B01_1282CS19Q4004_SF1449_Enisgn_Gulch_Stewardship.pdf
PDF 463 KB Posted
- Solicitation number
- 1282CS19Q4004
About this file
Solicitation form.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B01-A02_Q&A_20190724.docx | DOCX document | |
| B01-A02_1282CS19Q4004_SF30_Form.pdf | ||
| B01-A01_1282CS19Q4004_SF30_Form.pdf | ||
| B01-A01_Ensign_Gulch_Prebid_mtg.docx | DOCX document | |
| B01g_Ensign_Gulch_Vicinity_Map.pdf | ||
| B01i_WD_1976-1351_Rev56_20190312.pdf | ||
| B01c_EG_Appendix_C.docx | DOCX document | |
| B01e_Ensign_Gulch_PR_Map.pdf | ||
| B01b_EG_Appendix_B.doc | DOC document | |
| B01d_IREA_Safety_Measures_Ensign_Gulch_IRSC.docx | DOCX document | |
| B01h_Ensign_Gulch_Traffic_Control_Map.pdf | ||
| B01f_Ensign_Gulch_Service_Area_Map.pdf | ||
| B01a_EG_Appendix_A.doc | DOC document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUMIS CHECKED
CODE 18a. PAYMENT WILL BE MADE BY
CODE
FACILITYCODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
OFFEROR
82CS
DURANGO CO 81301-3647
15 BURNETT COURT
SAN JUAN NATIONAL FOREST
82BH CODE 16. ADMINISTERED BYCODE
X
X
113310
SIZE STANDARD:
% FOR:SET ASIDE:UNRESTRICTED OR82CS
RFPIFB
10. THIS ACQUISITION ISCODE
RFQ
14. METHOD OF SOLICITATION
13b. RATING
NAICS:
SMALL BUSINESS
07/29/2019 1700 ET
06/20/2019
970-385-1266RANDAL SADLER
(No collect calls)
INFORMATION CALL:
FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME
4. ORDER NUMBER3. AWARD/ 6. SOLICITATION
1282CS19Q4004
5. SOLICITATION NUMBER
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF
1 62 955438OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
TELEPHONE NO.
17a. CONTRACTOR/
PUEBLO CO 81008
2840 KACHINA DRIVE
PIKE SAN ISABEL NATIONAL FOREST
15. DELIVER TO
DURANGO CO 81301-3647
15 BURNETT COURT
9. ISSUED BY
7.
2. CONTRACT NO.
EFFECTIVE DATE
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW
ISSUE DATE
DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
11.
SEE SCHEDULEX
12. DISCOUNT TERMS
THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13a.
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
8(A)
SAN JUAN NATIONAL FOREST
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
Ensign Gulch Integrated Resource Service Contract
A Pre-Bid Meeting will be held on July 16, 2019 at 0900 at the Junction of Rampart Range Road
(300) and FR 312:
Traveling north on Rampart Range Rd out of Woodland Park, continue to Forest Road 300 (also Rampart Range Road) and turn left onto 300. After 200 yards, stop at junction of 300 & 312.
See clause 452.237-71 for details.
(Use Reverse and/or Attach Additional Sheets as Necessary)
HEREIN, IS ACCEPTED AS TO ITEMS:
XX
DATED
RANDAL W. SADLER
. YOUR OFFER ON SOLICITATION (BLOCK 5),
INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER
ARE
ARE
31c. DATE SIGNED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)
ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL
SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
26. TOTAL AWARD AMOUNT (For Govt. Use Only)
OFFER
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
ARE NOT ATTACHED.
ARE NOT ATTACHED.
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
30b. NAME AND TITLE OF SIGNER (Type or print)
30a. SIGNATURE OF OFFEROR/CONTRACTOR
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
25. ACCOUNTING AND APPROPRIATION DATA
29. AWARD OF CONTRACT:
REF.
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER
37. CHECK NUMBER
FINALPARTIAL
36. PAYMENT
FINALPARTIAL
35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER33. SHIP NUMBER
COMPLETE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)
42b. RECEIVED AT (Location)
42a. RECEIVED BY (Print)
41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
STANDARD FORM 1449 (REV. 2/2012) BACK
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
Period of Performance: 08/01/2019 to 06/30/2021
001 Ensign Gulch Integrated Resource Service Contract
Complete and return section B.2 Schedule of Items with your quote.
32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
62 2 of
Solicitation: 1282CS19Q4004 Page 3 of 62
A - Solicitation/Contract Form B - Supplies or Services/Prices
PART I - THE SCHEDULE
C - Description/Specifications D - Packaging and Marking E - Inspection and Acceptance F - Deliveries or Performance G - Contract Administration Data H - Special Contract Requirements I - Contract Clauses J - List of Documents, Exhibits and Other Attachments K - Representations, Certifications, and Other Statements of Bidders L - Instructions,Conditions, and Notices to Bidders M - Evaluation Factors for Award
A - Solicitation/Contract Form
52.252-2 Clauses Incorporated by Reference. (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): FAR Clauses and provision: https://www.acquisition.gov/browsefar AGAR Clauses and provisions:
https://www.dm.usda.gov/procurement/policy/agar.htm
(End of clause)
Solicitation: 1282CS19Q4004 Page 4 of 62
B - Supplies or Services/Prices
PART I - THE SCHEDULE
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
B.1 GENERAL INFORMATION:
Proposals shall be valid for 60 days after the date of receipt for the solicitation. If additional time is needed, an extension will be requested. Refer to Section L for instructions on preparing your proposal and pricing.
