Appendix C___Pearl Cache.pdf
PDF 219 KB Posted
- Attached to
- Pearl Cache IRSC Federal contract opportunity
- Solicitation number
- 1282AT20R4002
About this file
This document contains an appendix outlining road maintenance requirements for a federal stewardship contract. The appendix specifies pre-haul, during-haul, and post-haul maintenance requirements for various forest roads, including activities like slide and slump repair, ditch cleaning, surface blading, drainage structure maintenance, and roadway vegetation management. It provides definitions for terms and outlines specifications for each maintenance activity. The related federal contract opportunity is for the Pearl Cache IRSC project on the Canyon Lakes Ranger District of the Arapaho Roosevelt National Forest. The purpose of the project is to improve forest health through activities like stand cleaning, thinning, fuels reduction, snag and down wood management, and removal of timber or other products. The solicitation was issued by the USDA Forest Service Rocky Mountain Region.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 4___Pearl Cache.pdf | ||
| Amendment 1___Pearl Cache.pdf | ||
| Amendment 2___Pearl Cache.pdf | ||
| Amendment 3___Pearl Cache.pdf | ||
| Past Performance Reference.docx | DOCX document | |
| 12-82AT-20-R-4002___Pearl Cache.docx | DOCX document | |
| Experience Questionnaire.docx | DOCX document | |
| Contract Area Map___Pearl Cache.pdf | ||
| Service Contract Act - Rev 58.pdf | ||
| Appendix B___Pearl Cache.pdf | ||
| Appendix A___Pearl Cache.pdf | ||
| 12-82AT-20-R-4002___Pearl Cache.docx | DOCX document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pearl Cache IRSC Page 1 of 10
Arapaho Roosevelt NF APPENDIX C Canyon Lakes RD
Appendix C
ROAD MAINTENANCE REQUIREMENTS
Contractor will be responsible for doing all Pre-haul, During-haul and Post-haul road maintenance.
Contractor shall maintain roads in accordance with the following Contract Road Maintenance Requirements Summary:
Pre-Haul
Termini Applicable Road Maintenace Specifications
Road From To Miles T-800 T-801 T-802 T-803 T-805 T-807
NFSR 169
Junction with
LCR 86
Junction with
NFSR 175
3.6 C C C C C
NFSR 173
Junction with
LCR 86
Junction with temp road into Unit 20A
3.6 C C C C C
NFSR 175
Junction with
NFSR 169
Termination point in
Unit 6B
0.8 C C C C C
NFSR 300
Junction with
LCR 86
Termination point at intersection with
Killpecker Trail
6.4 C C C C C
NFSR 300.A
Junction with
NFSR 300
Termination point at norther boundary of
Unit 25A
0.2 C C C C C
NFSR 333
Junction with
NFSR 300
Termination point at temp road for Unit 23
0.2 C C C C C
NFSR 175.1A
Junction with
NFSR 175
Termination point in
Unit 6A
0.2 C C C C C
*NFSR 169
Junction with
NFSR 175
Junction with LCR 80C 11.7 C C C C C
During Haul
Termini Applicable Road Maintenace Specifications
Road From To Miles T-800 T-801 T-802 T-803 T-805 T-807
NFSR 169
Junction with
LCR 86
Junction with
NFSR 175
3.6 C C C C C
NFSR 173
Junction with
LCR 86
Junction with temp road into Unit 20A
3.6 C C C C C
NFSR 175
Junction with
NFSR 169
Termination point in
Unit 6B
0.8 C C C C C
NFSR 300
Junction with
LCR 86
Termination point at intersection with
Killpecker Trail
6.4 C C C C C
NFSR 300.A
Junction with
NFSR 300
Termination point at norther boundary of
Unit 25A
0.2 C C C C C
Pearl Cache IRSC Page 2 of 10
NFSR 333
Junction with
NFSR 300
Termination point at temp road for Unit 23
0.2 C C C C C
NFSR 175.1A
Junction with
NFSR 175
Termination point in
Unit 6A
0.2 C C C C C
*NFSR 169
Junction with
Post-Haul
Termini Applicable Road Maintenace Specifications
Road From To Miles T-800 T-801 T-802 T-803 T-805 T-807
NFSR 169
Junction with
LCR 86
Junction with
NFSR 175
3.6 C C C C C
NFSR 173
Junction with
LCR 86
Junction with temp road into Unit 20A
3.6 C C C C C
NFSR 175
Junction with
NFSR 169
Termination point in
Unit 6B
0.8 C C C C C
NFSR 300
Junction with
LCR 86
Termination point at intersection with
Killpecker Trail
6.4 C C C C C
NFSR 300.A
Junction with
NFSR 300
Termination point at norther boundary of
Unit 25A
0.2 C C C C C
NFSR 333
Junction with
NFSR 300
Termination point at temp road for Unit 23
0.2 C C C C C
NFSR 175.1A
Junction with
NFSR 175
Termination point in
Unit 6A
0.2 C C C C C
*NFSR 169
Junction with
NFSR = National Forest System Road, LCR = Larimer County Road, C = Contractor
*If Contractor elects to haul this direction, maintenance requirements apply to the section of road that hauling occurs on.
