001_Fillable_Schedule_of_Items_Rev1.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- Peaceful Valley & Camp Dick Bridges
- Solicitation number
- 1282AT18R0011
About this file
001 Fillable Schedule of Items Rev1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 002_Fill_In_Biobased_Statement_Letter.docx | DOCX document | |
| 1282AT18R0011_SF30_Amend_0002.pdf | ||
| Attach_06__Fire_Plan.docx | DOCX document | |
| 1282AT18R0011_SF30_Amend_0001.pdf | ||
| 1282BHR180001_Fillable_Attachments.zip | ZIP file | |
| 1282AT18R0011_Rev_Solicitation.docx | DOCX document | |
| 1282AT18R0011_Attachments.zip | ZIP file | |
| 1282AT18R0011_Peaceful_Valley_&_Camp_Dick_Bridges.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PV Bridge - Bid Schedule
| SECTION B - BID SCHEDULE |
| Peaceful Valley Bridge Rehabilitation |
| PAY ITEM NO. | DESCRIPTION | PAY UNIT | ESTIMATED QUANTITY | UNIT PRICE | TOTAL PRICE |
| 151(01) | Mobilization | Lump Sum | 1 | $ | $ |
| 152(05) | Bridge survey and staking | Lump Sum | 1 | $ | $ |
| 152(12) | Slope, reference, and clearing and grubbing stakes; method 1, tolerance A | Lump Sum | 1 | $ | $ |
| 152(55) | Grade finishing stakes, pavement, tolerance A | Lump Sum | 1 | $ | $ |
| 157(02) | Silt fence | LNFT | 111 | $ | $ |
| 201(02) | Clearing and grubbing | SQYD | 85 | $ | $ |
| 203(05) | Removal of structures and obstructions | Lump Sum | 1 | $ | $ |
| 203(15) | Saw cutting pavement | LNFT | 29 | $ | $ |
| 204(16) | Waste, unclassified excavation | CUYD | 5 | $ | $ |
| 204(55) | Embankment construction | CUYD | 14 | $ | $ |
| 208(01) | Structure excavation | CUYD | 5 | $ | $ |
| 208(03) | Structural backfill | CUYD | 3 | $ | $ |
| 301(03) | Aggregate base grading D, compaction method C | CUYD | 2 | $ | $ |
| 418(06) | Full depth patch, hot asphalt concrete mixture | SQYD | 15 | $ | $ |
| 555(01) | Structural steel, channel stiffener, furnished, fabricated, and erected | LB | 1150 | $ | $ |
| 556(01) | W-beam, type IV, Class A, side-mounted bridge railing | LNFT | 50 | $ | $ |
| 556(07) | Terminal section, type 3k | EACH | 4 | $ | $ |
| 556(50) | Bridge approach rail, type IV, Class A | LNFT | 80 | $ | $ |
| 557(01) | Structural timber and lumber, treated | MFBM | 1 | $ | $ |
| 557(52) | Treated structural timber, dowel-laminated | MFBM | 9 | $ | $ |
| 625(02) | Seeding w/ furnished material, dry method | SQYD | 85 | $ | $ |
| 629(01) | Erosion control mat, type 3.B | SQYD | 85 | $ | $ |
| 633(06) | Object marker, type 3 | EACH | 4 | $ | $ |
| 635(01) | Temporary traffic control | Lump Sum | 1 | $ | $ |
| Total of Project Items | $ |
CD Bridge - Bid Schedule
| SECTION B - BID SCHEDULE |
| Camp Dick Bridge Rehabilitation |
| PAY ITEM NO. | DESCRIPTION | PAY UNIT | ESTIMATED QUANTITY | UNIT PRICE | TOTAL PRICE |
| 151(01) | Mobilization | Lump Sum | 1 | $ | $ |
| 152(05) | Bridge survey and staking | Lump Sum | 1 | $ | $ |
| 152(12) | Slope, reference, and clearing and grubbing stakes; method 1, tolerance A | Lump Sum | 1 | $ | $ |
| 152(55) | Grade finishing stakes, pavement, tolerance A | Lump Sum | 1 | $ | $ |
| 157(02) | Silt fence | LNFT | 111 | $ | $ |
| 201(02) | Clearing and grubbing | SQYD | 102 | $ | $ |
| 203(05) | Removal of structures and obstructions | Lump Sum | 1 | $ | $ |
| 203(15) | Saw cutting pavement | LNFT | 28 | $ | $ |
| 204(16) | Waste, unclassified excavation | CUYD | 5 | $ | $ |
| 204(55) | Embankment construction | CUYD | 17 | $ | $ |
| 208(01) | Structure excavation | CUYD | 5 | $ | $ |
| 208(03) | Structural backfill | CUYD | 3 | $ | $ |
| 251(01) | Placed riprap, method A, class 4 | CUYD | 6 | $ | $ |
| 301(03) | Aggregate base grading D, compaction method C | CUYD | 2 | $ | $ |
| 418(06) | Full depth patch, hot asphalt concrete mixture | SQYD | 14 | $ | $ |
| 552(04) | Structural concrete, air entrained for stem wall repair | CUYD | 1 | $ | $ |
| 554(01) | Reinforcing steel | LB | 62 | $ | $ |
| 555(01) | Structural steel, channel stiffener, furnished, fabricated, and erected | LB | 920 | $ | $ |
| 556(01) | W-beam, type IV, Class A, side-mounted bridge railing | LNFT | 50 | $ | $ |
| 556(07) | Terminal section, type 3k | EACH | 4 | $ | $ |
| 556(50) | Bridge approach rail, type IV, Class A | LNFT | 80 | $ | $ |
| 557(01) | Structural timber and lumber, treated | MFBM | 1 | $ | $ |
| 557(52) | Treated structural timber, dowel-laminated | MFBM | 9 | $ | $ |
| 625(02) | Seeding w/ furnished material, dry method | SQYD | 102 | $ | $ |
| 629(01) | Erosion control mat, type 3.B | SQYD | 102 | $ | $ |
| 633(06) | Object marker, type 3 | EACH | 4 | $ | $ |
| 635(01) | Temporary traffic control | Lump Sum | 1 | $ | $ |
| Total of Project Items | $ | ||||
| TOTAL OF ALL PROJECT ITEMS | $ |