Bonds: Bid Bonds, Payment Bonds, and Performance Bonds are not required for this project.
All Contractors must be actively registered in the System for Award Management (SAM) (https://SAM.gov) to be eligible for award under this solicitation. If not actively registered by time of proposal evaluations, you will be found non-responsive. Registration in SAM is a free service - you do not need to pay to register in this system. If your registration is not active, you will not be considered for award.
B.2 SCHEDULE OF ITEMS
B.2.1 MANDATORY WORK ACTIVITIES:
Contractor Name
Item No.
Description OF Mandatory work activities Unit
Estimated Quantity ACRES Unit Price Total
Cut designated trees that are 5-7.9" dbh (all species except lodgepole) and 5 -6.9" dbh (lodgepole), whole tree yard, process and deck trees at locations agreed to by the Forest Service, remove trees from contract area, and pile landing slash. Masticate designated non-saw and biomass. Road Maintenance -During and Post Haul. 1 18 $ $
Cut designated trees that are 5-7.9" dbh (all species except lodgepole) and 5 -6.9" dbh (lodgepole), whole tree yard, process and deck trees at locations agreed to by the Forest Service, remove trees from contract area, and pile landing slash. Masticate designated non-saw and biomass. Road Maintenance -During and Post Haul. 2 55 $ $
Cut designated trees that are 5-7.9" dbh (all species except lodgepole) and 5 -6.9" dbh (lodgepole), whole tree yard, process and deck trees at locations agreed to by the Forest Service, remove trees from contract area, and pile landing slash. Hand cut designated non-saw and biomass and pile in unit. Road Maintenance - During and Post Haul. 3 48 $ $
Cut designated trees that are 5-7.9" dbh (all species except lodgepole) and 5 -6.9" dbh (lodgepole), whole tree yard, process and deck trees at locations agreed to by the Forest Service, remove trees from contract area, and pile landing slash. Hand cut designated non-saw and biomass and pile in unit. Road Maintenance -Pre, During and Post Haul. 4 92 $ $
Cut designated trees whole tree yard, process and deck trees at locations agreed to by the Forest Service, and pile landing slash. Masticate designated non-saw and biomass. 5 67 $ $
Cut designated trees, whole tree yard, process and deck trees at locations agreed to by the Forest Service, and pile landing slash. Masticate designated non-saw and biomass. 6 22 $ $
6A Masticate designated trees that are 5-9.9" dbh (all 7 17 $ $
Solicitation: 1282CS19Q4004 Page 5 of 62 species except live aspen)
Cut designated trees that are 5-7.9" dbh (all species except lodgepole) and 5 - 6.9" dbh (lodgepole), whole tree yard, process and deck trees at locations agreed to by the Forest Service, remove trees from contract area, and pile landing slash. Hand cut designated non-saw and biomass and pile in unit. Road Maintenance - During and Post Haul. 8 10 $ $
Total All Mandatory Service Items $
B.2.2 OPTIONAL WORK ACTIVITIES:
There are no optional work activities for this contract.
B.2.3 TIMBER/PRODUCT REMOVAL PRICE SCHEDULE:
Note: These schedules are for pricing/payment purposes. See Instructions to Offerors for business proposal requirements.
NOTE: Price Proposals MUST be provided on ALL Items in Schedules: Mandatory Work and Option Work Activities and Timber or other products Removal Price Schedule. Unit prices prevail.
B.3 LAND MANAGEMENT ACTIVITIES.
Performance of land management activities shall be in accordance with Section C - Project Description and Work Specifications.
Payment for Land Management Work Activities in Schedule B-2.1 will be made in Stewardship Credits in lieu of cash, as defined in Section G. All Base Work Activities shall be performed. Option activities are listed in order of planned priority. Award may be made for option items in any order that the Contracting Officer determines is in the best interest of the Government.
SPECIES PRODUCT QUANTITY UNIT OF
MEASURE
MINIMUM
ACCEPTABLE
OFFER
OFFER
(FLAT)
TOTAL
OFFER
Combined Softwoods Sawtimber 558 CCF $3.00
Spruce Sawtimber 247 CCF $5.00
Combined Softwoods Non-saw 585 CCF $1.00
Timber Subject to Agreement
All Biomass 321 Green Tons $0.10
Total - All Products
Solicitation: 1282CS19Q4004 Page 6 of 62
C - Description/Specifications
452.211-72 Statement of Work/Specifications. (FEB 1988)
The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
(End of Clause)
SECTION C - DESCRIPTION/ SPECIFICATIONS/STATEMENT OF WORK
C.2 Project Description
(a) Description of Work - The purpose and need for this project are: Reduce the risk of high-intensity wildfires by restoring low-intensity fire to ponderosa pine, aspen, shrub and grass ecosystems within a Wildland Urban Interface project area, moving the vegetation closer to historical conditions. The objectives of the project are as follows:
Move the landscape toward a more desirable, ecologically resilient condition better able to support more natural forest structures, disturbance regimes, vegetative diversity, wildlife habitats, and proper functioning watersheds for future generations.
