SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
915742
GRAND MESA UNCOMPAHGRE GUNNISON N
USDA FOREST SERVICE
ATTN PEGGY DOBIE
216 NORTH COLORADO STREET
82MK
GUNNISON CO 81230
USDA Forest Service - GMUG NFs
216 North Colorado Street Gunnison, CO 81230 Attn: Peggy Dobie (email: pdobie@fs.fed.us)
PEGGY DOBIE 970-642-4415
1x 06/19/2018
1282MK18R0008
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Grand Mesa, Uncompahgre and Gunnison National Forests - Gunnison Ranger District
Title: Willow Creek Bridge #1
Location: Taylor Park Area - Forest Service Road 765 towards Tincup, Colorado
Description: Remove existing bridge, purchase and install new bridge.
Set Aside: Small Business
Magnitude of Project: Between $500,000 and $1,000,000
Contact Person:_______________________________________
Email:________________________________________________
Phone Number:_________________________________________
DUNS:_________________________________________________
Continued ...
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 90 calendar days and complete it within ________________ ________________ calendar days after receiving
08/08/2018
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
GRAND MESA UNCOMPAHGRE GUNNISON N
USDA FOREST SERVICE
ATTN PEGGY DOBIE
216 NORTH COLORADO STREET
82MK
GUNNISON CO 81230
PEGGY DOBIE
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 32
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
1282MK18R0008
Delivery: 90 Days After Notice to Proceed
Delivery Location Code: 82Z7
USDA FOREST SERVICE
GUNNISON RANGER DISTRICT
216 N COLORADO STREET
GUNNISON CO 81230-2197 US
FOB: Destination
Period of Performance: 08/01/2018 to 10/31/2019
001 Delivery and Installation of Willow Cr #1 Bridge.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Willow Creek Bridge #1 1282MK18R0008 GMUG NFs – Gunnison RD Page 4 of 32
B - SECTION B - Supplies or Services and Prices/Costs Schedule of Items
C - SECTION C - Description/specifications/Statement of Work
D - SECTION D - Packaging and Marking
E - SECTION E - Inspection and Acceptance
F - SECTION F - Deliveries or Performance
G - SECTION G - Contract Administration Data
H - SECTION H - Special Contract Requirements
I - SECTION I - Contract Clauses
J - SECTION J - List of Documents, Exhibits, and Other Attachments
K - SECTION K - Representations, Certifications, and Other Statements of Offerors
L - SECTION L - Instructions, Conditions, and Notices to Offerors or Respondents
M - SECTION M - Evaluation Factors for Award
GMUG NFs – Gunnison RD Page 5 of 32
SECTION B – SCHEDULE OF ITEMS
ITEM
NO. DESCRIPTION
METHOD
OF
MEASURE
EST
QTY
PAY
UNIT
UNIT
PRICE
TOTAL
PRICE
15101 Mobilization CQ 1 LS $ $ 15205 Bridge survey and staking CQ 1 LS $ $
15212 Slope, reference, and clearing and grubbing stakes, method I, tolerance A
CQ
1 LS $ $
15255 Grade finishing stakes, surface course and aggregate surface, tolerance A
CQ
1 LS $ $
15702 Silt Fence CQ 990 FT $ $ 15713 Soil erosion & pollution control CQ 1 LS $ $ 20102 Clearing and grubbing CQ 1 LS $ $ 20305 Removal of structures and obstructions CQ 1 LS $ $ 20455 Embankment construction CQ 958 CY $ $ 20801 Structure excavation CQ 516 CY $ $ 20803 Structural backfill CQ 74 CY $ $ 25102 Placed riprap, method A, class 3 AQ 130 CY $ $ 25116 Geotextile, type IV, A AQ 507 SY $ $
27201 Geocell abutment stabilization, 6 inch depth
AQ
55 SY $ $
30111 Aggregate surface course, grading G, compaction method B
AQ
168 CY $ $
30118A Screened aggregate, grading 1.5” max, compaction method B
AQ
19 CY $ $
30118B Screened aggregate, grading #67, compaction method B
AQ
10 CY $ $
55301A Precast concrete member, grade beam CQ 2 EA $ $ 55301B Precast concrete member, wingwall CQ 4 EA $ $
55302 Precast prestressed concrete structural member, box beam
CQ
422 LF $ $
55350 Post tensioning CQ 1 LS $ $ 55601 TXDOT T101 bridge railing CQ 136 FT $ $ 55607 Terminal section, type 3K CQ 4 EA $ $ 55650 Bridge approach railing, type 1, class A CQ 160 FT $ $ 62502 Seeding & mulching, dry method CQ 1 LS $ $ 63306 Object markers, type III CQ 4 EA $ $ 63307 Delineators, type 1 CQ 4 EA $ $ 63308 Removing and resetting sign CQ 1 EA $ $ 63310A Removing sign CQ 6 EA $ $ 63310B Removing object marker CQ 4 EA $ $ 63352 Sign (including post(s)) CQ 1 EA $ $ 63501 Temporary traffic control CQ 1 LS $ $
TOTAL PRICE $
Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the solicitation closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs incurred.
