1._PROJECT_SPECS_TRINITYCENTER_(003).pdf

PDF 838 KB Posted

Attached to
Trinity Center Boat Launch Facility Improvement Federal contract opportunity
Solicitation number
129AC718R0004
Issued by
Department of Agriculture Forest Service R5-Pacific Southwest Region

About this file

Project Specs - Trinity Center

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page - 1 - of 74

Table of Contents

Table of Contents ....................................................................................................................................- 3 -

NOTE: SECTION 02489(01) ALUMINUM FRAME CONCRETE BOARDING FLOATS IS IN

SEPARATE DOCUMENT.

Preface.....................................................................................................................................................- 5 -

101 - Terms, Format, and Definitions.....................................................................................................- 7 -

101.01 Meaning of Terms...................................................................................................................- 7 -

101.03 Abbreviations. .........................................................................................................................- 7 -

101.04 Definitions...............................................................................................................................- 7 -

102 - Bid, Award, and Execution of Contract ......................................................................................- 10 -

102 Bid, Award, and Execution of Contract.....................................................................................- 10 -

103 - Scope of Work .............................................................................................................................- 11 -

Deletions ...........................................................................................................................................- 11 -

104 - Control of Work...........................................................................................................................- 12 -

Deletions ...........................................................................................................................................- 12 -

104.06 Use of Roads by Contractor..................................................................................................- 12 -

105 - Control of Material ......................................................................................................................- 13 -

105.02 Material Sources. ..................................................................................................................- 13 -

105.02(a) Government-provided sources..........................................................................................- 13 -

105.05 Use of Material Found in the Work. .....................................................................................- 13 -

106 - Acceptance of Work ....................................................................................................................- 14 -

106.07 Delete ....................................................................................................................................- 14 -

107 - Legal Relations and Responsibility to the Public........................................................................- 15 -

107.05 Responsibility for Damage Claims. ......................................................................................- 15 -

107.06 Contractor’s Responsibility for Work...................................................................................- 15 -

107.09 Legal Relationship of the Parties. .........................................................................................- 15 -

107.10 Environmental Protection. ....................................................................................................- 15 -

107.02 Protection and Restoration of Property and Landscape....................................................- 16 -

108 - Prosecution and Progress.............................................................................................................- 17 -

108 Delete. ........................................................................................................................................- 17 -

109 - Measurement and Payment..........................................................................................................- 18 -

109 Deletions ....................................................................................................................................- 18 -

Page - 2 - of 74

109.02 Measurement Terms and Definitions....................................................................................- 18 -

151 - Mobilization.................................................................................................................................- 19 -

151.01 Description............................................................................................................................- 19 -

155 - Schedules for Construction Contracts .........................................................................................- 20 -

155 Delete. ........................................................................................................................................- 20 -

203 - Removal of Structures and Obstructions .....................................................................................- 21 -

203.01 Description............................................................................................................................- 21 -

301 - Untreated Aggregate Courses ......................................................................................................- 22 -

301.05 Compacting ...........................................................................................................................- 22 -

301.09 Measurement.........................................................................................................................- 22 -

409 - Asphalt Surface Treatment ..........................................................................................................- 23 -

409.02 Material. ................................................................................................................................- 23 -

409.06 Weather. ................................................................................................................................- 23 -

409.10 Fog Seal. ...............................................................................................................................- 23 -

Table 409-4 Sampling and Testing Requirements............................................................................- 23 -

552 - Structural Concrete ......................................................................................................................- 24 -

SPECIAL PROJECT SPECIFICATION..........................................................................................- 24 -

SPECIAL PROJECT SPECIFICATION..........................................................................................- 25 -

601 - Minor Concrete............................................................................................................................- 31 -

601.01................................................................................................................................................- 31 -

Table 601-2. Sampling and Testing Requirements

628 – Cofferdams and Dewatering

702 ASPHALT Material .............................................................................................................- 39 -

718 - Traffic Signing and Marking Material.........................................................................................- 40 -

718.05 Aluminum Panels..................................................................................................................- 40 -

SECTION 01061 - REGULATORY REQUIREMENTS GENERAL.................................................- 42 -

SECTION 01300 – SUBMITTALS......................................................................................................- 44 -

SECTION 02115 - SIGNS....................................................................................................................- 46 -

SECTION 02073 ABANDON VAULT TOILET ..............................................................................- 47 -

SECTION 02220 - STRUCTURAL EXCAVATION AND BACKFILL............................................- 48 -

SECTION 03100 – CONCRETE FORMWORK .................................................................................- 50 -

SECTION 03200 – REINFORCING STEEL.......................................................................................- 52 -

Page - 3 - of 74

SECTION 03300 – CONCRETE..........................................................................................................- 55 -

SECTION 05501 – METAL FABRICATED RAIL SYSTEM............................................................- 57 -

SECTION 06100 – CARPENTRY.......................................................................................................- 63 -

SECTION 10400-1 – RECREATION SIGNS & PAD ........................................................................- 68 -

GENERAL............................................................................................................................................- 68 -

SECTION 10601- TRASH RECEPTACLE & CONCRETE PADS ...................................................- 70 -

SECTION 13120 PRECAST CONCRETE COMFORT STATION...................................................- 72 -

SECTION 16410 SOLAR LIGHT.......................................................................................................- 74 -

NOTE: SECTION 02489(01) ALUMINUM FRAME CONCRETE BOARDING FLOATS IS IN

SEPARATE DOCUMENT.

