A-10_Attachment_1_-_2018.04.16_-_Final_PS&E_Project_SCRs_(Willow_Creek_Bridge__1).pdf

PDF 3 MB Posted

Attached to
Willow Creek Bridge #1 Federal contract opportunity
Solicitation number
1282MK18R0008
Issued by
Department of Agriculture Forest Service R2-Rocky Mountain Region

About this file

Attachment 1 - Updated Special Contract Requirements

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Gunnison National Forest

Willow Creek Bridge #1

Special Contract Requirements Final PS&E Submittal

April 16, 2018

USDA Forest Service Rocky Mountain Region (R2)

Gunnison National Forest

Prepared by:

12499 West Colfax Ave Lakewood, CO 80215

303-431-6100

04/16/2018

Willow Creek Bridge #1 GMUG NFs - Gunnison RD

ATTACHMENT 1

MODIFICATION 1

1282MK18R0008

This page intentionally left blank

GMUG NFs - Gunnison RD

ATTACHMENT 1

MODIFICATION 1

USDA Forest Service Willow Creek Bridge #1 Region 2 – Rocky Mountain Region Gunnison National Forest

- 1 -

SECTION C – SPECIAL CONTRACT REQUIREMENTS

GENERAL

Scope of Work:

The work shall consist of what is shown on the plans, stated in the specifications, and the major items are summarized below:

• Establish temporary traffic control signing as required for construction of the detour.

• Install temporary erosion control measures.

• Remove trees and clear and grub as required.

• Adjust temporary traffic control signing as necessary.

• Remove existing bridge.

• Excavate for abutment grade beam.

• Place abutment stabilization.

• Place precast abutment grade beams.

• Grade portions of the channel banks under the new bridge.

• Install riprap adjacent to the new structure.

• Place precast, prestressed box girders.

• Transverse post-tension box girders.

• Construct the remaining backfill and the approach roadway embankments.

• Install the bridge rails.

• Install the approach rails.

• Install permanent traffic control signing.

• Prepare the finished grading and apply seeding.

• Remove temporary traffic control signing.

• Open the road and new bridge to traffic.

Project Location:

The bridge carries NFSR 765 over Willow Creek. The bridge is located 35 miles northeast of

Gunnison, Colorado in the Gunnison National Forest.

Willow Creek Bridge #1 GMUG NFs - Gunnison RD

ATTACHMENT 1

MODIFICATION 1

Gunnison National Forest

- 2 -

Work Procedure:

All work related to this project shall be done in accordance with all applicable OSHA and State of

Colorado regulations.

Final construction staging areas shall be designated by the CO. Security of the staging area shall be the responsibility of the Contractor.

If the contractor will be camping near the site, a permit must first be obtained. The permit request shall be made through the CO.

Referenced Specifications:

Construction shall conform to the specifications in the “Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, U.S. Customary Units” publication FP-14, 2014 Edition. This publication may be obtained from:

Headquarters, Washington D.C.

David K. Green

Construction Standards Engineer

Internet: david.green@fhwa.dot.gov

Mail: Federal Highway Administration

HFPD-3

400 Seventh Street, SW

Washington, D.C. 20590

Willow Creek Bridge #1 GMUG NFs - Gunnison RD

ATTACHMENT 1

MODIFICATION 1

Gunnison National Forest

- 3 -

SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES

ON FEDERAL HIGHWAY PROJECTS

2014 Standard

Specification

Number

Special Contract

Requirements Specification Title

101 SCR 101 Terms, Format, and Definitions

- SCR 102 Bid, Award, and Execution of Contract

103 SCR 103 Scope of Work

104 SCR 104 Control of Work

105 SCR 105 Control of Material

106 SCR 106 Acceptance of Work

107 SCR 107 Legal Relations and Responsibilities to the Public

- SCR 108 Prosecution and Progress

109 SCR 109 Measurement and Payment

151 - Mobilization

152 SCR 152 Construction Survey and Staking

153 SCR 153 Contractor Quality Control

- SCR 154 Contractor Sampling and Testing

155 SCR 155 Schedules for Construction Contracts

156 SCR 156 Public Traffic

157 SCR 157 Soil Erosion and Sediment Control

201 SCR 201 Clearing and Grubbing

203 SCR 203 Removal of Structures and Obstructions

204 SCR 204 Excavation and Embankment

207 - Earthwork Geosynthetics

208 SCR 208 Structure Excavation and Backfill for Selected Major Structures

209 - Structure Excavation and Backfill

251 SCR 251 Riprap

301 SCR 301 Untreated Aggregate Courses

314 SCR 314 Stockpiled Aggregates

Willow Creek Bridge #1 GMUG NFs - Gunnison RD

ATTACHMENT 1

MODIFICATION 1

Gunnison National Forest

- 4 -

SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES

ON FEDERAL HIGHWAY PROJECTS (CONT.)