GMUG NFs – Gunnison RD Page 6 of 32
SECTION C – DESCRIPTION/SPECIFICATIONS
C.1 SCOPE OF WORK
This contract includes but is not limited to removing and replacing Willow Creek Bridge #1. Existing bridge shall be removed and disposed of properly off of USDA Forest Service lands. Contractor shall be responsible for purchasing new bridge and installing according to drawings and specifications.
New bridge location shall be approximately at existing bridge location. Contractor shall be responsible for but not limited to the following: establishing traffic control signing, installation of erosion control, excavation for abutments, abutment stabilization, place precast abutment grade beams, grading portions of channel banks under new bridge, install rip rap, placing prestressed box girders, traverse post-tension box girders, construct roadway embankments, install bridge rails, install approach rails, install traffic control signing, prepare finish grade and seed, open road to traffic, and remove temporary traffic signing.
C.2 LOCATION OF PROJECT
The location of the bridge is approximately 35 miles north east of Gunnison Colorado on NFSR 765 in the Gunnison National Forest.
C.3 PERFORMANCE OF THE WORK
All work shall be conducted in a safe and expedient manner and in conformance with the specifications referenced in Section J. When applicable, traffic control shall be in accordance with standards set forth in the most current edition of the Manual on Uniform Traffic Control Devices (MUTCD). See General Notes in Section B of compensation for traffic control work. All work shall be conducted by personnel fully qualified to perform such tasks assigned and shall be supervised by an onsite designated Contractor’s Representative.
C.4 EQUIPMENT
All equipment shall be in good repair and capable of accomplishing assigned tasks in a safe and environmentally acceptable manner. Where applicable, all equipment shall be fitted with approved spark arrestors. All repairs to equipment under this contract shall be made and paid for by the Contractor.
Equipment may be owned, rented or subcontracted.
All equipment shall be cleaned of earthen and vegetative materials that may contain weed seed prior to delivery onto National Forest Lands.
C.5 EQUIPMENT AND MATERIALS STORAGE AND STAGING
Upon concurrence from the Contracting Officer, certain areas on the National Forest may be used on a case-by-case basis for storage of equipment and/or materials during active construction/reconstruction or maintenance periods. The Contractor shall be responsible for the protection of items stored on Government property, and shall ensure adequate safety measures are maintained at such sites.
C.6 TECHNICAL SPECIFICATIONS
Section J contains Supplemental and Special Project Specifications that supplement and/or modify the Standard Specifications. The Standard, Supplemental, and Special Project Specifications shall all be used in conjunction with each other to properly determine the correct specification for each Pay item in the Schedule of Items.
GMUG NFs – Gunnison RD Page 7 of 32
C.7 STANDARD SPECIFICATIONS
“Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14”, U.S.
Customary Units, is applicable for this project. The requirements contained in these Standard Specifications are hereby made a part of this solicitation and any resulting work. These specifications can be viewed at no cost on the FHWA website, which also gives ordering information:
http://flh.fhwa.dot.gov/resources/specs/
Section J of this contract contains Supplemental and Special Project Specifications that supplement and/or modify the Standard Specifications. The Standard, Supplemental, and Special Project Specifications shall all be used in conjunction with each other to property determine the correct specification for each Pay Item in the Schedule of Items.
