Firestop Systems.
E. Substitutions: must be an approved equal to those products listed herein.
2.2 MATERIALS
A. General: Choose products and methods meeting applicable codes and Specification requirements for each firestopping application, subject to CO acceptance.
B. Firestopping Materials: Furnish materials for penetrations in time-rated floor, wall, and partition assemblies capable of preventing passage of flame, smoke, and hot gases.
1. Penetration Test: Furnish materials passing ASTM E814 for penetration firestopping indicating maintenance of time-rated adjacent assemblies.
a. Additional Tests: Where required by applicable authorities, provide materials passing ASTM E119 time-temperature fire conditions for fire ratings indicated for assemblies.
2. Flame Spread: ASTM E84 flame spread rating of 25 or less.
C. Firestopping: Fire rating of assemblies such as floor, partition, or wall, shall be in accordance with ASTM E119 tests.
D. In the absence of site specific fire rated construction information for interior and exterior wall / floor / ceiling penetrations, seal all penetrations with approved UL-listed fire stopping products rated for up to 4 hours.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Install firestopping systems to comply with manufacturer's written instructions and with requirements listed in the testing agency's directory for the indicated fire-resistance rating.
END OF SECTION 07 84 00
June 2019 Painting 09 90 00 - 1/10
SECTION 09 90 00
PAINTING
PART 1 - GENERAL
1.1 SCOPE
A. This Section includes surface preparation, painting, and finishing of exposed interior and exterior items and surfaces.
1. Surface preparation, priming, and finish coats specified in this section are in addition to shop priming and surface treatment specified under other sections.
B. Paint exposed surfaces whether or not colors are designated in "schedules," except where a surface or material is specifically indicated not to be painted or is to remain natural. Where an item or surface is not specifically mentioned, paint the same as similar adjacent materials or surfaces. If color or finish is not designated, the Contracting Officer will select from standard colors or finishes available.
1. Painting includes field painting exposed bare and covered pipes and ducts (including color coding), hangers, conduit, exposed steel and iron work, and primed metal surfaces of mechanical and electrical equipment.
C. Painting is not required on prefinished items, finished metal surfaces, concealed surfaces, operating parts, and labels.
1. Prefinished items not to be painted include the following factory-finished components:
a. Metal toilet enclosures.
b. Acoustic materials.
c. Finished mechanical and electrical equipment.
d. Light fixtures.
e. Switchgear.
f. Distribution cabinets.
2. Concealed surfaces not to be painted include wall or ceiling surfaces in the following generally inaccessible areas:
a. Furred areas.
b. Pipe spaces.
c. Duct shafts.
3. Finished metal surfaces not to be painted include:
a. Anodized aluminum.
b. Stainless steel.
c. Chromium plate.
d. Copper.
e. Bronze.
f. Brass.
4. Operating parts not to be painted include moving parts of operating equipment such valve and damper operators, and motor and fan shafts.
5. Labels: Do not paint over Underwriter's Laboratories, Factory Mutual or
June 2019 Painting 09 90 00 - 2/10 other code-required labels or equipment name, identification, performance rating, or nomenclature plates.
D. Related Sections: The following sections contain requirements that relate to this section:
1. Section 28 31 00 "Fire Detection and Alarm .”
1.2 DEFINITIONS
A. "Paint" includes coating systems materials, primers, emulsions, enamels, stains, sealers and fillers, and other applied materials whether used as prime, intermediate, or finish coats.
1.3 SUBMITTALS
A. Product Data: Manufacturer's technical information, label analysis, and application instructions for each material proposed for use.
1. List each material and cross-reference the specific coating and finish system and application. Identify each material by the manufacturer's catalog number and general classification.
B. Samples for verification purposes: Provide samples of each color and material to be applied, with texture to simulate actual conditions, on representative samples of the actual substrate. Define each separate coat, including block fillers and primers. Use representative colors when preparing samples for review. Resubmit until required sheen, color, and texture are achieved.