2014 Standard

Specification

Number

Special Contract

Requirements Specification Title

552 SCR 552 Structural Concrete

553 SCR 553 Prestressed Concrete

554 SCR 554 Reinforcing Steel

556 - Bridge Railing

564 - Bearing Devices

590 SCR 590 Precast Concrete Structures

605 - Underdrains, Sheet Drains, and Pavement Edge Drains

617 SCR 617 Guardrail

624 - Topsoil

625 SCR 625 Turf Establishment

629 SCR 272 Geocell Abutment Stabilization

633 - Permanent Traffic Control

635 SCR 635 Temporary Traffic Control

701 SCR 701 Cement

703 SCR 703 Aggregate

709 SCR 709 Reinforcing Steel and Wire Rope

710 - Fence and Guardrail

711 SCR 711 Concrete Curing Material and Admixtures

714 - Geosynthetic Material

722 - Anchor Material

725 SCR 725 Miscellaneous Material

- SCR 736 Geocell

Note: All of the specifications cited are applicable to this project. The Special Contract Requirements

(SCR) are included with this solicitation. The other specifications are within the 2014 Standard

Specifications for Construction of Roads and Bridges on Federal Highway Projects. Other specifications referred to within these specifications (even though not specifically listed herein) are also fully applicable to this project.

Willow Creek Bridge #1 GMUG NFs - Gunnison RD

ATTACHMENT 1

MODIFICATION 1

Gunnison National Forest

- 5 -

List of Required Submittals:

The required submittals shall include, but are not limited to, the following:

Submittal Type Plan Sheet

Reference

Specification

Reference Description

Equipment Mobilization

Notification

NA SCR 107

Equipment Mobilization

Notification

Written Plan N/A SCR 107 Hazardous Spill Plan

Written Plan N/A SCR 107 Fire Prevention and Suppression

Plan

Written Plan N/A 153, SCR 153

Quality Control Plan

Written Plan N/A SCR 153 Proposal for Alternate Test

Methods (if applicable)

Written Plan N/A SCR 157 Erosion & Sediment Control Plan

Written Plan N/A SCR 203 Bridge Removal Plan

Certification/Documentation N/A SCR 107 Noxious Weed Certification

(Vehicles)

Certification/Documentation N/A SCR 153 Certification of Testing Personnel

Certification/Documentation N/A SCR 153 Documentation of Testing

Equipment

Certification/Documentation N/A SCR 153 Material Test Reports

Certification/Documentation N/A 552 Concrete Mix Design

Certification/Documentation N/A 553 Prestress Fabrication

Qualifications

Certification/Documentation N/A 553 Prestress Concrete Box Girder

Design Calculations

Certification/Documentation N/A 553 Prestress Concrete Box Girder

Load Rating Calculations

Certification/Documentation N/A 553 Concrete Mix Design for

Prestress Concrete Box Girder

Certification/Documentation N/A 553

Prestress Concrete Box Girder

Reinforcement & Prestress Strand

Certifications

Certification/Documentation N/A 553 Prestress Concrete Box Girder

Curing Documents

Willow Creek Bridge #1 GMUG NFs - Gunnison RD

ATTACHMENT 1

MODIFICATION 1

Gunnison National Forest

- 6 -

List of Required Submittals (cont.):

Submittal Type Plan Sheet

Reference

Specification

Reference Description

Certification/Documentation N/A SCR 590 Concrete Mix Design for Precast

Concrete

Certification/Documentation N/A SCR 590 Precast Concrete Structure

Reinforcement Certification

Documentation N/A 109.01 Measurement Notes

Documentation N/A SCR 155 Construction Schedule

Documentation N/A 157 Erosion Control Inspection

Report

Documentation N/A

203.05 (a) and

(d); SCR

203.05(d)

Disposal Agreements, Statements, and Permits

Documentation N/A 301.03 Target Values for Aggregate

Sample N/A SCR 552 Water Repellent Concrete Sealer

Drawings N/A SCR 104 As-Built Drawings

Drawings N/A 208

Working Drawings &

Construction Details of

Excavation Support Systems (if applicable)

Drawings N/A 553 Prestress Concrete Box Girder

Shop Drawings

Drawings N/A SCR 590 Precast Concrete Structures Shop

Drawings

Drawings Sheet 14 N/A Bridge Railing Shop Drawings

Drawings Sheets 15 & 16 N/A Approach Rail Shop Drawings

Willow Creek Bridge #1 GMUG NFs - Gunnison RD

ATTACHMENT 1

MODIFICATION 1

101 - Terms, Format, and Definitions

101.01_nat_04_02_2004

101.01 Meaning of Terms.

Add the following:

Delete all references in FP-14 to Transportation Acquisition Regulations (TAR). For Timber

Sales, delete all references in FP-14 to Federal Acquisition Regulations (FAR).

101.03_nat_04_02_2004

101.03 Abbreviations.

Add the following to (a) Acronyms:

AFPA

MSHA

NEC

WCLIB

WWPA

ALSC

WWPI

NLGA

NSLB

NLMA

RIS

SPIB

American Forest and Paper Association

Mine Safety and Health Administration

National Electrical Safety Code

West Coast Lumber Inspection Bureau

Western Wood Products Association

American Lumber Standards Committee

Western Wood Preservers Institute

National Lumber Grades Authority

Northern Softwood Lumber Bureau

Northeastern Lumber Manufacturer’s Association

Redwood Inspection Service

Southern Pine Inspection Bureau

101.04_nat_04_29_2004

101.03 Abbreviations.

Add the following to (b) SI Symbols:

mp Milepost ppm Part Per Million

Willow Creek Bridge #1 GMUG NFs - Gunnison RD

ATTACHMENT 1

MODIFICATION 1

101.04 Definitions.

Delete the following definitions and substitute the following:

Bid Schedule--The Schedule of Items.

