Trinity_Center_Boat_Launch_solicitation_Final.pdf
PDF 1 MB Posted
- Attached to
- Trinity Center Boat Launch Facility Improvement Federal contract opportunity
- Solicitation number
- 129AC718R0004
About this file
Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_003,_129AC718R0004_Final.pdf | ||
| Amendment_002_Package_Final.pdf | ||
| 2._TrinityCenterPlans20140428-revised.pdf | ||
| 4._North_Coast_Regional_Water_Quality_Control_Board_Permit.pdf | ||
| 5._US_Army_Corps_of_Engineers_Permit.pdf | ||
| 1._Amendment_001_TC_Boat_Launch_final.pdf | ||
| 3._BENCH-specifications.pdf | ||
| 6._CA9,_mod_15,__07272018.pdf | ||
| Questions_and_Answers_as_of_8-2-2018.pdf | ||
| 1._PROJECT_SPECS_TRINITYCENTER_(003).pdf | ||
| 5._CA9,_mod_12,_dated_07062018.pdf | ||
| 4._TrinityCenter_PAL_Fire_Plan.pdf | ||
| 2._PROJECT_SPECS_BOARDING_FLOAT.pdf | ||
| 6._SF24_Bid_Bond.pdf | ||
| 3._Trinity_Center_Plans20140428.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION FORMS
OFFEROR'S COPY
CONSTRUCTION
Issuing Office:
U.S.D.A. - Forest Service Northern California Acquisition Service Area 3644 Avtech Parkway Redding, CA 96002
Solicitation Number:
129AC718R0004
Project Name and Location:
TRINITY CENTER BOAT LAUNCH
Weaverville Ranger District Shasta-Trinity National Forest
Issue Date: 07/11/2018 Due Date: 08/14/2018, 1300 PT
IMPORTANT INFORMATION
1. This is a Request for Proposals (RFP) requiring a technical response along with pricing. Price information shall be submitted on the Schedule of Items. A separate Technical Proposal is required that addresses the evaluation criteria identified in the Provisions in Section M.
2. This project requires bonding and a Bid Guarantee is required. See Section I.
3. Electronic/Facsimile transmission is NOT authorized for this solicitation. Proposals shall be submitted to the issuing office address listed above.
4. This procurement is a 100% set-aside for total small business concerns.
5. A DUNS number and registration in the System for Award Management (SAM) is required.
Please note that Vendors shall have a current entity registration in the System for Award Management (SAM) by the closing date of the solicitation.
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
908481
USDA FOREST SERVICE
R5 NO-CAL ACQ SERVICE AREA NCASA
3644 AVTECH PARKWAY SUITE 180
REDDING CA 96002
9AC7
PAUL WOOD
Northern CA Acquisition Service Area 3644 Avtech Parkway Redding, CA 96002
PAUL WOOD
b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS) ncasacontracting@fs.fed.us
1x 07/11/2018
129AC718R0004
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
TRINITY CENTER BOAT LAUNCH IMPROVEMENT PROJECT
SHASTA-TRINITY NATIONAL FOREST
NAICS: 237310
Size Standard: $36.5 Million
Set Aside: 100% Total Small Business
Government Estimate between: $1,000,000 - $5,000,000
DUNS: ___________________________________
EMAIL:___________________________________
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 120 calendar days and complete it within ________________ ________________ calendar days after receiving
08/14/2018
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
USDA FOREST SERVICE
R5 NO-CAL ACQ SERVICE AREA NCASA
3644 AVTECH PARKWAY SUITE 180
REDDING CA 96002
9AC7
PAUL M. WOOD
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
129AC718R0004
Trinity Center Boat Launching Facility
Improvements
Delivery: 02/01/2019
Delivery Location Code: 9A28
USDA FOREST SERVICE
SHASTA TRINITY NATIONAL FOREST
3644 AVTECH PARKWAY
REDDING CA 96002 US
FOB: Destination
001 Trinity Center Boat Launching Facility
Improvements
AAP#447455