1.4 QUALITY ASSURANCE
A. Single-Source Responsibility: Provide primers and undercoat paint produced by the same manufacturer as the finish coats.
B. Coordination of Work: Review other sections in which primers are provided to ensure compatibility of the total systems for various substrates. On request, furnish information on characteristics of finish materials to ensure use of compatible primers.
1. Notify the Contracting Officer of problems anticipated using the materials specified.
C. Material Quality: Provide the manufacturer's best quality trade sale paint material of the various coating types specified. Paint material containers not displaying manufacturer's product identification will not be acceptable.
1. Proprietary names used to designate colors or materials are not intended to imply that products named are required or to exclude equal products of other manufacturers.
2. Federal Specifications establish a minimum quality level for paint materials, except where other product identification is used. Provide
June 2019 Painting 09 90 00 - 3/10 written certification from the manufacturer that materials provided meet or exceed these criteria.
3. Products that comply with qualitative requirements of applicable Federal Specifications, yet differ in quantitative requirements, may be considered for use when acceptable to the Contracting Officer. Furnish material data and manufacturer's certificate of performance to Contracting Officer for proposed substitutions.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Deliver materials to the job site in the manufacturer's original, unopened packages and containers bearing manufacturer's name and label and the following information:
1. Product name or title of material.
2. Product description (generic classification or binder type).
3. Federal Specification number, if applicable.
4. Manufacturer's stock number and date of manufacture.
5. Contents by volume, for pigment and vehicle constituents.
6. Thinning instructions.
7. Application instructions.
8. Color name and number.
B. Store materials not in use in tightly covered containers in a well-ventilated area at a minimum ambient temperature of 45 deg F (7 deg C). Maintain containers used in storage in a clean condition, free of foreign materials and residue.
1. Protect from freezing. Keep storage area neat and orderly. Remove oily rags and waste daily. Take necessary measures to ensure that workers and work areas are protected from fire and health hazards resulting from handling, mixing, and application.
1.6 JOB CONDITIONS
A. Apply water-based paints only when the temperature of surfaces to be painted and surrounding air temperatures are between 50 deg F (10 deg C) and 90 deg F (32 deg C).
B. Apply solvent-thinned paints only when the temperature of surfaces to be painted and surrounding air temperatures are between 45 deg F (7 deg C) and 95 deg F (35 deg C).
C. Do not apply paint in snow, rain, fog, or mist, when the relative humidity exceeds
85 percent, at temperatures less than 5 deg F (3 deg C) above the dew point, or to damp or wet surfaces.
1. Painting may continue during inclement weather if surfaces and areas to be painted are enclosed and heated within temperature limits specified by the manufacturer during application and drying periods.
June 2019 Painting 09 90 00 - 4/10
PART 2 - PRODUCTS
2.1 PAINT MATERIALS: Paint products and the like shall be LEED Certified, Green seal
(GS-11, 2008) with Zero VOC and shall be as follows or approved equal:
A. Fiber Cement Siding, Exterior Wood Trim (not noted as clear finish): Minimum 2 coats of Benjamin Moore Aura WB Exterior, Semi-Gloss (632).
B. Ferrous Metal : Minimum 2 coats of Pittsburg Paints Pitt-Tech Plus Int./Ext.
Semi-Gloss DTM Enamel (90-1210).
C. Galvanized Metal: Primer to be Pittsburg Paints Pitt-Tech Int./Ext./Primer/Finish DTM Enamel (90-712). Finish to be Pittsburg Paints Pitt-Tech Plus Int./Ext.
Semi-Gloss DTM Enamel (90-1210).
D. Gypsum Board: Primer to be Benjamin Moore ECO Spec WB Interior Latex
Primer (372). Finish to be a minimum of 2 coats of Benjamin Moore ECO Spec WB Eggshell (374).
E. Redwood/Cedar (not noted as clear finish): Primer to be Benjamin Moore Fresh
Start All Purpose 100% Acrylic Primer (023). Finish to be a minimum of 2 coats of Benjamin Moore Aura WB Exterior, Semi-Gloss (632).
