Attachment_2_-_Drawings.pdf
PDF 734 KB Posted
- Attached to
- ALWRI Net Zero Solar Panels and Roof Replacement Federal contract opportunity
- Solicitation number
- 1282FT18R0011
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1282FT18R0011AME0001.pdf | ||
| Solicitation_1282FT18R0011.doc.pdf | ||
| Attachment_4_-_Wage_Determination.pdf | ||
| Attachment_3_-_Solar_Analysis.pdf | ||
| Attachment_1_-_Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VICINITY MAP
THIS PROJECT
MONTANA INDEX MAP
STATION ENGINEER
DATE
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
RMRS
Aldo Leopold Wilderness Research Institute Rocky Mountain Research Station
MISSOULA COUNTY, MONTANA
RMRS
THIS PROJECT
ALWRI ROOF REPLACEMENT
& SOLAR PV PROJECT
AutoCAD SHX Text
HELENA
AutoCAD SHX Text
HARDIN
AutoCAD SHX Text
GREAT FALLS
AutoCAD SHX Text
HARDIN
AutoCAD SHX Text
MISSOULA
AutoCAD SHX Text
BILLINGS
AutoCAD SHX Text
KALISPELL
AutoCAD SHX Text
LIBBY
AutoCAD SHX Text
EUREKA
AutoCAD SHX Text
BOZEMAN
AutoCAD SHX Text
SUPERIOR
AutoCAD SHX Text
ST REGIS
A
B
A5.1
A5.1
A5.1
A5.1
(E
S
LO
P E
D S
T R
U C
T U
R E
1/ 8"
'-0
7 7
3'
ROOF PLAN CONST GENERAL NOTES
CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS & DIMENSIONS
1.
REFERENCE THE SPECIFICATIONS FOR ADDITIONAL INFORMATION ON THE BASIS OF DESIGN.
IT SHALL BE THE RESPONSIBILITY OF THE SYSTEM MANUFACTURER AND THE CONTRACTOR TO
MODIFY DETAILS AS REQUIRED FOR THEIR SYSTEM. THERE WILL BE NO ADDITIONAL COMPENSATION
AFTER THE BID OPENING FOR ANY REQUIRED CHANGES.
2.
PROVIDE FLASHING AT ALL OPENINGS AND EQUIPMENT SHOWN ON THIS DRAWINGS, REFERENCE
MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDL ITEMS PENETRATING THE ROOF ASSEMBLY
3.
REFER TO STRUCTURAL,DRAWINGS FOR ADDL NOTES4.
PROVIDE ROOF CRICKETS AT ALL UPSLOPE AREAS OF MECH EQUIPMENT, CURBS & ROOF HATCHES5.
CRICKETS TO SLOPE POSITIVELY 1/4" PER FOOT FROM HORIZONTAL PLANE. MAINTAIN 1/8" PER FOOT
MINIMUM FOR ALL CRICKET VALLEYS. CRICKETS ARE FOR REFERENCE ONLY. CONTRACTOR TO
PROVIDE DETAILED LAYOUT PLAN FOR ARCHITECT REVIEW PRIOR TO INSTALLATION.
6.
ROOF PENETRATIONS OF ANY KIND SHALL NOT BE LOCATED IN CRICKET VALLEYS, REF DETAIL7. /15 A2.2
ROOF PLAN CONST KEYNOTES
COORDINATE WITH SOLAR PV CONTRACTOR FOR ATTACHMENTS, SUBMIT SHOP DRAWINGS TO COR2
EXISTING PARAPET SCUPPER W/ CONDUCTOR HEAD
ENSURE PATCH (E) RTU PENETRATIONS, ACHIEVES A WATERTIGHT SEAL
RICKET BUILT-UP W/ TAPERED INSUL, REF SPECS FOR ADD'L INFO - TYP.
ROOFTOP MECH EQUIPMENT, EXISTING8
NEW ADHERED EPDM MEMBRANE ROOFING W/ 2 LAYERS OF 1" ROOF BOARD INSULATION
EW METAL COPING - WRAP AND SECURE MEMBRANE OVER PARAPET PRIOR TO INSTALLING
COPING CAP, REF DETAIL 13 / A2.2
NEW FLEXIBLE WALKWAYS - SLIP RESISTANT, ACCEPTABLE TO ROOFING MFR, REF DETAIL
14 / A2.2
9 ROOFTOP FALL PROTECTION GUARD RAIL, EXISTING
ROOF PLAN LEGEND
CRICKET BUILT-UP WITH
TAPERED INSULATION
ROOF WALKWAY PAD,
2'-6" WIDE, TYPICAL
NOTE:
BOTTOM LAYER OF INSULATION SHALL BE
LAID DOWN IN A STAGGERED PROFILE.