Reduce crown fire risk, spot fire potential and surface fire intensity in short needle stands by the means of mechanical and hand thinning, pile burning, and mastication.
Utilize Timber or other products (public firewood) - Provide wood resource to forest product industry.
- Nutrient recycling in long-needle pine beds.
Improve Forest Health - Provide growing space for healthy trees, reduce fuel loadings, and increase the vigor of grasses, forbs and shrubs.
Improve and protect wildlife and their habitat.
Lower present and future mountain pine beetle and spruce budworm infestations.
Improve Road Management - Provide maintenance and obliteration to meet project area transportation plan and resource needs.
Reduce the negative impacts that wildfire could have on watersheds.
To accomplish these objectives, the contract includes the following components: stand cleaning/thinning, mechanical fuels reduction, non-commercial cleaning/thinning, and piling of fuels, timber or other products, removal and decking of sawtimber and non-sawtimber, and road work.
(b) Resulting Contract - Any resultant contract will be a commercial services contract with requirements for timber removal.
(c) Project Location - The Ensign Gulch Fuels Management Project is located on the Pikes Peak Ranger District of the Pike and San Isabel National Forests approximately four (4) miles NW of the town of Woodland Park, CO. The legal description is: T12S, R68W, Sections 3, 4, 5, 8, 9, and 10, 6th PM, El Paso County Colorado.
C.3 Specifications
Specifications for each Stewardship Activity individually described by an item number in Schedule B pages can be found in Appendix A. Specifications for timber removal can be found in Appendix B. Road Maintenance plans and specifications can be found in Appendix C.
C.4 Contract Area Map
The boundaries of Subdivisions or Payment Units and any cutting units thereof, are as shown on the attached "Contract Area Map," which is made a part hereof, and were, before solicitation, designated on the ground by Forest Service to meet the anticipated needs of the parties. The location of the Subdivisions or Payment Units and their approximate acreage are stated in Division A/AT.
Subdivisions or Payment Units may be revised and additional ones may be established only by written agreement of both parties.
Where applicable, the following are also identified on Contract Area Map:
Solicitation: 1282CS19Q4004 Page 7 of 62
(a) Identified claims limiting Contractor's rights;
(b) Boundaries of cutting units;
(c) Areas where leave trees are marked to be left uncut;
(d) Roads listed
(e) Sources of base course, rock riprap and surface rock;
(f) Roads where log hauling is prohibited or restricted;
(g) Roads and trails to be kept open;
(h) Improvements to be protected;
(i) Locations of known historical sites;
(j) Maximum stump heights when more than one height is listed by areas;
(k) Skidding or yarding methods specified;
(l) Streamcourses to be protected;
(m) Other features required by Appendix B; and
(n) Boundaries of stewardship work activities.
C.5 Government-Furnished Property Not Applicable
C.6 Operating Plan and Schedule:
The Contractor will provide a detailed timeline of when the contract requirements will be accomplished while conforming to the requirements within Section F.5. The operating plan should indicate the sequence of activities that will take place to accomplish the tasks described within the solicitation, Appendix A, Appendix B, and Appendix C including proposed start and completion dates. The operating plan and schedule should contain the following elements:
A list of employees/personnel working on this contract identifying each by the Occupational Code/Job Title for the work as it applies to this contract under the applicable Service Contract Act wage rate.
All Subcontractors must also provide a list of all employees/personnel working on this contract identifying each by their Occupational Code/Job Title as it applies to this contract under the applicable Service Contract Act wage rate.
A proposed communication plan regarding findings, progress, information exchange, questions, and concerns of both parties.
Depending upon how the contractor proposes accomplishing the activities within the solicitation, the Operating Plan and Schedule may be developed by indicating when and how all work activities within individual units will be completed, when and how individual tasks will be completed, or a combination of when and how units or tasks will be completed. The contractor should be able to display through an operating plan and schedule that all of the contract activities will be accomplished in a timeline that will meet the contract requirements.
Key Personnel
The following personnel are considered key personnel by the government: Project Manager and Field Representative. The contractor shall provide a Project Manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The Project Manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 8:00 a.m. to 5:30 p.m Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons. Qualifications for all key personnel are listed below:
The government desires that the project manager and Alternate have 3 years of experience in forest management projects. The field representative should have at least 3 years of experience in managing operations of forest management projects.
C.7 Sustainable Acquisition
The Contractor shall comply with the Agricultural Act of 2014; the Food, Conservation and Energy Act of 2008 (FCEA), 7 U.S.C.
8102; the Farm Security and Rural Investment Act of 2002 (FSRIA), 7 U.S.C. 8102; the Federal Acquisition Regulation; Executive Order (EO) 13514, -Federal Leadership in Environmental, Energy and Economic Performance,- dated October 5, 2009; EO 13423, "Strengthening Federal Environmental, Energy, and Transportation Management," dated January 24, 2007; and Presidential Memorandum, "Driving Innovation and Creating Jobs in Rural America through Biobased and Sustainable Product Procurement,"
Solicitation: 1282CS19Q4004 Page 8 of 62 dated February, 2012 to provide biobased products.
In compliance with FAR Part 23.4 through performance of this contract, the Contractor shall make maximum use of EPA designated and USDA designated biobased in accordance with FAR clause 52.223-2 Affirmative Procurement of Biobased Products under Service and Construction Contracts and 52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction Contracts the Contractor shall utilize products and material made from biobased materials (e.g. biobased greases, biobased hydraulic fluids, biobased absorbents) to the maximum extent possible in the performance of this contract without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. Information about this requirement and a catalog of products are available at the BioPreferred Web Site.