2.2 STAIN AND CLEAR FINISH: Stain and clear finish shall have a VOC equal to or less than 350 g/L and shall be as follows or equal:
A. Wood Door Veneer: Stain to be Rudd Problend 30-7002. Finish to be two coats of Benjamin Moore Benwood Stays Clear acrylic Polyurethane 423.
B. Clear finish on exterior wood surfaces Provide Epifanes Clear Varnish, Semi gloss, 3 coats minimum, 90 microns total thickness.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates and conditions under which painting will be performed for compliance with requirements for application of paint. Do not begin paint application until unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. General Procedures: Remove hardware and hardware accessories, plates, machined surfaces, lighting fixtures, and similar items in place that are not to be painted, or provide surface-applied protection prior to surface preparation and painting. Remove these items if necessary for complete painting of the items and
June 2019 Painting 09 90 00 - 5/10 adjacent surfaces. Following completion of painting operations in each space or area, have items reinstalled by workers skilled in the trades involved.
1. Clean surfaces before applying paint or surface treatments. Remove oil and grease prior to cleaning. Schedule cleaning and painting so that dust and other contaminants from the cleaning process will not fall on wet, newly painted surfaces.
B. Surface Preparation: Clean and prepare surfaces to be painted in accordance with the manufacturer's instructions for each particular substrate condition and as specified.
1. Provide barrier coats over incompatible primers or remove and reprime.
Notify Contracting Officer in writing of problems anticipated with using the specified finish-coat material with substrates primed by others.
2. Wood: Clean surfaces of dirt, oil, and other foreign substances with scrapers, mineral spirits, and sandpaper, as required. Sand surfaces exposed to view smooth and dust off.
a. Scrape and clean small, dry, seasoned knots and apply a thin coat of white shellac or other recommended knot sealer before application of primer. After priming, fill holes and imperfections in finish surfaces with putty or plastic wood filler. Sand smooth when dried.
3. Ferrous Metals: Clean nongalvanized ferrous-metal surfaces that have not been shop coated; remove oil, grease, dirt, loose mill scale, and other foreign substances. Use solvent or mechanical cleaning methods that comply with recommendations of the Steel Structures Painting Council.
a. Touch up bare areas and shop-applied prime coats that have been damaged. Wire-brush, clean with solvents recommended by the paint manufacturer, and touch up with the same primer as the shop coat.
4. Galvanized Surfaces: Clean galvanized surfaces with non-petroleum-based solvents so that the surface is free of oil and surface contaminants. Remove pretreatment from galvanized sheet metal fabricated from coil stock by mechanical methods.
C. Materials Preparation: Carefully mix and prepare paint materials in accordance with manufacturer's directions.
1. Maintain containers used in mixing and application of paint in a clean condition, free of foreign materials and residue.
June 2019 Painting 09 90 00 - 6/10
2. Stir material before application to produce a mixture of uniform density;
stir as required during application. Do not stir surface film into material. Remove film and, if necessary, strain material before using.
3. Use only thinners approved by the paint manufacturer, and only within recommended limits.
D. Tinting: Tint each undercoat a lighter shade to facilitate identification of each coat where multiple coats of the same material are applied. Tint undercoats to match the color of the finish coat, but provide sufficient differences in shade of undercoats to distinguish each separate coat.
3.3 SCAFFOLDING AND PROTECTION: The Contractor shall furnish, maintain and remove all scaffolding, ladders, and planks required for this work and all drop cloths for the protection of concrete walks, floors, prefinished materials, metal roofing, gutters, downspouts and building fixtures. Contractor shall be responsible for any and all damage caused by his work.
3.4 APPLICATION
A. Apply paint in accordance with manufacturer's directions. Use applicators and techniques best suited for substrate and type of material being applied.
B. Do not paint over dirt, rust, scale, grease, moisture, scuffed surfaces, or conditions detrimental to formation of a durable paint film.