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Trinity Center Boat Launch Improvement Project Page 4 of 37
129AC718R0004
TABLE OF CONTENTS
PART I - SCHEDULE OF ITEMS
SECTION B - SCHEDULE OF ITEMS
B.1 Option for Increased Quantity—Separately Priced Line Item (FAR 52.217-7) (Mar 1989)
B.2 Note Regarding Bond Premiums
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 Scope of Work
C.2 Location of Project
C.3 Contract Requirement
C.4 Project Access
C.5 Sampling and Testing
C.6 Contractor’s Responsibilities
C.7 Project Specifications
C.8 Attachments to Statement of Work/Specifications, AGAR 452.211-73 (FEB 1988)
C.9 Special Project Specification List
SECTION D – GOVERNMENT FURNISHED PROPERTY
SECTION E - INSPECTION AND ACCEPTANCE
E.1 Inspection of Construction FAR 52.246-12 (AUG 1996)
E.2 Inspection of Construction FAR 52.246-12 (AUG 1996)
SECTION F - DELIVERIES OR PERFORMANCE
F.1 Clauses Incorporated by Reference, FAR 52.252-2 (FEB 1998)
F.2 Commencement, Prosecution, and Completion of Work, FAR 52.211-10 (APR 1984)
F.3 Schedules for Construction Contracts, FAR 52.236-15 (APR 1984)
SECTION G - CONTRACT ADMINISTRATION DATA
G.1 Postaward Conference, AGAR 452.215-73 (NOV 1996)
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H.1 Emergency Response, AGAR 452.236-77 (NOV 1996)
H.2 Invoice Processing Platform (IPP)
PART II – CONTRACT CLAUSES
SECTION I - CONTRACT CLAUSES
I.1 Clauses Incorporated by Reference, FAR 52.252-2 (FEB 1998)
I.2 Affirmative Procurement of Biobased Products under Service and Construction Contracts, FAR 52.223-2 (SEP 2013)
I.3 Buy American—Construction Materials, FAR 52.225-9 (MAY 2014)
I.4 Bid Guarantee, FAR 52.228-1 (SEP 1996)
PART III – LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
Trinity Center Boat Launch Improvement Project Page 4 of 36
TABLE OF CONTENTS
PART I - SCHEDULE OF ITEMS
SECTION B - SCHEDULE OF ITEMS
B.1 Option for Increased Quantity—Separately Priced Line Item (FAR 52.217-7) (Mar 1989)
B.2 Note Regarding Bond Premiums
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 Scope of Work
C.2 Location of Project
C.3 Contract Requirement
C.4 Project Access
C.5 Sampling and Testing
C.6 Contractor’s Responsibilities
C.7 Project Specifications
C.8 Attachments to Statement of Work/Specifications, AGAR 452.211-73 (FEB 1988)
C.9 Special Project Specification List
SECTION D – GOVERNMENT FURNISHED PROPERTY
SECTION E - INSPECTION AND ACCEPTANCE
E.1 Inspection of Construction FAR 52.246-12 (AUG 1996)
E.2 Inspection of Construction FAR 52.246-12 (AUG 1996)
SECTION F - DELIVERIES OR PERFORMANCE
F.1 Clauses Incorporated by Reference, FAR 52.252-2 (FEB 1998)
F.2 Commencement, Prosecution, and Completion of Work, FAR 52.211-10 (APR 1984)
F.3 Schedules for Construction Contracts, FAR 52.236-15 (APR 1984)
SECTION G - CONTRACT ADMINISTRATION DATA
G.1 Postaward Conference, AGAR 452.215-73 (NOV 1996)
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H.1 Emergency Response, AGAR 452.236-77 (NOV 1996)
H.2 Invoice Processing Platform (IPP)
PART II – CONTRACT CLAUSES
SECTION I - CONTRACT CLAUSES
I.1 Clauses Incorporated by Reference, FAR 52.252-2 (FEB 1998)
I.2 Affirmative Procurement of Biobased Products under Service and Construction Contracts, FAR 52.223-2 (SEP 2013)
I.3 Buy American—Construction Materials, FAR 52.225-9 (MAY 2014)
I.4 Bid Guarantee, FAR 52.228-1 (SEP 1996)
PART III – LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
Trinity Center Boat Launch Improvement Project Page 5 of 36
SECTION J - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
