12-82AT-20-R-4002___Pearl Cache.docx

DOCX document 278 KB Posted

Attached to
Pearl Cache IRSC Federal contract opportunity
Solicitation number
1282AT20R4002
Issued by
Department of Agriculture Forest Service R2-Rocky Mountain Region

About this file

This solicitation is for a stewardship contract to perform land management activities on the Arapaho Roosevelt National Forest. The contract includes mandatory work activities such as clearcutting, overstory removal, road maintenance, and optional work activities such as skidding pre-bunched material. Products to be removed include sawtimber of lodgepole pine, Engelmann spruce, and subalpine fir. The period of performance is from July 2020 to August 2024. Offerors must submit proposals by February 28, 2020 addressing mandatory and optional work activities as well as product removal pricing. The solicitation is set aside for small businesses and offers the opportunity to utilize stewardship credits in lieu of cash payment. The Forest Service seeks to improve forest health through activities such as thinning, fuels reduction, and product removal on the Canyon Lakes Ranger District of the Arapaho Roosevelt National Forest west of Fort Collins, Colorado.

View the file

Other files for this federal contract opportunity

Other files attached to Pearl Cache IRSC, newest first.
File Type Posted
Amendment 4___Pearl Cache.pdf PDF
Amendment 1___Pearl Cache.pdf PDF
Amendment 2___Pearl Cache.pdf PDF
Amendment 3___Pearl Cache.pdf PDF
12-82AT-20-R-4002___Pearl Cache.docx DOCX document
Experience Questionnaire.docx DOCX document
Past Performance Reference.docx DOCX document
Appendix A___Pearl Cache.pdf PDF
Appendix C___Pearl Cache.pdf PDF
Contract Area Map___Pearl Cache.pdf PDF
Service Contract Act - Rev 58.pdf PDF
Appendix B___Pearl Cache.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

1. REQUISITION NUMBER

986317

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

2. CONTRACT NO.

3. AWARD/EFFECTIVE DATE

4. ORDER NUMBER

n/a

5. SOLICITATION NUMBER

1282AT20R4002

6. SOLICITATION ISSUE DATE

01/27/2020

7. FOR SOLICITATION

INFORMATION CONTACT:

a. NAME AND EMAIL Brooke Barker: brooke.barker@usda.gov

b. TELEPHONE NUMBER (No collect calls)

(970) 295-6610

8. OFFER DUE DATE:

02/28/2020

TIME: 0900 MST/MDT

9. ISSUED BY
CODE
82AT
10. THIS ACQUISITION IS |X| UNRESTRICTED OR |_| SET ASIDE
% FOR:

USDA Forest Service Region 2 Arapaho & Roosevelt National Forests 2150 Centre Avenue, Building E Fort Collins, CO 80526 Email: brooke.barker@usda.gov

|_|
SMALL BUSINESS
|_| WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMAN- OWNED SMALL BUSINESS PROGRAM

|_| EDWOSB
NAICS: 113310
|_|
HUBZONE SMALL BUSINESS
|_|
SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS
|_| 8(A)
SIZE STANDARD:

500 Employees

11. DELIVERY FOR FOB DESTINATION

UNLESS BLOCK IS MARKED

|_| SEE SCHEDULE

12. DISCOUNT TERMS

|_|13a. THIS CONTRACT IS A RATED ORDER UNDER DPAS (15 CFR 700)
13b. RATING

14. METHOD OF SOLICITATION

|_| RFQ
|_| IFB
|X|RFP
15. DELIVER TO:
CODE
16. ADMINISTERED BY: See Block 9
CODE
17A. CONTRACTOR/OFFEROR
CAGE CODE:
FACILITY CODE
18a. PAYMENT WILL BE MADE BY
CODE

Email: @ Telephone No: ( ) - x Invoice Processing Payment (IPP) Submit invoices electronically to www.ipp.gov

DUNS:

|_|
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

IS CHECKED: |_| ‘ SEE ADDENDUM

19.

CLIN

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

PEARL CACHE Stewardship Arapaho National Forest(s) Canyon Lakes Ranger District

ESTIMATE PERIOD OF PERFORMANCE:

July 16, 2020 to August 30, 2024.

See attached Schedule of Items in Section B

25. ACCOUNTING AND APPROPRIATION DATA:

26. TOTAL AWARD AMOUNT (Govt. Use Only)

|X| 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
|X| ARE
|_| ARE NOT ATTACHED
|X| 27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
|X| ARE
|_| ARE NOT ATTACHED
|_|28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1 ELECTRONIC (email) COPY TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
|_| 29. AWARD OF CONTRACT: REF. OFFER DATED ,

YOUR OFFER ON SOLICITATION (BLOCK 5), INCLUDING ANY

ADDITIONS OR CHANGES WHICH ARE SET FORTH HEREIN,

IS ACCEPTED AS TO ITEMS: ,

30a. SIGNATURE OF OFFEROR/CONTRACTOR
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTIONSTANDARD FORM 1449 (REV.2/2012)
Pearl Cache IRSCPage 21 of 74
PREVIOUS EDITION IS NOT USABLEPrescribed by GSA FAR (48 CFR) 53.212
Arapaho Roosevelt NFs1282AT20R4002Canyon Lakes RD