Bridge-- A structure, including supports, erected over a depression or an obstruction such as water along a road, a trail, or a railway and having a deck for carrying traffic or other loads.

Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.

Culvert-- Any structure with a bottom, regardless of fill depth, depth of invert burial, or presence of horizontal driving surface, or any bottomless (natural channel) structure with footings that will not have wheel loads in direct contact with the top of the structure.

Drawings-- (Public Works Contracts) Design sheets or fabrication, erection, or construction details submitted to the CO by the Contractor according to FAR Clause 52.236-21 Specifications and Drawings for Construction. Also refers to submissions and submittals.

Notice to Proceed -- (Public Works Contracts) Written notice to the Contractor to begin the contract work.

Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line

(including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Solicitation--(Public Works Contracts) The complete assembly of documents (whether attached or incorporated by reference) furnished to prospective bidders.

Add the following:

Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition

Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or

“design change” as used in the Timber Sale Contract.

Design Quantity-- “Design quantity” is a Forest Service method of measurement from the FS-96

Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.

Lump Sum Quantity-- “Lump sum quantity” (“LSQ”) – These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job.

Forest Service--The United States of America, acting through the Forest Service, U.S.

Department of Agriculture.

Neat Line--A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road--Temporary construction access built along the route of the project.

Willow Creek Bridge #1 GMUG NFs - Gunnison RD

ATTACHMENT 1

MODIFICATION 1

Purchaser--The individual, partnership, joint venture, or corporation contracting with the

Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36

CFR, part 260.

Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, methods of measurement, unit price, and amount.

Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.

Willow Creek Bridge #1 GMUG NFs - Gunnison RD

ATTACHMENT 1

MODIFICATION 1

Figure 101-1—Illustration of road structure terms.

R ig h t o f

W a y

R o a d s id e R o a d s id e

C le a ri n g W id th

R o a d w a y C le a ri n g L im it

X Y

G ro u n d

L in e

T ra v e le d

W a y

C L B e rm

S u rf a c e

C o u rs e

B a s e

C o u rs e

F ill

S lo p e

B a c k S lo p e

D ra in a g e D itc h

G ro u n d L in e

S u b g ra d e

R o a d

B e d

S h a p e s a n d d im e n s io n s w ill v a ry t o f it l o c a l c o n d iti o n s

S e e d ra w in g s f o r ty p ic a l s e c tio n s

X a n d

Y d e n o te c le a ri n g o u ts id e o f ro a d w a y

N o te

Right - of - Way Line

Right - of - Way Line

Clearing Limit

Shoulder

Shoulder

Willow Creek Bridge #1 GMUG NFs - Gunnison RD

ATTACHMENT 1

MODIFICATION 1

102 - Bid, Award, and Execution of Contract

102.00_nat_03_27_2004

102 Delete

Delete Section 102 in its entirety.

GMUG NFs - Gunnison RD

ATTACHMENT 1

MODIFICATION 1

103 - Scope of Work

103.00_nat_04_02_2004

103 Delete

Delete all but subsection 103.01 Intent of Contract.

ATTACHMENT 1

MODIFICATION 1

104 - Control of Work

104.01_nat_03_27_2004

104 Control of Work.

Delete sections 104.01 and 104.02.

104.03_nat_03_23_2004

104.03 Specifications and Drawings.

Add the following:

(c) As-Built-Plans. Furnish one set of as built plans. The Government will provide one set of contract plans to be used exclusively for recording the as-built details of the project. Use red pencil or red ink to record the information on the as-built plans.

Note all additions or revisions to the location, character, and dimensions of the prescribed work shown on the contract plans. Line out all details shown that are not applicable to the completed work. Check off details shown that were incorporated into the completed work without change.

Retain the plans at the project site and, as work progresses, continually update them to reflect the as-built details. Upon request, make the plans available to the CO to review for compliance with these specifications.

Show the following types of changes on the as-built plans:

(1) Typical section(s)

(a) Revisions in dimensions

(b) Revisions in materials

(2) Plan and profile

• Revisions to the alignment

• Changes in the construction limits

• Revisions in location, type, and grade of road approaches

• Location and type of utilities

• Location, size, and type of underdrains

• Channel changes

• Location of monuments and permanent references

• Locations for all aerial and underground crossings of utilities

• Location, length, and type of fencing

• Revisions to grades, elevations, and stationing of intersection PIs

• Equations

• Location, length, stationing, and end treatment of guardrail

Willow Creek Bridge #1 GMUG NFs - Gunnison RD

ATTACHMENT 1

MODIFICATION 1

(3) Bridge

(a) Stationing of bridge ends

(b) Revisions to footing and seal elevations

(c) Pile length, size, type, and tip elevation

(d) Any changes in plan or dimensions including any major changes in reinforcing

(4) Miscellaneous

(a) Revisions to parking areas or turnouts

(b) Final location, type and length of curbs, sidewalks, etc.