C.8 BIOBASED AND SUSTAINABLE PRODUCTS
The Contractor must comply with the Agricultural Act of 2014; the Food, Conservation and Energy Act of 2008 (FCEA), 7 8102; the Farm Security and Rural Investment Act of 2002 (FSRIA), 7 U.S.C.
8102; the Federal Acquisition Regulation; Executive Order (EO) 13514, “Federal Leadership in Environmental, Energy and Economic Performance,” dated October 5, 2009; EO 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” dated January 24, 2007; and Presidential Memorandum, “Driving Innovation and Creating Jobs in Rural America through Biobased and Sustainable Product Procurement,” dated February, 2012 to provide biobased products.
All supplies and materials shall be of a type and quantity that conform to applicable Federal specifications and standards, and to the extent feasible and reasonable; include the exclusive use of biobased and recycled products. The following is a list of categories for biopreferred products that may be required for performance of this contract.
Equipment Lubricants, Engine Oils, Office Products (Ink, paper, etc)
For more information regarding the Department of Agriculture Biobased Program go to:
http://www.biopreferred.gov.
452.211-72 Statement of Work/Specifications. (FEB 1988) 452.211-73 Attachments to Statements of Work/Specifications. (FEB 1988)
SECTION D - Packaging and Marking There are no clauses for this Section.
SECTION E - Inspection and Acceptance
52.246-12 Inspection of Construction. (AUG 1996) 52.246-13 Inspection - Dismantling, Demolition, or Removal of Improvements. (AUG 1996)
452.246-70 Inspection and Acceptance. (FEB 1988)
(a) The Contracting Officer or the Contracting Officer's duly authorized representative will inspect and accept the supplies and/or services to be provided under this contract.
b) Inspection and acceptance will be performed at: the project site.
http://flh.fhwa.dot.gov/resources/specs/
GMUG NFs – Gunnison RD Page 8 of 32
SECTION F - Deliveries or Performance
F.1 CONTRACT TIME
The Contractor shall start work promptly after award or receipt of a Notice to Proceed (NTP). The Contractor shall maintain progress at a rate that will assure completion within the stated contract time.
The contract time will generally not exceed a required rate of progress exceeding that determined from the accepted work plan. If more than one area is available for planting, the Government may prescribe the planting sequence.
The Forest Service will issue a NTP as soon as weather and ground conditions are favorable for planting and survival of the trees on one or more of the areas.
F.2 WORK COMPLETED AFTER THE PERFORMANCE PERIOD.
Whenever the Contractor fails to complete work within the performance period, and is allowed to work beyond that period, the Contractor will be assessed the actual damages. Items to be included in the actual damage includes but is not limited to: wages of the COR and Government inspector(s) for quality assurance after the performance period, costs of vehicles, meals and lodging that are incurred while administering the contract after the performance period.
52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984) The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than October 30, 2019. The time stated for completion shall include final cleanup of the premises.
52.242-14 Suspension of Work. (APR 1984) 52.242-15 Stop-Work Order. (AUG 1989)
SECTION G - Contract Administration Data
G.1 FOREST SERVICE REPRESENTATIVES
Ann (Peggy) Dobie shall serve as the Contracting Officer (CO) on this contract, unless changed by an authorized government contracting officer. The assigned Contracting Officer has full warrant authority over all contract issues. The CO can be reached by email at pdobie@fs.fed.us
A Contracting Officer Representative (COR) will be appointed upon award. COR delegation authority, responsibilities and contact information will be defined on a delegation form issued after contract award.
G.2 CHANGES
The Contracting Officer is the only person authorized to approve changes to the requirements under this contract. In the event the Contractor effects any such change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in costs incurred as a result thereof.
mailto:pdobie@fs.fed.us
GMUG NFs – Gunnison RD Page 9 of 32
G.3 GOVERNMENT FURNISHED PROPERTY
Except for the materials specifically stated within the awarded contract, the contractor shall be expected to provide all the tools, equipment and materials necessary to carry out this work. The government shall provide the contractor building access.
G.4 UNAUTHORIZED INSTRUCTIONS FROM GOVERNMENT OR OTHER PERSONNEL
The Contractor shall not accept instructions issued by any person employed by the U.S. Government or otherwise other than the Contracting Officer, or the authorized representative of the Contracting Officer acting within the limits of his/her authority.