Page - 4 - of 74

Preface

Delete all but the first paragraph and add the following:

Preface_wo_03_15_2004_m

The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National

Forest System Roads.

Page - 5 - of 74

101 - Terms, Format, and Definitions

101.01 Meaning of Terms

101.00_nat_us_07_25_2005

101.01_nat_us_01_22_2009

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

101.03_nat_us_06_16_2006

101.03 Abbreviations.

Add the following to (a) Acronyms:

AFPA

MSHA

NIST

NESC

WCLIB

American Forest and Paper Association

Mine Safety and Health Administration

National Institute of Standards and Technology

National Electrical Safety Code

West Coast Lumber Inspection Bureau

Add the following to (b) SI symbols:

mp Milepost ppm Part Per Million

101.04_nat_us_03_29_2007

101.04 Definitions.

Delete the following definitions and substitute the following:

Bid Schedule--The Schedule of Items.

Bridge--No definition.

Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.

Culvert--No definition.

Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line

(including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2)

Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Add the following:

Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition

Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.

Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest

Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.

Forest Service--The United States of America, acting through the Forest Service, U.S. Department of

Agriculture.

http://www.nist.gov/

Page - 6 - of 74

Neat Line--A line defining the proposed or specified limits of an excavation or structure.

Page - 7 - of 74

Pioneer Road--Temporary construction access built along the route of the project.

Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road

Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.

Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

Page - 8 - of 74

Figure 101-1—Illustration of road structure terms.

Page - 9 - of 74

102 - Bid, Award, and Execution of Contract

102 Bid, Award, and Execution of Contract

Delete Section 102 in its entirety.

102.00_nat_us_02_16_2005

Page - 10 - of 74

103 - Scope of Work

Deletions

Delete all but subsection 103.01 Intent of Contract.

103.00_nat_us_02_16_2005

Page - 11 - of 74

104 - Control of Work

Deletions

Delete Sections 104.01, 104.02, and 104.04.

104.00_nat_us_06_16_2006

Add the following subsection:

104.06 Use of Roads by Contractor

104.06_nat_us_02_17_2005

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road

Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

Page - 12 - of 74

105 - Control of Material

105.02 Material Sources.

105.02_nat_us_01_18_2007

105.02(a) Government-provided sources.

Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.

105.05_nat_us_05_12_2004

105.05 Use of Material Found in the Work.

Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:

Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.

Page - 13 - of 74

106 - Acceptance of Work

106.07 Delete

Delete subsection 106.07.

106.07_nat_us_05_11_2004

Page - 14 - of 74

107 - Legal Relations and Responsibility to the Public

107.05 Responsibility for Damage Claims.

Delete the entire subsection.

107.05_nat_us_05_11_2004

107.06 Contractor’s Responsibility for Work.

Delete the following from the first paragraph.

“except as provided in Subsection 106.07”.

107.09 Legal Relationship of the Parties.

Delete the entire subsection.

107.06_nat_us_06_16_2006

107.09_nat_us_06_16_2006

107.10 Environmental Protection.

107.10_nat_us_06_16_2006

Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.

Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:

Description of the item spilled (including identity, quantity, manifest number, and other identifying information).

Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.

Exact time and location of spill including a description of the area involved.

Containment procedures.

Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.

Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.

When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.

The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with

Federal, state, and local laws and regulations.

Page - 15 - of 74

107.10_05_us_05_04_2007

Page - 16 - of 74

107.02 Protection and Restoration of Property and Landscape

Meet the requirements chapters 10, 11, and 12.2 in their entirety of “Water Quality Management for

National Forest System Lands in California Best Management Practices” dated September 2000

Page - 17 - of 74

108 - Prosecution and Progress

108 Delete.

Delete Section 108 in its entirety.

108.00_nat_us_02_16_2005

Page - 18 - of 74

109 - Measurement and Payment

109 Deletions

Delete the following entire subsections:

109.06 Pricing of Adjustments.

109.07 Eliminated Work.

109.08 Progress Payments.

109.09 Final Payment.

109.00_nat_us_02_17_2005

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Add the following:

109.02_nat_us_06_16_2006

Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

Change the following:

“(b) Cubic yard” to “(c) Cubic yard”.

Add the following definition:

(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.