The Contractor shall utilize products and material to the maximum extent possible in the performance of this contract from EPA's list of designated products and the accompanying recommendations for post-consumer content and recovered materials content in the following eight categories: Construction products, Landscaping products, Nonpaper Office Products, Paper and Paper Products, Park and Recreation products, Transportation Products, Vehicular Products, and Miscellaneous Products.
Compliance with the USDA Biobased requirements requires Contractors to report the purchase of biobased products under service and construction contracts through the System for Award Management (https://SAM.gov) and provide a copy of the report to the Contracting Officer.
C7.1 Sustainable products identified for this solicitation:
The following is a list of categories for biopreferred products and EPA products that that may be used in the performance of this contract. The list is not all inclusive; the Contractor shall research for available products.
C7.1.1 BioPreferredProducts:
a Diesel Fuel Additives
(1) Any substance, other than one composed solely of carbon and/or hydrogen, that is intentionally added to diesel fuel (including any added to a motor vehicle's fuel system) and that is not intentionally removed prior to sale or use.
(2) Neat biodiesel, also referred to as B100, when used as an additive. Diesel fuel additive does not mean neat biodiesel when used as a fuel or blended biodiesel fuel (e.g., B20). 90% - Minimum Biobased Content.
b Hydraulic Fluids - Mobile Equipment Hydraulic fluids formulated for general use in nonstationary equipment, such as tractors, end loaders, or backhoes. 44% - Minimum Biobased Content.
c Penetrating Lubricants Products formulated to provide light lubrication and corrosion resistance in close tolerant internal and external applications including frozen nuts and bolts, power tools, gears, valves, chains, and cables. 68% - Minimum Biobased Content.
d Greases - Truck Lubricants composed of oils thickened to a semisolid or solid consistency using soaps, polymers or other solids, or other thickeners. Lubricants that are designed for use on the fifth wheel of tractor trailer trucks onto which the semi-trailer rests and pivots. 71% - Minimum Biobased Content.
e Gear Lubricants Products, such as greases or oils, that are designed to reduce friction when applied to a toothed machine part (such as a wheel or cylinder) that meshes with another toothed part to transmit motion or to change speed or direction. 58% - Minimum Biobased Content.
f Fuel Conditioners Products formulated to improve the performance and efficiency of engines by providing benefits such as removing accumulated deposits, increasing lubricity, removing moisture, increasing the cetane number, and/or preventing microbial growths within the fuel system. 64% - Minimum Biobased Content.
g Erosion Control Woven or non-woven fiber materials manufactured for use on construction, demolition, or other sites to prevent wind or water http://www.biopreferred.gov/BioPreferred/ http://www.epa.gov/epawaste/conserve/tools/cpg/products/index.htm http://www.epa.gov/epawaste/conserve/tools/cpg/products/index.htm https://www.sam.gov/portal/SAM/%231 http://www.biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xhtml
Solicitation: 1282CS19Q4004 Page 9 of 62 erosion of loose earth surfaces, which may be combined with seed and/or fertilizer to promote growth. 77% - Minimum Biobased Content.
h 2-Cycle Engine Oils Lubricants designed for use in 2-cycle engines to provide lubrication, decreased spark plug fouling, reduced deposit formation, and/or reduced engine wear. 34% - Minimum Biobased Content.
C7.1.2 EPA Designated Products:
Plastic trash bags, printer ribbons, toner cartridges, print & writing papers, Traffic Barricades, Traffic Cones, Engine Coolants, Rebuilt Vehicular Parts, Re-refined lubricating oils, retread tires, manual grade strapping, signage, sorbents.
C.8 Definitions Acceptable Quality Level: The allowable leeway or variance from a standard before the government will reject the specific service.
An AQL does not say that the contractor may knowingly offer defective service. It implies that the government recognizes that defective performance sometimes happens unintentionally. As long as the percent of defective performance does not exceed the AQL, the service will not be rejected by the government. The contractor, however, must re-perform the defective service when possible.
Biobased Products: See Sustainable Acquisitions
Contracting Officer (CO): Individual with authority to bind the government with their signature on the contract.
Contracting Officer Representative (COR): Individual(s) designated to act on the behalf of the CO within the delegation given them in writing.
Period of performance (also Performance period or Contract time): All calendar days allowed for completion of contract work.
Includes all days of the week including weekends and holidays.
Quality Assurance: Those actions taken by the government to check goods or services to determine that they meet the requirements of the SOW.
Quality Assurance Surveillance Plan (QASP): An organized written document used for quality assurance surveillance. The document contains information about how the government will assess performance, checklists, and may contain decision tables.
Quality Control: Those actions taken by a contractor to control the production of goods or services so that they will meet the requirements of the Performance Statement of Work. Refer to Inspection and Acceptance in clause 52.212-4 and Contractors Quality Control Plan as described in Section E.
Quality Control Plan: Contractors plan for self-monitoring work prior to Government inspection and acceptance. See Section E.
Random Sampling: A method of looking at a few individual items in a lot to determine the quality of that lot against a standard.