G.5 DESIGNATION OF AUTHORIZED REPRESENTATIVE OF THE CONTRACTOR
The Contractor shall assign a member or employee who will act as Project Manager during the course of this contract or during the course of this project. The official shall be responsible for affording liaison between the contract forces and the contracting offices. This designation shall be in writing and a copy furnished to the Contracting Officer.
G.6 PRE-WORK MEETING
Prior to commencement of work the Contractor shall attend a meeting to discuss the contract terms, work performance requirements, and safety. Also at this meeting such items as work progress schedule, quality control, camping/worksite plan, and fire prevention plans shall be finalized in writing (if required). The meeting will be held at a time and place determined by the Contracting Officer or Contracting Officer Representative.
G.7 INVOICES & PAYMENTS
All invoices are to be submitted via the electronic Invoice Processing Platform (IPP) System.
"Submit Invoice-to" address for USDA orders is the Department of Treasury's Invoice Processing Platform (IPP). The contractor must follow the instructions on how to register and submit invoices via IPP. This is a mandatory requirement initiated by the U.S. Department of Treasury. More information can be found at this website https://www.ipp.gov/index.htm. Ensure your company has registered at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish your account. Offeror must have an established account prior to commencement of work.
IPP does not allow the contractor to change the description of the line items being invoiced against, therefore the contractor shall create an invoice in IPP and an itemized invoice. Itemized invoice must be uploaded as an attachment.
Itemized Invoice shall mirror the schedule of items and shall include at a minimum:
Contractor Name Invoice Number Address Contract, Task Order or Purchase Order number Phone number and e-mail address Description of Services or work completed.
Date of services or completion.
In order for invoices to be processed certain documents must be uploaded as an attachment(s):
Itemized Invoice, Certified Payrolls, Final Inspection and a Contractor Notification and Release of Claims https://www.ipp.gov/index.htm https://www.ipp.gov/vendors/enrollment-vendors.htm
GMUG NFs – Gunnison RD Page 10 of 32
Itemized Invoice shall mirror the schedule of items and shall include at a minimum:
Contractor Name, Address, Phone Number and e-mail address Contract Number Invoice Number Description and date of services or work completed.
Certified payrolls for Construction: certified payrolls must be uploaded as an attachment.
Contractor and all subcontractors, through the contractor, shall furnish all certified payrolls covering payments to laborers and mechanics for on-site work. Final payrolls shall be marked “Final”.
Final Payment - Following completion and acceptance of the work (including return of Government-furnished property and site cleanup), Final payment will made within 30 calendar days after presentation of a properly executed invoice.
Contractor Notification & Release of Claims for Final Payment A contractor notification and release of all claims form shall be completed by the COR and the contractor. The completed form shall be uploaded as an attachment.
Coordinate Invoices – Coordinate submission of invoices with the primary COR and/or CO.
G.8 CONTRACT RELEASE
The following supplements the Payments clause in Section I:
Before final payment will be made the Contractor shall sign a release of all claims against the Government arising by virtue of this contract, other than claims, in stated amounts (indicated under reservations of the Contractor Certification and Release of Claims Form), that the Contractor has specifically accepted from the operation of the release. A release may also be required of the assignee if the Contractor's claim to amounts payable under this contract has been assigned under the Assignment of Claims Act of 1940 (31 U.S.C. 3727 and 41 U.S.C. 15).
G.9 EVALUATING CONTRACTOR PERFORMANCE
AGAR ADVISORY NUMBER 96B Contractor Performance Information and Contractor Performance Assessment Reporting System (CPARS) Evaluations CPARS is used by the Forest Service for evaluating contractor performance. CPARS is the single USDA-wide system used to collect, maintain, and disseminate contractor performance evaluations to the Past Performance Information Retrieval System (PPIRS). Past performance reporting is required by FAR 42.1502 and 42.1503. The contractor will be notified by email to review evaluation information submitted by the Agency. The contractor will have 30 days to submit comments, rebutting statements, or additional information to the Assessing Official before any evaluation is considered final.