TABLE OF CONTENTS

PART I—THE SCHEDULE4
SECTION B—SUPPLIES OR SERVICES AND PRICES/COSTS4
B.1GENERAL INFORMATION4
B.2SCHEDULE OF ITEMS5
B.3LAND MANAGEMENT ACTIVITIES6
SECTION C—DESCRIPTION/ SPECIFICATIONS/STATEMENT OF WORK7
C.1PROJECT DESCRIPTION7
C.2SPECIFICATIONS7
C.3CONTRACT AREA MAP7
C.4GOVERNMENT-FURNISHED PROPERTY8
C.5OPERATING/WORK PLAN AND OVERALL SCHEDULE8
C.6SUSTAINABLE ACQUISITION8
C.7DEFINITIONS10
SECTION D—PACKAGING AND MARKING12
SECTION E—INSPECTION AND ACCEPTANCE13
E.1CONTRACTOR QUALITY CONTROL INSPECTION SYSTEM13
E.2ACCEPTANCE13
E.3GOVERNMENT QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)14
E.4FAR and AGAR CLAUSES15
SECTION F—DELIVERIES OR PERFORMANCE17
F.1SPECIAL CONTRACT TIME AND PERFORMANCE RESTRICTIONS17
F.2[Reserved]17
F.3SCHEDULES AND REPORTS17
F.4[Reserved]18
F.5FAR and AGAR CLAUSES18
SECTION G—CONTRACT ADMINISTRATION DATA20
G.1MEASUREMENT20
G.2PAYMENT20
G.3INCIDENTAL PAYMENT ITEMS22
G.4PRODUCT PAYMENT GUARANTEE22
G.5STEWARDSHIP CREDITS23
G.6ESTABLISHMENT OF STEWARDSHIP CREDITS23
G.7EXCESS STEWARDSHIP CREDITS23
G.8EXCESS TIMBER OR OTHER PRODUCTS VALUE23
G.9REFUND OF EXCESS CASH23
G.10[Reserved]23
G.11[Reserved]23
SECTION H—SPECIAL CONTRACT REQUIREMENTS24
H.1EMPLOYMENT24
H.2SAFETY28
H.3REQUIREMENTS OF RIGHTS-OF-WAY28
H.4USE OF ROADS BY CONTRACTOR28
H.5ROAD MAINTENANCE29
H.6TRAFFIC CONTROL PLAN30
H.7USE BY OTHERS30
H.8PROTECTION OF LAND SURVEY MONUMENTS31
H.9PROTECTION MEASURES NEEDED FOR PLANTS ANIMALS, CULTURAL RESOURCES, AND CAVE RESOURCES31
H.10PROTECTION OF RESIDUAL TREES32
H.11SANITATION AND SERVICING32
H.12PREVENTION OF OIL SPILLS32
H.13HAZARDOUS SUBSTANCES32
H.14EQUIPMENT CLEANING32
H.15EROSION PREVENTION AND CONTROL33
H.16STREAMCOURSE PROTECTION33
H.17MEADOW PROTECTION34
H.18WETLANDS PROTECTION34
H.19FIRE34
H.20URGENT REMOVAL EXTENSIONS36
H.21PROTECTED IMPROVEMENTS36
H.22PROTECTION OF IMPROVEMENTS NOT OWNED BY FOREST SERVICE36
H.23SLASH TREATMENT37
H.24[Reserved]38
H.25CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM38
H.26[Reserved]38
H.27[Reserved]38
H.28FAR and AGAR CLAUSES38
SECTION I—CONTRACT CLAUSES41
I.1FAR and AGAR CLAUSES41
PART III—LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS48
SECTION J—LIST OF ATTACHMENTS48
PART IV—REPRESENTATIONS AND INSTRUCTIONS49
SECTION K—REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS OR RESPONDENTS49
K.1WORKFORCE CERTIFICATION49
K.2STATE LICENSING REQUIREMENTS49
K.3EMPLOYMENT CERTIFICATION49
K.4LOCAL CONTRACTOR CERTIFICATION50
K.5FAR and AGAR PROVISIONS50
SECTION L—INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS68
L.1[Reserved]68
L.2PROPOSAL PREPARATION INSTRUCTIONS68
L.3PROPOSAL CONTENT69
L.4FAR and AGAR PROVISIONS71
SECTION M—EVALUATION FACTORS FOR AWARD73
M.1EVALUATION, NEGOTIATION AND AWARD PROCESS73
M.2[Reserved]73
M.3FAR and AGAR PROVISIONS73

PART I—THE SCHEDULE

SECTION B—SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 GENERAL INFORMATION

STEWARDSHIP AUTHORITY

Section 604 (16 USC 6591c) of Public Law 108-148 as amended by Section 8205 of Public Law 113-79, the Agricultural Act of 2014—Grants the U.S. Forest Service (Government) permanent authority to enter into stewardship contracts or agreements to achieve land management goals for the National Forests or public lands that meet local and rural community needs. Section 8205 supersedes the temporary authority granted to the Forest Service (Government) in section 347 of Public Law 105-277, the Omnibus Consolidated and Emergency Appropriations Act, 1999.

REGISTRATION

All Contractors must be actively registered in the System for Award Management (SAM) (http://www.SAM.gov) to be eligible for award. If not actively registered by time of proposal evaluations, you will not be considered for award. Registration in SAM is a free service – you do not need to pay to register in this system.

BONDS

Neither a Payment nor Performance bond is required for this project.

PROPOSALS

Proposals shall be valid for 90-days after the date of receipt for the solicitation. If additional time is needed, an extension must be requested in writing and may or may not be granted.

PRE-BID/PRE-PROPOSAL CONFERENCE

Scheduled for 2/5/2020. Details are located in Section L.4.1 of this solicitation under “AGAR 452.237-71—PRE-BID/PRE-PROPOSAL CONFERENCE.”

QUESTIONS

In accordance with AGAR 452.204-70—INQUIRIES, pre-award questions, inquiries and all correspondence concerning this solicitation shall be submitted in writing to the Contracting Officer (CO). Offerors shall contact only the CO issuing the solicitation about any aspect of this requirement prior to contract award. The CO’s contact information is located in Block 7a of the SF-1449.

B.2SCHEDULE OF ITEMS
B.2.1MANDATORY WORK ACTIVITIES
CLIN
UNIT
DESCRIPTION OF

MANDATORY WORK ACTIVITIES

UNIT OF MEASURE
ESTIMATED

QUANTITY

UNIT PRICE
TOTAL
0001
6A, 6B, 6C, 20A, 20B, 20C, 20E, 21, 23, 25D, 27, 28, 29
Treatment Units—Clearcut: Cut trees as identified in Appendix A, Task 1 (A). Complete all slash treatment and Landing Clean-up (Appendix A, Task 1 and 3 apply)
Acres
220*
$
$
0002
24A, 24B, 25A, 25B, 25C, 30A, 30B
Treatment Units—Overstory Removal: Cut trees as identified in Appendix A, Task 1 (B). Complete all slash treatment and Landing Clean-up

(Appendix A, Task 1 and 3 apply)

Acres
112*
$
$
0003
24A, 24B, 25A, 25B, 25C, 30A, 30B
Treatment Units—Overstory Removal: Thin biomass trees, scatter cut biomass trees.