Page - 19 - of 74

151 - Mobilization

151.01 Description

Add the following at the end of the last sentence:

151.01_0105_us_05_04_2007

“Work also includes cleaning of all equipment used at the project site. Clean all construction equipment prior to entry on the project site. Remove all dirt, plant parts and material that may carry noxious weed seeds into the area. Only construction equipment inspected by the Forest Service will be allowed to operate within the project area. Treat subsequent move-ins of equipment the same as the initial move-in.

Clean truck beds and dump boxes hauling to the project site prior to entering the work area.”

Page - 20 - of 74

155 - Schedules for Construction Contracts

155 Delete.

Delete Section 155 in its entirety.

155.00_nat_us_05_11_2004

Page - 21 - of 74

203 - Removal of Structures and Obstructions

203.01 Description.

Delete and replace with the following:

203.01_nat_us_02_25_2005

This work consists of disposing of construction slash and debris, salvaging, removing, and disposing of buildings, fences, structures, pavements, culverts, utilities, curbs, sidewalks, and other obstructions.

Page - 22 - of 74

301 - Untreated Aggregate Courses

301.05 Compacting

Delete and replace with the following:

301.05_nat_us_05_17_2005

Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and all places not accessible to the roller, compact the material with approved tampers or compactors.

Compact the aggregate using one of the following methods as specified:

Compaction A. Operating spreading and hauling equipment over the full width of the travelway.

Compaction B. Operate rollers and compact as specified in Subsection 204.11(a)(1).

Compaction C. Moisten or dry the aggregate to a uniform moisture content between 5 and 7 percent based on total dry weight of the mixture. Operate rollers and compact as specified in

Subsection 204.11(a)(1).

Compaction D. Compact to a density of at least 95 percent of the maximum density, as determined by AASHTO T 99, method C or D.

Compaction E. Compact to a density of at least 96 percent of the maximum density, as determined by the Modified Marshall Hammer Compaction Method (available upon request from USDA

Forest Service, Regional Materials Engineering Center, P.O. Box 7669, Missoula, MT 59807).

Compaction F. Compact to a density of at least 95 per-cent of the maximum density, as determined by AASHTO T 180, method C or D.

Compaction G. Compact to a density of at least 100 percent of the maximum density as determined by the Modified Marshall Hammer Compaction Method (available upon request from

USDA Forest Service, Regional Materials Engineering Center, P.O. Box 7669, Missoula, MT

59807).

For all compaction methods, blade the surface of each layer during the compaction operations to remove irregularities and produce a smooth, even surface. When a density requirement is specified, determine the in place density and moisture content according to AASHTO T 310 or other approved test procedures.

301.09_nat_us_07_07_2005

301.09 Measurement.

Replace the second paragraph with the following:

Measure aggregate by cubic yard compacted in place when payment is by contract quantities.

Page - 23 - of 74

409 - Asphalt Surface Treatment

409.02 Material.

409.02_shasta-t_06_2_2011

When designated, conform to applicable State department of transportation asphalt cement or emulsified asphalt requirements.

If Option # 2 Parking lot seal coat is awarded supply the Government with a copy of the manufactures data sheet for seal coat material prior to applying. Apply according to manufactures recommendations on data sheet.

409.06_nat_us_05_12_2004

409.06 Weather.

Delete the first paragraph and replace with the following:

Apply surface treatments with aggregate only when ambient air and surface temperatures are above 60

°F and rising in the shade, when the weather is not foggy or rainy, and when rain is not forecast for at least 24 hours after application.

409.08_nat_us_06_21_2005

409.10 Fog Seal.

Add the following to the first paragraph:

Dilute by adding an equal amount of water to the emulsified asphalt. Do not cut the emulsified asphalt more than once.

409.13_nat_us_05_13_2004 Table 409-4 Sampling and Testing Requirements.

Delete the last cell (4th) under Sampling Frequency and replace with the following:

1 per tanker truck and 1 per trailer

Delete the 2nd and 3rd cell under Type of Acceptance and replace with the following:

Measured and tested for conformance (106.04)

Page - 24 - of 74

552 - Structural Concrete

SPECIAL PROJECT SPECIFICATION

Section 552. — STRUCTURAL CONCRETE

552.11_05_14_06_01_2005

552.11 Handling and Placing Concrete.

NOTE: This is The Department of Boating and Waterways recommended procedure to produce the required concrete finish. It is up to the Contractor themselves to determine the best way to produce the required concrete finish.

(f) V-Groove Construction Procedure

The consistent experience of the engineering staff of the Department of Boating and Waterways is that the successful accomplishment of satisfactory V-grooves by contractors is a continuing problem. It is not a difficult task, but contractors are consistently overconfident of their skills, abilities, and past experience of finishing concrete on level ground. However, finishing V-grooves on a 12%-15% slope is another matter.