Each award requiring an evaluation must be registered in CPARS. The contractor will receive several automated emails. Within thirty days of award, the contractor will receive an e-mail that contains user account information, as well as the applicable contract number(s) and evaluation module assigned. The contractor will have one user account set up that will allow access to all three modules.
GMUG NFs – Gunnison RD Page 11 of 32
Copies of the evaluations, contractor responses, and review comments, if any, will be retained as part of the contract file, and may be used by Federal Agencies to support future award decisions. The contractor is responsible for the accuracy and completeness of the data within the System for Award Management (SAM) database.
452.215-73 Postaward Conference. (NOV 1996) A post award conference with the successful offeror is required. Contractor Officer Representative (COR) will contact you on time and place of post award conference
SECTION H - Special Contract Requirements
H.1 CONTRACTOR REPRESENTATIVE
The contractor shall provide a contract representative for the performance of the work. The name of this person and an alternate(s) who shall act for the contractor when the contractor is absent shall be designated in writing to the contracting officer. The contractor representative or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contractor representative and alternate(s) must be able to read, write, speak, and understand English, as well as the primary language of the work crews.
H.2 ACCIDENT REPORTING.
Maintain an accurate record of all work-related accidents resulting in death, injury, occupational disease, or damage to property, materials, supplies, or equipment.
H.3 INJURY NOTIFICATION.
Injuries to workers will be reported promptly to the COR and appropriate contractor personnel.
Emergency care for workers while on the job site is a contractor responsibility.
H.4 FIRE PREVENTION AND CONTROL.
The contractor shall, both independently and in cooperation with the Forest Service, take all reasonable and practicable action to prevent and suppress fires in the project area using all necessary personnel and equipment at Contractor’s disposal on the site.
The Fire Plan outlines the Contractor’s responsibilities for fire prevention and suppression activities within the Contractor’s project area. For the purposes of this provision, the project area is defined as the area within one half mile (0.5 miles) of the project boundary. See Fire Prevention and Control Plan Attachment.
H.5 CAMPING PERMITS.
The Contractor does/does not intend to camp on National Forest lands. Forest Service permits, issued by the District Ranger, will specify restrictions regarding campsite and sanitary provisions.
Combustible refuse, resulting from lunches, etc., may be burned if authorized. All noncombustible materials, cans, bottles, etc., shall be removed from Forest land.
H.6 NOXIOUS WEEDS.
The contractor shall ensure that prior to moving on to the National Forest all equipment is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. The contractor shall employ whatever cleaning methods are necessary to ensure that equipment is free of noxious weeds. The contractor shall provide the Contacting Officer with certification, in writing, that all
GMUG NFs – Gunnison RD Page 12 of 32 equipment is free of noxious weeds prior to start-up of operations. Equipment shall be considered free of soil, seeds, and other such debris when a visual inspection by the Government does not disclose such material.
Disassembly of equipment components or specialized inspection tools is not required. Unless otherwise directed by the CO, the Government will not require the contractor’s equipment to be cleaned before moving to another treatment unit if the contractor is moving directly from one contract unit to another.
H.7 REPORTING ALLEGED CHILD ABUSE.
Pursuant to the spirit and requirements of P.L. 101-647, Section 225 and 226, the following applies:
Any employee or representative of the Contractor who becomes aware of allegations that a child in the program covered by this contract is (a) a victim of a crime of physical abuse, sex abuse, or exploitation; or (b) a witness to a crime committed against another person; shall make a report of the suspected abuse to the Contracting Officer’s Representative within 24 hours. The initial report shall be made by phone and shall be followed-up in writing, providing salient points of the allegations.
When such allegations about a contractor employee occur as covered by this clause, the Contractor employee who is the subject of the allegations will immediately be required to vacate the work site and will be replaced by another contactor employee. The subject employee will remain away from the work site until an investigation is completed. The Government will not incur additional costs by the Contractor who must provide a replacement employee.
The Contractor shall limit disclosure of documents concerning alleged child abuse to the persons who by reason of their participation in the proceeding have reason to know such information.
Any conviction of a sex crime, an offense involving a child victim or drug felony, will be grounds for denying employment or for dismissal of an employee in any position-serving children. Conviction of a crime other than a sex crime may be considered if it bears on an individual’s fitness to have responsibility for the safety and well-being of children. The consideration of another crime bearing on an individual’s fitness will be mutually agreed upon between the NTC and agency involved.