Furnish the as-built working plans to the CO before the final inspection. Correct all details found during the final inspection that are not shown on the as-built plans and return to the CO within 5 days.

104.04 Coordination of Contract Documents.

Replace with the following:

The special contract requirements, standard specifications, and plans are contract documents. A requirement in one document is binding as though occurring in all contract documents. The contract documents are intended to be complementary and to describe and provide for a complete contract. In case of discrepancy, calculated and shown dimensions govern over scaled dimensions. The contract documents govern in the following order:

(a) Special contract requirements;

(b) Standard specifications; and,

(c) Plans.

104.05_nat_03_23_2004

Add the following subsections:

104.06 Use of Roads by Contractor.

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

104.07 Other Contracts.

The contractor shall schedule activities to coordinate and cooperate with other contracts, when applicable.

ATTACHMENT 1

MODIFICATION 1

105 - Control of Material

105.02_nat_03_26_2004

105.02 Material Sources.

105.02(a) Government Provided Sources.

Add the following:

Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.

105.02(c) Contractor-located sources.

Add the following:

All certifiable material (e.g., soil, gravel, seed, mulch etc.) transported onto National Forest

System land or incorporated into the work will be weed-free. The Contracting Officer may request written documentation of methods used to determine the weed-free status of any and all materials furnished by the contractor. Contractor-provided expertise and methods to establish weed-free status must be appropriate for the weeds of concern in the local area.

All seed and mulch materials must be certified weed free.

105.05 Use of Material Found in the Work.

Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:

Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.

Willow Creek Bridge #1 GMUG NFs - Gunnison RD

ATTACHMENT 1

MODIFICATION 1

106 - Acceptance of Work

106.01 Conformity with Contract Requirements.

Delete Subsection 106.01 and substitute the following:

Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.

References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.

Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.

Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more restrictive.

Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.

When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.

The Government may inspect, sample, or test all work at any time before final acceptance of the project. When the Government tests work, copies of test reports are furnished to the Contractor upon request. Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the

Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.

Acceptable work conforming to the contract will be paid for at the contract unit bid price. Three methods of determining conformity and accepting work are described in Subsections 106.02 to

106.04 inclusive. The primary method of acceptance is specified in each Section of work.

However, work may be rejected at any time it is found by any of the methods not to comply with the contract.

Remove and replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted, at no cost to the Government.

(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include

Willow Creek Bridge #1 GMUG NFs - Gunnison RD

ATTACHMENT 1

MODIFICATION 1

a narrative describing the dispute and a proposed resolution protocol that addresses the following:

(1) Sampling method;

(2) Number of samples;

(3) Sample transport;

(4) Test procedures;

(5) Testing laboratories;

(6) Reporting;

(7) Estimated time and costs; and

(8) Validation process.

If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program.

Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.

The CO will review the proposed resolution protocol and may modify it before final approval and execution.

The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol.

If the validity of the Government test results cannot be determined, the Contractor and

Government will equally share all costs associated with developing and carrying out the resolution protocol.

(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:

(1) Have the work accepted at a reduced price; or

(2) Be given permission to perform corrective measures to bring the work into conformity.

The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.

ATTACHMENT 1

MODIFICATION 1

106.05 Statistical Evaluation of Work and Determination of Pay Factor (Value of Work).

Replace the entire section with the following:

Statistical evaluation of the work will not be required. All specifications referring to this

Subsection shall instead be referred to Subsections 106.02 through 106.04 as appropriate for the work performed.

106.07_nat_04_02_2004

106.07 Partial and Final Acceptance

Delete subsection 106.07.

ATTACHMENT 1

MODIFICATION 1

107 - Legal Relations and Responsibility To the Public

107.05 Responsibility for Damage Claims.

Delete subsection 107.05.

107.06 Contractor’s Responsibility for Work.

Delete the following:

“except as provided in Subsection 106.07”.

107.08_nat_03_24_2004

107.08 Sanitation, Health, and Safety.

Add the following:

Perform all operations in a prudent, conscientious, safe and professional manner. Ensure that all personnel involved in handling and packaging the hazardous waste are trained for the level of expertise required for the proper performance of the task and, in particular, in the areas of chemical incompatibility, general first aid procedures, and spills. Provide handling and personal protective equipment appropriate to ensure safe handling of the hazardous waste according to 29

CFR 1910.120. Notify the Forest Service of all hazardous material that may be brought onto the

National Forest.

Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.

Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:

• Description of the item spilled (including identity, quantity, manifest number, and other identifying information).

• Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.

• Exact time and location of spill including a description of the area involved.

• Containment procedures.

• Summary of any communications contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.

• Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.

Willow Creek Bridge #1 GMUG NFs - Gunnison RD

ATTACHMENT 1

MODIFICATION 1

When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.

The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.

107.09 Legal Relationship of the Parties.

Delete subsection 107.09.

107.10_nat_03_24_2004

107.10 Environmental Protection.

(c) Dirt, plant, and foreign material

Noxious weed control requirements:

Clean all construction equipment prior to entry onto National Forest lands. Remove all dirt and plant parts and material that could carry noxious weed seeds into National Forest lands. Only construction equipment so cleaned and inspected by the Forest Service will be allowed to operate within National Forest lands. Treat all subsequent move-ins of construction equipment in the same manner as initial move-ins. “Construction equipment” does not include personal vehicles, paving equipment or support equipment that remains on the main travel route.