J.1 Attachments to Statements of Work/Specifications, AGAR 452.211-73 (FEB 1988)
PART IV – REPRESENTATIONS AND INSTRUCTIONS
SECTION K - REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS
K.1 Clauses Incorporated by Reference, FAR 52.252-2 (FEB 1998)
K.2 Annual Representations and Certifications, FAR 52.204-8 (JAN 2018)
K.3 Certification Regarding Responsibility Matters, FAR 52.209-5 (OCT 2015)
K.4 Information Regarding Responsibility Matters, FAR 52.209-7 (JUL 2013)
K.5 Preparation of Proposals—Construction, FAR 52.236-28 (OCT 1997)
K.6 Size Standard and NAICS Code Information, AGAR 452.219-70 (SEP 2001)
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS
L.1 Inquiries AGAR 452.204-70 (FEB 1988)
L.2 System for Award Management, FAR 52.204-7 (OCT 2016)
L.3 Instructions to Offerors—Competitive Acquisition, FAR 52.215-1 (JAN 2017)
L.4 Type of Contract, FAR 52.216-1 (APR 1984)
L.5 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction, FAR
52.222-23 (FEB 1999)
L.6 Notice of Buy American Act Requirement - Construction Materials, FAR 52.225-10 (MAY 2014)
L.7 Service of Protest, FAR 52.233-2 (SEP 2006)
L.8 Preparation of Proposals – Construction, FAR 52.236-28 (OCT 1997)
L.9 Instructions for the Preparation of Technical and Business Proposals
L.10 Site Visit (Construction) FAR 52.236-27 (FEB 1995)
SECTION M - EVALUATION FACTORS FOR AWARD
Trinity Center Boat Launch Improvement Project Page 6 of 36
PART I - SCHEDULE OF ITEMS
SECTION B - Schedule of Items
Trinity Center Boat Launch Facility
Shasta-Trinity National Forest
Construction of Boat Ramp Access & Parking Area - Station 0+00 to 5+50
Line Item
Item Unit Est.
Qty.
Unit Rate Total Price
15101 Mobilization LS 1 $_________ $_________
15201(a) Construction Staking (for Parking) LS 1 $_________ $_________
15713 Soil Erosion and Pollution Control LS 1 $_________ $_________
20102 Clearing and Grubbing (Parking Lot Planting Areas) LS 1 $_________ $_________
20305(a) Removal of structures and obstructions (Parking Area Curbs)
LS 1
20305(b) Removal of structures and obstructions (Vault Toilet) LS 1 $_________ $_________
20305(c) Removal of structures and obstructions (Parking Sidewalks)
LS 1
20305(d) Removal of structures and obstructions (Signs and Misc.)
LS 1
30103 Aggregate Base, grading "D", Compaction "F" (95% T180) (Compaction testing required)
TON 20
40301 Hot Bibuminous Plant Mix (Commercial Source) Grading DG-1, AC Grade PG 69-16
TON 700
40803 Emulsified Asphalt, Grade: SS1 Type: Seal Coat (EXCLUDES WATER) Class A, Type IV
TON 1.32
41301 Asphalt Pavement Milling, 2" Depth SY 6,350 $_________ $_________
55207 Reinforced Concrete Sidewalks, Seating Area and Dumpster Pad. 4" Thickness
SF 500
60901 Portland Cement Concrete Curb, Type Standard, 10" Depth
LF 780
60902 Portland Cement Concrete Curb and Gutter, Type Standard, 14" Depth
LF 465
60950 Portland Cement Concrete Wheel Stop EA 2 $_________ $_________
63405(a) Pavement Markings, Reflectorized Thermoplastic, Symbols & Letters ARROWS
EA 6
63405(b) Pavement Markings, Reflectorized Thermoplastic, Symbols & 2-foot Letters "FEE AREA PARKING
ONLY"
EA 1
63405( c) Pavement Markings, Reflectorized Thermoplastic, Symbols & 2 foot Letters "10 MINUTE PARKING"
EA 1
63405(d) Pavement Markings, Reflectorized Thermoplastic, Symbols & 2 foot Letters "TIE DOWN AREA"
EA 1
63405(e) Pavement Markings, Reflectorized Thermoplastic, Symbols & 2 foot Letters "15 MINUTE PARKING
ONLY"
EA 1
Trinity Center Boat Launch Improvement Project Page 7 of 36
Construction of Boat Ramp Access & Parking Area - Station 0+00 to 5+50 (Continued)
Line Item
Item Unit Est.
Qty.