H.8 SAFETY PLAN
When required by FAR 52.236-13 Accident Prevention Alt. I, the Contractor shall prepare a Safety Plan which addresses the specific hazards of the work site, and shall include working in areas of dead trees and falling debris. The Contractor shall identify the specific conditions that s/he considers is a hazard. The Safety Plan shall also address the personal protective equipment and mitigating measures the Contractor will do to increase safety on the worksite.
H.9 USE AND OCCUPANCY RESTRICTION ORDERS
Contractor will abide by Forests’ Use and Occupancy Orders. Contractor is responsible for contacting the local Forest prior to starting work to ascertain if there is applicable Use and Occupancy Restriction Orders for that forest.
H.10 HAZARDOUS SUBSTANCES
The Contractor shall notify the National Response Center and Contracting Officer Representative of all releases of reportable quantities of hazardous substance on National Forest lands that are cause by Contractor’s employees, equipment, agents, contractors, subcontractors, or their employees or agents, directly or indirectly, as a result of Contractor’s operations, in accordance with 40 CFR 302.
See Section J for reporting requirements and documentation.
GMUG NFs – Gunnison RD Page 13 of 32
H-11 LANDSCAPE PRESERVATION
The Contractor shall give attention to the effect of contract operation upon the landscape, shall take care to maintain natural surroundings undamaged, and shall conduct the work at all times in compliance with the following requirements.
a. Prevention of the Landscape Defacement. The Contractor shall not remove, deface, injure, or destroy trees, shrubs, lawns, or other natural features or any other improvements in the work area unless specifically authorized by the Contracting Officer. Unless otherwise provided herein, the Contractor shall confine contract operations to within the areas designated in contract documents.
b. Protection of Streams, Lakes, and Reservoirs. The Contractor shall take sufficient precautions to prevent pollution of streams, lakes, small ponds, and reservoirs with fuels, oils, bitumens, calcium chloride, silt, or other harmful materials. Mechanical equipment shall not be operated in live streams without written approval of the Contracting Officer.
H-12 PERFORMANCE AND PAYMENT BONDS AND BID GUARANTEE
Order Value Requirement Orders <$30,000 Performance and Payment Bond are not required.
Orders $30,000 to $150,000 Only Payment Bond required for 100% of the order amount.
Orders $150,000+ Performance and Payment Bonds required for 100% of the order amount. Value of bonds shall be equal to the value of the Task Order.
Bid Guarantee 20 percent of the bid price (As per FAR 52.228-1)
452.237-74 Key Personnel. (FEB 1988)
(a) The Contractor shall assign to this contract the following key personnel: Contractor Representative, Foreman/Inspector, Project Manager, Field Supervisor.
(b) During the first ninety (90) days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph
(c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.
(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer.
Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.
GMUG NFs – Gunnison RD Page 14 of 32
SECTION I – Contract Clauses
52.202-1 Definitions. (NOV 2013) 52.203-3 Gratuities. (APR 1984) 52.203-5 Covenant Against Contingent Fees. (MAY 2014) 52.203-6 Restrictions on Subcontractor Sales to the Government. (SEP 2006) 52.203-7 Anti-Kickback Procedures. (MAY 2014) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity. (MAY 2014) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. (MAY 2014) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions. (OCT 2010) 52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees of
Whistleblower Rights. (APR 2014) 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper. (MAY 2011) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. (OCT 2016) 52.204-13 System for Award Management Maintenance. (OCT 2016) 52.204-14 Service Contract Reporting Requirements. (OCT 2016) 52.209-6 Protecting the Government’s Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment. (OCT 2015) 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters. (JUL 2013) 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations (Nov 2015) 52.211-18 Variation in Estimated Quantity. (APR 1984) 52.215-2 Audit and Records – Negotiation. (OCT 2010) 52.215-8 Order of Precedence – Uniform Contract Format. (OCT 1997) 52.219-6 Notice of Total Small Business Set-Aside. (NOV 2011) 52.219-8 Utilization of Small Business Concerns. (NOV 2016) 52.219-14 Limitations on Subcontracting. (JAN 2017) 52.219-28 Post-Award Small Business Program Rerepresentation. (JUL 2013) 52.222-3 Convict Labor. (JUN 2003) 52.222-4 Contract Work Hours and Safety Standards – Overtime Compensation. (MAY 2014) 52.222-6 Construction Wage Rate Requirements. (MAY 2014) 52.222-7 Withholding of Funds. (MAY 2014) 52.222-8 Payrolls and Basic Records. (MAY 2014) 52.222-9 Apprentices and Trainees. (JUL 2005) 52.222-10 Compliance With Copeland Act Requirements. (FEB 1988) 52.222-11 Subcontracts (Labor Standards). (MAY 2014) 52.222-12 Contract Termination – Debarment. (MAY 2014) 52.222-13 Compliance With Construction Wage Rate Requirements and Related Regulations. (MAY