1. Paint colors, surface treatments, and finishes are indicated in "schedules."
2. Provide finish coats that are compatible with primers used.
3. The number of coats and film thickness required is the same regardless of the application method. Do not apply succeeding coats until the previous coat has cured as recommended by the manufacturer. Sand between applications where sanding is required to produce an even smooth surface in accordance with the manufacturer's directions.
4. Apply additional coats when undercoats, stains, or other conditions show through final coat of paint until paint film is of uniform finish, color, and appearance. Give special attention to ensure that surfaces, including edges, corners, crevices, welds, and exposed fasteners, receive a dry film thickness equivalent to that of flat surfaces.
5. The term "exposed surfaces" includes areas visible when permanent or built-in fixtures, convector covers, covers for finned tube radiation, grilles, and similar components are in place. Extend coatings in these areas as required to maintain the system integrity and provide desired protection.
June 2019 Painting 09 90 00 - 7/10
6. Paint surfaces behind movable equipment and furniture same as similar exposed surfaces. Paint surfaces behind permanently fixed equipment or furniture with prime coat only before final installation of equipment.
7. Paint interior surfaces of ducts, where visible through registers or grilles, with a flat, nonspecular black paint.
8. Paint backsides of access panels and removable or hinged covers to match exposed surfaces.
9. Finish exterior doors on tops, bottoms, and side edges same as exterior faces.
10. Sand lightly between each succeeding enamel or varnish coat.
11. Omit primer on metal surfaces that have been shop-primed and touch up painted.
C. Scheduling Painting: Apply first coat to surfaces that have been cleaned, pretreated, or otherwise prepared for painting as soon as practicable after preparation and before subsequent surface deterioration.
1. Allow sufficient time between successive coats to permit proper drying.
Do not recoat until paint has dried to where it feels firm, and does not deform or feel sticky under moderate thumb pressure and where application of another coat of paint does not cause lifting or loss of adhesion of the undercoat.
D. Minimum Coating Thickness: Apply materials at not less than the manufacturer's recommended spreading rate. Provide a total dry film thickness on the entire system as recommended by the manufacturer.
E. Mechanical and Electrical Work: Painting mechanical and electrical work is limited to items exposed and in occupied spaces.
F. Prime Coats: Before application of finish coats, apply a prime coat of material as recommended by the manufacturer to material that is required to be painted or finished and has not been prime coated by others. Recoat primed and sealed surfaces where evidence of suction spots or unsealed areas in first coat appears, to assure a finish coat with no burn through or other defects due to insufficient sealing.
G. Orange Peel Enamel Finish: Roll and redistribute paint to an even and fine texture. Leave no evidence of rolling such as laps, irregularity in texture, skid marks, or other surface imperfections.
June 2019 Painting 09 90 00 - 8/10
H. Pigmented (Opaque) Finishes: Completely cover to provide an opaque, smooth surface of uniform finish, color, appearance, and coverage. Cloudiness, spotting, holidays, laps, brush marks, runs, sags, ropiness, or other surface imperfections will not be acceptable.
I. Transparent (Clear) Finishes: Use multiple coats to produce a glass-smooth surface film of even luster. Provide a finish free of laps, cloudiness, color irregularity, runs, brush marks, orange peel, nail holes, or other surface imperfections.
1. Provide satin finish for final coats.
J. Apply exterior wood paint evenly, preferably with brush. Thoroughly paint edges and ends of boards. Brush out excess paint that collects in butts of boards.
1. Start at one edge and continue through to a logical break, maintain a wet edge for a uniform finish and to avoid lap marks.
2. Drying Time: Allow 24 hours between coats.
K. Completed Work: Match approved samples for color, texture, and coverage.
Remove, refinish, or repaint work not in compliance with specified requirements.
3.5 CLEANING
A. Cleanup: At the end of each work day, remove empty cans, rags, rubbish, and other discarded paint materials from the site.
B. Upon completion of painting, clean glass and paint-spattered surfaces. Remove spattered paint by washing and scraping, using care not to scratch or damage adjacent finished surfaces.