Consequently, it is strongly advised that contractors involved in V-groove finish work on launching ramps pay close attention to the following recommendations:

a. Use a concrete crew of not less than 5 workers including at least 2 finishers.

b. All tools, supplies, equipment and materials are to be on site before beginning placement of concrete.

c. Place concrete and finish one launching lane at a time, maximum width of 15' (up to

20' on single lane ramps).

d. Start early in the day with attention to:

time of year altitude haul distance temperature winds design mix weather forecast climate size of crew

e. Start concrete placement at bottom and work uphill. Some contractors insist on starting at the top and working downhill.

f. Limit placement of concrete to the following maximum rates per hour:

8-10 cu.yd./hour for 6” thick sections

11-13 cu.yd/hour for 8” thick sections

This will result in a production rate of about 30-35 linear feet of 15’ wide launching lane per hour, or an area of about 450-525 square feet.

Page - 25 - of 74

g. Adequately vibrate the concrete every 12” on centers with internal vibrators to eliminate air pockets and to insure full contact with the rebar and construction forms.

Do not over-vibrate as the aggregate will settle to the bottom and waken the launching ramp slab.

h. Screed the wet concrete to the top of the forms using a vibratory power screed, working uphill via hand or gasoline powered winches. Do not attempt to manually drag the screed uphill!

i. Beginning at the appropriate lower corner, begin forming V-grooves at 60 from the longitudinal axis of the ramp. Initially, there will be a triangular area at the very bottom of the ramp within which it will be awkward to use the V-groove tool. However, after progressing up the ramp to the point where the V-groove tool can be used over the full width of the launching lane, the grooving operation will be much easier. Care must be taken to insure the 60 angles on the front and rear of the V- groove tool fit snugly against the forms on each pass of the tool across the wt concrete. It is often helpful to fabricate a couple of smaller V-groove hand tools to use in the tight corners at the top and bottom of the ramp. The offset from side to side of a 15’ wide lane will be about

8’-8”. The use of a straight 20’ length of 2”x6” lumber will be of great assistance in maintaining the correct alignment and provides a guide for running the V-groove tool across the wet concrete. The diagonal distance across the launching lane will be about

17’-4”. When done properly, crisp V-grooves can be formed with only one or two passes of the tool.

j. Vibrate, screed and V-groove one hourly placement of concrete before allowing the next placement. If unexpected delays occur between hourly placements due to equipment problems, traffic, etc., leave the rough edge along the upper side of the last placement generally along the same 60 alignment of the V-grooves. This will eliminate most of the problems of trying to finish both “old” and “new” concrete on the same pass of the finish tool.

SPECIAL PROJECT SPECIFICATION

Section 552. — STRUCTURAL CONCRETE

552.16_05_14_06_01_2005

552.16 Finishing Formed Concrete Surfaces.

(h) Class 8 — V-Groove Launching Ramp Finish.

NOTE: This is The Department of Boating and Waterways recommended procedure to produce the required concrete finish. It is up to the Contractor themselves to determine the best way to produce the required concrete finish.

1. V-grooves are to be 1" x 1", and aligned at 60o to the longitudinal axis of the launching ramp. Larger grooves are sometimes used but are more difficult to walk on. Under no

Page - 26 - of 74 circumstances shall the grooves exceed 1-1/2".

2. A V-groove finish will not only provide good traction, but will also assist in "cleaning" the launching ramp surface in response to boat wakes, wind and storm waves, and rainwater running down the ramp. Sand, soil and other debris will tend to be carried down and off the sides of the launching lanes and launching ramp.

V-Groove Detail

V-Groove Alignment

Herringbone V-Grooves

3. On wide, multiple lane launching ramps, it is advantageous to alternate the direction of the

V-grooves from lane to lane, thus forming a "herringbone" pattern. This provides a distinct permanent delineation of the launching lanes. Changes in the direction of the

Page - 27 - of 74

V-grooves should never be made except at launching lane lines.

B. V-groove tool design varies in size, shape, weight, and material used for fabrication. Steel, aluminum and wood tools have been used successfully. However, it appears that aluminum is perhaps the best choice in consideration of the tool's size, weight, and the ease and speed with which a finisher can produce crisp, straight V-grooves in wet concrete.

1. V-Groove Tool Design , for a tool to be used to finish large areas of cast-in-place concrete.

a. Weight: 22# to 25#

b. Length: 24" to 30"

c. Width: 20" to 24"

d. Material:1"x 1" x 3/16" aluminum angle

e. Fabrication: Cut, shape, weld and grind smooth one end (see commentary below) of

14 to 17 pieces of aluminum angle to resemble the bow of a boat. Assemble the pieces to form a tool 20" to

24" wide. Fit them snugly together, slightly staggering each piece so as to form a 60o angle on both the leading and following edges so that the tool will fit snugly against the forms on each side of the launching lane. Weld the angles to cross pieces of larger angle or channel to hold the tool together. Provide an appropriate means of attaching a handle. The handle assembly for a "Fresno" float works well. If a

"herringbone" finish is required on a multiple lane launching ramp, a second "mirror image" tool must be made in order to form V-grooves in alternating directions.

f. Commentary: Contractors have suggested cutting the trailing edge of the tool square rather than bow shaped. They claim that the wet concrete breaks free of the trailing edge much sharper and cleaner than it does from the gradual release from a bow shape. Also, some contractors prefer to build lighter tools and add

Page - 28 - of 74 field weights as required to get the best results and production.