(Appendix A, Task 2 applies)

Acres
112*
$
$

Road Maintenance – Pre-Haul (Appendix A, Task 4 and Appendix C apply)

Lump Sum
1
$
$
Road Maintenance – During and Post-Haul (Appendix C applies)
Lump Sum
1
$
$
TOTAL—MANDATORY WORK ACTIVITIES
$

* Exclusion acres are not included in estimated quantities.

B.2.2OPTIONAL WORK ACTIVITIES
CLIN
UNIT
DESCRIPTION OF

OPTIONAL WORK ACTIVITIES

UNIT OF MEASURE
ESTIMATED

QUANTITY

UNIT PRICE
TOTAL
0006
70
Skid existing pre-bunched material into designated locations and pile for burning by Forest Service. (Appendix A, Task 5 applies and the following Appendix B provisions: C.3.2, C.3.2.2, G.4.2.2, G.6.4, G.6.5, K-F.3.4#, K-G.6#, K-G.6.0.1#,

K-G.6.0.2#)

Acres
6
$
$
TOTAL—OPTIONAL WORK ACTIVITIES
$
B.2.3TIMBER OR OTHER PRODUCTS REMOVAL
SPECIES
PRODUCT
QUANTITY
UNIT OF MEASURE
MINIMUM ACCEPTABLE OFFER
OFFER

(FLAT)

TOTAL OFFER

Lodgepole Pine and Others Live/Dead

Sawtimber
5,465
CCF
$3.00
$
$

Engelmann Spruce Live/Dead

Sawtimber
1,719
CCF
$5.00
$
$

Subalpine Fir Live/Dead

Sawtimber
142
CCF
$3.00
$
$

TOTAL QUANTITY

7,326

TOTAL—ALL PRODUCT REMOVAL
$

Notes:

· See Instructions to Offerors (Section L) for business proposal requirements

· These schedules are for pricing/payment purposes

· Price Proposals must be provided on ALL Items in the Schedules: Mandatory Work Activities, Optional Work Activities, and Timber or Other Products Removal

· Unit prices Prevail

B.3 LAND MANAGEMENT ACTIVITIES

All Mandatory Work Activities in Section B.2.1 shall be performed.

Performance of land management activities shall be in accordance with the Project Description and Specifications in Section C—Description/Specifications/Statement of Work.

Payment for land management, Mandatory Work Activities (CLIN 0001-0005 and Optional 0006), listed in Section B.2.1, will be made with either Stewardship Credits in lieu of cash, as defined in Section G, or in appropriated dollars.

Optional Work Activities in Section B.2.2 are listed in order of planned priority. Award may be made for optional items in any order that the CO determines is in the best interest of the Government.

SECTION C—DESCRIPTION/ SPECIFICATIONS/STATEMENT OF WORK

C.1 PROJECT DESCRIPTION

(a) Description of Work— The Pearl Cache IRSC is part of the Deadman 1 project, located on the Canyon Lakes Ranger District of the Arapaho Roosevelt National Forest approximately 60 miles west of Fort Collins, Colorado. Land management objectives for the project area are summarized as follows:

(1) Improve Forest Health – Provide growing space for healthy trees and reduce fuel loadings

(2) Utilize Timber or other products – Provide wood resource to forest product industry.

(b) To accomplish these objectives, the contract includes the following components: stand cleaning/thinning, mechanical fuels reduction, snag and down wood management, and removal of Timber or Other Products.

(c) Contract—will be a commercial services contract with requirements for timber removal, and minor construction.

(d) Project Location—the contract is located in T10N, R74W, sections 7, 8, 27, 28, 29, 30, 31, 32, 33 and 34; T10N, R75W, section 36; T9N, R74W, sections 4, 5 and 6; T9N, R75W, section 1. From Fort Collins, Colorado, drive north on Highway 287 to Livermore, CO to the junction of County Road 74E; turn west on 74E and continue into Red Feather Lakes. Continue through Red Feather Lakes to the junction of County Road 86 (Deadman Road) and continue west approximately 5 miles to the intersection of NFSR 300. This intersection is the approximate eastern edge of the project area boundary. To access treatment units 6A, 6B and 6C follow County Road 86 north to NFSR 169, turn north on NFSR 169 for approximately 3 miles to intersection with NFSR 175. Refer to the Contract Area Map to locate the Units from this point.

C.2 SPECIFICATIONS

Specifications for each Stewardship Activity described by CLIN in Section B—Schedule of Items, can be found within the contract as well as within the appendices. Technical specifications for service items, Appendix A; timber/product removal specifications, Appendix B; and road maintenance plans and specifications, Appendix C.

C.3 CONTRACT AREA MAP

The boundaries of the Units, are as shown on the attached "Contract Area Map," which is made a part hereof, and were, before contract award, designated on the ground by the Government to meet the anticipated needs of the parties. The location of the Units and their approximate acreage are stated in Appendix B, Division A.2. Units may be revised and additional ones may be established only by written agreement of both parties. Where applicable, the following are also identified on Contract Area Map:

(a) Claims limiting Contractor's rights;

(b) Unit boundaries;

(c) Areas where leave trees are marked to be left uncut;

(d) Roads listed

(e) Sources of base course, rock riprap and surface rock;

(f) Roads where log hauling is prohibited or restricted;

(g) Roads and trails to be kept open;

(h) Improvements to be protected;

(i) Locations of known historical sites;

(j) Maximum stump heights when more than one height is listed by areas;

(k) Skidding or yarding methods specified;

(l) Streamcourses to be protected;

(m) Other features required by Appendix B; and

(n) Stewardship work activity boundaries.

C.4 GOVERNMENT-FURNISHED PROPERTY

See FAR clause 52.245-2—GOVERNMENT PROPERTY INSTALLATION OPERATION SERVICES in Section I.1.1.

