Peaceful Valley & Camp Dick Bridges
Solicitation number
1282AT18R0011
Issued by

About this file

001 Fillable Schedule of Items Rev1

View the file

Other files

File Type Posted
002_Fill_In_Biobased_Statement_Letter.docx DOCX document
1282AT18R0011_SF30_Amend_0002.pdf PDF
Attach_06__Fire_Plan.docx DOCX document
1282AT18R0011_SF30_Amend_0001.pdf PDF
1282BHR180001_Fillable_Attachments.zip ZIP file
1282AT18R0011_Rev_Solicitation.docx DOCX document
1282AT18R0011_Attachments.zip ZIP file
1282AT18R0011_Peaceful_Valley_&_Camp_Dick_Bridges.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PV Bridge - Bid Schedule

SECTION B - BID SCHEDULE
Peaceful Valley Bridge Rehabilitation
PAY ITEM NO.DESCRIPTIONPAY UNITESTIMATED QUANTITYUNIT PRICETOTAL PRICE
151(01)MobilizationLump Sum1$$
152(05)Bridge survey and stakingLump Sum1$$
152(12)Slope, reference, and clearing and grubbing stakes; method 1, tolerance ALump Sum1$$
152(55)Grade finishing stakes, pavement, tolerance ALump Sum1$$
157(02)Silt fenceLNFT111$$
201(02)Clearing and grubbingSQYD85$$
203(05)Removal of structures and obstructionsLump Sum1$$
203(15)Saw cutting pavementLNFT29$$
204(16)Waste, unclassified excavationCUYD5$$
204(55)Embankment constructionCUYD14$$
208(01)Structure excavationCUYD5$$
208(03)Structural backfillCUYD3$$
301(03)Aggregate base grading D, compaction method CCUYD2$$
418(06)Full depth patch, hot asphalt concrete mixtureSQYD15$$
555(01)Structural steel, channel stiffener, furnished, fabricated, and erectedLB1150$$
556(01)W-beam, type IV, Class A, side-mounted bridge railingLNFT50$$
556(07)Terminal section, type 3kEACH4$$
556(50)Bridge approach rail, type IV, Class ALNFT80$$
557(01)Structural timber and lumber, treatedMFBM1$$
557(52)Treated structural timber, dowel-laminatedMFBM9$$
625(02)Seeding w/ furnished material, dry methodSQYD85$$
629(01)Erosion control mat, type 3.BSQYD85$$
633(06)Object marker, type 3EACH4$$
635(01)Temporary traffic controlLump Sum1$$
Total of Project Items$

CD Bridge - Bid Schedule

SECTION B - BID SCHEDULE
Camp Dick Bridge Rehabilitation
PAY ITEM NO.DESCRIPTIONPAY UNITESTIMATED QUANTITYUNIT PRICETOTAL PRICE
151(01)MobilizationLump Sum1$$
152(05)Bridge survey and stakingLump Sum1$$
152(12)Slope, reference, and clearing and grubbing stakes; method 1, tolerance ALump Sum1$$
152(55)Grade finishing stakes, pavement, tolerance ALump Sum1$$
157(02)Silt fenceLNFT111$$
201(02)Clearing and grubbingSQYD102$$
203(05)Removal of structures and obstructionsLump Sum1$$
203(15)Saw cutting pavementLNFT28$$
204(16)Waste, unclassified excavationCUYD5$$
204(55)Embankment constructionCUYD17$$
208(01)Structure excavationCUYD5$$
208(03)Structural backfillCUYD3$$
251(01)Placed riprap, method A, class 4CUYD6$$
301(03)Aggregate base grading D, compaction method CCUYD2$$
418(06)Full depth patch, hot asphalt concrete mixtureSQYD14$$
552(04)Structural concrete, air entrained for stem wall repairCUYD1$$
554(01)Reinforcing steelLB62$$
555(01)Structural steel, channel stiffener, furnished, fabricated, and erectedLB920$$
556(01)W-beam, type IV, Class A, side-mounted bridge railingLNFT50$$
556(07)Terminal section, type 3kEACH4$$
556(50)Bridge approach rail, type IV, Class ALNFT80$$
557(01)Structural timber and lumber, treatedMFBM1$$
557(52)Treated structural timber, dowel-laminatedMFBM9$$
625(02)Seeding w/ furnished material, dry methodSQYD102$$
629(01)Erosion control mat, type 3.BSQYD102$$
633(06)Object marker, type 3EACH4$$
635(01)Temporary traffic controlLump Sum1$$
Total of Project Items$
TOTAL OF ALL PROJECT ITEMS$