Prior to the initial move-in, the contractor shall make all construction equipment available for inspection by the Forest Service at an agreed upon location. Provide the Forest Service at least

48 hours advance notification when equipment is ready for inspection.

New infestations of noxious weeds, of concern to Forest Service and identified by either

Contractor or Forest Service, on the Project Area or on the haul route, shall be promptly reported to the other party. Contractor and Forest Service shall agree on treatment methods to reduce or stop the spread of noxious weeds when new infestations are found.

107.11 Protection of Forests, Parks, and Public Lands:

Fire Precautions. Specific fire precautionary measures listed below shall be applicable during

Contractor’s Operations in “Fire Precautionary Period” described as between June 1st and August

31st. Contracting Officer may change the dates of Fire Precautionary Period by advance written notice, if justified by unusual weather or other conditions. Required tools and equipment shall be kept in serviceable condition and immediately available for fire fighting at all times during

Contractors Operations in Fire Precautionary Period.

Substitute Precautions. Forest Service may authorize substitute measures or equipment, or waive specific requirements by written notice, if substitute measures or equipment will afford equal protection or some of the required measures and equipment are unnecessary.

Willow Creek Bridge #1 GMUG NFs - Gunnison RD

ATTACHMENT 1

MODIFICATION 1

Emergency Precautions. Forest Service may require the necessary shutting down of equipment on portions of Contractor’s Operations, as specified by the emergency fire precautions as listed below.

Fire Control. Contractor shall, both independently and in cooperation with Forest Service, take all reasonable and practicable action to prevent and suppress fires resulting from Contractor’s

Operations and to suppress any forest fire in the project area. Contractor’s independent initial fire suppression action on such fires shall be immediate and shall include the use of all necessary personnel and equipment at Contractor’s disposal on site.

Fire Suppression Costs. Contractor’s obligations for cost of fire suppression vary according to three classifications of fires as follows:

Operations Fire. An “Operations Fire” is a fire caused by Contractor’s Operations other than a Negligent Fire. Forest Service shall under 16 USC 572, perform fire suppression activities on Operations Fires. Contractor agrees to reimburse Forest Service for such cost for each Operations Fire, subject to a maximum of the cost to suppress the fire.

Negligent Fire. A “Negligent Fire” is a fire caused by negligence or fault of Contractor’s

Operations, including, but not limited to, one caused by smoking by persons engaged in

Contractor’s Operations during the course of their employment, or during rest or lunch periods; or if Contractor’s failure to comply with the fire prevention requirements results in a fire starting or permits a fire to spread. Damages and the cost of suppressing Negligent Fires shall be borne by Contractor.

Other Fires on Construction Project Area. Forest Service shall pay Contractor, at fire fighting rates common in the area or at prior agreed rates, for equipment or personnel furnished by Contractor at the request of Forest Service, on any fire on Project Area other than an Operations Fire or a Negligent Fire.

Other.

1. Smoking and Lunch Fires. Smoking is prohibited except inside a building, developed recreation site, vehicle, or while seated in an area of at least three feet in diameter that is barren or cleared of all flammable materials. 36 CFR 261.52(d).

The building of camp, lunch, warming and other fires within the project area and vicinity is prohibited, except at established camps or at other safe places where all flammable material has been cleared away sufficiently to prevent the start and spread of wildfires. Forest Service may, upon written request of Contractor, designate specific places where campfires may be built for purposes of heating lunches.

2. Spark Arrester and Mufflers. Operating or using any internal combustion engine, on any timber, brush, or grass covered land, including trails and roads traversing such land, without a spark arrester, maintained in effective working order, meeting either (I) Department of

Agriculture, Forest Service standard 5100, "SPARK ARRESTERS FOR INTERNAL

COMBUSTION ENGINES," (current edition); or (II) the Society of Automotive Engineers

(SAE) recommended Practices J335, "MULTIPOSITION SMALL ENGINE EXHAUST

Willow Creek Bridge #1 GMUG NFs - Gunnison RD

ATTACHMENT 1

MODIFICATION 1

SYSTEM FIRE IGNITION SUPPRESSION," (current revision) and J350, 36 CFR 261.52(j), is prohibited.

Passenger carrying vehicles, pickups, medium and large highway trucks (80,000 GVW) will be equipped with a factory designed muffler system which is specified for the make and model of the respective vehicle/truck or with a muffler system that is equivalent or that exceeds factory specifications.

Exhaust systems shall be properly installed and continually maintained in serviceable condition.

3. Fire Extinguishers and Tools on Equipment. While in use, each internal combustion engine including tractors, trucks, yarders, loaders, welders, generators, stationary engines, or comparable powered equipment shall be provided with at least the following:

(a) One fire extinguisher, at least 5#ABC with an Underwriters Laboratory (UL) rating of

3A - 40BC, or greater.

(b) One shovel, sharp, size O or larger, round-pointed with an overall length of at least 48 inches.