(Acceptable) Service: A job performed to the standard and within the acceptable quality level. The contractor must do the specific job, and meet the standard, and meet the acceptable quality level before one can say that performance has been acceptable and that he/she should be paid.
Standard: An acknowledged measure of comparison.
Stewardship Contracting: An exchange of goods/products for services including construction.
Sustainable Acquisitions (FAR Part 23.4 - Use of recovered materials and biobased products)
a. Biobased Products: Managed by the U.S. Department of Agriculture (USDA), the goal of the BioPreferred program is to increase the purchase and use of biobased products. The BioPreferred program was created by the 2002 Farm Bill and reauthorized and expanded as part of the Agricultural Act of 2014 (the 2014 Farm Bill). The program's purpose is to spur economic development, create new jobs and provide new markets for farm commodities. The increased development, purchase, and use of biobased products reduce our nation's reliance on petroleum, increase the use of renewable agricultural resources, and contribute to reducing adverse environmental and health impacts. Information on biobased/biopreferred products can be found at the BioPreferred Site . The Contractor shall comply with the clause at FAR 52.223-2, Affirmative http://www.epa.gov/epawaste/conserve/tools/cpg/products/index.htm http://www.biopreferred.gov/BioPreferred/faces/pages/AboutBioPreferred.xhtml http://www.gpo.gov/fdsys/pkg/BILLS-113hr2642enr/pdf/BILLS-113hr2642enr.pdf http://www.biopreferred.gov/BioPreferred/
Solicitation: 1282CS19Q4004 Page 10 of 62
Procurement of Biobased Products Under Service and Construction Contracts and the provision at FAR 52.223-1, Biobased Product Certification.
b. EPA-designated items: Products that are or can be made with recovered material. The Comprehensive Procurement Guideline (CPG) program is part of EPA's continuing effort to promote the use of materials recovered from solid waste.
Buying recycled-content products ensures that the materials collected in recycling programs will be used again in the manufacture of new products. See FAR 52.223-17 Affirmative Procurement of EPA-designated items in Service and Construction Contracts.
C.8.1 Technical Definitions - See Appendices.
http://www.epa.gov/epawaste/conserve/tools/cpg/index.htm http://www.epa.gov/epawaste/conserve/tools/cpg/index.htm
Solicitation: 1282CS19Q4004 Page 11 of 62
D - Packaging and Marking
There are no clauses for this section.
Solicitation: 1282CS19Q4004 Page 12 of 62
E - Inspection and Acceptance
E.2 Contractor Quality Control Inspection System
The Contractor shall identify the quality control inspection system it will use to ensure that contract specifications will be achieved.
At no time shall the contractor rely upon Government inspections to provide notification of unsatisfactory performance. The Contractor shall produce written inspection records in a format and at times and places satisfactory to the Contracting Officer.
Inspection records shall be made available upon request of the Contracting Officer and be maintained until the date of contract closure. The Contracting Officer may observe the Contractor's inspection at any time and shall otherwise have unlimited access to the inspection data.
E.2.1 Quality Control Plan. The Contractor shall provide a general Quality Control Plan (QCP) with the technical proposal. The Contractor shall supplement the QCP within 7 days before start work based on items awarded to the Contractor and Government comments. The contractor shall conduct quality control inspections on all aspects of work. The field inspections shall be performed on each sub-item listed in each Contract.
The general Quality Control Plan must demonstrate how the Contractor will assure quality meets the requirements and specifications of the contract. The Plan shall describe how quality will be monitored to assure the performance standards are met, the supervision of crew and work, and personnel that will be performing the quality control. Quality control shall include monitoring quality while work is in progress, residiual tree care and other associated tasks, an unbiased sample of the following:
a) Thinning
1. Treatment of non-saw in accordance with Appendix A.
2. Treatment of sawtimber in accordance with Appendix B.
b) -Slash Requirements
1. Treatment of slash in accordance with Appendix A, Section 5.2 and Appendix B, RO-K-G.7#.
2. Piling at landings in accordance with Appendix A, Section 5.2.E and Appendix B, RO-K-G.7#.
c) -Temporary Road Work / Skid Trails
1. As outlined in Appendix B.
E.2.2 Contractor Quality Control Inspection Refer to Appendix A, 7
E.2.2.1 Plot Inspections. Refer to Appendix A, 7
E.3 Acceptance The Contractor shall provide a written request for inspection and submit inspection sheets in accordance with the QCP. The Government will conduct an inspection and up to one re-inspection for each unit. If the contractor fails to meet the minimum AQL, the contractor shall rework the unit. Anytime more than two inspections are required per unit, the contractor may be assessed for additional inspections, which will include mileage and hourly rate of the COR. If follow-up inspections indicate that the minimum AQL was not met, the work will be deemed unsatisfactory and a deduction in payment may result (Section G-3.4). Acceptance may be made for all or portions of work.
E.4 Government Quality Assurance Surveillance Plan Quality assurance specific to individual items will be found in Appendix A.
Solicitation: 1282CS19Q4004 Page 13 of 62
F - Deliveries or Performance
452.211-74 Period of Performance. (FEB 1988)
The period of performance of this contract is from date of award through June 30, 2021.
(End of Clause)
F. 2 Commencement, Prosecution, and Completion of Work The Contractor shall be required to (a) commence work under this contract in accordance with the accepted operation plan; starting work when the Contractor receives the Notice to Proceed, (b) prosecute the work diligently, and (c) complete the entire project including final cleanup of the premises by June 30th 2021.