C.5 OPERATING/WORK PLAN AND OVERALL SCHEDULE

Contractor shall provide, a detailed timeline of when the contract requirements will be accomplished while conforming to the requirements within Section F. The Operating/Work Plan and Overall Schedule shall contain the following elements:

(a) The Operating/Work Plan and Overall Schedule shall indicate the sequence of activities that will take place to accomplish the work described within the contract, Appendix A, Appendix B and Appendix C including proposed start and completion dates.

(b) Contractor’s Field Representative (Field Rep)—The Contractor shall designate (in writing) an on-site Field Rep and an alternate in their absence. Each designated representative shall be fluent in both spoken and written English. The Field Rep shall be readily available to the area of operations when operations are in progress, shall have a copy of the contract on site during operations, and shall be authorized to receive notices in regard to performance under this contract and take related action. The responsibilities of the Field Rep shall include the safeguarding of National Forest resources and performance within the terms of the contract.

(c) A list of employees/personnel working on this contract identifying each by the Occupational Code/Job Title for the work as it applies to this contract under the applicable Service Contract Act wage rate.

(d) All subcontractors must also provide a list of all employees/personnel working on this contract identifying each by the Occupational Code/Job Title for the work as it applies to this contract under the applicable Service Contract Act wage rate.

Depending upon how the Contractor proposes accomplishing the activities within the contract, the Operating/Work Plan and Overall Schedule may be developed by indicating when and how all work activities within individual Units will be completed, when and how individual tasks will be completed, or a combination of when and how Units or tasks will be completed. The Contractor should be able to display through an Operating/Work Plan and Overall Schedule that all of the contract activities will be accomplished in a timeline that will meet the contract requirements.

C.6 SUSTAINABLE ACQUISITION

Contractor shall comply with the Agricultural Act of 2014; the Food, Conservation and Energy Act of 2008 (FCEA), 7 USC §8102; the Farm Security and Rural Investment Act of 2002 (FSRIA), 7 USC §8102; the Federal Acquisition Regulation; Executive Order (EO) 13514, “Federal Leadership in Environmental, Energy and Economic Performance,” dated October 5, 2009; EO 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” dated January 24, 2007; and Presidential Memorandum, “Driving Innovation and Creating Jobs in Rural America through Biobased and Sustainable Product Procurement,” dated February, 2012 to provide biobased products.

In compliance with FAR Part 23.4 through performance of this contract, the Contractor shall make maximum use of EPA designated and USDA designated biobased in accordance with FAR clauses 52.223-2—Affirmative Procurement of Biobased Products under Service and Construction Contracts and 52.223-17—Affirmative Procurement of EPA-designated Items in Service and Construction Contracts.

Contractor shall utilize products and material made from biobased materials (e.g. biobased greases, biobased hydraulic fluids, biobased absorbents) to the maximum extent possible in the performance of this contract without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. Information about this requirement and a catalog of products are available at the BioPreferred Web Site.

Contractor shall utilize products and material to the maximum extent possible in the performance of this contract from EPA’s list of designated products and the accompanying recommendations for post-consumer content and recovered materials content in the following eight categories: Construction Products, Landscaping Products, Nonpaper Office Products, Paper and Paper Products, Park and Recreation Products, Transportation Products, Vehicular Products, and Miscellaneous Products.

Compliance with the USDA Biobased requirements requires Contractors to report the purchase of biobased products under service and construction contracts through the System for Award Management (https://SAM.gov) and provide a copy of the report to the Contracting Officer.

C.6.1 SUSTAINABLE PRODUCTS

The following is a list of categories for BioPreferred Products and EPA products that may be used in the performance of this contract. The list is not all inclusive; the Contractor shall research for available products.

Bio Preferred Products:

(a) Diesel Fuel Additives

(1) Any substance, other than one composed solely of carbon and/or hydrogen that is intentionally added to diesel fuel (including any added to a motor vehicle's fuel system) and that is not intentionally removed prior to sale or use.

(2) Neat biodiesel, also referred to as B100, when used as an additive. Diesel fuel additive does not mean neat biodiesel when used as a fuel or blended biodiesel fuel (e.g., B20). 90% - Minimum Biobased Content.

(b) Hydraulic Fluids—Mobile Equipment

(1) Hydraulic fluids formulated for general use in nonstationary equipment, such as tractors, end loaders, or backhoes. 44% - Minimum Biobased Content.

(c) Penetrating Lubricants

(1) Products formulated to provide light lubrication and corrosion resistance in close tolerant internal and external applications including frozen nuts and bolts, power tools, gears, valves, chains, and cables. 68% - Minimum Biobased Content.

(d) Greases—Truck

(1) Lubricants composed of oils thickened to a semisolid or solid consistency using soaps, polymers or other solids, or other thickeners. Lubricants that are designed for use on the fifth wheel of tractor trailer trucks onto which the semi-trailer rests and pivots. 71% - Minimum Biobased Content.

(e) Gear Lubricants

(1) Products, such as greases or oils, that are designed to reduce friction when applied to a toothed machine part (such as a wheel or cylinder) that meshes with another toothed part to transmit motion or to change speed or direction. 58% - Minimum Biobased Content.

(f) Fuel Conditioners

(1) Products formulated to improve the performance and efficiency of engines by providing benefits such as removing accumulated deposits, increasing lubricity, removing moisture, increasing the cetane number, and/or preventing microbial growths within the fuel system. 64% - Minimum Biobased Content.

(g) Erosion Control

(1) Woven or non-woven fiber materials manufactured for use on construction, demolition, service, or other sites to prevent wind or water erosion of loose earth surfaces, which may be combined with seed and/or fertilizer to promote growth. 77% - Minimum Biobased Content.

(h) 2-Cycle Engine Oils

(1) Lubricants designed for use in 2-cycle engines to provide lubrication, decreased spark plug fouling, reduced deposit formation, and/or reduced engine wear. 34% - Minimum Biobased Content.

C.6.2 EPA DESIGNATED PRODUCTS:

Plastic trash bags, printer ribbons, toner cartridges, print & writing papers, Traffic Barricades, Traffic Cones, Engine Coolants, Rebuilt Vehicular Parts, Re-refined lubricating oils, retread tires, manual grade strapping, signage, sorbents.