(c) One axe, sharp, double bit 3-1/2#, or one sharp pulaski.

Extinguishers, shovels, axes, and pulaskis shall be mounted so as to be readily available from the ground. All tools shall be maintained in a serviceable condition.

4. Power Saws. Each gasoline engine power saw shall be provided with one chemical-pressurized fire extinguisher of not less than 8-ounce capacity by weight, and one size O or larger, round-pointed shovel with an overall length of at least 48 inches. The extinguisher and shovel shall be maintained in good working order. The extinguisher shall be with the power saw operator and immediately available for use at all times. The extinguisher shall not be affixed to the saw. The shovel shall be readily available to the operator of the saw at all times. Having the shovel with the gas can used to refuel the saw may be considered "readily available" if not more than 200 feet from the saw. During periods of critical fire danger, Forest Service may prescribe other precautionary measures.

Any fueling or refueling of a power saw shall be done in an area which has first been cleared of material which will carry fire. The power saw shall be moved at least 10 feet from the place of fueling or refueling before starting.

5. Blasting and Welding. The use of fuses in blasting shall not be permitted except near power lines where the danger of accidental detonation is present, and then only by special written permission of Forest Service. Whenever the relative humidity falls below 50 percent, Contractor shall place a watchman at each point where blasting is done who shall remain on duty for at least one hour after blasting is finished, and who shall be equipped with a shovel and a water-filled backpack can equipped with hand pump. During periods when the relative humidity falls below

Willow Creek Bridge #1 GMUG NFs - Gunnison RD

ATTACHMENT 1

MODIFICATION 1

20 percent, blasting shall be discontinued unless authorized, with special provisions, in writing by Forest Service. Blasting shall not be permitted in any area not cleared to mineral soil without advance written approval of Forest Service and with such special precautions as may be required.

Prima Cord shall not be used in clearing operations, and in other areas where timber has been felled and slash not burned.

Unless otherwise directed in writing by Forest Service, all flammable material shall be cleared for 10 feet around any piece of equipment being welded. In addition, Contractor shall provide a fire extinguisher of a size and type designed to extinguish a fire in the flammable materials surrounding the spot being welded.

In order to determine the relative humidity, Contractor shall either (a) provide and maintain weather instruments, that will measure relative humidity, in the area where blasting will occur; or (b) provide communications to obtain weather data from Forest Service.

Explosives shall be stored at all times in a locked box marked "Explosives. "Powder and blasting caps shall be stored in separate boxes.

6. Storage of Flammables. Gasoline, oil, grease and other highly flammable material shall be stored either in a separate building, or at a site where all debris is cleared within a radius of 25 feet. Storage buildings or sites shall be a minimum distance of 50 feet from other structures. Storage buildings shall be adequately posted to warn of the flammables and to prohibit smoking in or around the building.

7. Camp Fire Protection. The grounds around all trailers, buildings, other facilities constructed or placed on or near the project area shall be kept free of flammable material for a distance of at least 20 feet from the wall of such structure.

Stovepipes of all wood burning stoves shall be equipped with suitable roof jacks and serviceable spark arresters. Stovepipes shall be no closer than 2 feet from any wood or other flammables unless adequately protected by metal or asbestos shield.

8. Equipment Cleaning.

Entering, crossing, and leaving the stream channel with the Contractor’s or his agent’s equipment shall be at locations(s) approved in advance by the CO. The number of crossings and length of time equipment operates within the river channel shall be kept to the minimum necessary for the purposes of constructing the bridge. The equipment shall be cleaned of all anti-freeze, grease, hydraulic fluid, brake fluid, steering fluid, oil, or fuel prior to entering the water influence zone. The Contractor shall notify the CO, so the Government can inspect the cleaning operation prior to commencing work at the project site. Equipment cleaning shall be done

Willow Creek Bridge #1 GMUG NFs - Gunnison RD

ATTACHMENT 1

MODIFICATION 1

outside the water influence zone as approved by the CO or off National Forest lands, in accordance with all federal, state and local laws. The Contractor shall inspect the equipment daily for leaks prior to use.

Equipment maintenance or refueling shall be done outside the water influence zone as approved by the CO or off National Forest lands. Under no circumstances will the Contractor allow unauthorized crossings by the public. All equipment used in the river or crossing the river shall not leak anti-freeze, grease, hydraulic fluid, brake fluid, steering fluid, oil, or fuel. Equipment shall be immediately removed from the water influence zone, if leaks are discovered. The CO may inspect any equipment prior to or during its use. The Contractor's Hazardous Spill Plan shall include provisions for mitigating any spills or leaks within the river's water influence zone.

DURATION OF THIS PLAN

This plan will apply to any and all subcontractors and their employees. The contractor will be responsible to see that all subcontractors and their employees are made aware of the contents.

This plan will be in force for the duration of the above-referenced project.

FIRE RESTRICTIONS

Contractor will follow all fire restrictions that may occur by Special Order during the contract time period. Special Authorization by an approved Forest Service Official must be received and attached as part of the Contract prior to restricted actions taking place.

ATTACHMENT 1

MODIFICATION 1

108 - Prosecution and Progress

108.00_nat_03_24_2004

Delete Section 108 in its entirety.