See Section F.4 below for special contract time and performance restrictions concerning the performance of work on this contract. Additional restrictions on the Scheduling of Work for resource protection, etc. may be addressed in the Technical Specifications.
F.4 Special Contract Time and Performance Restrictions The Contractor shall perform this contract according to the following restrictions. Additional performance restrictions may also be found in the Technical Specifications and/or on contract maps.
Treatment Unit # Description of Restriction 2 No contract related activities will be allowed from 6 P.M. on Friday until 6 A.M. on Monday or
6 P.M. of the day preceding a federal holiday to 6 A.M. of the day following the holiday.
F.5 Schedules and Reports Contractor shall provide the following submittals as stated below unless otherwise mutually agreed upon. The Contractor shall update all submittals as needed, or as required by the CO, but in no case less than once per calendar year on a date specified by the Contracting Officer:
ITEM DESCRIPTION SUMBITAL DUE COPIES
REQUIRED
Proposed Operation Plan (Overall Schedule): The Contractor shall prepare and submit two copies (or one electronic copy) of a practicable schedule showing the order in which the Contractor proposes to perform the work, and the starting and completion dates of various phases of the work. The schedule shall comply with the contract time requirements in the contract (or Task Order), including, but not limited to Paragraphs F.2 and F.5. The schedule shall be provided in either 8.5"x11" or 11"x17" format.
With Proposal 2
Subcontractors: List of proposed sub-contractors and their intended work. Sub-contractors must have Contracting Officer's written approval prior to starting work on the project.
With Proposal 2
Traffic Control Plan. The Contractor shall prepare and submit a Traffic Control Plan detailing conformance with OSHA requirements, MUTCD requirements, and all other contract requirements, including, but not limited to Paragraph H.9, "Traffic Control Plan" and the requirements included in the Appendices, if any.
10 days after issuance of Notice to Proceed 2
Soil Erosion and Water Pollution Control Plan. The Contractor shall prepare and submit an Erosion Control Plan detailing permanent and temporary control measures to minimize erosion and sedimentation during and after contract performance. Plan shall conform to all contract requirements, including but not limited to Paragraph H.18, "Erosion Prevention and Control", and the requirements in the Appendices, if any.
10 days after issuance of Notice to Proceed 2
Safety Plan. The Contractor shall comply with the requirements of FAR 52.236-13 - Accident Prevention, for all activities under this contract. (Paragraph I.2)
With Proposal 1
Quality Control Plan. Submit original with proposal. Any updates need to be provided for approval to the CO. Refer to E.2
With Proposal 2
Designation of Contractor personnel describing responsibilities and authorities At prework Meeting 2
BioBased Report. Submit annually. Refer Section C.7 October 31 All schedules and reports shall be submitted to the Contracting Officer's Representative identified by the CO, unless the Contracting Officer directs the Contractor to submit any schedules or reports directly to the CO.
Solicitation: 1282CS19Q4004 Page 14 of 62
G - Contract Administration Data
G.2 Measurement All linear and area measurements under this contract are measured on a horizontal plane.
G.3 Payment It is anticipated that funds will be exchanged in the performance of this contract because the value of the timber or other products will not completely offset the value of the work to be performed. Payment shall only be made under this clause to the extent that the work performed will not be offset by the timber or other products value during the contract period. When payment is made to the contractor for work performed, it will be made in accordance with FAR 52.212-4 Contract Terms and Conditions-Commercial Items (i) - Payments and 52.232-33 Payment by Electronic Funds Transfer - System for Award Management (See clause 52.212-5). Submit certification G.8 with all invoices.
Invoices are to be submitted to IPP.gov : INVOICE PROCESSING PLATFORM IPP ALL INVOICES MUST BE SUBMITTED
ELECTRONICALLY THROUGH THE INVOICE PROCESSING PLATFORM (IPP) VIA WWW.IPP.GOV
The value of work completed and timber or other products removed will be documented in a Stewardship Statement of Account produced by Timber Sale Accounting (TSA) monthly when harvesting operations are underway.
G.3.1 Payment Reductions G.3.1.1 Payments for tasks meeting stated minimum AQL or above The Government expects to receive quality services. The minimum AQL is required to achieve a satisfactory performance rating.
Full payment will be made for final work meeting at least identified AQL and above (As identified in Appendix A, Section VII.)
G.3.1.2 Payments for task with AQL between 1% and 10% below minimum AQL If the task deliverable cannot or will not be reworked to achieve the minimum required AQL, payment of 90% of the unit price will be applied to tasks falling between 1% and 10% below identified AQL.
Example - 90% AQL is achieved on task with 95% AQL requirement (5% below minimum AQL.) Unit price is $10,000.00 10,000 x 90% = 9,000 price to be paid for unit.
G.3.1.3 Payments for task with AQL between 11% and 20% below minimum AQL If the task deliverable cannot or will not be reworked to achieve the minimum required AQL, payment of 90% of the unit price will be applied to tasks falling between 11% and 20% below identified AQL.
Example - 75% AQL is achieved on task with 95% AQL requirement (20% below minimum AQL.) Unit price is $10,000.00 10,000 x 90% = 9,000 x 75% = $6,750.00 price to be paid for unit.