552.02_nat_us_06_20_2007

Material

552.02 Add the following:

Anchor bolts 717.01

Dowels 717.17

Epoxy resin adhesives 725.21

High strength non-shrink grout 701.02

Mortar 701.02

Portland cement 701.01

Sealants, fillers, seal, and sleeves 712.01

Construction Requirements

552.03 Composition (Concrete Mix Design).

Specifications for launching ramp concrete should include the following:

6 sack concrete 3/4”maximum aggregate

4,000 psi compressive strength 5% air entrainment

Type II cement 3” to 4” slump

These specifications have been developed over a period of 20 years and are based on actual construction experience on dozens of launching ramp projects. They provide a concrete mix that is easy to work, will readily take and hold a V-groove finish, and will result in a strong, durable, functional launching ramp with a long service life. Therefore, any deviation from these specifications should be done carefully and thoughtfully.

Note: For more information on Boat Ramp construction refer to the Handbook: Layout, Design and

Construction For Small Craft Boat Launching Facilities at the following address:

www.dbw.ca.gov/PDF/LaunchFac/LRamps.pdf

Delete the first paragraph and replace with the following:

Submit written concrete mix designs for approval at least 30 calendar days before production.

Add the following under the list of items to be included in the mix design submittal:

(y) Evaluation of potential aggregate reactivity http://www.dbw.ca.gov/PDF/LaunchFac/LRamps.pdf

Page - 29 - of 74

552.08 Delivery.

(a) Truck mixer/agitator.

Do not exceed 130 total revolutions at mixing speed, including both initial mixing and remixing.

Do not exceed 300 total revolutions, including both mixing and agitating speed.

552.09 Quality Control of Mix.

Add the following after the first paragraph:

At least 2 weeks prior to the start of concrete placement operations, arrange a pre-concrete placement conference. Coordinate attendance with the CO and any applicable subcontractors. Be prepared to discuss and/or submit the following:

(1) Proposed concrete placement schedule.

(2) Review approved concrete mix design and determination of batch weights.

(3) Discuss Section 153, Contractor Quality Control, minimum frequency schedule for process control sampling and testing (to be performed by the Contractor).

(4) Discuss batching, mixing, placing, and curing requirements.

(5) Discuss Subsections 106.03, Certification, and 106.05, Statistical Evaluation of Material for Acceptance.

552.11 Handling and Placing Concrete.

Add the following after the forth paragraph:

Use an approved form release agent to produce a minimum of staining, air holes, and hydration discoloration.

552.12 Construction Joints.

Add the following at the end of the first paragraph:

Provide form cleanout ports at construction joints.

552.18 Loads on New Concrete Structures.

Page - 30 - of 74

Add the following paragraph:

Do not allow public traffic on the bridge until approaches, curbs, and bridge rail are completed and in-place. Erect barricades at each end of bridge spans when road approaches allow vehicles to drive directly onto the structure.

Page - 31 - of 74

601 - Minor Concrete

Delete the entire specification and replace it with the following:

601.00_nat_us_02_27_2007

Description

This work consists of constructing minor concrete structures.

Material

Conform to the following Subsections:

Air-entraining admixtures 711.02

Chemical admixtures 711.03

Coarse aggregate 703.02

Concrete coloring agents 711.05

Curing material 711.01

Fine aggregate 703.01

Fly ash 725.04

Hydraulic Cement 701.01

Joint fillers 712.01

Precast concrete curbing 725.06

Precast concrete units 725.11

Reinforcing steel 709.01

Structural steel 717.01 Water 725.01

Concrete Composition. Use the designated concrete composition:

(a) Method A. Submit a mix design showing the proposed masses of aggregate, water, and cement per cubic yard of concrete a minimum of 7 days prior to beginning placement. Proportion the cement, aggregate, and water to obtain concrete with good workability.

Composition of Minor Structure Concrete

Property Specification Test Method

Slump 3-4in AASHTO T 119

Air content 5 percent AASHTO T 152 or T 196

28-day compressive strength 4000 psi AASHTO T 23 and T 22

(b) Method B. Submit the following information a minimum of 7 days prior to beginning placement:

(1) Type, grading, and sources of aggregate.

(2) Type and source of cement, blended cement, or fly ash.

(3) Saturated surface dry weights of the fine and coarse aggregate in pounds per cubic yard of concrete.

(4) Weight of mixing water in pounds per cubic yard of concrete.

(5) Weight of cement in pounds per cubic yard of concrete.