3.6 PROTECTION
A. Protect work of other trades, whether to be painted or not, against damage by painting. Correct damage by cleaning, repairing or replacing, and repainting, as acceptable to Contracting Officer.
B. Provide "wet paint" signs to protect newly painted finishes. Remove temporary protective wrappings provided by others for protection of their work after completion of painting operations.
1. At completion of construction activities of other trades, touch up and restore damaged or defaced painted surfaces.
June 2019 Painting 09 90 00 - 9/10
3.7 EXTERIOR PAINT SCHEDULE
A. General: Provide the following paint systems for the various substrates indicated.
B. Exterior Exposed wood:
1. Marine Grade Spar Varnish : 2 coats.
C. Zinc-Coated Metal:
1. High-Gloss Alkyd Enamel: 2 finish coats over primer.
a. Primer: Alkyd Based Corrosion Inhibitive Primer.
b. First and Second Coat: Industrial Strength Alkyd Gloss Enamel.
3.7 INTERIOR PAINT SCHEDULE
A. General: Provide the following paint systems for the various substrates, as indicated.
B. Gypsum Drywall Systems:
1. Eggshell Latex Based Enamel Finish: 3 coats with total dry film thickness not less than 2.5 mils.
a. Primer: Interior Latex-Based White Primer .
b. First and Second Coat: Interior Eggshell Latex Based Enamel.
C. Painted Woodwork:
1. Semigloss Enamel Finish: 3 coats.
a. Primer and Undercoat: Interior Enamel Undercoat.
b. Finish Coat: Interior Semigloss Odorless Alkyd Enamel (Color determined by C.O.).
D. Stained Woodwork:
1. Stained-Varnish Rubbed Finish: 3 finish coats over stain plus filler on open-grain wood. Wipe filler before applying first varnish coat.
a. Stain Coat: Oil type interior wood stain (selected by C.O.).
June 2019 Painting 09 90 00 - 10/10
b. Second Coat: Polyurethane Varnish, gloss.
c. Third Coat: Polyurethane Varnish, semi-gloss.
E. Metal All Types:
1. Gloss Enamel Finish: 2 coats over primer with total dry film thickness not less than 2.5 mils.
a. Primer: Alkyd Based Corrosion Inhibitive Primer.
b. First and Second Coat: Industrial Maintenance Alkyd Gloss
Enamel.
END OF SECTION 09 90 00
June 2019 Fire Detection and Alarm 28 31 00 - 1/11
SECTION 28 31 00
FIRE DETECTION AND ALARM
1. PART 1 - GENERAL
1.01 SUMMARY
A. This Section covers fire alarm systems, including initiating devices, notification appliances, controls, and supervisory devices.
B. Work covered by this section includes the furnishing of labor, equipment, and materials for the complete installation and testing of the fire alarm system as indicated on the drawings and specifications. Work also includes any required design, including drawings, calculations and material submittals, O&M manual preparation, and training.
C. The Fire Detection and Alarm System shall consist of all necessary hardware equipment and software programming to perform the following functions:
1. Fire alarm and detection operations in Building 1, 2, and 3 of the Pacific Southwest
Research Station (PSW) – Riverside.
2. Monitoring and control of Building HVAC system shutdowns and other equipment as indicated in the drawings and specifications.
3. Fire sprinkler system monitoring in Building 3.
1.02 PROJECT DESCRIPTION
A. Installation of one new fully addressable fire alarm detection and notification system in
Buildings 1 & 2 of the PSW – Riverside.
B. Expansion of the existing fire alarm detection and notification system in Building 3 of the
PSW – Riverside.
C. Duct smoke sensors (supply and return) shall be installed on all existing HVAC systems in
Buildings 1, 2, and 3, and shall be monitored and alarmed. In addition, duct smoke sensors shall be integrated with existing HVAC control systems to shutdown all operational capacities of the air distribution system upon activation.
D. Monitoring of the fire sprinkler system in Building 3 via waterflow detection connected to the existing fire alarm detection and notification system.
E. Existing equipment (smoke sensors, duct smoke sensors, pull station, notification devices) to remain in service shall be connected to the new equipment and tested for proper functionality.