C.7 DEFINITIONS

(a) Acceptable Quality Level (AQL): The allowable leeway or variance from a standard before the Government will reject the specific service. As long as the percent of defective performance does not exceed the AQL, the service will not be rejected by the Government. The Contractor, however, must re-perform the defective service when possible.

(b) Biobased Products: See Sustainable Acquisitions.

(c) Biomass: Any conifer material 2 feet in height to 4.9 inches DBH.

(d) Clean-up: Items may include—slash work, fall leaners and broken tops, seeding, landing obliteration and ripping, temp road obliteration and ripping, construction of cross ditches and water bars, road maintenance, removal of warning signs, removal of equipment from project area, return of Government Furnished Property, designated improvement repair, etc.

(e) CLIN: Contract Line Item (Section B.2).

(f) Contracting Officer (CO): Individual with authority to bind the Government with their signature on the contract.

(g) Contracting Officer Representative (COR): Individual(s) designated to act on the behalf of the CO within the delegation given them in writing.

(h) Federal/National Holiday: New Year’s Day, Martin Luther King Jr. Day, Presidents’ Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, and Christmas Day.

(i) LCR: Larimer County Road.

(j) NFSR: National Forest Service Road.

(k) Non-Sawtimber: For Lodgepole Pine: 5.0” DBH - 6.9” DBH, and for Engelmann Spruce and Subalpine Fir: 5.0” DBH – 7.9” DBH.

(l) Period of performance (also PoP, Performance Period or Contract Time): All calendar days allowed for completion of the contract work. Includes all days of the week including weekends and holidays.

(m) Plastic Limit: Soil moisture exceeding operational feasibility when soil can be rolled into 3 millimeter threads without breaking or crumbling/when a ball can be formed in the fist that holds together on gentle tossing or shaking from a height of 6 inches.

(n) Quality Assurance: Those actions taken by the Government to check goods or services to determine that they meet the requirements found in the contract and all attachments listed in Section J.

(o) Quality Assurance Surveillance Plan (QASP): An organized written document used for quality assurance surveillance. The document contains information about how the Government will assess performance, checklists, and may contain decision tables.

(p) Quality Control: Those actions taken by the Contractor to control the production of goods or services so that they will meet the requirements of the contract and all attachments listed in Section J. Refer to FAR clause(s) 52.246-4—Inspection of Services—Fixed Price.

(q) Quality Control Plan (QCP): Contractor’s plan for self-monitoring work prior to the Government inspection and acceptance (Section E).

(r) Random Sampling: A method of looking at a few individual items in a lot to determine the quality of that lot against a standard.

(s) Sawtimber: Included timber meeting the Utilization Specifications as defined in Appendix B, Division A.2.

(t) (Acceptable) Service: A job performed to the standard and within the AQL. The Contractor must do the specific job, and meet the standard, and meet the AQL before one can say that performance has been acceptable and that the Contractor should be paid.

(u) Standard: An acknowledged measure of comparison.

(v) Stewardship Contracting: An exchange of goods/products for services including construction.

(w) Sustainable Acquisitions: (FAR Part 23.4—Use of recovered materials and biobased products)

(1) Biobased Products: Managed by the U.S. Department of Agriculture (USDA), the goal of the BioPreferred program is to increase the purchase and use of biobased products. The BioPreferred program was created by the 2002 Farm Bill and reauthorized and expanded as part of the Agricultural Act of 2014 (the 2014 Farm Bill). The program's purpose is to spur economic development, create new jobs and provide new markets for farm commodities. The increased development, purchase, and use of biobased products reduce our nation's reliance on petroleum, increase the use of renewable agricultural resources, and contribute to reducing adverse environmental and health impacts. Information on biobased/biopreferred products can be found at the BioPreferred Site. The Contractor shall comply with FAR clause 52.223-2—Affirmative Procurement of Biobased Products Under Service and Construction Contracts and FAR provision 52.223-1—Biobased Product Certification.

(2) EPA-designated Items: Products that are or can be made with recovered material. The Comprehensive Procurement Guideline (CPG) program is part of EPA's continuing effort to promote the use of materials recovered from solid waste. Buying recycled-content products ensures that the materials collected in recycling programs will be used again in the manufacture of new products. The Contractor shall comply with FAR clause 52.223-17—Affirmative Procurement of EPA-designated Items in Service and Construction Contracts.

(x) Whole Tree Skidding/Yarding: Contractor shall leave tops and limbs of felled trees attached to included timber, and skid/yard them to deignated area/location.

C.7.1 TECHNICAL DEFINITIONS: See Appendices.

SECTION D—PACKAGING AND MARKING

There are no clauses in this section.

SECTION E—INSPECTION AND ACCEPTANCE

E.1 CONTRACTOR QUALITY CONTROL INSPECTION SYSTEM

Contractor shall identify the Quality Control Inspection System it will use to ensure that contract specifications will be achieved. At no time shall the Contractor rely upon Government inspections to provide notification of unsatisfactory performance. The Contractor shall produce written inspection records in a format and at times and places satisfactory to the CO. Inspection records shall be made available upon request of the CO and/or COR and be maintained until the date of contract closure. The CO and/or COR may observe the Contractor's inspection at any time and shall otherwise have unlimited access to the inspection data.

E.1.1 QUALITY CONTROL PLAN (QCP)

Contractor shall provide a general QCP with the Technical Proposal. The Contractor shall supplement the QCP within 7-days before starting work based on items awarded to the Contractor and the Government’s comments. The Contractor shall conduct quality control inspections on all aspects of work.

The general QCP shall demonstrate how the Contractor will assure quality meets the requirements and specifications of the contract. The QCP shall describe how quality will be monitored to assure the performance standards are met, the supervision of crew and work, and personnel that will be performing the quality control. Quality control shall include monitoring quality while work is in progress, residual tree care and other associated tasks, such as sample plots of thinning and subitems.

E.1.2 CONTRACTOR QUALITY CONTROL INSPECTION

At no time shall the Contractor rely upon Government inspections to provide notification of unsatisfactory performance. The CO and/or COR may observe the Contractor's inspection at any time and shall otherwise have unlimited access to the inspection data. Inspection procedures must provide the following information:

E.1.2.1 PLOT INSPECTIONS

Where the unit of measure is per acre, the Contractor shall maintain a plot system that provides an unbiased sample of tasks listed in the Performance Requirements Summary (Section E.3.3).