STAGGER AND OFFSET TOP LAYER OF
INSULATION FROM BOTTOM LAYER TO
PREVENT ALIGNED EDGES.
NEW ADHERED EPDM MEMBRANE
NEW 1/2" FIBERGLASS MAT
FACED GYPSUM CORE COVER
BOARD, REF SPECS, TYP.
2-1" LAYERS OF ROOF BOARD
INSULATION ON SLOPING ROOF
DECK TO DRAIN PER ROOF PLAN
EXISTING PLYWD ROOF SHEATHING W/
NEW FOAMED-IN-PLACE INSUL OVER
TJL OPEN WEB JOISTS
HEAT WELD ALL 4 SIDES OF THE
WALKWAY TO ROOF MEMBRANE
AS PER MFR SPECS.
COMPATIBLE W/
SPECIFIED ROOF MATERIAL.
NOTES:
- PROVIDE WALKWAY FROM ROOF
ACCESS TO ALL SERVICEABLE
MECHANICAL EQUIPMENT.
- WALKWAY SECTIONS SPACED TO
ALLOW FOR DRAINAGE BETWEEN
SECTIONS: 1" MIN. TO 3" MAX.
2' - 6"
WATERSTOP BY
ROOFING MANUFACTURER
REF: MECHANICAL
HVAC UNIT CURB FLASHING
FASTEN COUNTER-FLASHING
w/ NEOPRENE WASHERED
FASTENERS 6" O.C.
COUNTER-FLASHING
BASE TIE-IN BY
ROOFING MANUFACTURER
ROOF MEMBRANE ASSEMBLY
REF.
RIGID INSULATION REF.
ROOF DECK
BONDING ADHESIVE
WRAP MEMBRANE OVER
PARAPET
(E) MANSARD ROOF ASSEMBLY
/12 A2.2
/12 A2.2
2" MIN
11/2"
HOT PIPE
BASE WRAP TO EXTEND MINIMUM 1" UP VERTICAL
SURFACE OF PIPE AND 2" MINIMUM ONTO FIELD MEMBRANE
WITH A SOLID WELD TO THE DECK MEMBRANE.
UPPER WRAP TO EXTEND 1-1/2" ONTO BASE WRAP AND
8" MINIMUM UP PIPE AND SEALED INTO A BEAD OF
WATER STOP WITH A STAINLESS STEEL COMPRESSION BAND.
METAL HOOD
WATER STOP
REF: MEP SHEETS FOR LOCATIONS
0 1 2 3 4 5 6 7 8 9 10 inches
DRAWING NO.
PKG
NO.
SHEET
OF
DESIGNED SUB SHEET NO.
3/
/2
4:
:4
P
M
A2.2
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
TITLE OF SHEET
ALWRI ROOF REPLACEMENT
& SOLAR PV
CADD
TECH.
REVIEW
DESIGNED
6-19-18
: 1/4" = 1'-0"A2.2A2.2
9 CONSTRUCTION ROOF PLAN
NORTH : 3" = 1'-0"A2.2A8.1
12 MECHANICALLY FASTENED EPDM MEMBRANE REROOF
: 1" = 1'-0"A2.2A2.2
14NEW FLEXIBLE WALKWAY
: 1" = 1'-0"A2.2A5.2
13 ROOF CURB FLASHING
: 3/4" = 1'-0"A2.2A2.2
15PRE-FABRICATED PIPE BOOT
clkegel Highlight
(E) TAPERED TJL'S @ 24" OC
TO REMAIN
A A
B B
8' - 0"
(E) 1/2" SHEATHING TO REMAIN
/8
:1
/8
:1
(3
/2
(2
/2
(3
DENOTES APPROXIMATE
DEPTH OF (E) OPEN WEB
ROOF TRUSSES
0 1 2 3 4 5 6 7 8 9 10 inches
DRAWING NO.
PKG
NO.
SHEET
OF
DESIGNED SUB SHEET NO.
/8
/2
:4
:5
P
M
S2.2
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
TITLE OF SHEET
ALWRI ROOF REPLACEMENT
& SOLAR PV
FOREST SERVICE / ROCKY MOUNTAIN RESEARCH
STATION
: 1/8" = 1'-0"S2.2
5 ROOF FRAMING PLAN - EXISTING
GENERAL NOTES:
REFER TO SPECIFICATION 263100 - SOLAR PV FOR INFORMATION ON SUBMITTALS
REFER TO SOLAR ANALYSIS
COORDINATE WITH NORTHWESTERN ENERGY
COORDINATE WITH ROOFING CONTRACTOR PRIOR TO ANY WORK
smoses Text Box smoses Text Box
| COVERSHEET-Layout1 |
| Sheets and Views |
| Layout1 |
| ALWRI ROOF REPLACEMENT SHEET 2 |
| ALWRI ROOF REPLACEMENT SHEET 3 |
File details come from the government source that posted it.