1.03 RELATED DOCUMENTS
A. Statement of Work B. Drawings incorporated by attachment C. The work covered by this section is to be coordinated with related work as specified elsewhere in the specifications.
D. The system and all associated operations shall be installed in accordance with the following current versions of:
1. CA Title 24, all applicable sections
2. NFPA 20, Standard for installation of Stationary pumps for fire protection
June 2019 Fire Detection and Alarm 28 31 00 - 2/11
3. NFPA 72, National Fire Alarm Code
4. NFPA 70, National Electrical Code
5. NFPA 101, Life Safety Code
6. NFPA 90A, Standard for the Installation of Air Conditioning and Ventilating Systems
7. Other applicable NFPA standards
8. Local Jurisdictional Adopted Codes and Standards
9. ADA Accessibility Guidelines
1.04 GOVERNMENT FURNISHED PROPERTY
A. The Government will furnish the project floor plans in AutoCAD format for use in making the Fire alarm system permit drawings and submittal drawings. Contractor shall field verify dimensions.
1.05 INITIAL SUBMITTALS
A. Contractor shall submit the following for approval before commencing work:
1. Product Data:
a. Manufacturer data sheets for all major system components.
b. Provide a Materials list spreadsheet (XLS) showing all equipment descriptions, quantities, model numbers, and ratings in hard copy and xls format.
2. Certification that system will be installed by NICET certified personnel Level II or above.
3. Shop Drawings: Comply with NFPA 72 requirements.
a. Provide existing floor plans showing existing devices, type, and ratings.
Clearly identify areas where detector or audible and visible alarm spacing does not comply with NFPA 72. Provide revised floor plans showing devices and types. Show size and route of new cable and conduits.
b. System riser diagram with new and existing conduit sizes, cable and wire types and sizes.
c. Batteries: Size calculations.
d. Wire Voltage Drop: Submit calculations showing voltage drop through each new circuit.
1.06 ADDITIONAL REQUIREMENTS
A. It is the responsibility of the Contractor to determine the extent of all interconnections to other building systems such as fire sprinkler system if any, communication systems, electrical circuits, and HVAC system for shutdown.
1.07 QUALITY ASSURANCE
A. All items of the Fire Alarm System shall be listed as a product of a single fire alarm system manufacturer under the appropriate category by Underwriters Laboratories, Inc. (UL), and shall bear the "UL" label.
B. Performance: Comply with NFPA 72 and the authority having jurisdiction (AHJ).
June 2019 Fire Detection and Alarm 28 31 00 - 3/11
2. PART 2 – PRODUCTS
2.01 GENERAL
A. All equipment must be California State Fire Marshall (CSFM) approved.
2.02 FIRE ALARM CONTROL PANEL (FACP)
A. Silent Knight IntelliKnight 5808 addressable fire alarm control panel or approved equal.
B. Panel must be compatible with existing Silent Knight panel in Building 3 for future connectivity.
2.03 REMOTE ANNUNCIATOR PANEL
A. Silent Knight model #5860 remote annunciator or approved equal.
1. For hallways and common areas, use gray annunciator panel and flush mount install.
2. For mechanical / utility areas, use red annunciator panel with red trim ring and surface mount.
2.04 ADDRESSABLE SMOKE SENSORS (DETECTORS)
A. General: Comply with UL 268, "Smoke Detectors for Fire Protective Signaling Systems."
Include the following features:
1. Factory Nameplate: Serial number and type identification.
2. Plug-In Arrangement: Sensor and associated electronic components are mounted in a module that connects to a fixed base with a twist-locking plug connection. Removal of the detector head shall interrupt the supervisory circuit of the fire alarm detection loop and cause a trouble signal at the control unit.
3. Sensors include a communication transmitter and receiver in the mounting base having a unique identification and capability for status reporting to the FACP. Sensor address shall be located in base to eliminate false addressing when replacing sensors.
4. Removal of the sensor head for cleaning shall not require the…