Unit Rate Total Price
63452(a) Pavement Traffic Marking, Reflectorized Thermoplastic, 6" Striping for hatched areas
SF 3460 $_________ $_________
63452(b) Pavement Traffic Marking, Reflectorized Thermoplastic, 4" Striping for parking stalls
LF 2400 $_________ $_________
63453 Painted Traffic Marking, HANDICAP SYMBOL EA 3 $_________ $_________
02073 Abandon Existing Vault Toilet LS 1 $_________ $_________
02115(01) Remove and Replace Sign (DBAW PROJECT SIGN) EA 1 $_________ $_________
02115(02) Remove and Replace Sign (NO SWIMMING WITHIN
25 FEET )
EA 1 $_________ $_________
02800 8' Concrete Bench incl. installation EA 1 $_________ $_________
10400(01) Recreation Signs and Pads, Type: 5 panel kiosk information center includes sidewalk, MDO signs
EA 1 $_________ $_________
10601a Trash Receptacles & Concrete Pads Bearsaver HA-P Handicapped Accessible Bear-Proof Refuse Container
EA 2 $_________ $_________
10601b Trash Receptacles & Concrete Pads Bearsaver HA2- P Handicapped Accessible Bear-Proof Refuse Container
EA 2 $_________ $_________
13120 "Tioga Special with Chase" Model CXT toilet building EA 1 $_________ $_________
16410 Solar Lighting. EA 1 $_________ $_________
Total Section 1 = $________
SECTION 2 - BOAT RAMP, STA 0+00 TO 6+30
Item # Item Unit Est.
Qty
Unit Rate Total Price
15201(b) Construction Staking (for Ramp) LS 1 $_________ $_________
15713 Soil Erosion and Pollution Control LS 1 $_________ $_________
20305(c) Removal of structures and obstructions (Ramp Sidewalks and Rail)
LS 1
25104 Keyed Riprap, Class V TON 900 $_________ $_________
30103 Aggregate Base, grading "D", Compaction "D" TON 220 $_________ $_________
55204(a)
Structural Concrete,Type II cement, 6 sack mix ,28 day strength of 4000 psi, 3-4"slump, 5% entrained air, maximum aggregate size of 3/4" for boatramp with sidewalk.
LS
02489(01) Steel Frame Concrete Boarding Floats EA 3 $_________ $_________
05501(01) Metal Fabricated Single Rail System LF 630 $_________ $_________
Total Section 2 = $________
Trinity Center Boat Launch Improvement Project Page 8 of 36
OPTIONAL ITEMS
Item # Item Unit Est.
Qty
Unit Rate Total Price
62801(a) Cofferdam for dewatering (three foot max.) LS 1 $_________ $_________
OR…
62801(b) Cofferdam for dewatering (six foot max.) LS 1 $_________ $_________
Option 1 Subtotal: $_________
B.1 Option for Increased Quantity—Separately Priced Line Item (FAR 52.217-7) (Mar 1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor by January 1, 2019. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
B.2 Note Regarding Bond Premiums
Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization. Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted
Trinity Center Boat Launch Improvement Project Page 9 of 36
SECTION C - Description/Specifications/Statement of Work
C.1 Scope of Work
Trinity Center Boat Launching Facility
The scope of this contract is to widen resurface the Trinity Center Boat Launching Facility at Trinity Lake.
Fluctuating water levels are to be expected. The Bureau of Reclamation predicts the lowest lake levels usually occur in December. Construction within the window of opportunity for weather and lake levels is critical and the contractor shall schedule work to attain progress corresponding with declining lake levels. A wet weather pattern typically begins in the area after October 15 and may affect progress. The contractor will be responsible to maintain access to the project throughout construction, which may include snow plowing if necessary.
The project is to be constructed according to the plans and specifications and quality control, compliance, and verification shall be performed by a professional selected by the Government or Government’s representatives.
PARKING AREA: Remove and/or replace existing parking curbs and sidewalks and some of the designated planting areas. Remove and properly dispose of existing vault toilet. Grind existing asphalt to a depth of 2-inches, regrade, compact and repave. Construct 780 LF 4” curb, 465 LF 8” curb and 500 SF sidewalks and concrete flatwork. Construct five-panel kiosk that includes sign panels and sidewalk. Furnish and install prefabricated concrete toilet building, trash receptacles, concrete DBAW Project sign, bench and solar lighting.
BOAT RAMP: Remove existing sidewalk and footings from ramp. Overlay existing ramp with 6” concrete and widen lower part of ramp from 15’ to 30’ wide. Construct new 8’ sidewalk with 630’ metal rail system.
Place 900 tons riprap. Furnish and install three concrete boarding floats. The boat ramp option items also include a cofferdam for dewatering with line item options for different sizes.
C.2 Location of Project
From Weaverville, take Highway 3 North for approximately 30 miles to Trinity Center. Turn right and follow signs to boat ramp.
C.3 Contract Requirement
Prior to beginning work, Contractor shall submit an Erosion Control Plan, Safety Plan, Schedule of Operations and Sign Plan (Traffic Control) for Closure.
