1282FT18R0011AME0001.pdf
PDF 1 MB Posted
- Attached to
- ALWRI Net Zero Solar Panels and Roof Replacement Federal contract opportunity
- Solicitation number
- 1282FT18R0011
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_1_-_Specifications.pdf | ||
| Attachment_4_-_Wage_Determination.pdf | ||
| Attachment_3_-_Solar_Analysis.pdf | ||
| Attachment_2_-_Drawings.pdf | ||
| Solicitation_1282FT18R0011.doc.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
1282FT18R0011
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
82FT
FORT COLLINS CO 80526
240 W PROSPECT STREET
ROCKY MOUNTAIN RESEARCH STATION
USDA FOREST SERVICE
07/12/20180001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/12/2018
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
ALWRI Net Zero Solar Panels and Roof Replacement
The purpose of Amendment 0001 is as follows:
Provide questions and answers through 07/25/18 and to provide photos of items that need to be removed.
Period of Performance: 08/27/2018 to 12/21/2018
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
ANTHONY O. SALAS
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
1282FTR180011
ALWRI Net Zero Solar Panels and Roof Replacement Amendment No. 0001, dated 07/20/2018
ALWRI Net Zero Solar Panels and Roof Replacement Solicitation Number 12-82FT-R-18-0011
Amendment 0001 – Questions and Answers
GENERAL
Q1.) Have any roof cores been taken?
A1.) No.
Q2.) Does the handrail need to be retained?
A2.) Yes, the contractor shall remove the handrail during roof replacement and re-install.
Q3.) Are the receptacles on the north elevation that were used for heat tape retained?
A3.) No. Please remove the receptacles, wiring and all associated components. In addition, there is another receptacle on the roof deck with a photo-cell that shall also be removed.
Q4.) Can Versico’s EPDM roofing system be approved for this project?
A4.) The Verisco EPDM roofing system is acceptable. The basis-of-design for this product is listed in Specification 075323 Section 8.3.
Sign-In Sheet from the pre-bid walk.
Tyler Gordon Missoula Sheet Metal & Roofing 406-728-2317
Pictures of GFCI Outlets to be removed
East Outlet
West Outlet
Photocell and service outlet
Phone riser to be removed (wire will be already removed)
Handrail to be removed and reinstalled after roofing installation.
| SF-30 |
| Q&A |
| ALWRI Roof Photos |
File details come from the government source that posted it.