ATTACHMENT 1

MODIFICATION 1

109 - Measurement and Payment

109.01 Measurement of Work

Replace the sixth paragraph with the following:

Submit measurement notes to the CO as directed. For lump sum items, submit documentation to support invoiced progress payment.

109.02_nat_03_25_2004

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Add the following:

Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

(c) Cubic Yard

Delete methods (2) and (4).

Measurement Terms and Definitions.

Replace the following definition:

(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.

109.03 Weighing Procedures and Devices.

Add the following to Subsection 109.03(c):

(c) Project weighing system.

For aggregates weighed for payment, adjust scale weights of material to deduct the daily average moisture content in excess of 2 percentage points over optimum moisture as determined by

AASHTO T 99 or the designated compaction method. If moisture determination is necessary, determine the daily average moisture content in accordance with AASHTO T 255, from not less than three representative samples of aggregate taken at random intervals each day that aggregate is being weighed.

Manual scales may be used if approved in writing by the CO and if the method of weighing meets all other contract requirements.

ATTACHMENT 1

MODIFICATION 1

109.05 Scope of Payment.

Replace the last paragraph with the following:

The quantities shown in the bid schedule are contract quantities unless designated otherwise.

Limit pay quantities to those shown on the bid schedule or otherwise authorized before performing the work. Payment will be made for contract quantities unless designated otherwise on the bid schedule. For designated quantities to be measured for payment and for quantities to be adjusted according to Section 109.02(b), measure quantities as directed in each associated

Standard Section or Special Contract Requirement.

109.06_nat_03_24_2004

Delete the following entire subsections:

109.06 Pricing of Adjustments.

109.07 Eliminated Work.

109.08 Progress Payments.

109.09 Final Payment.

Willow Creek Bridge #1 GMUG NFs - Gunnison RD

ATTACHMENT 1

MODIFICATION 1

152 - Contractor Survey and Staking

152.00_nat_04_29_2004

Construction Requirements

152.04 General.

Add the following:

When indicated on the plans, a preliminary survey line has been established on the ground. The horizontal control line (HCL) is established by offsets from this preliminary line.

152.04(c) Material.

Add the following:

Use required stake dimensions and materials. Pre-paint the top 2 inches of all stakes and lath, or mark them with plastic flagging. Use designated colors for paint or flagging. Mark all stakes with a stake pencil that leaves a legible imprint, or with waterproof ink.

Do not use aerosol spray paints.

Use moisture-resistant paper for survey notes. Keep notes in books with covers that will protect the contents and retain the pages in numerical sequence.

Delete the last sentence in fourth-from-last paragraph and replace with the following:

Reestablish missing reference, control lines, or stakes as necessary to control subsequent construction staking operations.

152.05 Survey and Staking Requirements.

(b) Centerline establishment.

Replace the last sentence with the following:

Reestablish centerline from instrument control points. The maximum spacing between centerline points is 25 feet when the centerline curve radius is less than or equal to 200 feet. When the centerline curve radius is greater than 200 feet, the maximum distance between centerline points is 50 feet.

(d) Slope and reference stakes:

Replace section with the following:

(d) Slope stakes and references. (2) Conventional Survey Methods When required, locate slope stakes on designated portions of the road. Locate the slope stake catch points and use them to establish clearing limits and slope stake references.

Mark slope stakes with the station, the amount of cut or fill, the horizontal distance to centerline, and the slope ratios.

Willow Creek Bridge #1 GMUG NFs - Gunnison RD

ATTACHMENT 1

MODIFICATION 1

Place slope reference stakes at least 10 feet outside the clearing limit and mark with the offset distance to the slope stake. Place sight stakes when required.

Prior to clearing and grubbing operations, move the slope stake outside the clearing limit to the slope reference stake. After clearing and grubbing and before excavation, reset the slope stakes in their original position.

Use the designated method to establish the slope stake catchpoint.

• Method I—Computed Method. Use the template information shown in the plans or other Government-provided data to calculate the actual location of the catchpoint. The slope stake “catchpoint distance” provided may be used as a trial location to initiate slope staking. Recatch slope stakes on any section that does not match the staking report within the tolerances established in Table 152-2.

• Method II—Catchpoint Measurement Method. Determine the location of slope stake catchpoints by measuring the catchpoint distances shown in the plans or other Government-provided data.

(e) Clearing and grubbing limits.

Add the following:

Establish clearing limits on each side of the horizontal control line (HCL) by measuring the required horizontal or slope distances shown in the stake notes. Mark the clearing limits with flagging or tags on trees to be left standing, or on lath. Make markings intervisible, and no more than 90 feet apart.

After establishing clearing limits, move the location line (road centerline) stake outside the clearing limits for station identification purposes, and mark it with horizontal distance to location line (road centerline)

(g) Culverts.

Delete this section

(h) Bridges.