2014) 52.222-14 Disputes Concerning Labor Standards. (FEB 1988) 52.222-15 Certification of Eligibility. (MAY 2014) 52.222-21 Prohibition of segregated facilities. (APR 2015) 52.222-26 Equal Opportunity. (SEP 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction. (APR 2015)
52.222-35 Equal Opportunity for Veterans. (OCT 2015)
(a) Definitions. As used in this clause-- “Active duty wartime or campaign badge veteran,” “Armed Forces service medal veteran,” “disabled veteran,” “protected veteran,” “qualified disabled veteran,’ and “recently separated veteran” have the meanings given at FAR 22.1301.
GMUG NFs – Gunnison RD Page 15 of 32
(b) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-300.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified protected veterans, and requires affirmative action by the Contractor to employ and advance in employment qualified protected veterans.
(c) Subcontracts. The Contractor shall insert the terms of this clause in subcontracts of $150,000 or more unless exempted by rules, regulations, or orders of the Secretary of Labor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate of identify properly the parties and their undertakings.
[Class Deviation- 2017-O0008, Office of Federal contract Compliance Programs Waiver of Certain Clause Requirements in Contracts for Hurricane Harvey Relief Efforts. This clause deviation is effective on Sept 01, 2017, and remains in effect until incorporated into the FAR, or otherwise rescinded.
(d) Notwithstanding the provisions of this section, the Contractor will not be obligated to develop the written affirmative action program required under the regulations implementing the Vietnam Era Veterans’ Readjustment Assistance Act (VEVRAA).
52.222-36 Equal Opportunity for Workers with Disabilities (JUL 2014)
(a) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60.741.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified individuals on the basis of disability, and requires affirmative action by the Contractor to employ and advance in employment qualified individuals with disabilities.
(b) Subcontracts. The Contractor shall include the terms of this clause in every subcontract or purchase order in excess of $15,000 unless exempted by rules, regulations, or orders of the Secretary, so that such provisions will be binding upon each subcontractor or vendor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs of the U.S.
Department of Labor, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.
[Class Deviation- 2017-O0008, Office of Federal contract Compliance Programs Waiver of Certain Clause Requirements in Contracts for Hurricane Harvey Relief Efforts. This clause deviation is effective on Sept 01, 2017, and remains in effect until incorporated into the FAR, or otherwise rescinded.
(c) Notwithstanding the provisions of this section, the Contractor will not be obligated to develop the written affirmative action program required under the regulations implementing section
52.222-37 Employment Reports on Veterans. (FEB 2016) 52.222-50 Combating Trafficking in Persons. (MAR 2015) 52.222-54 Employment Eligibility Verification. (OCT 2015) 52.222-55 Minimum Wages Under Executive Order 13658. (DEC 2015) 52.223-1 Biobased Product Certification. (MAY 2012) 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts. (SEP
2013)
GMUG NFs – Gunnison RD Page 16 of 32
52.223-5 Pollution Prevention and Right-to-Know Information. (MAY 2011) 52.223-6 Drug-Free Workplace. (MAY 2001) 52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction Contracts.
(MAY 2008)
52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving. (AUG 2011)
52.225-9 Buy American – Construction Materials. (MAY 2014)
(a) Definitions. As used in this clause--
“Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is—
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
“Component” means an article, material, or supply incorporated directly into a construction material.