CLIN 0004 and 0005 Lump Sum payment applies. An overweight permit shall be requested and obtained from the Forest
Service prior to hauling any loads greater than 80,000 GVW over bridges located on NFSR 169 near the junction with
LCR 80C.
Pearl Cache IRSC Page 3 of 10
ROAD MAINTENANCE T-SPECIFICATIONS FOR STEWARDSHIP CONTRACTS
No. Specification Title
T-800 Definitions
T-801 Slide and Slump Repair
T-802 Ditch Cleaning
T-803 Surfacing Blading
T-805 Drainage Structures
T-807 Roadway Vegetation
Pearl Cache IRSC Page 4 of 10
SPECIFICATION T-800 DEFINITIONS
Wherever the following terms or pronouns are used in Specifications T-801 through T-807, the intent and meaning shall be interpreted as follows:
800-1.1—Agreement. Maintenance projects require a mutually acceptable method to resolve the problems which arise when incompatible situations arise between drawings and specifications and actual conditions on the ground to allow orderly and satisfactory progress of the maintenance.
These specifications have been developed in anticipation of those problem areas and have provided that such changes will be by Agreement.
It is intended that drawings and specifications will govern unless "on-the-ground" conditions warrant otherwise, when specifications call for "Agreement", "agreed", or "approval" such Agreement or approval shall be promptly confirmed in writing.
800-1.2—Annual Road Maintenance Plan. A plan prepared by various users of one or several roads. The plan is an
Agreement on maintenance responsibilities to be performed for the coming year.
800-1.3—Base Course. Material used to reinforce Subgrade or, as shown on drawings, placed on Subgrade to distribute wheel loads.
800-1.4—Berm. Curb or dike constructed to prevent Roadway runoff water from discharging onto embankment slope.
800-1.5—Borrow. Select Material taken from designated borrow sites.
800-1.6—Crown, Inslope, and Outslope. The cross slope of the Traveled Way to aid in drainage and traffic maneuverability.
800-1.7—Culverts. A conduit or passageway under a road, trail, or other obstruction. A culvert differs from a bridge in that it is usually entirely below the elevation of the Traveled Way.
800-1.8—Drainage Dip. A dip in the Traveled Way which intercepts surface runoff and diverts the water off the Traveled
Way. A Drainage Dip does not block the movement of traffic.
800-1.9—Drainage Structures. Manufactured structures which control the runoff of water from the Roadway including
Inslope, overside drains, aprons, flumes, downdrains, downpipes, culverts and the like.
800-1.10—Dust Abatement Plan. A table which lists the road, dust palliative, application rates, and estimated number of subsequent applications.
800-1.11—Lead-off Ditches. A ditch used to transmit water from a Drainage Structure or Drainage Dip outlet to the natural drainage area.
800-1.12—Material. Any substances specified for use in the performance of the work.
800-1.13—Pre haul Maintenance. Road maintenance work which must be accomplished to maintain the roads to a satisfactory condition commensurate with the Contractor's use, provided Contractor's Operations do not damage improvements under FAR 52.236-9 or National Forest resources and hauling can be done safely. This work will be shown in the Annual Road Maintenance Plan as provided in 800-1.2.
800-1.14—Roadbed. The portion of a road between the intersection of Subgrade and sideslopes, excluding that portion of the ditch below Subgrade.
Pearl Cache IRSC Page 5 of 10
800-1.15—Road Maintenance Plan. A table which shows applicable road maintenance specifications to be performed by
Contractor on specific roads.
800-1.16—Roadside. A general term denoting the area adjoining the outer edge of the Roadway.
800-1.17—Roadway. The portion of a road within the limits of excavation and embankment.
800-1.18—Shoulder. That portion of Roadway contiguous with Traveled Way for accommodation of stopped vehicles, for emergency use, and lateral support of base and Surface Course, if any.
800-1.19—Slide. A concentrated deposit of Materials from above or on back slope extending onto the Traveled Way or
Shoulders, whether caused by mass land movements or accumulated raveling.
800-1.20—Slough. Material eroded from the backslope which partially or completely blocks the ditch, but does not encroach on the Traveled Way so as to block passage of traffic.
