SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 SCOPE OF CONTRACT

This project requires the contractor to furnish all supplies, labor, equipment and supervision to to construct ~ 1.6 miles of four wire fence in California Park. Stream restoration projects are occurring at two locations along First Creek and the fence would be constructed around both sites. The western site would entail 0.9 miles of fence and the eastern site 0.7 miles (see attachment 3 – Locations and Maps).

Wooden fence posts will be installed every 12 feet and would be 4” * 6.5’ on straight sections and 6” * 8’ on braces.

There will be two wooden stays between posts.

The height of the four wires will be 10“(smooth wire), 18” and 26” (barbed wire), and

38” (black vinyl coated smooth wire).

A removable fenced water gap will be constructed at each of the four crossings on First

Creek.

Six additional 20’ wire gates with stays will be constructed.

An “antelope underpass” design will be constructed every 10 posts (see page 26-28 in

Colorado Parks and Wildlife “Fencing with wildlife in mind” brochure https://cpw.state.co.us/Documents/LandWater/PrivateLandPrograms/FencingWithWildlif eInMind.pdf

C.2 Project Location & Description

The project area is located in California Park which is north of Hayden, CO. From Hayden, travel north on Routt County Road 80 for approximately 22 miles to the intersection with

National Forest System Road 115. The two fence location are located approximately one and three miles west of the intersection. There is vehicle access to the portion of both fences south of

First Creek and an all-terrain vehicle will be needed to access the fence north of First Creek. See attached maps for more information.

C.3 Maps

Maps showing the vicinity and road locations are included.

C.4 Estimated Start Date & Contract Time

Start date of work: September 15, 2019

End date of work: June 26, 2020

C.5 Restrictions on Work

N/A

C.6 Licenses and Insurance - contractor’s responsibility.

C.7 Camping and Housing https://cpw.state.co.us/Documents/LandWater/PrivateLandPrograms/FencingWithWildlifeInMind.pdf https://cpw.state.co.us/Documents/LandWater/PrivateLandPrograms/FencingWithWildlifeInMind.pdf

There is no commercial lodging, or developed campgrounds in the vicinity of the project.

Dispersed camping near the site will be allowed; reference the current Motor Vehicle Use Map

(MVUM) for the Routt NF for more information.