C.4 Project Access
Representatives of the Department of Boating and Waterways shall be allowed access to all parts of the construction work. Work may not occur between May 21st and September 10th, unless water is below ramp level and/or approved by Contracting Officer. All roads for the project may be closed to traffic during construction. The Forest Service shall be given fifteen days prior notice of construction for public notification.
C.5 Sampling and Testing
The contractor will be required to complete all sampling and testing in accordance with the specifications. Sampling and testing does not have a separate pay item. Any cost associated with sampling and testing should be included in the associated bid item.
Trinity Center Boat Launch Improvement Project Page 10 of 36
C.6 Contractor’s Responsibilities
No placement or v-grooving of concrete for boat launching ramps on the Project shall be allowed until the construction contractor demonstrates proficiency in creating a satisfactory v-grooved surface by preparing a concrete test panel measuring no less than 6 feet by 4 feet. A DBW representative must accept the test panel before the construction contractor shall be allowed to place or v-groove concrete for boat launching ramps. Precast boat launching ramp panels are exempt from the test panel requirement, but must also be approved by a DBW representative prior to placement or installation.
Test panels must be adjacent to, but not part of, any ramp work to be completed and must remain accessible until all ramp work is completed and accepted by DBW. Contractor may incorporate test panel into other concrete work (i.e. trash enclosure, etc.)
Contractor and its subcontractors shall not unlawfully discriminate, harass, or allow harassment against any employee who is employed in the work covered by this contract or against any applicant for such employment because of sex, sexual orientation, race, color, ancestry, religious creed, national origin, physical disability (including HIV and AIDS), mental disability, medical condition, age, marital status and denial of family care leave, and that such provisions shall include, but not be limited to: employment, upgrading, promotion or transfer, recruitment or recruitment advertising, layoff or termination, rates of pay or other forms of compensation and selection for training including apprenticeship.
Contractor and its subcontractors shall comply with all air pollution and environmental control rules, regulation, ordinances and statues which apply to the Project and any work performed pursuant to this contract.
C.7 Project Specifications
All Project Specifications for this project are from the Federal Highway Administration’s FP-03 STANDARD
SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY
PROJECTS and DEPARTMENT OF BOATING AND WATERWAYS’ LAYOUT, DESIGN AND CONSTRUCTION HANDBOOK FOR SMALL CRAFT BOAT LAUNCHING FACILITIES are part of this solicitation and any resultant contract. The website for the specifications are:
www.wfl.fha.dot.gov/design/specs/fp03.htm https://dbw.parks.ca.gov/pages/28702/files/lramps.pdf
C.8 Attachments to Statement of Work/Specifications, AGAR 452.211-73 (FEB 1988)
The attachments to the Statement of Work/Specifications listed in Section J are hereby made a part of this solicitation and any resultant contract.
C.9 Special Project Specification List
The special project specifications applicable to this solicitation are in Section J. as a separate attachment.
See Table of Contents at front of special project specifications for list of included special project specifications.
SECTION D – Government Furnished Property
There are no specifications in this section.
SECTION E - Inspection and Acceptance
E.1 Inspection of Construction FAR 52.246-12 (AUG 1996)
(a) Definition. “Work” includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall http://www.wfl.fha.dot.gov/design/specs/fp03.htm https://dbw.parks.ca.gov/pages/28702/files/lramps.pdf
Trinity Center Boat Launch Improvement Project Page 11 of 36 maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
(c) Government inspections and tests are for the sole benefit of the Government and do not—
(1) Relieve the Contractor of responsibility for providing adequate quality control measures;
(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
(3) Constitute or imply acceptance; or
(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.
(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.
(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
(g) If the Contractor does not promptly replace or correct rejected work, the Government may—
(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or
(2) Terminate for default the Contractor’s right to proceed.
(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the
Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting
Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.
E.2 Inspection of Construction FAR 52.246-12 (AUG 1996)
Trinity Center Boat Launch Improvement Project Page 12 of 36
Government inspections are for the purpose of satisfying the Government that the supplies and/or services are acceptable and do not relieve the Contractor of the responsibility for maintaining quality control. The Contractor (or designated representative) is encouraged to be present to observe inspections
SECTION F - Deliveries or Performance
F.1 Clauses Incorporated by Reference, FAR 52.252-2 (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
www.acquisition.gov/far/ www.usda.gov/procurement/policy/agar.html
Variation in Estimated Quantity, FAR 52.211-18 (APR 1984)
Suspension of Work, FAR 52.242-14 (APR 1984)
F.2 Commencement, Prosecution, and Completion of Work, FAR 52.211-10 (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 2/01/2019.