The plot system shall be consistent with the method of work. The Contractor shall sample at least 1% of the Unit, with a minimum of 3 plots per Unit.

(a) Plots shall be marked and identifiable on the ground, this includes plot numbers and visible flagging.

(b) Contractor shall provide inspection sheets and a sketch map of the Unit with plot locations to the Government. Inspection sheets shall be signed and dated by the person who conducted the inspection and shall certify that the inspection records are complete and accurate.

E.2 ACCEPTANCE

Contractor shall provide a written request for inspection and submit inspection sheets in accordance with the QCP. The Government will conduct an inspection and up to one re-inspection for each Unit. If the Contractor fails to meet the minimum AQL, the Contractor shall rework the Unit. Anytime more than two inspections are required per Unit, the Contractor may be assessed for additional inspections, which will include mileage and hourly rate of the COR. If follow-up inspections indicate that the minimum AQL was not met, the work will be deemed unsatisfactory and a payment reduction may result (Section G.2.1). Acceptance may be made for all or portions of work.

E.3GOVERNMENT QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
E.3.1QUALITY ASSURANCE INSPECTIONS

The purpose of this plan is to provide a QASP for contract items and tasks performed. This QASP provides a basis for the COR to evaluate the quality of the Contractor’s performance. The oversight provided for the contract and this QASP will help to ensure that quality levels of the Contractor’s service(s) reach the required levels of performance.

By monitoring the Contractor’s service work, the COR will determine whether the performance levels set forth in the contract have been attained. Quality standards for all work descriptions specified in the Performance Requirements Summary (Section E.3.3).

The Government has the right to inspect and test all services called for by the contract to the extent practicable at all times and places during the term of the contract. The Government will perform inspections and tests in a manner that will not unduly delay the Contractor’s work.

If any of the services do not conform to contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by reworking, the Government may:

(a) Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and

(b) Reduce the contract price to reflect the reduced value of the services performed.

E.3.2 GOVERNMENT INSPECTION OF SERVICES

The Government will inspect service work completed by the Contractor and/or subcontractor as a basis for acceptance and payments, and to provide recommendations to improve work quality while work is in progress. The Contractor is responsible for providing quality control to assure that work complies with the requirements of contract specifications.

All work included in the contract specifications is subject to inspections by the Government at periodic intervals throughout the performance of this contract. Treatment inspections are for the sole benefit of the Government and shall not release the Contractor of the responsibility of providing quality control measures to assure that the work strictly complies with the contract requirements.

E.3.2.1 GOVERNMENT TIMING OF INSPECTIONS

Once the Contractor notifies the Government of Unit completion, the Government will have 14 days to start inspection for payment. Timeframe to complete inspections will depend upon the number of acres to inspect and availability of inspectors. Work with CO to determine when Units will be inspected.

E.3.2.2 WORK QUALITY PERCENTAGE

Work quality percentages are derived from data developed from inspection plots. The total number of satisfactory quadrants divided by the number of quadrants inspected determines the quality rate. The rate multiplied by 100 provides the work quality percentage.

For each completed work activity, Contractor’s quality control inspection percentage services completed will be compared to the Government’s assessment results. If the results differ by <5%, and the inspection has been conducted to the standards specified, the Contractor’s inspection will be considered acceptable and the quality percentage will be used as the basis for payment. When the results differ by more than 5%, the Government’s percentage will be used as the basis for payment.

EXAMPLE:Number of quadrants inspected25
Number of satisfactory quadrants23
23 divided by 2592
Work Quality Percentage92%

Government will pay 100% of CLIN price if work quality of all plots meeting the AQL % or greater. If below, the Government will issue a letter of non-compliance. The Contractor will be permitted to bring work quality to an acceptable standard. If the Contractor is unable to bring the work to an acceptable standard, then CLIN pricing will be reduced according to the Payment Reductions (Section G.2.1).

In the event that work is performed that is contrary to the requirements in the contract, the Government is not liable for costs incurred by the Contractor during negligent performance that is without the fault or negligence of the Government.

E.3.3PERFORMANCE REQUIREMENTS SUMMARY
PERFORMANCE REQUIREMENTS
WORK DESCRIPTION
PERFORMANCE STANDARD
ACCEPTABLE QUALITY LEVEL (AQL)
MONITORING METHOD
Felling
Cut all trees identified in the treatment descriptions; Appendix A; Section II
98%, unless otherwise permitted by contract specifications
· Review Contractor’s written record of Plot Inspections

· Visual inspection—walk through Units

· Random verification of compliance—Plot Inspections

Thin Biomass Trees

Thin biomass trees as identified in Appendix A; Section II.

98%, unless otherwise permitted by contract specifications
· Regular onsite review of specification compliance

· Written documentation of visual inspection

Slash Treatment
Treatment of all slash including non-sawtimber trees and biomass to contract specifications; Section H.23
98%, unless otherwise permitted by contract specifications
· Regular onsite review of specification compliance

· Written documentation of visual inspection

· Periodic verification of compliance with the use of walk through inspection and/or Plot Inspections

Road Work & Maintenance
Completion of road work to contract specifications.

Appendix C

100%, unless otherwise permitted by contract specifications
· Regular onsite review of specification compliance

· Written documentation of visual inspection

Disincentives for failure to meet the above standards may be as follows:

(a) Rework will be completed at Contractor’s expense.

(b) If rework is not physically possible, payment deductions will be made for work falling below AQL (Payment Reductions, Section G.2.1).

(c) Damage to the residual stand or infrastructure will be assessed against the Contractor.

(d) Government re-inspection charges.

(e) Poor performance rating will be given.

E.4 FAR and AGAR CLAUSES

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1)

AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4)

E.4.1[Reserved]
E.4.2[Reserved]
E.4.3[Reserved]

E.4.4 CLAUSES INCORPORATED BY REFERENCE

FAR 52.252-2—CLAUSES INCORPORATED BY REFERENCE (Feb 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses: http://www.acquisition.gov/far and http://www.usda.gov/procurement/policy/agar.html.