Replace the subsection with the following:

Set adequate horizontal and vertical control, reference lines, and reference points for the bridge, abutment footings, abutment bearing seats, wing walls, and other major components. Establish the bridge control, reference lines, and reference points by setting hubs and guard stakes beyond the clearing limits on each side of the channel. Record the following reference stakes:

(1) Station or coordinates of actual point where the abutment centerline of bearing intersects the road centerline and the skew angle;

(2) Reference points and lines for the location of both footings including footing elevations;

(3) Reference points and lines for wingwalls and abutment walls locations including all elevations shown on the plans;

(4) Reference points and lines for all top of embankment stations and offsets;

(5) Reference points, offsets and lines for approach rail posts;

(6) Riprap coordinates and elevations, and;

(7) Reference lines, aggregate thicknesses, and grade of surface aggregate.

Perform this work after clearing is completed and within the tolerances established in Table 152-1. The structural component’s control is established as a local network and the tolerances are relative to that network.

Willow Creek Bridge #1 GMUG NFs - Gunnison RD

ATTACHMENT 1

MODIFICATION 1

(l) Miscellaneous survey and staking.

Channel construction staking at 50-foot increments showing grades and elevations and where the channel catches existing ground. The tolerance shall be that listed for slope stakes in Table 152-1.

Replace Table 152-1 with the following table:

Table 152-1 Construction Survey and Staking Tolerances

Table 152-1

Construction Survey and Staking Tolerances (1)

Staking Phase Horizontal Vertical

Control points set from existing

Government control points- Tolerance Class A

±0.03 feet

(±10 millimeters) ±0.01 feet × N

(±3 millimeters × N )(2)

Mapping, topography, and cross-section

Points- Tolerance Class A

±0.16 feet

(±50 millimeters)

±0.16 feet

(±50 millimeters)

Centerline points (3) including (PC), (PT), (POT),(POC), and references- Tolerance Class A

±0.06 feet

(±20 millimeters)

±0.06 feet

(±20 millimeters)

Slope-stake and slope-stake references- Tolerance

Class A (4)

±0.16 feet

(±50 millimeters)

±0.16 feet

±50 millimeters)

Culverts, ditches, and minor drainage structures stakes- Tolerance Class A

±0.16 feet

(±50 millimeters)

±0.06 feet

(±20 millimeters)

Retaining walls stakes ±0.06 feet

(±20 millimeters)

±0.03 feet

(±10 millimeters)

Curb and gutter stakes ±0.06 feet

(±20 millimeters)

±0.03 feet

(±10 millimeters)

Bridge substructures stakes ±0.03 feet

(±10 millimeters)(5)

±0.03 feet

(±10 millimeters)

Bridge superstructures stakes ±0.03 feet

(±10 millimeters)(5)

±0.03 feet

(±10 millimeters)

Clearing and grubbing limit stakes- Tolerance

Class A

±1.00 feet

(±300 millimeters)

Roadway subgrade finish stakes- Tolerance Class

A (6)

±0.16 feet

(±50 millimeters)

±0.03 feet

(±10 millimeters)

Roadway finish grade stakes (6) ±0.16 feet

(±50 millimeters)

±0.03 feet

(±10 millimeters)

Willow Creek Bridge #1 GMUG NFs - Gunnison RD

ATTACHMENT 1

MODIFICATION 1

Table 152-1

Construction Survey and Staking Tolerances (continued) (1)

Staking Phase Horizontal Vertical

Control points set from existing Government control points –Tolerance Class B (7)

±0.16 feet

(±20 millimeters) ±0.16 feet × N

(±20 millimeters × N )(2)

Mapping, topography, and cross-section points–

Tolerance Class B (7)

±1.00 feet

(±300 millimeters)

±0.50 feet

(±150 millimeters)

Centerline points including (PC), (PT), (POT),(POC), and references–Tolerance Class B (7)

±0.16 feet

(±20 millimeters)

±0.16 feet

(±20 millimeters)

Slope-stake and slope-stake references–Tolerance

Class B (7)

±0.50 feet

(±50 millimeters)

±0.16 feet

±50 millimeters)

Culverts, ditches, and minor drainage structures stakes–Tolerance Class B (7)

±0.50 feet

(±150 millimeters)

±0.16 feet

(±20 millimeters)

Clearing and grubbing limit stakes–Tolerance

Class B (7)

±2.00 feet

(±600 millimeters)

Roadway subgrade finish stakes–Tolerance Class

B (7)

±0.50 feet

(±50 millimeters)

±0.16 feet

(±10 millimeters)

Roadway finish grade stakes–Tolerance Class B (7)

±0.50 feet

(±50 millimeters)

±0.16 feet

(±10 millimeters)

(1) At statistical 95 percent confidence level. Tolerances are relative to existing Government control points.

(2) N is the number of instrument setups.

(3) Centerline points: PC - point of curve, PT - point of tangent, POT - point on tangent, POC - point on curve.

(4) Take the cross-sections normal to the centerline ±1 degree.

(5) Bridge control is established as a local network and the tolerances are relative to that network.

(6) Includes paved ditches.

(7) Tolerance Class B for Very Low Volume Roads with an aggregate or native finished surface.

Willow Creek Bridge #1 GMUG NFs - Gunnison RD

ATTACHMENT 1

MODIFICATION 1

152.07 Measurement

All surveying required to complete the channel construction shall be included in item 15212 listed below.

152.08 Payment

Add the following:

All surveying required to complete the project shall be included in the following items:

15205 Bridge survey and staking Lump Sum

15212 Slope,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.