Estimated start date is September 5th, 2018.
F.3 Schedules for Construction Contracts, FAR 52.236-15 (APR 1984)
(a) The Contractor shall, within five days after the work commences on the contract or another period of time determined by the Contracting Officer, prepare and submit to the Contracting Officer for approval three copies of a practicable schedule showing the order in which the Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the several salient features of the work (including acquiring materials, plant, and equipment). The schedule shall be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the period. If the Contractor fails to submit a schedule within the time prescribed, the Contracting Officer may withhold approval of progress payments until the Contractor submits the required schedule.
(b) The Contractor shall enter the actual progress on the chart as directed by the Contracting Officer, and upon doing so shall immediately deliver three copies of the annotated schedule to the Contracting Officer. If, in the opinion of the Contracting Officer, the Contractor falls behind the approved schedule, the Contractor shall take steps necessary to improve its progress, including those that may be required by the Contracting Officer, without additional cost to the Government. In this circumstance, the Contracting Officer may require the Contractor to increase the number of shifts, overtime operations, days of work, and/or the amount of construction plant, and to submit for approval any supplementary schedule or schedules in chart form as the Contracting Officer deems necessary to demonstrate how the approved rate of progress will be regained.
(c) Failure of the Contractor to comply with the requirements of the Contracting Officer under this clause shall be grounds for a determination by the Contracting Officer that the Contractor is not prosecuting the work with sufficient diligence to ensure completion within the time specified in the contract. Upon making this determination, the Contracting Officer may terminate the Contractor’s right to proceed with the work, or any separable part of it, in accordance with the default terms of this contract.
http://www.acquisition.gov/far/ http://www.usda.gov/procurement/policy/agar.html
Trinity Center Boat Launch Improvement Project Page 13 of 36
SECTION G - Contract Administration Data
G.1 Postaward Conference, AGAR 452.215-73 (NOV 1996)
A post award conference with the successful offeror may be required. The conference will be held at a mutually agreeable time and location.
SECTION H - Special Contract Requirements
H.1 Emergency Response, AGAR 452.236-77 (NOV 1996)
(a) Contractor's Responsibility for Fire Fighting. (1) The Contractor, under the provisions of FAR clause 52.236-9, PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS, shall immediately extinguish all fires on the work site other than those fires in use as a part of the work. (2) The Contractor may be held liable for all damages and for all costs incurred by the Government for labor, subsistence, equipment, supplies, and transportation deemed necessary to control or suppress a fire set or caused by the Contractor or the Contractor's agents or employees.
(b) Contractor's Responsibility for Notification in Case of Fire. The Contractor shall immediately notify the Government of any fires sighted on or in the vicinity of the work site.
(c) Contractor's Responsibility for Responding to Emergencies. When directed by the Contracting Officer, the Contractor shall allow the Government to temporarily use employees and equipment from the work site for emergency work (anticipated to be restricted to firefighting). An equitable adjustment for the temporary use of employees and equipment will be made under the CHANGES clause, FAR 52.243-4.
H.2 Invoice Processing Platform (IPP)
The "Submit Invoice-to" address for USDA orders is the Department of Treasury's Invoice Processing Platform (IPP). The contractor must register and submit invoices via IPP. All invoices shall be submitted via the electronic Invoice Processing Platform. This platform is managed by the U.S. Department of Treasury and additional information is available at this website https://www.ipp.gov/index.htm.
Vendors register at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish an account.