Page - 32 - of 74

(6) Admixture type, quantity, and certification by manufacturer.

(7) Air content.

(8) Slump.

(9) 28-day compressive strength.

Furnish concrete containing not less than 680 pound of cement per cubic yard. Ensure that slump is 4 inches or less, as determined by AASHTO T 119.

(c) Method C. Make the concrete using a dry, preproportioned, blended, and bagged mix meeting the requirements of ASTM C 387 and mixed at the jobsite according to the manufacturer’s recommendations.

(d) Fly Ash- or Pozzolan-Modified Concrete. Fly ash may be substituted for cement at the rate of 20 ounces of fly ash per 16 ounces of Portland cement. After substitution, reduce the design aggregate volumes by an amount equal to the net increase in volume of the combined cement and fly ash. Replace no less than 10 percent and no more than 20 percent of the weight of Portland cement required with fly ash at the above rate. For purposes of controlling the maximum water/cement ratio of 0.49, make the water/cement ratio for fly-ash-modified concrete the ratio of the weight of water to the combined weights of Portland cement and 60 percent of the weight of the fly ash.

Extend the standard 28-day curing period for compressive-strength tests for fly-ash modified concrete by 1 day (rounded to the nearest whole day) for each 1.5 percent of Portland cement replaced with fly ash at the selected rate. (Example: If the maximum of 20 percent cement is replaced, the curing period for cylinders is 41 days.)

Page - 33 - of 74

General. Perform excavation and backfill work according to Section 209. When concrete is cracked, spalling, or scaling, remove concrete to the nearest joint.

Design and construct forms that are free of bulge and warp and allow for removal without injuring the concrete. When concrete contains a retarding admixture, fly ash, or other pozzolan replacement for cement, design the forms for a lateral pressure equal to that exerted by a fluid with a mass of 2.5 ton per cubic yard.

Use wood, metal, or other suitable material for forms. Keep forms clean and coat with a form release agent or form oil before placing concrete.

Place and fasten reinforcing steel according to Subsection 554.08.

Placing Concrete. Place all reinforcing steel in position and ensure that it is securely held in place by approved supports during placing of concrete. Do not place concrete until the grading, forms, and steel reinforcements have been inspected and approved by the CO. Provide 24 hours written notice prior to placement of any concrete.

Place reinforcing steel according to Section 554.

Discharge all concrete prepared using methods A and B into the forms within the time limits shown in table 601-1. These time limits are based on jobsite ambient air temperature, cement type, and admixture used. Begin counting time from when the cement is introduced into the aggregate. Discharge concrete prepared using method C into the forms within 1-1/2 hours after introducing water to the mixture. Do not retemper concrete. When required cement must be added to the mixer at the jobsite. Do not mix or place concrete when the temperature is, or is expected to be, less than 40 °F unless adequate provisions are made to protect the concrete.

Place concrete to avoid segregation. Use high-frequency internal vibrators for consolidating concrete in the forms. Operate vibrators to produce concrete free of voids, but do not hold them in one place long enough to result in segregation or formation of laitance on the surface.

Method C concrete may be rodded instead of internally vibrated as necessary to remove voids.

Do not use aluminum pipe, conduit, or troughs for transporting concrete. When concrete is pumped, take samples from the discharge stream at the point of placement. Do not apply water to plastic concrete surfaces during finishing operations.

Page - 34 - of 74

Table 601-1 Concrete discharge time limits.

Cement Type With and Without Admixtures Time limit (hour)

< 85 oF1 >85 oF1

Type I, IA, II, or IIA 2.0 1.

Type I, IA, II, or IIA with water reducing or retarding admixture

3.0 2.

Type III 1.5 1.

Type III with water reducing or retarding admixture 2.0 1.

Ambient air temperature.

Curing Concrete. Cure concrete a minimum of 7 days. If high early strength cement is used, cure concrete a minimum of 3 days. Cure according to Subsection 552.15. Finish according to Subsection

552.16 class 2 rubbed finish.

Acceptance. See Table 601-2 for sampling and testing requirements. Material for minor concrete structures including reinforcing steel, and structural steel for minor structures will be evaluated under

Subsections 106.03. The concrete mixture's slump, air content, unit mass, and temperature will be evaluated under Subsections 106.02 and 106.04. See Tables 552-1 and 552-2 for specification limits.

Excavation and backfill will be evaluated under Section 209.

Construction of minor concrete structures will be evaluated under Subsections 106.02 and 106.04.

Measurement

Measure the Section 601 items listed in the bid schedule according to Subsection 109.02.

Payment

The accepted quantities will be paid at the contract price per unit of measurement for the Section 601 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this

Section. See Subsection 109.05.

The concrete lump sum item will be prorated based on the progress of the work under this Section.

601.02_nat_us_03_02_2005

Table 601-2. Sampling and Testing Requirements.