800-1.21—Slump. A localized portion of the Roadbed which has slipped or otherwise become lower than that of the adjacent Roadbed and constitutes a hazard to traffic.
800-1.22—Special Project Specifications. Specifications which detail conditions and requirements peculiar to the individual project.
800-1.23—Subgrade. Top surface of Roadbed upon which Base Course or Surface Course is constructed. For roads without
Base Course or Surface Course, that portion of Roadbed prepared as the finished wearing surface.
800-1.24—Surface Course. The Material placed on Base Course or Subgrade primarily to resist abrasion and the effects of climate. Surface Course may be referred to as surfacing.
800-1.25—Surface Treatment Plan. A table which lists the roads and surface treatments to be applied.
800-1.26—Traveled Way. That portion of Roadway, excluding Shoulders, used for the movement of vehicles.
800-1.27—Turnouts. That portion of the Traveled Way constructed as additional width on single lane roads to allow for safe passing of vehicles.
800-1.28—Water Source. A place designated on the Road Maintenance Map for acquiring water for road maintenance purposes.
800-1.29—Waterbar. A dip in the Roadbed which intercepts surface runoff and diverts the water off the Roadway. A waterbar is not designed to be traversable by logging trucks.
Pearl Cache IRSC Page 6 of 10
SPECIFICATION T-801 SLIDE AND SLUMP REPAIR
DESCRIPTION
1.1—Slide removal is the removal from Roadway and disposal of any Material, such as soil, rock, and vegetation that cannot be routinely handled by a motor grader during Ditch Cleaning, T-802, and Surface Blading, T-803 Operations.
Slump repair is the filling of depressions or washouts in Roadway which cannot be routinely filled by a motor grader during
Surface Blading, T-803 Operations.
Slide removal and Slump repair includes excavation, loading, hauling, placing, and compacting of waste or replacement
Material and the development of disposal or borrow areas.
REQUIREMENTS
3.1—Slide Material, including soil, rock and vegetative matter which encroaches into the Roadway, shall be removed. The slope which generated the Slide Material shall be reshaped during the removal of the Slide Material with the excavation and loading equipment. Slide Material deposited on the fillslope and below the Traveled Way will not be removed unless needed for slope stability or to protect adjacent resources.
Surface and Base Courses shall not be excavated during Slide removal operations.
Slide Material which cannot be used for other beneficial purposes shall be disposed of at sites designated by the Forest
Service. Material placed in disposal sites will not require compaction unless shown on Road Maintenance Plan. Side casting may be approved by the Forest Service. Side casting into streams, lakes or water courses will not be permitted.
3.2—When filling Slumps or washouts, Material shall be moved from agreed locations or borrow sites, placed in layers, and compacted by operating the hauling and spreading equipment uniformly over the full width of each layer.
Existing aggregate surfacing shall be salvaged when practical and re-laid after depressions have been filled.
Damaged aggregate base, aggregate surfacing, and bituminous pavement shall be repaired under Specification T-804
Surfacing Repair.
The repaired areas of the Slump shall conform to the cross-section which existed prior to the Slump and shall blend with the adjacent undisturbed Traveled Way.
3.3—The maximum volume of Contractor responsibility for Slide and Slump repair is 10 Cubic yards per 100 foot station.
Greater volumes of Slide and Slump repair are Forest Service responsibility.
Pearl Cache IRSC Page 7 of 10
SPECIFICATION T-802 DITCH CLEANING
DESCRIPTION
1.1—Ditch cleaning is removing and disposing of all Slough Material and other debris from Roadway ditches, including outlet and lead-off ditches, to provide a free-draining waterway.
REQUIREMENTS
3.1—Ditch cleaning shall be repeated during the year as often as necessary to facilitate proper drainage.
3.2—All Slough Material or other debris which might obstruct water flow in the Roadway ditch shall be removed. Material removed from the ditch, if suitable, may be blended into existing native road surface or Shoulder or placed in designated
Berms in conjunction with Surface Blading T-803 operations.
Material removed from ditches that is not by Agreement blended into existing roads or placed in Berms shall be loaded and hauled to the disposal site designated by the Forest Service.
3.3—Roadway backslope or Berm shall not be undercut.
Pearl Cache IRSC Page 8 of 10
SPECIFICATION T-803 SURFACE BLADING
DESCRIPTION
1.1—Surface blading is keeping a native or aggregate Roadbed in a condition to facilitate traffic and provide proper drainage. It includes maintaining the Crown, Inslope or Outslope of the Traveled Way, Turnouts, and Shoulder; repairing
Berms; blending approach road intersections; and cleaning bridge decks, Drainage Dips, and Lead-off Ditches.