https://www.ipp.gov/index.htm https://www.ipp.gov/vendors/enrollment-vendors.htm
Trinity Center Boat Launch Improvement Project Page 14 of 36
PART II – CONTRACT CLAUSES
SECTION I - Contract Clauses
I.1 Clauses Incorporated by Reference, FAR 52.252-2 (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://www.acquisition.gov/ www.usda.gov/procurement/policy/agar.html
FEDERAL ACQUISITION REGULATIONS (FAR)
52.202-1 Definitions. (NOV 2013)
52.203-3 Gratuities. (APR 1984)
52.203-5 Covenant against Contingent Fees. (MAY 2014)
52.203-6 Restrictions on Subcontractor Sales to the Government (SEP 2006)
52.203-7 Anti-Kickback Procedures (MAY 2014)
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (MAY 2014)
52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (MAY 2014)
52.203-12 Limitation on Payments to Influence Certain Federal Transactions (OCT 2010)
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper. (May 2011)
52.204-13 System for Award Management Maintenance (OCT 2017)
52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (OCT 2015)
52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (Jul 2013)
52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015)
52.215-2 Audit and Records - Negotiation (OCT 2010)
52.219-6 Total Small Business Set-Aside (NOV 2011)
52.219-14 Limitations on Subcontracting. (NOV 2011)
52.219-28 Post-Award Small Business Program Representations (JUL 2013)
52.222-3 Convict Labor (JUN 2003)
52.222-4 Contract Work Hours and Safety Standards Act - Overtime Compensation (MAY 2014)
52.222-5 Davis-Bacon Act--Secondary Site of the Work. (MAY 2014)
52.222-6 Davis-Bacon Act. (MAY 2014)
52.222-7 Withholding of Funds (MAY 2014)
52.222-8 Payrolls and Basic Records (MAY 2014)
52.222-9 Apprentices and Trainees (JUL 2005)
52.222-10 Compliance with Copeland Act Requirements (FEB 1988)
52.222-11 Subcontracts (Labor Standards) (MAY 2014)
52.222-12 Contract Termination - Debarment (MAY 2014)
52.222-13 Compliance with Davis-Bacon and Related Act Regulations (MAY 2014)
52.222-14 Disputes Concerning Labor Standards (FEB 1988)
52.222-15 Certification of Eligibility (MAY 2014)
52.222-21 Prohibition of Segregated Facilities (APR 2015)
52.222-26 Equal Opportunity (APR 2015)
52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015)
52.222-35 Equal Opportunity for Veterans (OCT 2015)
52.222-36 Equal Opportunity Action for Workers with Disabilities (JUL 2014)
52.222-37 Employment Reports on Veterans (OCT 2015) http://www.acquisition.gov/ http://www.usda.gov/procurement/policy/agar.html
Trinity Center Boat Launch Improvement Project Page 15 of 36
52.222-50 Combating Trafficking in Persons (MAR 2015)
52.222-55 Minimum Wages under Executive Order 13658 (DEC 2015)
52.223-6 Drug-Free Workplace. (MAY 2001)
52.223-18 Encouraging Contractor Policies to Ban Text (AUG 2011)
Messaging While Driving.
52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008)
52.227-1 Authorization and Consent. (DEC 2007)
52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (DEC 2007)
52.227-4 Patent Indemnity--Construction Contracts (DEC 2007)
52.228-2 Additional Bond Security (OCT 1997)
52.228-11 Pledges of Assets. (JAN 2012)
52.228-12 Prospective Subcontractor Requests for Bonds (MAY 2014)
52.228-14 Irrevocable Letter of Credit. (NOV 2014)
52.228-15 Performance and Payment Bonds - Construction. (OCT 2010)
52.229-3 Federal, State, and Local Taxes. (FEB 2013)
52.232-5 Payments under Fixed-Price Construction Contracts. (MAY 2014)
52.232-17 Interest. (MAY 2014)
52.232-23 Assignment of Claims. (MAY 2014)
52.232-27 Prompt Payment for Construction Contracts. (MAY 2014)
52.232-33 Payment by Electronic Funds Transfer - Central Contractor Registration. (JUL 2013)
52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013)
52.233-1 Disputes. (MAY 2014)
52.233-3 Protest after Award. (AUG 1996)
52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004)
52.236-2 Differing Site Conditions. (APR 1984)
52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984)
52.236-5 Material and Workmanship. (APR 1984)
52.236-6 Superintendence by the Contractor. (APR 1984)
52.236-7 Permits and Responsibilities. (NOV 1991)
52.236-8 Other Contracts. (APR 1984)
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (APR 1984)
52.236-10 Operations and Storage Areas. (APR 1984)
52.236-11 Use and Possession Prior to Completion. (APR 1984)
52.236-12 Cleaning Up. (APR 1984)
52.236-13 Accident Prevention. (NOV 1991)
52.236-15 Schedules for Construction Contracts. (APR 1984)
52.236-21 Specifications and Drawings for Construction (FEB 1997)
52.242-13 Bankruptcy. (JUL 1995)
52.243-4 Changes. (JUN 2007)
52.244-6 Subcontracts for Commercial Items. (DEC 2015)
52.246-21 Warranty of Construction. (MAR 1994)
52.248-3 Value Engineering - Construction. (OCT 2015)
52.249-2 Termination for Convenience of the Government (Fixed-Price). (APR 2012)
52.249-10 Default (Fixed-Price Construction). (APR 1984)
52.253-1 Computer Generated Forms. (JAN 1991)
Trinity Center Boat Launch Improvement Project Page 16 of 36
AGRICULTURE ACQUISITION REGULATION
452.232-70 Reimbursement for Bond Premiums - Fixed-Price Construction Contracts. (NOV 1996)
452.236-71 Prohibition against the Use of Lead-Based Paint. (NOV 1996)
452.236-72 Use of Premises. (NOV 1996)
452.236-73 Archaeological or Historic Sites. (FEB 1988)
452.236-74 Control of Erosion, Sedimentation, and Pollution. (NOV 1996)
452.236-76 Samples and Certificates. (FEB 1988)
I.2 Affirmative Procurement of Biobased Products under Service and Construction Contracts, FAR
52.223-2 (SEP 2013)
(a) In the performance of this contract, the contractor shall make maximum use of biobased products that are United States Department of Agriculture (USDA)-designated items unless—
(1) The product cannot be acquired—
(i) Competitively within a time frame providing for compliance with the contract performance schedule;
(ii) Meeting contract performance requirements; or
(iii) At a reasonable price.