Material or

Product

Type of

Acceptance

(Subsection)

Characteristic Category Test Methods

Specifications

Sampling

Frequency

Point of

Sampling

Split

Sample

Reporting

Time

Concrete Measured Unit Weight - AASHTO T 121 One set per Point of - Upon and tested 32 cubic discharge completion for yards but of project conformance not less

(106.04) than one per day

Air content - AASHTO T 152 “ “ - “ or AASHTO T

Slump - AASHTO T 119 “ “ - “ Temperature - Field Measured “ “ - “ Compressive - AASHTO T 22 & “ Discharge - “ strength AASHTO T 23 stream at point of placement

628 – Cofferdams and Dewatering Description

This work consists of designing, constructing, maintaining, dewatering, removing and disposing of cofferdams, which are necessary for construction of the structure. A four foot maximum depth will be required.

General. At locations where proposed construction work is at a lower elevation than the elevation of the lake or ground water at the time of performing the work, suitable cofferdams (protection dikes or other such measures) and a dewatering system, shall be constructed by the

Contractor. The locations of the cofferdams and the dewatering system shall be selected by the Contractor and presented in a plan submitted to the Government for review. The construction area shall be dewatered prior to commencement of the work and the water level shall be kept below all proposed construction work during construction operations. The cofferdams shall be constructed of materials that will provide a safe and reasonably dry work area.

The Contractor shall submit a Cofferdam and Dewatering Plan to the Government at least 30 days prior to the start of dewatering for the

Governments review. Review by the Government does not constitute any liability by the Government. The cofferdam and dewatering plan shall present, at a minimum, the following information:

1. The locations of cofferdams and details concerning the cofferdams’ materials and method of installation.

2. Locations and details regarding the dewatering system including, but not limited to, pumps, sumps, well points, dewatering wells, ditches, piping, electrical sources, and discharge points.

3. The Contractor’s dewatering system shall approximately uniformly draw down the groundwater level across the site. As such, well points or dewatering wells shall be spaced at no more than 35-foot center-center spacing (less as required to develop an approximate uniform drawdown).

4. Dewatering calculations, well screen sizes, and filter pack gradation sizes. Well screens and filter pack material shall be properly sized so as to prevent piping or removal of embankment materials during dewatering operations. Gradation results from soil borings performed at the site are attached to this specification section for Contractor reference.

5. Testing means for discharge water to ensure that piping or removal of embankment materials during dewatering operations is not occurring.

6. Backup power generating devices (e.g. diesel generators) as required to operate dewatering pumps in the event that electrical service becomes unavailable (e.g. during power outages).

7. Equipment and procedures necessary to promptly notify the Contractor if electrical service becomes unavailable. Notification shall be required regardless of the time of day.

8. Means, methods, and procedures necessary to switch over to the backup power generating devices in a timely manner as required to prevent damage to the embankment in the event that the dewatering system should fail to operate.

9. Erosion and Sediment Control structures to prevent any erosion on any adjacent areas.

Responsibility for Damage or Destruction as Result of Flooding.

The Contractor shall be responsible for any and all damage that may occur at the site as a result of floods, and shall replace or restore damaged structures or features of work, either of a permanent or temporary character, at no additional cost to the Government. The

Contractor shall have no basis of claims because floods occurring during the construction period were unprecedented in magnitude or frequency.

The design, construction, and performance of the cofferdams are the sole responsibility of the Contractor. By designing the cofferdams and submitting the Dewatering Plans for the project, the Contractor has indicated that he has observed the sites, has reviewed the subsurface conditions, and has accounted for those conditions in the design and performance of the cofferdams and the dewatering systems. Any and all damages associated with the installation, performance, or removal of the cofferdams and dewatering systems are the responsibility of the

Contractor and shall be repaired by the Contractor at no cost to the Government.

During dewatering operations the Contractor shall maintain, on-site, backup power generating devices (e.g. diesel generators) as required to operate dewatering pumps in the event that electrical service becomes unavailable (e.g. during power outages). The Contractor shall also have in-place the means, methods, and procedures necessary to switch over to the backup power generating devices in a timely manner as required to prevent damage to the embankment in the event that the dewatering system should fail to operate.

Upon completion of dewatering operations, all dewatering equipment shall be removed from the site.

Measurement

628.03 Measure the Section 628 items listed in the bid schedule according to Subsection 109.02 and the following as applicable.

Payment

628.04 The accepted quantities will be paid at the contract price per unit of measurement for the Section 628 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this section. See subsection 109.05.