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

Clause Number
Title
Date

PERTAINING TO ALL ITEMS

52.246-4
Inspection of Services—Fixed Price
(Aug 1996)
52.246-20
Warranty of Services
(May 2001)

SECTION F—DELIVERIES OR PERFORMANCE

F.1 SPECIAL CONTRACT TIME AND PERFORMANCE RESTRICTIONS

Unless otherwise agreed, the Contractor shall perform this contract according to the following restrictions. Additional performance restrictions may also be found in the Technical Specifications and/or on contract maps.

RESTRICTIONS

UNIT
RESTRICTION
TIME PERIOD
PURPOSE
6A, 6B, 6C
No Operations
May 15th through June 30th
To avoid disturbance in Elk Productivity Areas
6A, 6B, 6C
No Operations, Except Hauling
May 15th through August 31st
To avoid disturbance to breeding and dispersing boreal toads
All Units
No Operations
March 15th through June 15th when soils and temporary roads are wet (saturated or near saturated soil and spring snow thaw creates overland water flow or water flow in ephemeral drainages)
To protect the soil and watershed resources

F.1.1 OPERATING SEASON

The normal operating season is July 16th through November 1st annually.

F.1.2 START WORK DATE

The estimated start work date is July 16, 2020.

See Section F.1—Special Contract Time and Performance Restrictions, concerning the performance of work on this contract. Additional restrictions on the Scheduling of Work for Resource Protection, etc. may be addressed in the Technical Specifications.

F.1.3 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

Contractor shall be required to:

(a) Commence work under this contract in accordance with the accepted Operating/Work Plan and Overall Schedule;

(b) Start work when the Contractor receives the Notice to Proceed (NTP);

(c) Prosecute the work diligently; and

(d) Complete the entire project including final clean-up of the premises by August 30, 2024.

F.2[Reserved]
F.3SCHEDULES AND REPORTS

Contractor shall provide the following submittals as stated below unless otherwise mutually agreed upon. Contractor shall update all submittals as needed, or as required by the CO, but in no case less than once per calendar year on the anniversary of the initial contract award as stated in Block 3 of the SF-1449.

All schedules and reports shall be submitted electronically (via email) to the CO and COR, as identified by the CO.

SUBMITTALS

DESCRIPTION
DUE
OPERATION/WORK PLAN (OVERALL SCHEDULE): Contractor shall prepare and submit a practicable schedule showing the order in which the Contractor proposes to perform the work, and the starting and completion dates of various phases of the work. The schedule shall comply with the contract time requirements, including, but not limited to Sections C.5 and F.1
With Proposal

(Refer to Section L for instructions) Provide at Prework Meeting Annually & When changes are made

SUBCONTRACTORS: If applicable, list of proposed subcontractors and their intended work. Subcontractors must have CO’s written approval prior to starting work on the project. Submit SF-1413
With Proposal

(Refer to Section L for instructions) Provide at Prework Meeting Annually & When changes are made

QUALITY CONTROL PLAN: Refer to Section E
With Proposal

(Refer to Section L for instructions) Provide at Prework Meeting Annually & When changes are made

TRAFFIC CONTROL PLAN: Contractor shall prepare and submit a Traffic Control Plan detailing conformance with OSHA requirements, MUTCD requirements, and all other contract requirements, including, but not limited to Section H.6, “Traffic Control Plan” and the requirements included in the Appendices, if any
With Proposal

(Refer to Section L for instructions) Provide at Prework Meeting Annually & When changes are made

EROSION AND PREVENTION CONTROL PLAN: Contractor shall prepare and submit an Erosion Control Plan detailing permanent and temporary control measures to minimize erosion and sedimentation during and after contract performance. The plan shall conform to all contract requirements (Section H.15), including but not limited to the requirements in the Appendices, if any
With Proposal

(Refer to Section L for instructions) Provide at Prework Meeting Annually & When changes are made

SAFETY PLAN: Contractor shall comply with the requirements of FAR clause 52.236-13—Accident Prevention, for all activities under this contract (Section H.2)
Provide at Prework Meeting

(in addition to electronic copy) When changes are made

DESIGNATION OF CONTRACTOR PERSONNEL: Delegation of Authority— describing responsibilities and authorities (Section C.5 and AGAR clause 452.237-74—Key Personnel in Section H.28.1)
Provide at Prework Meeting

(in addition to electronic copy) Annually & When changes are made

SPILL PREVENTION CONTROL & COUNTERMEASURES PLAN: Contractor shall submit a Spill Prevention Control and Countermeasure Plan detailing measures for the control and countermeasures to be taken in the event of a spill, to contain the spill, if applicable (Section H.12)
Provide at Prework Meeting

(in addition to electronic copy) When changes are made

FIRE PREVENTION PLAN: Prior to initiating operations in the Fire Precautionary Period, Contractor shall prepare and submit a Fire Control Plan detailing the operations necessary to control or suppress fires within the contract area. (Section H.19)
Prior to the Fire Precautionary Period

(email to CO & COR when complete) When changes are made

F.4[Reserved]
F.5FAR and AGAR CLAUSES

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1)

AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4)

F.5.1 CLAUSES PERTAINING TO ALL ITEMS—FULL TEXT

AGAR 452.211-74—PERIOD OF PERFORMANCE (Feb 1988) The effective period of this contract is from Date of Award through August 30, 2024.

(End of Clause)

F.5.2[Reserved]
F.5.3[Reserved]

F.5.4 CLAUSES INCORPORATED BY REFERENCE

FAR 52.252-2—CLAUSES INCORPORATED BY REFERENCE (Feb 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at theses addresses: http://www.acquisition.gov/far and http://www.usda.gov/procurement/policy/agar.html.

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

Clause Number
Title
Date

PERTAINING TO ALL ITEMS

52.242-15
Stop-Work Order
(Aug 1989)

SECTION G—CONTRACT ADMINISTRATION DATA

G.1 MEASUREMENT

All linear and area measurements under this contract are measured on a horizontal plane, unless otherwise noted.

G.1.1 RE-MEASUREMENT

The Contractor may, at any time after award, request a re-measurement of the acreage of any Unit. The request shall be in writing within 10-calendar days after completion of a Unit. The Government’s re-measurement of the Unit shall be made within established boundaries.