(2) The product is to be used in an application covered by a USDA categorical exemption (see 7 CFR 3201.3(e)). For example, all USDA-designated items are exempt from the preferred procurement requirement for the following:
(i) Spacecraft system and launch support equipment.
(ii) Military equipment, i.e., a product or system designed or procured for combat or combat-related missions.
(b) Information about this requirement and these products is available at http://www.biopreferred.gov.
(c) In the performance of this contract, the Contractor shall—
(1) Report to http://www.sam.gov, with a copy to the Contracting Officer, on the product types and dollar value of any USDA-designated biobased products purchased by the Contractor during the previous Government fiscal year, between October 1 and September 30; and
(2) Submit this report no later than—
(i) October 31 of each year during contract performance; and
(ii) At the end of contract performance.
I.3 Buy American—Construction Materials, FAR 52.225-9 (MAY 2014)
(a) Definitions. As used in this clause—
“Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is—
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
“Component” means an article, material, or supply incorporated directly into a construction material.
“Construction material” means an article, material, or supply brought to the construction site by the
Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of http://www.biopreferred.gov/ http://www.sam.gov/ http://www.acquisition.gov/far/current/html/Subpart%202_1.html#wp1145508 http://uscode.house.gov/
Trinity Center Boat Launch Improvement Project Page 17 of 36 those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
“Cost of components” means—
(3) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(4) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
“Domestic construction material” means—
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if—
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
“Foreign construction material” means a construction material other than a domestic construction material.
“United States” means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy
American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The
Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows: NONE
[Contracting Officer to list applicable excepted materials or indicate “none”]
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that—
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute.
(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including—
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and http://uscode.house.gov/ http://uscode.house.gov/ http://www.acquisition.gov/far/current/html/Subpart%2012_5.html#wp1077123
Trinity Center Boat Launch Improvement Project Page 18 of 36
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the
Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the
Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting
Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
FOREIGN AND DOMESTIC CONSTRUCTION MATERIALS PRICE COMPARISON
Construction Material Description Unit of Measure Quantity Price (Dollars)*
Item 1:
Foreign construction material _______ _______ _______
Domestic construction material _______ _______ _______
Item 2: _______ _______ _______
Foreign construction material _______ _______ _______
Domestic construction material
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.]
[Include other applicable supporting information.]
[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]
I.4 Bid Guarantee, FAR 52.228-1 (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds -
(1) To unsuccessful bidders as soon as practicable after the opening of bids; and
(2) To the successful bidder upon execution of contractual documents and bonds (including any
Trinity Center Boat Launch Improvement Project Page 19 of 36 necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3 Million, whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
I.5 Order of Precedence—Uniform Contract Format, FAR 52.215-8 (OCT 1997)
Any inconsistency in this solicitation or contract shall be resolved by giving precedence in the following order:
(1) The Schedule (excluding the specifications)
(2) Representations and Other Instructions
(3) Contract Clauses
(4) Other Documents, Exhibits, and Attachments
(5) The Specifications
(6) Drawings
I.6 INSURANCE—WORK ON A GOVERNMENT INSTALLATION (JAN 1997), FAR 52.228-5
(a) The Contractor shall, at its own expense, provide and…
This is the start of the file's text. The full file is on GovTribe.