Page - 39 - of 74

702 ASPHALT Material

702.01 Delete the first sentence add the following:

Performance graded (PG) asphalt binder shall conform to the following Standard Specifications, State of California:

Performance Graded Asphalt Binder

Specification

Grade

Property AASHTO

Test

Method

PG

58-22a

64-10

64-16

64-28

70-10

Original Binder

Flash Point, Min. °C T48 230 230 230 230 230

Solubility, Min. % b T44 99 99 99 99 99

Viscosity at 135°C, c Max., Pa·s

T316

3.0

Dynamic Shear, Test Temp. at 10 rad/s, °C

Min. G*/sin(delta), kPa

T315

1.00

RTFO Test e, Mass Loss, Max., %

T240

RTFO Test Aged Binder

Dynamic Shear, Test Temp. at 10 rad/s, °C

Min. G*/sin(delta), kPa

T315

2.20

Ductility at 25°C Min., cm

T51

PAV f Aging, Temperature, °C

R28

RTFO Test and PAV Aged Binder

Dynamic Shear, Test Temp. at 10 rad/s, °C Min. G*sin(delta), kPa

T315

22 d

31 d

28 d

22 d

34 d

Creep Stiffness, Test Temperature, °C Max. S-value, MPa

Min. M-value

T313

-12

0.300

-6

-18

0.300

Notes:

a. For use as asphalt rubber base stock for high mountain and high desert area.

b. The Engineer will waive this specification if the supplier is a Quality Supplier as defined by the Department's "Certification Program for Suppliers of Asphalt."

c. The Engineer will waive this specification if the supplier certifies the asphalt binder can be adequately pumped and mixed at temperatures meeting applicable safety standards.

d. Test the sample at 3°C higher if it fails at the specified test temperature. G*sin(delta) shall remain 5000 kPa maximum.

e. "RTFO Test" means the asphaltic residue obtained using the Rolling Thin Film Oven

Test, AASHTO Test Method T240 or ASTM Designation: D 2872.

f. "PAV" means Pressurized Aging Vessel.

Page - 40 - of 74

718 - Traffic Signing and Marking Material

718.05 Aluminum Panels

Delete the third paragraph and replace with the following:

718.05_nat_us_08_05_2009

Clean, degrease and properly prepare the panels according to methods recommended by the sheeting manufacturer. Conversion coatings will conform to ASTM B-921 or ASTM B-449.

Page - 41 - of 74

DIVISION 1 - GENERAL REQUIREMENTS

DIVISION 1 – GENERAL REQURIEMENTS

SECTION 01061 - REGULATORY REQUIREMENTS GENERAL

1.01 SCOPE

A. This section describes the codes and standards which apply to the work in this contract.

Additional codes and standard may be cited in sections to which they apply.

1.02 CODES AND STANDARDS

A. The following codes and standards shall apply to the work in this contract:

1. Uniform Building Code (UBC), 1997 Edition

2. Uniform Plumbing Code (UPC), 1997 Edition

3. Uniform Mechanical Code (UMC), 1997 Edition

4. National Electrical Code (NEC), 1999 Edition

5. Uniform Federal Accessibility Standards (UFAS), 1999 Edition.

6. American Institute of Steel Construction (AISC) 9th Edition.

7. American Iron and Steel Institute (AISI) 1986 Edition.

8. American Society for Testing and Materials (ASTM) latest edition.

9. Metal Buildings Manufacturers Association (MBMA).

10. Underwriter's Laboratories, (UL)

11. Architectural Aluminum Manufacturers Association (AMMA)

12. Steel Door Institute, Standard 100

13. American Water Works Association (AWWA)

14. National Fire Protection Association (NFPA)

15. Uniform Fire Code (UFC) 2005 Edition

16. American Gas Association (AGA)

B. Unless otherwise specified in this contract, reference to a specific standard or specification shall mean the latest edition or amendment in affect on the date of the invitation to bid.

1.03 DEFINITIONS

A. Administrative Authority as used in the Uniform Mechanical Code, the Uniform Plumbing

Code and the National Electrical Code will be the Government.

B. Building Official as used in the Uniform Fire Code, Uniform Building Code and the

Uniform Building Code Standards will be the Government.

Page - 42 - of 74

PRODUCTS

NOT APPLICABLE

EXECUTION

NOT APPLICABLE

END OF SECTION

01061

Page - 43 - of 74

DIVISION 1 – GENERAL REQUIREMENTS

SECTION 01300 – SUBMITTALS

GENERAL

1.01 SCOPE: This work consists of furnishing samples, shop drawings, pertinent data, and the submittal of technical information, including requests for substitutions. It describes the review time for submittals, shop drawings, and substitutions.

MEASUREMENT AND PAYMENT: No separate measurement or payment will be made for the work specified in this section.

REQUIREMENTS:

A. It will be the Contractor's responsibility to submit all information necessary to insure compliance. The Contractor shall submit information at least ten business days prior to beginning the associated work.

The following submittal is required following award of contract for review and/or approval pursuant to contract provisions:

Item Description Copies Required References

Cost breakdown schedule listing main types of work and total amount of contract.

1 FAR 52.232-05

Not Applicable

3.01 MANUFACTURER’S LITERATURE AND SHOP DRAWINGS

Submit (2) two copies to the C.O.

This is the start of the file's text. The full file is on GovTribe.