REQUIREMENTS
3.1—Surface blading shall be performed before, during, and after Contractor's use as often as necessary to facilitate traffic and proper drainage.
3.2—The surface blading shall preserve the existing cross-section. Surface irregularities shall be eliminated and the surface left in a free-draining state and to a smoothness needed to facilitate traffic. Surface Material which has been displaced to the Shoulders or Turnouts shall be returned to the Traveled Way. The blading operation shall be conducted to prevent the loss of surface Material and to provide for a thorough mixing of the Material being worked.
3.3—Water, taken from Water Sources designated on Contract Area Map, shall be applied during blading if sufficient moisture is not present to cut, mix, or compact the surface Material.
3.4—On native surfaced roads, Material generated from backslope sloughing, and ditch cleaning may be blended with the surface Material being worked. On aggregate surfaced roads this Material shall not be blended with Surface or Base Course
Material unless agreed otherwise.
3.5—Roadway backslopes or Berms shall not be undercut, nor shall new Berms be established unless agreed otherwise.
Berms shall be repaired by placing Material, as needed to restore the Berm, to reasonably blend with existing line, grade, and cross-section.
3.6—Drainage Dips and Lead-off Ditches shall be cleaned and maintained to reasonably blend with existing line, grade, and cross-section.
3.7—Intersecting roads shall be bladed for a distance of 50 feet to assure proper blending of the two riding surfaces.
3.8—Rocks or other Material remaining on the Traveled Way after the final pass that are larger than 4 inches in diameter or are larger than the maximum size of imported surfacing shall be removed from the Traveled Way. Unless otherwise designated by the Forest Service, the oversized Material shall be disposed of by sidecasting. Sidecasting into streams, lakes, or water courses will not be permitted.
3.9—Material resulting from work under this specification shall not remain on or in structures, such as Culverts, overside drains, cattleguards, ditches, Drainage Dips, and the like.
3.10—Material resulting from work under this specification, plus any other accumulated debris, shall be removed from bridge decks and the deck drains opened. This includes existing debris under pre haul maintenance.
Pearl Cache IRSC Page 9 of 10
SPECIFICATION T-805 DRAINAGE STRUCTURES
DESCRIPTION
1.1—This work consists of maintaining Drainage Structures and related items such as conveyor belt water deflectors, inlet and outlet channels, existing riprap, trash racks, and drop inlets.
MATERIALS
2.1—All Materials used in the maintenance of Drainage Structures shall conform by type and specification to the Material in the structure being maintained.
REQUIREMENTS
3.1—Drainage Structures and related items shall be cleared of all foreign Material which has been deposited above the bottom of the structure and all vegetative growth which interferes with the flow pattern. Material removed that cannot be incorporated into maintenance work shall be hauled to a disposal site designated by the Forest Service.
3.2—If outlet or inlet riprap was installed by Contractor as a construction item or existed prior to Contractor’s haul, it shall be maintained in good condition including the replacement of riprap if necessary to previous line, grade and cross-section.
3.3—Perform maintenance to insure the proper functioning of the head walls, aprons, inlet assemblies, overside drains, riprap, trash racks, and other facilities related to the Drainage Structure.
Pearl Cache IRSC Page 10 of 10
SPECIFICATION T-807 ROADWAY VEGETATION
DESCRIPTION
1.1— This work consists of cutting vegetative matter including brush and trees from within the Roadway limits.
REQUIREMENTS
3.1—Remove all vegetative matter from Roadbed and ditch for a minimum Roadbed width of 12 feet and ditch width of 3 feet. Roadbed width includes extra width for curve widening and turnouts. Cut trees and brush parallel to the ground and to a maximum height of 1 inch above the ground. All limbs which extend over the roadbed or ditch within 14 feet above the road elevation shall be removed. Tree limbs shall be trimmed as near flush with the trunk as practicable or to within 12 inches from the tree.
3.2—Remove all vegetative matter less than four (4) inches in diameter for 2 feet from road shoulder each side of the road including ditch section. Cut trees and brush outside the roadbed and ditch to a maximum height of 6 inches above the ground surface.
3.3—Remove all vegetative matter from Roadway which interferes with rolling dip or culvert drainage, road maintenance operations such as surface blading and ditch cleaning, and on curves and intersections where sight distance is impeded.
3.4—Vegetative matter removed from the Roadway in excess of 1 foot in length or 3 inches in diameter shall be scattered outside the roadway to a depth less than 18 inches above the ground.
3.5—Vegetative matter shall not be placed in live streams or drainages.
File details come from the government source that posted it. Updated .