G.3.1.4 Payments for tasks with AQL below 21% minimum AQL If the task deliverable cannot or will not be reworked to achieve the minimum required AQL, payment of 80% of the unit price times the actual AQL received will be made for AQL falling below 21% required AQL.
Example - 70% AQL is achieved on task with 95% AQL requirement (AQL is 25% below minimum AQL.) Unit price is $10,000.00 10,000 x 80% = 8,000 x 70% = $6,400.00 price to be paid for unit.
G.3.2 Re-Inspection Costs If rework of task(s) is required, the Contractor will be assessed the costs incurred by the Government in performing such activities.
One inspection will be authorized at each of the draft stages and one at the final report stage.
Any resubmittals of drafts will be re-inspected and will accrue re-inspection costs.
If final report requires rework the resubmittal will be re-inspected and will accrue re-inspection costs.
The table below lists charge rates for Government re-inspection of work.
Activity Charge rate Government wages (per employee performing re-inspection)
$50.00/hour
*Government mileage $0.575/mile
Solicitation: 1282CS19Q4004 Page 15 of 62
*Mileage reimbursement rate in effect January 1, 2016 is $.54 per mile. Mileage rates change periodically and the most current mileage rates for assessed damages at the time will be used. Most current mileage rates can be found at the General Services Administration website GSA Mileage.
G.3.3 FINAL PAYMENT - RELEASE OF CLAIMS
The Government shall pay the amount due the Contractor under this contract after
(1) Completion and acceptance of all work;
(2) Presentation of a properly executed invoice; and
(3) Presentation of release of all claims against the Government arising by virtue of this contract, other than claims, in stated amounts, that the Contractor has specifically excepted from the operation of the release.
G.4 Incidental Payment Items The intent of the contract is to provide for the complete performance of the project described in the contract. Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with drawings, specifications, and provisions of the contract. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment for items shown.
G.5 Product Payment Guarantee To guarantee payment for product in advance of cutting, Contractor may earn Stewardship Credits in advance of cutting, or provide a product payment guarantee in the form of an acceptable surety payment bond, irrevocable letter of credit (ILOC), cash, or a deposit in a Federal Depository negotiable securities of the United States.
Any earned stewardship credits and product payment guarantee together will maintain a minimum unobligated balance equal to the applicable charges for product the Forest Service estimates will be cut or removed in not less than 30 calendar days and not more than 60 calendar days, plus the value of any outstanding charges for product removed.
Securities shall be deposited through the Contracting Officer accompanied by a power of attorney and agreement authorizing the bond-approving officer to sell or collect such securities if payment is not made within 15 days of billing by Forest Service. The penal sum of such surety bond or the market value at time of deposit of such negotiable securities shall be the maximum amount of the payment guaranteed.
Product payment guarantee for a single contract shall be provided utilizing Form FS6500-12 Payment Bond.
Blanket Payment Bond:
Contractor may furnish an acceptable bond, or deposits securities, to guarantee payment for product from multiple contracts.
Contractor shall not start cutting hereunder until this contract receives an allocation that will meet the obligation for product payment guarantee.
The amount of such bond or deposited securities shall be allocated to such contracts by the Forest Service. The Contractor shall provide the contact information for the Forest Service representative administering the blanket payment bond to the Contracting Officer. The Forest Service representative administering the blanket payment bond will provide the Contracting Officer with documentation showing the allocation to this contract.
When there is to be no product cutting or removal hereunder for 30 days or more and payment of current charges has been made, the allocation to this contract may be reallocated to other contracts at Contractor's request.
Payment guaranteed with acceptable blanket payment bond for multiple contracts shall be provided utilizing Form FS-6500- 12a Blanket Payment Bond.
G.6 Stewardship Credits Stewardship Credits are credits that are earned and established when work listed in the B.1 Schedule of Supplies/Services has been performed and accepted. Stewardship credits shall be earned at the rate as shown in the Schedule. Earned credits may be used to pay for timber or other products value included in Schedule B.2. Unless otherwise indicated in the Schedules, credits will be earned based upon Actual Quantities accomplished and accepted.
G.7 Establishment of Stewardship Credits http://www.gsa.gov/portal/category/104715
Solicitation: 1282CS19Q4004 Page 16 of 62
Notwithstanding references to payments in "Payment" clauses of this contract, payment for Stewardship Activities will be made with Product Value or other funding as indicated in the award document.
Stewardship Credits will be established on a monthly basis. Stewardship credits will be established for the number of units of each activity that have been completed and accepted. Acceptance may be for all, or a reasonable portion of, any specific activity.
Stewardship credits will not be established for work that is in progress that has not been accepted by the Forest Service. No credits will be established for work performed under terms of Schedule B.2.3.
G.8 Contractor Certification Contractor will submit certification with every invoice and monthly, as Stewardship Credits are established. The Contractor shall furnish the following certification indicating if for invoice, stewardship credit or both. Credit will not be received if certification is not submitted.
CONTRACTOR CERTIFICATION
- Invoice and/or Stewardship Credit Earned
Page of Unit (Region, Forest, District) Project: Contract No.
Name and Address of Contractor:
Invoice No. Invoice Date:
I hereby certify, to the best of my knowledge and belief, that--
(1) The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the contract;
(2) Payments to subcontractors and suppliers have been made, and timely payments will be made for the work activities covered by this certification, in accordance with subcontract agreements and the requirements of Chapter 39 of Title 31, United States Code;
(3) This request for progress payments/credits does not include any amounts which the prime contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract; and
(4) This certification is not to be construed as final acceptance of a subcontractor's performance.
