1291S820R0046 RFIs.pdf
PDF 108 KB Posted
- Attached to
- PRD Bldg Decommissioning Federal contract opportunity
- Solicitation number
- 1291S820R0046
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1291S820R0046 Amendment 2.pdf | ||
| Answers to 2nd set of RFI.pdf | ||
| Asbestos Sampling - Oak Grove.pdf | ||
| Att 1 Specifications.pdf | ||
| Lead Paint Sampling - Oak Grove.pdf | ||
| 1291S820R0046 PRD Bldg Decommissioning.pdf | ||
| 1291S820R0046 Amendment 1.pdf | ||
| Att 3 PRD Bldg Decommissioning Site Plans 24x36.pdf | ||
| Att 8 Past Performance Form.docx | DOCX document | |
| Att 4 Oak Grove Station Fire Plan.pdf | ||
| Att 2 PRD Bldg Decommissioning Site Plans 11x17.pdf | ||
| Att 5 Silverado_El Cariso Fire Plan.pdf | ||
| Att 6 WD 2015-5635 Rev 12 (San Diego County).pdf | ||
| Att 7 WD 2015-5645 Rev 13 (Orange County).pdf | ||
| Att 1 Specifications.pdf | ||
| 1291S820R0046 PRD Bldg Decommissioning.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1291S820R0046 PRD Building Decommissioning
RFI Answers
Questions
1. Oak Grove
a. What does “contract work area is fifty feet beyond building footprint in all directions” mean? Does this mean all improvements (concrete, asphalt, wood, etc..) within fifty feet of building shall be demolished as part of this contract?
i. The work area defines where the contractor is allowed to work.
However, not all improvements within the work area will be demolished. Only the items specified for demolition in the Contract shall be demolished.
b. Can the Forest Service provide details and reports of hazmat sampling?
i. Yes. The Forest Service will provide the results of hazmat sampling.
Please see Hazmat Sampling Attachments.
2. El Cariso Hot Shots
a. Was there a hazmat assessment completed for these structures?
i. No. The structure was built in 1994 and it is assumed that based on the date of construction, there will be no hazardous materials.
b. Are the driveways and sidewalks associated with the mobile homes supposed to be demolished as part of this contract?
i. No. Only the items specified in the Solicitation are to be demolished
(mobile home, porch, wood ramp, etc.).
3. Silverado
a. Was there a hazmat assessment completed for these structures?
i. No. The structure was built in 2002 and it is assumed that based on the date of construction, there will be no hazardous materials.