“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
“Cost of components” means--
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
“Domestic construction material” means—
GMUG NFs – Gunnison RD Page 17 of 32
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if—
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
“Foreign construction material” means a construction material other than a domestic construction material.
“United States” means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements the 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows: ______ [Contracting Officer to list applicable excepted materials or indicate “none”]
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute.
(1)
GMUG NFs – Gunnison RD Page 18 of 32
(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
GMUG NFs – Gunnison RD Page 19 of 32
Foreign and Domestic Construction Materials Price Comparison
Construction material description Unit of measure Quantity Price (dollars) * Item 1 Foreign construction material Domestic construction material Item 2 Foreign construction material Domestic construction material
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response;
if oral, attach summary.]
[Include other applicable supporting information.]
[*Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]
52.225-13 Restrictions on Certain Foreign Purchases. (JUN 2008) 52.227-1 Authorization and Consent. (DEC 2007) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement. (DEC 2007) 52.227-4 Patent Indemnity–Construction Contracts. (DEC 2007) 52.228-1 Bid Guarantee. (SEP 1996) 52.228-2 Additional Bond Security. (OCT 1997) 52.228-11 Pledges of Assets. (JAN 2012) 52.228-12 Prospective Subcontractor Requests for Bonds. (MAY 2014) 52.228-14 Irrevocable Letter of Credit. (NOV 2014) 52.228-15 Performance and Payment Bonds – Construction. (OCT 2010) 52.229-3 Federal, State, and Local Taxes. (FEB 2013) 52.232-5 Payments Under Fixed-Price Construction Contracts.(MAY 2014) 52.232-17 Interest. (MAY 2014) 52.232-18 Availability of Funds. (Apr 1984) 52.232-23 Assignment of Claims. (MAY 2014) 52.232-27 Prompt Payment for Construction Contracts. (JAN 2017) 52.232-33 Payment by Electronic Funds Transfer – System for Award Management. (JUL 2013) 52.232-39 Unenforceability of Unauthorized Obligations. (JUN 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. (DEC 2013) 52.233-1 Disputes. (MAY 2014) 52.233-3 Protest After Award. (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004) 52.236-2 Differing Site Conditions. (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984) 52.236-5 Material and Workmanship. (APR 1984) 52.236-6 Superintendence by the Contractor. (APR 1984) 52.236-7 Permits and Responsibilities. (NOV 1991) 52.236-8 Other Contracts. (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (APR
1984)
GMUG NFs – Gunnison RD Page 20 of 32
52.236-10 Operations and Storage Areas. (APR 1984) 52.236-11 Use and Possession Prior to Completion. (APR 1984) 52.236-12 Cleaning Up. (APR 1984) 52.236-13 Accident Prevention. (NOV 1991) 52.236-15 Schedules for Construction Contracts. (APR 1984) 52.236-17 Layout of Work. (APR 1984) 52.236-21 Specifications and Drawings for Construction. (FEB 1997) 52.236-26 Preconstruction Conference. (FEB 1995) 52.242-13 Bankruptcy. (JUL 1995) 52.243-4 Changes. (JUN 2007) 52.244-6 Subcontracts for Commercial Items. (NOV 2017) 52.245-1 Government Property. (JAN 2017) 52.245-9 Use and Charges. (APR 2012) 52.246-21 Warranty of Construction. (APR 1984) 52.249-2 Termination for Convenience of the Government (Fixed-Price). (APR 2012) 52.249-10 Default (Fixed-Price Construction). (APR 1984)
52.252-2 Clauses Incorporated by Reference. (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.acquisition.gov/far or www.usda.gov/procurement/policy/agar.html
52.253-1 Computer Generated Forms. (JAN 1991)
452.228-70 Alternative Forms of Security. (NOV 1996) If furnished as security, money orders, drafts, cashiers checks, or certified checks shall be drawn payable to: USDA Forest Service.
452.228-71 Insurance Coverage. (NOV 1996) Pursuant to FAR clause 52.228-5, Insurance-Work on a Government Installation, the Contractor will be required to present evidence to show, as a minimum, the amounts of insurance coverage indicated below:
(a)Workers Compensation and Employer’s Liability. The Contractor is required to comply with applicable Federal and State workers’ compensation and…