If re-measurement indicates a variance of 5% or less in the acreage stated in Section B.2—Schedule of Items, there will be no adjustment in acres and the Contractor shall pay for the actual cost of re-measurement.

If re-measurement results in a variance greater than 5% in the acreage stated in Section B.2—Schedule of Items, payment shall be based on the re-measured acreage and the Government shall pay for the re-measurement.

G.2 PAYMENT

It is anticipated that funds will be exchanged in the performance of this contract because the Timber or Other Products Value will not completely offset the costs of the work to be performed. Payment shall only be made under this Section to the extent that the work performed will not be offset by the Timber or Other Products Value during the contract period.

When payment is made to the Contractor for work performed, it will be made in accordance with FAR clauses 52.212-4(i)—Contract Terms and Conditions—Commercial Items, and 52.323-33—Payment by Electronic Funds Transfer—System for Award Management (included in FAR 52.212-5—Contract Terms and Conditions Required to Implement Statutes or Executive Orders—Commercial Items (Section I).

Contractor shall electronically submit complete invoices for payment to address listed in Block 18a of the SF-1449 when all invoiced work has been completed and accepted by the Government. Complete invoices shall contain:

(a) Company name;

(b) Tax Identification Number (TIN);

(c) Signature and contact information of a person authorized to sign on behalf of the company;

(d) Invoice number;

(e) Contract and/or Task Order number;

(f) Project name;

(g) Contract Line Item Numbers (CLIN) and the amounts to be paid for each; and

(h) Completed Contractor Certification (Section G.2.4).

The value of work completed and Timber or Other Products Removed will be documented in a Stewardship Statement of Account produced by Forest Product Financial System (FPFS) monthly, when harvesting operations are underway.

G.2.1 PAYMENT REDUCTIONS

The Government expects to receive quality services. The minimum AQL is required to achieve a satisfactory performance rating. Full payment will be made for final work meeting at least identified AQL, as identified in the Performance Requirements Summary (Section E.3.3).

If the work deliverable cannot be reworked to achieve the minimum required AQL, a reduction in payment of the Unit price will be applied as shown below.

PAYMENT REDUCTIONS

QUALITY LEVEL
PERFORMANCE LEVEL ACHIEVED
PERCENT PAYMENT APPLIED TO UNIT PRICE
Minimum AQL
98% - 100% Performance
100% Payment
1% - 10% below AQL
88% - 97% Performance
80% Payment
11% - 20% below AQL
78% - 87% Performance
70% Payment
More than 21% below AQL
77% or Less Performance
25% of the Unit Cost

multiplied by the actual level achieved

G.2.2 RE-INSPECTION COSTS

If rework of any work performed is required, the Contractor will be assessed the costs incurred by the Government in performing such activities. One inspection, per Unit, during ongoing operations will be authorized, and one final inspection at the completion of all operations.

(a) Any subsequent inspection requests will be re-inspected and will accrue re-inspection costs.

(b) If the final inspection requires rework, the rework will be re-inspected and will accrue re-inspection costs.

CHARGE RATES FOR GOVERNMENT RE-INSPECTION OF WORK

ACTIVITY
RATE
Government wages (per employee performing re-inspection)
$50.00 per hour
Government Mileage*
$0.58 per mile

*Mileage reimbursement rate in effect January 1, 2020 is $0.58 per mile. Mileage rates change periodically and the most current mileage rates for assessed damages at the time will be used. Most current mileage rates can be found at the General Services Administration website GSA Mileage.

G.2.3 FINAL PAYMENT – RELEASE OF CLAIMS

The Government shall pay the final remaining amount due to the Contractor under this contract only after—

(a) Completion and acceptance of all work

(b) A complete invoice (Section G.2), is received electronically at address listed in Block 18a of the SF-1449;

(c) Presentation of release of all claims against the Government arising by virtue of this contract, other than claims, in stated amounts, that the Contractor has specifically excepted from the operation of the release shall be received; and

(d) All Government Furnished Property has been returned and accepted by the COR (if applicable).

G.2.4 CONTRACTOR CERTIFICATION

Contractor shall submit certification with every invoice and monthly, as Stewardship Credits are established. The Contractor shall furnish the following certification indicating if for invoice, Stewardship Credit or both. Credit will not be received if certification is not submitted.

CONTRACTOR CERTIFICATION

|_| Invoice / |_| Stewardship Credit Earned
Page: of:

INVOICE #:

INVOICE DATE:

PROJECT:

CONTRACT/TASK ORDER #:

CONTRACTOR NAME & ADDRESS:

REGION / FOREST / DISTRICT:

I HEREBY CERTIFY, TO THE BEST OF MY KNOWLEDGE AND BELIEF, THAT—

(1) The amounts requested are only for performance in accordance with the specifications, terms, and conditions of this contract;

(2) Payments to subcontractors and suppliers have been made, and timely payments will be made for the work activities covered by this certification, in accordance with subcontract agreements and the requirements of Chapter 39 of Title 31, United States Code;

(3) This request for partial/progress payments and/or credits, does not include any amounts which the prime Contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract; and

(4) This certification is not to be construed as final acceptance of a subcontractor’s performance.

SIGNATURE:
_________________________________
NAME:
EMAIL:
TITLE:
PHONE:
DATE:
PHONE:

G.3 INCIDENTAL PAYMENT ITEMS

The intent of the contract is to provide for the complete performance of the project described in the contract. Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies to perform all work required to complete the project in accordance with the appendices, drawings, specifications, clauses, and provisions of the contract. Payment for contract work will be made only for and under those pay items included in Section B.2—Schedule of Items. All other work and materials will be considered as incidental to and included in the payment for items shown.

G.4 PRODUCT PAYMENT GUARANTEE

In accordance with 36 CFR §223.34, to guarantee payment for product in advance of cutting, the Contractor may earn Stewardship Credits in advance of cutting, or provide a product payment guarantee in the form of an acceptable surety, including a payment bond, irrevocable letter of credit (ILC), cash, or a deposit in a Federal Depository negotiable securities of the United States.

Any earned Stewardship Credits and product payment guarantee together will…

This is the start of the file's text. The full file is on GovTribe.