(Name)
(Title)
(Date)
G.9 Excess Stewardship Credits In the event there are excess (unused) established Stewardship Credits when all of the included timber or other products has been cut and removed the Forest Service, at its option, shall either add more timber or other products or make cash payment for the unused credits.
Solicitation: 1282CS19Q4004 Page 17 of 62
G.10 Excess Timber or Other Products Value In the event the value of the included timber or other products exceeds the total value of all of the mandatory activities plus the ordered optional activities, the Contractor shall make cash payment for the excess timber or other products value.
G.11 Refund of Excess Cash If at any time the credit balance of the Stewardship Statement of Account exceeds the charges for timber or other products removed to date and for timber or other products that the Forest Service estimates will be cut within the next 60 calendar days, any portion of such excess from cash in the account shall be refunded if requested by Contractor. If no cutting is planned within the next 60 calendar days, refund of the entire unencumbered cash balance may be made. After a refund, deposits shall be made to meet the requirements of the clause entitled, "PRODUCT PAYMENT GUARANTEE" before additional timber or other products may be cut.
Solicitation: 1282CS19Q4004 Page 18 of 62
H - Special Contract Requirements
452.236-72 Use of Premises. (NOV 1996)
(a) Before any camp, quarry, borrow pit, storage, detour, or bypass site, other than shown on the drawings, is opened or operated on USDA land or lands administered by the USDA, the Contractor shall obtain written permission from the Contracting Officer. A camp is interpreted to include a campsite or trailer parking area of any employee working on the project for the Contractor.
(b) Unless excepted elsewhere in the contract, the Contractor shall (i) provide and maintain sanitation facilities for the work force at the site and (ii) dispose of solid waste in accordance with applicable Federal, State and local regulations.
(End of clause)
452.215-73 Postaward Conference. (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled within 30 days after the date of contract award.
The conference will be held at: the project location, and will include discussion of contract terms and work performance requirements, work progress schedule and fire prevention/suppression and safety plans..
(End of Clause)
452.236-78 Fire Suppression and Liability. (MAR 2016)
(a) Contractor's Responsibility for Fire Fighting. The Contractor, under the provisions of FAR clause at 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements, shall immediately extinguish all fires on the work site other than those fires in use as a part of the work. The Contractor may be held liable for all damages and for all costs incurred by the Government for labor, subsistence, equipment, supplies, and transportation deemed necessary to control or suppress a fire set or caused by the Contractor or the Contractor's agents or employees subject to the following fire classifications listed in subsection (b).
(b) Fire Suppression Costs. The Contractor's obligations for cost of fire suppression vary according to three classifications of fires as follows:
(1) Operations Fire. An "operations fire" is a fire caused by the Contractor's operations other than a negligent fire.
The Contractor agrees to reimburse Forest Service for such cost for each operations fire, subject to a maximum dollar amount of $2,700. The cost of the Contractor's actions, supplies, and equipment on any such fire, or otherwise provided at the request of Forest Service, shall be credited toward such maximum. If the Contractor's actual cost exceeds contractor's obligation stated above, Forest Service shall reimburse the contractor for the excess.
(2) Negligent Fire. A "negligent fire" is a fire caused by the negligence or fault of the Contractor's operations including, but not limited to, one caused by smoking by persons engaged in the Contractor's operations during the course of their employment, or during rest or lunch periods; or if the Contractor's failure to comply with requirements under this contract results in a fire starting, or permits a fire to spread. Damages and the cost of suppressing negligent fires shall be borne by the Contractor.
(3) Other Fires on Contract Area. Forest Service shall pay the Contractor, at firefighting rates common in the area or at prior agreed rates, for equipment or personnel furnished by the Contractor at the request of Forest Service, on any fire on contract area other than an operations fire or a negligent fire.
(c) Contractor's Responsibility for Notification in Case of Fire. The Contractor shall immediately notify the Government of any fires sighted on or in the vicinity of the work site.
(d) Contractor's Responsibility for Responding to Emergencies. When directed by the Contracting Officer, the Contractor shall temporarily redirect employees and equipment from the work site for emergency work (anticipated to be restricted to firefighting). This is considered to be within the general scope of the contract. An equitable adjustment for any such redirection of employees and equipment will be made under the FAR clause at 52.243-4, Changes.
Solicitation: 1282CS19Q4004 Page 19 of 62
(e) Performance by the Contractor. Where the Contractor's employees, agents, contractors, subcontractors, or their employees or agents perform the Contractor's operations in connection with fire responsibilities, the Contractor's obligations shall be the same as if performance was by Contractor.
(f) State Law. The Contractor shall not be relieved by the terms of this contract of any liability to the United States for fire suppression costs recovered in an action based on State law, except for such costs resulting from operations fires. Amounts due to the Contractor for firefighting expenditures on operations fires shall not be withheld pending settlement of any such claim or action based on State law.
(End of Clause)
452.237-74 Key Personnel. (FEB 1988)
(a) The Contractor shall assign to this contract the following key personnel: Project Manager and Field Representative. See C.6.
(b) During the first ninety (90) days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph
(c) below. After the initial 90-day period, the Contractor shall submit…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.